Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML21258A40212 September 2021Letter from Michael Ford Re Comments on Final Environmental Impact Statement for Interim Storage Partners' License Application for a Consolidated Interim Storage Facility in Andrews County, TexasNon-Destructive Examination
Fatality
ML21258A40710 September 2021Letter from Texas Riogrande Legal Aid Re Comments on Final Environmental Impact Statement for Interim Storage Partners' License Application for a Consolidated Interim Storage Facility in Andrews County, TexasEarthquake
Chernobyl
Environmental Justice
Fatality
ML21258A3983 September 2021Letter from Lone Star Legal Aid Re Comments on Final Environmental Impact Statement for Interim Storage Partners' License Application for a Consolidated Interim Storage Facility in Andrews County, TexasEarthquake
Chernobyl
Environmental Justice
Fatality
ML21105A77112 April 2021Enclosure 3: Wsc Consolidated Interim Storage Facility Revision 5 to Safety Analysis Report (Part 15 of 17) - Public Version, Chapter 2, Attachment H, Compiled Meteorological and Climatology DataHigh winds
ML21105A78512 April 2021Enclosure 5: Wsc Consolidated Interim Storage Facility, Revision 4 to License Application - Public VersionTime of Discovery
Decommissioning Funding Plan
Aging Management
Job Performance Measure
Safeguards Contingency Plan
Control of Heavy Loads
Fuel cladding
ML21105A76712 April 2021Enclosure 3: Wsc Consolidated Interim Storage Facility Revision 5 to Safety Analysis Report, (Part 5 of 17) - Public Version, Chapter 2, Attachment B, HEC-RAS Model for the Calculation of the 500-Year and PMP Water Surface Profiles, 3 of 5
ML21105A76512 April 2021Enclosure 3: Wsc Consolidated Interim Storage Facility Revision 5 to Safety Analysis Report (Part 7 of 17) - Public Version, Chapter 2, Attachment B, HEC-RAS Model for the Calculation of the 500-Year and PMP Water Surface Profiles Anteceden
ML21105A76412 April 2021Enclosure 3: Wsc Consolidated Interim Storage Facility Revision 5 to Safety Analysis Report (Part 13 of 17) - Public Version, Chapter 2, Attachment F, Compensated Neutron Formation Density, 3 of 3
ML21105A76312 April 2021Enclosure 3: Wsc Consolidated Interim Storage Facility Revision 5 to Safety Analysis Report (Part 11 of 17) - Public Version, Chapter 2, Attach F, Evaluation of Halite Dissolution in the Vicinity of Waste Control Specialists Disposal Site,Hydrostatic
ML21105A76212 April 2021Enclosure 3: Wsc Consolidated Interim Storage Facility Revision 5 to Safety Analysis Report (Part 9 of 17) - Public Version, Chapter 2, Attachment D, Seismic Hazard Evaluation for WCS CISF
ML21105A76112 April 2021Enclosure 3: Wsc Consolidated Interim Storage Facility Revision 5 to Safety Analysis Report (Part 8 of 17) - Public Version, Chapter 2, Attachment C, Boring Logs
ML21105A76012 April 2021Enclosure 3: Wsc Consolidated Interim Storage Facility Revision 5 to Safety Analysis Report (Part 10 of 17) - Public Version, Chapter 2, Attachment E, Geotechnical Investigation for WCS CISFEarthquake
ML21105A75912 April 2021Enclosure 3: Wsc Consolidated Interim Storage Facility Revision 5 to Safety Analysis Report (Part 12 of 17) - Public Version, Chapter 2, Attachment F, Occurrence of Gypsum at the WCS Site, 2 of 3
ML21105A77712 April 2021Enclosure 3: Wsc Consolidated Interim Storage Facility Revision 5 to Safety Analysis Report (Part 6 of 17) - Public Version, Chapter 2, Attachment B, HEC-RAS Model for the Calculation of the Developed Low Level & Byproduct Facility 500-Year
ML21105A77912 April 2021Enclosure 3: Wsc Consolidated Interim Storage Facility Revision 5 to Safety Analysis Report (Part 14 of 17) - Public Version, Chapter 2, Attachment G, Technical Specifications for Towers
ML21105A78012 April 2021Enclosure 3: Wsc Consolidated Interim Storage Facility Revision 5 to Safety Analysis Report (Part 1 of 17) - Public Version, Cover to Chapter 2High winds
Tornado Missile
Incorporated by reference
Tornado-Generated Missile
Aging Management
Safeguards Contingency Plan
Earthquake
ML21105A78212 April 2021Enclosure 3: Wsc Consolidated Interim Storage Facility Revision 5 to Safety Analysis Report (Part 3 of 17) - Public Version, Chapter 2, Attachment B, Flood Plain Report, 1 of 5
ML21105A79212 April 2021Enclosure 3: Wsc Consolidated Interim Storage Facility Revision 5 to Safety Analysis Report (Part 16 of 17) - Public Version, Chapters 3 to 15Safe Shutdown
High Radiation Area
Anticipated operational occurrence
Tornado Missile
Safe Shutdown Earthquake
Hydrostatic
Coatings
Emergency Lighting
Incorporated by reference
Finite Element Analysis
Decommissioning Funding Plan
Tornado-Generated Missile
Aging Management
Tornado Generated Missile
Job Performance Measure
Tornado Missile Protection
Design basis earthquake
Operability Determination
Safeguards Contingency Plan
License Renewal
Earthquake
Control of Heavy Loads
Fuel cladding
Scaffolding
ML21105A79712 April 2021Enclosure 3: Wsc Consolidated Interim Storage Facility Revision 5 to Safety Analysis Report (Part 4 of 17) - Public Version, Chapter 2, Attachment B, HEC-RAS Model for the Calculation of the 100-Year Water Surface Profile, 2 of 5
ML21027A14727 January 2021Supplemental Information Part 2 to Support Nrc'S Continued Review of the Safety Case for the WCS CISF, Docket 72-1050 Cac/Epid 001028/L-2017-NEW-0002Time of Discovery
Tornado Missile
Tornado-Generated Missile
Tornado Generated Missile
Design basis earthquake
Control of Heavy Loads
Fuel cladding
ML21014A06314 January 2021Interim Storage Partners, LLC - Submittal of Supplemental Information to Support Nrc'S Continued Review of the Safety Case for the WCS CISF, Docket 72-1050 Cac/Epid 001028/L-2017-NEW-0002Time of Discovery
Tornado Missile
Incorporated by reference
Tornado-Generated Missile
Aging Management
Tornado Generated Missile
Safeguards Contingency Plan
License Renewal
Control of Heavy Loads
Fuel cladding
Affidavit
ML20261H4542 September 2020WCS CISF - Revision 4 to Safety Analysis Report, Chapter 2, Attachment B, Flood Plain Report, 1 of 5
ML20261H4652 September 2020WCS CISF - Revision 4 to Safety Analysis Report, Chapter 2, Attachment F, Compensated Neutron Formation Density, 3 of 3
ML20261H4522 September 2020WCS CISF - Revision 4 to Safety Analysis Report, Cover to Chapter 2High winds
Tornado Missile
Incorporated by reference
Tornado-Generated Missile
Aging Management
Safeguards Contingency Plan
Earthquake
ML20261H4552 September 2020WCS CISF - Revision 4 to Safety Analysis Report, Chapter 2, Attachment B, HEC-RAS Model for the Calculation of the 100-Year Water Surface Profile, 2 of 5
ML20261H4562 September 2020WCS CISF - Revision 4 to Safety Analysis Report, Chapter 2, Attachment B, HEC-RAS Model for the Calculation of the 500-Year and PMP Water Surface Profiles, 3 of 5
ML20261H4572 September 2020WCS CISF - Revision 4 to Safety Analysis Report, Chapter 2, Attachment B, HEC-RAS Model for the Calculation of the Developed Low Level & Byproduct Facility 500-Year and PMP Water Surface Profiles Profiles, 4 of 5
ML20261H4582 September 2020WCS CISF - Revision 4 to Safety Analysis Report, Chapter 2, Attachment B, HEC-RAS Model or the Calculation of the 500-Year and PMP Water Surface Profiles Antecedent Moisture Condition III, 5 of 5
ML20261H4222 September 2020WCS CISF - Affidavit
ML20261H4592 September 2020WCS CISF - Revision 4 to Safety Analysis Report, Chapter 2, Attachment C, Boring Logs
ML20261H4602 September 2020WCS CISF - Revision 4 to Safety Analysis Report, Chapter 2, Attachment D, Seismic Hazard Evaluation for WCS CISF
ML20261H4612 September 2020WCS CISF - Revision 4 to Safety Analysis Report, Chapter 2, Attachment E, Geotechnical Investigation for WCS CISFEarthquake
ML20261H4632 September 2020WCS CISF - Revision 4 to Safety Analysis Report, Chapter 2, Attachment F, Evaluation of Halite Dissolution in the Vicinity of Waste Control Specialists Disposal Site, Andrews County, Tx, 1 of 3Hydrostatic
ML20261H4642 September 2020WCS CISF - Revision 4 to Safety Analysis Report, Chapter 2, Attachment F, Occurrence of Gypsum at the WCS Site, 2 of 3
ML20261H4662 September 2020WCS CISF - Revision 4 to Safety Analysis Report, Chapter 2, Attachment G, Technical Specifications for Towers
ML20261H4672 September 2020WCS CISF - Revision 4 to Safety Analysis Report, Chapter 2, Attachment H, Compiled Meteorological and Climatology DataHigh winds
ML20261H4682 September 2020WCS CISF - Revision 4 to Safety Analysis Report, Chapters 3 to 15Safe Shutdown
High Radiation Area
Anticipated operational occurrence
Tornado Missile
Safe Shutdown Earthquake
Hydrostatic
Coatings
Emergency Lighting
Incorporated by reference
Finite Element Analysis
Decommissioning Funding Plan
Tornado-Generated Missile
Aging Management
Tornado Generated Missile
Job Performance Measure
Tornado Missile Protection
Design basis earthquake
Operability Determination
Safeguards Contingency Plan
License Renewal
Earthquake
Control of Heavy Loads
Fuel cladding
Scaffolding
ML20128J30028 April 2020Attachment 7: HI-STORM 100 FSAR Proposed Changed PagesTornado Missile
Fuel cladding
ML20128J29928 April 2020Attachment 6: HI-STORM 100 FSAR Proposed Changed PagesTornado Missile
Fuel cladding
ML20104C05231 March 2020Attachment 4: Proposed HI-STORM Umax FSAR Supplement I, Revision 3.IHigh winds
Non-Destructive Examination
Coatings
Nondestructive Examination
Incorporated by reference
Aging Management
Design basis earthquake
Earthquake
Control of Heavy Loads
Fuel cladding
ML20101P40631 March 2020Draft RAI Responses with Associated SAR Change Pages