Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML21258A402 | 12 September 2021 | Letter from Michael Ford Re Comments on Final Environmental Impact Statement for Interim Storage Partners' License Application for a Consolidated Interim Storage Facility in Andrews County, Texas | Non-Destructive Examination Fatality |
ML21258A407 | 10 September 2021 | Letter from Texas Riogrande Legal Aid Re Comments on Final Environmental Impact Statement for Interim Storage Partners' License Application for a Consolidated Interim Storage Facility in Andrews County, Texas | Earthquake Chernobyl Environmental Justice Fatality |
ML21258A398 | 3 September 2021 | Letter from Lone Star Legal Aid Re Comments on Final Environmental Impact Statement for Interim Storage Partners' License Application for a Consolidated Interim Storage Facility in Andrews County, Texas | Earthquake Chernobyl Environmental Justice Fatality |
ML21105A771 | 12 April 2021 | Enclosure 3: Wsc Consolidated Interim Storage Facility Revision 5 to Safety Analysis Report (Part 15 of 17) - Public Version, Chapter 2, Attachment H, Compiled Meteorological and Climatology Data | High winds |
ML21105A785 | 12 April 2021 | Enclosure 5: Wsc Consolidated Interim Storage Facility, Revision 4 to License Application - Public Version | Time of Discovery Decommissioning Funding Plan Aging Management Job Performance Measure Safeguards Contingency Plan Control of Heavy Loads Fuel cladding |
ML21105A767 | 12 April 2021 | Enclosure 3: Wsc Consolidated Interim Storage Facility Revision 5 to Safety Analysis Report, (Part 5 of 17) - Public Version, Chapter 2, Attachment B, HEC-RAS Model for the Calculation of the 500-Year and PMP Water Surface Profiles, 3 of 5 | |
ML21105A765 | 12 April 2021 | Enclosure 3: Wsc Consolidated Interim Storage Facility Revision 5 to Safety Analysis Report (Part 7 of 17) - Public Version, Chapter 2, Attachment B, HEC-RAS Model for the Calculation of the 500-Year and PMP Water Surface Profiles Anteceden | |
ML21105A764 | 12 April 2021 | Enclosure 3: Wsc Consolidated Interim Storage Facility Revision 5 to Safety Analysis Report (Part 13 of 17) - Public Version, Chapter 2, Attachment F, Compensated Neutron Formation Density, 3 of 3 | |
ML21105A763 | 12 April 2021 | Enclosure 3: Wsc Consolidated Interim Storage Facility Revision 5 to Safety Analysis Report (Part 11 of 17) - Public Version, Chapter 2, Attach F, Evaluation of Halite Dissolution in the Vicinity of Waste Control Specialists Disposal Site, | Hydrostatic |
ML21105A762 | 12 April 2021 | Enclosure 3: Wsc Consolidated Interim Storage Facility Revision 5 to Safety Analysis Report (Part 9 of 17) - Public Version, Chapter 2, Attachment D, Seismic Hazard Evaluation for WCS CISF | |
ML21105A761 | 12 April 2021 | Enclosure 3: Wsc Consolidated Interim Storage Facility Revision 5 to Safety Analysis Report (Part 8 of 17) - Public Version, Chapter 2, Attachment C, Boring Logs | |
ML21105A760 | 12 April 2021 | Enclosure 3: Wsc Consolidated Interim Storage Facility Revision 5 to Safety Analysis Report (Part 10 of 17) - Public Version, Chapter 2, Attachment E, Geotechnical Investigation for WCS CISF | Earthquake |
ML21105A759 | 12 April 2021 | Enclosure 3: Wsc Consolidated Interim Storage Facility Revision 5 to Safety Analysis Report (Part 12 of 17) - Public Version, Chapter 2, Attachment F, Occurrence of Gypsum at the WCS Site, 2 of 3 | |
ML21105A777 | 12 April 2021 | Enclosure 3: Wsc Consolidated Interim Storage Facility Revision 5 to Safety Analysis Report (Part 6 of 17) - Public Version, Chapter 2, Attachment B, HEC-RAS Model for the Calculation of the Developed Low Level & Byproduct Facility 500-Year | |
ML21105A779 | 12 April 2021 | Enclosure 3: Wsc Consolidated Interim Storage Facility Revision 5 to Safety Analysis Report (Part 14 of 17) - Public Version, Chapter 2, Attachment G, Technical Specifications for Towers | |
ML21105A780 | 12 April 2021 | Enclosure 3: Wsc Consolidated Interim Storage Facility Revision 5 to Safety Analysis Report (Part 1 of 17) - Public Version, Cover to Chapter 2 | High winds Tornado Missile Incorporated by reference Tornado-Generated Missile Aging Management Safeguards Contingency Plan Earthquake |
ML21105A782 | 12 April 2021 | Enclosure 3: Wsc Consolidated Interim Storage Facility Revision 5 to Safety Analysis Report (Part 3 of 17) - Public Version, Chapter 2, Attachment B, Flood Plain Report, 1 of 5 | |
ML21105A792 | 12 April 2021 | Enclosure 3: Wsc Consolidated Interim Storage Facility Revision 5 to Safety Analysis Report (Part 16 of 17) - Public Version, Chapters 3 to 15 | Safe Shutdown High Radiation Area Anticipated operational occurrence Tornado Missile Safe Shutdown Earthquake Hydrostatic Coatings Emergency Lighting Incorporated by reference Finite Element Analysis Decommissioning Funding Plan Tornado-Generated Missile Aging Management Tornado Generated Missile Job Performance Measure Tornado Missile Protection Design basis earthquake Operability Determination Safeguards Contingency Plan License Renewal Earthquake Control of Heavy Loads Fuel cladding Scaffolding |
ML21105A797 | 12 April 2021 | Enclosure 3: Wsc Consolidated Interim Storage Facility Revision 5 to Safety Analysis Report (Part 4 of 17) - Public Version, Chapter 2, Attachment B, HEC-RAS Model for the Calculation of the 100-Year Water Surface Profile, 2 of 5 | |
ML21027A147 | 27 January 2021 | Supplemental Information Part 2 to Support Nrc'S Continued Review of the Safety Case for the WCS CISF, Docket 72-1050 Cac/Epid 001028/L-2017-NEW-0002 | Time of Discovery Tornado Missile Tornado-Generated Missile Tornado Generated Missile Design basis earthquake Control of Heavy Loads Fuel cladding |
ML21014A063 | 14 January 2021 | Interim Storage Partners, LLC - Submittal of Supplemental Information to Support Nrc'S Continued Review of the Safety Case for the WCS CISF, Docket 72-1050 Cac/Epid 001028/L-2017-NEW-0002 | Time of Discovery Tornado Missile Incorporated by reference Tornado-Generated Missile Aging Management Tornado Generated Missile Safeguards Contingency Plan License Renewal Control of Heavy Loads Fuel cladding Affidavit |
ML20261H454 | 2 September 2020 | WCS CISF - Revision 4 to Safety Analysis Report, Chapter 2, Attachment B, Flood Plain Report, 1 of 5 | |
ML20261H465 | 2 September 2020 | WCS CISF - Revision 4 to Safety Analysis Report, Chapter 2, Attachment F, Compensated Neutron Formation Density, 3 of 3 | |
ML20261H452 | 2 September 2020 | WCS CISF - Revision 4 to Safety Analysis Report, Cover to Chapter 2 | High winds Tornado Missile Incorporated by reference Tornado-Generated Missile Aging Management Safeguards Contingency Plan Earthquake |
ML20261H455 | 2 September 2020 | WCS CISF - Revision 4 to Safety Analysis Report, Chapter 2, Attachment B, HEC-RAS Model for the Calculation of the 100-Year Water Surface Profile, 2 of 5 | |
ML20261H456 | 2 September 2020 | WCS CISF - Revision 4 to Safety Analysis Report, Chapter 2, Attachment B, HEC-RAS Model for the Calculation of the 500-Year and PMP Water Surface Profiles, 3 of 5 | |
ML20261H457 | 2 September 2020 | WCS CISF - Revision 4 to Safety Analysis Report, Chapter 2, Attachment B, HEC-RAS Model for the Calculation of the Developed Low Level & Byproduct Facility 500-Year and PMP Water Surface Profiles Profiles, 4 of 5 | |
ML20261H458 | 2 September 2020 | WCS CISF - Revision 4 to Safety Analysis Report, Chapter 2, Attachment B, HEC-RAS Model or the Calculation of the 500-Year and PMP Water Surface Profiles Antecedent Moisture Condition III, 5 of 5 | |
ML20261H422 | 2 September 2020 | WCS CISF - Affidavit | |
ML20261H459 | 2 September 2020 | WCS CISF - Revision 4 to Safety Analysis Report, Chapter 2, Attachment C, Boring Logs | |
ML20261H460 | 2 September 2020 | WCS CISF - Revision 4 to Safety Analysis Report, Chapter 2, Attachment D, Seismic Hazard Evaluation for WCS CISF | |
ML20261H461 | 2 September 2020 | WCS CISF - Revision 4 to Safety Analysis Report, Chapter 2, Attachment E, Geotechnical Investigation for WCS CISF | Earthquake |
ML20261H463 | 2 September 2020 | WCS CISF - Revision 4 to Safety Analysis Report, Chapter 2, Attachment F, Evaluation of Halite Dissolution in the Vicinity of Waste Control Specialists Disposal Site, Andrews County, Tx, 1 of 3 | Hydrostatic |
ML20261H464 | 2 September 2020 | WCS CISF - Revision 4 to Safety Analysis Report, Chapter 2, Attachment F, Occurrence of Gypsum at the WCS Site, 2 of 3 | |
ML20261H466 | 2 September 2020 | WCS CISF - Revision 4 to Safety Analysis Report, Chapter 2, Attachment G, Technical Specifications for Towers | |
ML20261H467 | 2 September 2020 | WCS CISF - Revision 4 to Safety Analysis Report, Chapter 2, Attachment H, Compiled Meteorological and Climatology Data | High winds |
ML20261H468 | 2 September 2020 | WCS CISF - Revision 4 to Safety Analysis Report, Chapters 3 to 15 | Safe Shutdown High Radiation Area Anticipated operational occurrence Tornado Missile Safe Shutdown Earthquake Hydrostatic Coatings Emergency Lighting Incorporated by reference Finite Element Analysis Decommissioning Funding Plan Tornado-Generated Missile Aging Management Tornado Generated Missile Job Performance Measure Tornado Missile Protection Design basis earthquake Operability Determination Safeguards Contingency Plan License Renewal Earthquake Control of Heavy Loads Fuel cladding Scaffolding |
ML20128J300 | 28 April 2020 | Attachment 7: HI-STORM 100 FSAR Proposed Changed Pages | Tornado Missile Fuel cladding |
ML20128J299 | 28 April 2020 | Attachment 6: HI-STORM 100 FSAR Proposed Changed Pages | Tornado Missile Fuel cladding |
ML20104C052 | 31 March 2020 | Attachment 4: Proposed HI-STORM Umax FSAR Supplement I, Revision 3.I | High winds Non-Destructive Examination Coatings Nondestructive Examination Incorporated by reference Aging Management Design basis earthquake Earthquake Control of Heavy Loads Fuel cladding |
ML20101P406 | 31 March 2020 | Draft RAI Responses with Associated SAR Change Pages |