|
|
| (3 intermediate revisions by the same user not shown) |
| Line 14: |
Line 14: |
| | document type = Letter | | | document type = Letter |
| | page count = 3 | | | page count = 3 |
| | project = EPID:L-2017-LLA-0033 | | | project = CAC:001028, EPID:L-2017-LLA-0033 |
| | stage = Request | | | stage = Other |
| }} | | }} |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 January 17, 2018 | | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 January 17, 2018 Ms. Kimberly Manzione Licensing Manager Holtec International Holtec Technology Campus 1 Holtec Boulevard Camden, NJ 08104 |
| | |
| Ms. Kimberly Manzione Licensing Manager Holtec International Holtec Technology Campus | |
| | |
| 1 Holtec Boulevard Camden, NJ 08104 | |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
| APPLICATION FOR HOLTEC INTERNATIONAL HI-STORM UMAX MULTIPURPOSE CANISTER STORAGE SYSTEM LICENSE AMENDMENT REQUEST NO. 3 TO CERTIFICATE OF COMPLIANCE NO. 1040 - | | APPLICATION FOR HOLTEC INTERNATIONAL HI-STORM UMAX MULTIPURPOSE CANISTER STORAGE SYSTEM LICENSE AMENDMENT REQUEST NO. 3 TO CERTIFICATE OF COMPLIANCE NO. 1040 - |
| ACCEPTED FOR REVIEW | | ACCEPTED FOR REVIEW |
|
| |
|
| ==Dear Ms. Manzione:== | | ==Dear Ms. Manzione:== |
| | By {{letter dated|date=August 30, 2016|text=letter dated August 30, 2016}} (Agencywide Documents Access Management System, (ADAMS) Accession Number, ML16250A393), Holtec International (Holtec) submitted an application for amendment to the certificate of compliance (CoC) for the HI-STORM UMAX multipurpose canister storage system requesting to accommodate non-Holtec canisters (e.g., |
| | NUHOMS 24PT1-DSC). The calculation packages that support the amendment request were submitted under a separate {{letter dated|date=September 9, 2016|text=letter dated September 9, 2016}} (ML16258A213). By {{letter dated|date=November 2, 2016|text=letter dated November 2, 2016}} (ML16313A170), Holtec supplemented the amendment request. As a result of staffs formal request for supplemental information, {{letter dated|date=January 23, 2017|text=letter dated January 23, 2017}} (ML17023A058), and the public meeting held on June 7, 2017 (meeting summary, {{letter dated|date=July 7, 2017|text=letter dated July 7, 2017}}, ML17188A274), Holtec again supplemented the application by letters dated, March 3, 2017 (ML17067A060), June 29, 2017 (ML17187A176), and August 4, 2017 (ML17229B196). Staff performed an acceptance review of Holtecs application to determine if the application contains sufficient technical information in scope and depth to allow the staff to complete the detailed technical review. |
| | This letter acknowledges acceptance of Holtecs application. The application appears to contain the information needed to start our technical review. However, we have identified an early request for additional information (RAI). The RAI is provided as an enclosure to this letter. We expect a response to the administrative RAI without delay and response to the thermal RAI within forty-five (45) days from the date of this letter. If Holtec is unable to meet the due date, please inform us in writing at your earliest convenience, but no later than a week prior to the due date. You should also include a new proposed submittal date and the reasons for the delay to assist us in re-scheduling your review. |
| | We have established a schedule for the review. The schedule allows for staff to issue a comprehensive RAI package by May 15, 2018. The schedule allows for staff to issue the CoC/staff evaluation report in October 2018, based on the applicant responding to RAIs by July 29, 2018. If no additional RAI is needed, and based on the staffs evaluation, the |
|
| |
|
| By letter dated August 30, 2016 (Agencywide Documents Access Management System, (ADAMS) Accession Number, ML16250A393), Holtec International (Holtec) submitted an application for amendment to the certificate of compliance (CoC) for the HI-STORM UMAX multipurpose canister storage system requesting to accommodate non-Holtec canisters (e.g., NUHOMS 24PT1-DSC). The calculation packages that support the amendment request were submitted under a separate letter dated September 9, 2016 (ML16258A213). By letter dated November 2, 2016 (ML16313A170), Holtec supplemented the amendment request. As a result of staff's formal request for supplemental information, letter dated January 23, 2017 (ML17023A058), and the public meeting held on June 7, 2017 (meeting summary, letter dated
| | approval may be issued at approximately that time. In general, no additional changes to the application should be submitted except for changes resulting from your response to a RAI. |
| | | If you have any questions regarding this matter, please contact me at (301) 415-7465. |
| July 7, 2017, ML17188A274), Holtec again supplemented the application by letters dated, March 3, 2017 (ML17067A060), June 29, 2017 (ML17187A176), and August 4, 2017 (ML17229B196). Staff performed an acceptance review of Holtec's application to determine if the application contains sufficient technical information in scope and depth to allow the staff to complete the detailed technical review.
| |
| | |
| This letter acknowledges acceptance of Holtec's application. The application appears to contain the information needed to start our technical review. However, we have identified an early request for additional information (RAI). The RAI is provided as an enclosure to this letter. We expect a response to the administrative RAI without delay and response to the thermal RAI within forty-five (45) days from the date of this letter. If Holtec is unable to meet the due date, please inform us in writing at your earliest convenience, but no later than a week prior to the due date. You should also include a new proposed submittal date and the reasons for the delay to assist us in re-scheduling your review.
| |
| | |
| We have established a schedule for the review. The schedule allows for staff to issue a comprehensive RAI package by May 15, 2018. The schedule allows for staff to issue the CoC/staff evaluation report in October 2018, based on the applicant responding to RAIs by July 29, 2018. If no additional RAI is needed, and based on the staff's evaluation, the
| |
| | |
| approval may be issued at approximately that time. In general, no additional changes to the application should be submitted except for changes resulting from your response to a RAI. | |
| | |
| If you have any questions regarding this matter, please contact me at (301) 415-7465. | |
| | |
| Sincerely, | | Sincerely, |
| | | /RA J. Nguyen Acting for/ |
| /RA J. Nguyen Acting for/
| |
| Pamela Longmire, Ph.D. | | Pamela Longmire, Ph.D. |
| Division of Spent Fuel Management Office of Nuclear Material Safety and Safeguards Docket No.: 72-1040 CAC No.: 001028 EPID: L-2017-LLA-0033 | | Division of Spent Fuel Management Office of Nuclear Material Safety and Safeguards Docket No.: 72-1040 CAC No.: 001028 EPID: L-2017-LLA-0033 |
|
| |
|
| ==Enclosure:== | | ==Enclosure:== |
| Request for Additional Information | | Request for Additional Information |
| | |
| APPLICATION FOR HOLTEC INTERNATIONAL HI-STORM UMAX MULTIPURPOSE CANISTER STORAGE SYSTEM LICENSE AMENDMENT REQUEST NO. 3 TO CERTIFICATE OF COMPLIANCE NO. 1040 - ACCEPTED FOR REVIEW, DOCUMENT DATE: JANUARY 17, 2018
| |
| | |
| DISTRIBUTION: SFM R/F JTapp ARigato EGoldfeiz CBajwa JSolis JSmith DTarantino YDiaz-Sanabria PSilva TTate MRahimi
| |
| | |
| G:/SFST/HI-STORM UMAX/Amendment 3/Letters to applicant/Acceptance Letter.docx G:/SFST/HI-STORM UMAX/Amendment 3/Letters to applicant/RAI-staggered(1).docx ADAMS Package No.: ML18018A017
| |
|
| |
|
| C = COVER E = COVER & ENCLOSURE N = NO COPY OFC NMSS/DSFM NMSS/DSFM NMSS/DSFM NAME PLongmire WWheatley MRahimi DATE 12/21/2017 1/11/2018 1/17/2018 OFFICIAL RECORD COPY}} | | APPLICATION FOR HOLTEC INTERNATIONAL HI-STORM UMAX MULTIPURPOSE CANISTER STORAGE SYSTEM LICENSE AMENDMENT REQUEST NO. 3 TO CERTIFICATE OF COMPLIANCE NO. 1040 - ACCEPTED FOR REVIEW, DOCUMENT DATE: JANUARY 17, 2018 DISTRIBUTION: |
| | SFM R/F JTapp ARigato EGoldfeiz CBajwa JSolis JSmith DTarantino YDiaz-Sanabria PSilva TTate MRahimi G:/SFST/HI-STORM UMAX/Amendment 3/Letters to applicant/Acceptance Letter.docx G:/SFST/HI-STORM UMAX/Amendment 3/Letters to applicant/RAI-staggered(1).docx ADAMS Package No.: ML18018A017 C = COVER E = COVER & ENCLOSURE N = NO COPY OFC NMSS/DSFM NMSS/DSFM NMSS/DSFM NAME PLongmire WWheatley MRahimi DATE 12/21/2017 1/11/2018 1/17/2018 OFFICIAL RECORD COPY}} |
Letter Sequence Other |
|---|
CAC:001028, SR 3.5.1.2 Notation (Approved, Closed) EPID:L-2017-LLA-0033, Package: Application for Holtec International HI-STORM Umax Multipurpose Canister Storage System License Amendment Request No. 3 to Certificate of Compliance No. 1040 Accepted for Review (Withdrawn, Closed) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, ... further results|Request]]
- Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, ... further results|Supplement]]
Administration
- Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance
- Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, ... further results|Meeting]]
Results
- Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, ... further results|Approval]]
Other: L-18-006, ISFSI - Site-Specific License Renewal Application, Revision 0, July 2018, L-23-005, Independent Spent Fuel Storage Installation License Renewal Application, Revision 1 (Cac/Epid No. 001028/L-2022-RNW-0007), ML17311A450, ML18018A018, ML18022A077, ML18022A078, ML18022A079, ML18087A056, ML18087A057, ML18087A058, ML18087A059, ML18087A060, ML18087A061, ML18087A062, ML18100A185, ML18100A188, ML18100A190, ML18100A191, ML18100A193, ML18101A024, ML18108A052, ML18131A047, ML18131A048, ML18141A561, ML18141A562, ML18141A563, ML18141A564, ML18141A565, ML18141A567, ML18179A258, ML18179A260, ML18179A266, ML18201A455, ML18205A179, ML18222A351, ML18228A530, ML18228A531, ML18228A532, ML18228A533, ML18234A012, ML18248A121, ML18255A093, ML18255A094, ML18255A096, ML18255A097, ML18255A098, ML18255A101, ML18255A102, ML18324A577, ML18324A594... further results
|
MONTHYEARML19255E7911997-05-31031 May 1997 Enclosure 1 - Ecological Assessment of the Low Level Waste Depository, Andrews County, Tx Project stage: Other ML19255E7952004-10-25025 October 2004 Enclosure 2 - Habitat Characterization and Rare Species Survey for the Proposed Low Level Waste Repository, Andrews County, Tx Project stage: Other ML19337B5182007-03-16016 March 2007 Enclosure 10 - Applicable Sections of LLRW License Project stage: Other ML19255E7982007-03-16016 March 2007 Enclosure 3 - Supplemental Survey to Ecological Assessment of the Low Level Waste Depository, Andrews County, Texas Project stage: Supplement ML19217A2112007-04-30030 April 2007 Enclosure 1 - Report on Mapping of a Trench Through Pedogenic Calcrete (Caliche) Across a Drainage and Possible Lineament, Waste Control Specialists Disposal Site, Andrews County, Tx (Public) Project stage: Other ML19255E8002008-07-0303 July 2008 Enclosure 4 - Environmental Assessment Report Prepared for Application for Renewal of Radioactive Material License R04971 Waste Control Specialists LLC Andrews County, Texas Project stage: Request ML19217A2142008-07-28028 July 2008 Enclosure 4 - Report on Activities to Satisfy Byproduct RML Conditions 41A, 41C, and 43, July 2008 (Public) Project stage: Other ML19217A2132011-02-22022 February 2011 Enclosure 3 - Oag Water Levels: Empirical and Modeled Relationships Between Precipitation and Infiltration, 2011 (Public) Project stage: Other ML18100A1882013-04-11011 April 2013 Enclosure 7 - Procedure 12751-MNGP-QP-9.201, Revision 0, Visual Weld Examination Project stage: Other ML18100A1852013-04-11011 April 2013 Enclosure 6 - Procedure 12751-MNGP-OPS-01, Revision 0, Spent Fuel Cask Welding: 61BT/BTH NUHOMS Canisters Project stage: Other ML18100A1912014-01-30030 January 2014 Enclosure 9 - Structural Integrity Associates, Inc. Report 130415.402, Revision 0, Review of Trivis Inc. Welding Procedures Used for Field Welds on the Transnuclear NUHOMS 61BTH Type 1 & 2 Transportable Canister for BWR Fuel Project stage: Other ML18100A1902014-05-22022 May 2014 Enclosure 8 - Structural Integrity Associates, Inc. Report 130415.403, Revision 2, Assessment of Monticello Spent Fuel Canister Closure Plate Welds Based on Welding Video Records Project stage: Other ML18011A1582017-12-22022 December 2017 International HI-STORE Cis (Consolidated Interim Storage Facility) License Application Responses to Safeguards Related Requests for Supplemental Information Project stage: Supplement ML17249A1572018-01-11011 January 2018, 16 January 2018 Package: Vermont Yankee Nuclear Power Station ISFSI Environmental Assessment and Finding of No Significant Impact Related to Issuance of Exemption to Allow a New Loading Pattern and Loading Fuel Cooled for at Least 2 Years Project stage: Request ML18022A1512018-01-16016 January 2018 Memo to A. Hsia Summary of December 12, 2017, Meeting with Pacific Gas & Electric Company to Discuss the Upcoming Submittal of the Application for Renewal of the Humboldt Bay Independent Spent Fuel Storage Installation License Project stage: Meeting ML18022A1532018-01-16016 January 2018 Enclosure 2: Agenda (Memo to A. Hsia Summary of December 12, 2017, Meeting with Pacific Gas & Electric Company to Discuss the Upcoming Submittal of the Application for Renewal of the Humboldt Bay ISFSI License) Project stage: Meeting ML17249A1592018-01-16016 January 2018 Letter to C. C. Chappell Vermont Yankee Nuclear Power Station ISFSI Environmental Assessment and Finding of No Significant Impact Related to Issuance of Exemption to Allow a New Loading Pattern and Loading Fuel Cooled for at Least 2 Years Project stage: Approval ML18022A1542018-01-16016 January 2018 Enclosure 3: Handout-PG&E Presentation on Humboldt Bay ISFSI LRA (Memo to A. Hsia Summary of December 12, 2017, Meeting) Project stage: Meeting ML18022A1522018-01-16016 January 2018 Enclosure 1: Meeting Attendees (Memo to A. Hsia Summary of December 12, 2017, Meeting with Pacific Gas & Electric Company to Discuss the Upcoming Submittal of the Application for Renewal of the Humboldt Bay ISFSI License) Project stage: Meeting ML18018A0182018-01-17017 January 2018 Letter to K. Manzione Application for Holtec International HI-STORM Umax Multipurpose Canister Storage System License Amendment Request No. 3 to Certificate of Compliance No. 1040 - Accepted for Review Project stage: Other ML18018A0172018-01-17017 January 2018 Package: Application for Holtec International HI-STORM Umax Multipurpose Canister Storage System License Amendment Request No. 3 to Certificate of Compliance No. 1040 Accepted for Review Project stage: Request ML18018A0192018-01-17017 January 2018 Enclosurequest for Additional Information (Ltr to K. Manzione Application for Holtec International HI-STORM Umax Multipurpose Canister Storage System License Amendment Request No. 3 to Certificate of Compliance No. 1040-Accepted for Review) Project stage: RAI ML18022A6122018-01-19019 January 2018 Letter to K. Manzione Amendment No. 4 to Certificate of Compliance No. 1032 for the HI-STORM Flood/Wind Multipurpose Canister Storage System-Request for Additional Information Project stage: RAI ML18018B2972018-01-19019 January 2018 Federal Registered Notice: Correction of Certificate of Compliance No. 1004, Renewed Amendments No. 11, Revision 1 and No. 13, Revision 1 Project stage: Request ML18022A0772018-01-22022 January 2018 Letter to J. Bondre Correction to Tn Americas LLC Technical Specifications for Renewed Amendments No. 11, Revision 1 and No. 13, Revision 1 to Standardized NUHOMS Certificate of Compliance No. 1004 for Spent Fuel Storage Casks Project stage: Other ML18022A0762018-01-22022 January 2018 Package: Correction to Title of Figure 1-15 in Technical Specifications for Certificate of Compliance 1004 Renewed Amendments No. 11, Revision 1 and No. 13, Revision 1 Project stage: Request ML18022A0792018-01-22022 January 2018 Enclosure 2: Revised Title for Figure 1-5 Corrected Technical Specifications for Certificate of Compliance No. 1004 Renewed Amendment No. 13, Revision 1 Project stage: Other ML18022A0782018-01-22022 January 2018 Enclosure 1: Revised Title for Figure 1-5 Corrected Technical Specifications for Certificate of Compliance No. 1004 Renewed Amendment No. 11, Revision 1 Enclosure 1 Project stage: Other ML18024A2732018-01-24024 January 2018 Letter to D. G. Stoddard U.S. NRC Approval of Virginia Electric and Power Company Request for Withholding Information from Public Disclosure for North Anna Power Station ISFSI (Cac/Epid Nos. 001028/L-2017-RNW-0010 and 000993/L-2017-LNE-0008 Project stage: Withholding Request Acceptance ML18031A4572018-01-31031 January 2018 Submittal Date for Response to NRCs Requests for Additional Information (Rais) for License Amendment Request 1032-4 to HI-STORM FW CoC No. 1032 (CAC No. 001028) Project stage: Request ML17311A4502018-01-31031 January 2018 ISFSI License Renewal Final Environmental Assessment Project stage: Other ML18036A2222018-02-0101 February 2018 International - Transmittal of HI-STORM Umax License Amendment Request No. 3 - Administrative RAI Response Project stage: Request ML17298A1342018-02-0202 February 2018 Letter to C. C. Chappell Vermont Yankee Nuclear Power Station Independent Spent Fuel Storage Installation, Issuance of Exemption (CAC No.: 001028, Docket Nos. 50-271, 72-59, and 72-1014; EPID L-2017-LLE-0005) Project stage: Approval ML17298A1352018-02-0202 February 2018 Safety Evaluation Report (Letter to C. C. Chappell Vermont Yankee Nuclear Power Station Independent Spent Fuel Storage Installation, Issuance of Exemption (CAC No.: 001028, Docket Nos. 50-271, 72-59, and 72-1014; EPID L-2017-LLE-0005) Project stage: Approval ML18031A2222018-02-0606 February 2018 Letter to D. G. Stoddard Issuance of Renewed Materials License No. SNM-2507 for the North Anna Power Station Independent Spent Fuel Storage Installation (Cac/Epid Nos. 001028/L-2017-RNW-0010 and 000993/L-2017-LNE-0008) Project stage: Approval ML18031A2282018-02-0606 February 2018 Enclosure 2: Safety Evaluation Report (Letter to D. G. Stoddard Issuance of Renewed Materials License No. SNM-2507 for the North Anna Power Station ISFSI) Project stage: Approval ML18031A2242018-02-0606 February 2018 Enclosure 1: Preamble-SNM-2507 License Renewal Order (Letter to D. G. Stoddard Issuance of Renewed Materials License No. SNM-2507 for the North Anna Power Station Independent Spent Fuel Storage Installation) Project stage: Approval ML18031A2272018-02-0606 February 2018 Enclosurenewed License SNM-2507 Technical Specifications (Letter to D. G. Stoddard Issuance of Renewed Materials License No. SNM-2507 for the North Anna Power Station ISFSI) Project stage: Approval ML18031A2252018-02-0606 February 2018 Enclosurenewed License SNM-2507 (Letter to D. G. Stoddard Issuance of Renewed Materials License No. SNM-2507 for the North Anna Power Station Independent Spent Fuel Storage Installation) Project stage: Approval ML18031A2312018-02-0808 February 2018 Federal Register Notice - Notice of Issuance for License Renewal (Letter to D. G. Stoddard Issuance of Renewed Materials License No. SNM-2507 for the North Anna Power Station ISFSI) Project stage: Approval ML18053A2332018-02-15015 February 2018 Enclosure 4: CoC 1042 Amendment 1 Proposed Technical Specifications, Revision 0 Project stage: Request ML18053A2222018-02-15015 February 2018 Application for Amendment 1 to the NUHOMS Eos System, Revision O (Docket No. 72-1042) Project stage: Request ML18053A2342018-02-15015 February 2018 Enclosure 6: Proposed Amendment 1, Revision 0 Changes to the NUHOMS Eos System Updated Final Safety Analysis Report, Chapters 1 to 14 Project stage: Request ML18058A0572018-02-23023 February 2018 Enclosurequest for Additional Information (Letter to J. Giddens Request for Additional Information Regarding Entergy Operations, Inc.S Decommissioning Funding Plan Update) Project stage: RAI ML18058A0242018-02-23023 February 2018 Enclosurequest for Additional Information (Letter to G. Van Noordennen Request for Additional Information Regarding Zionsolutions, LLCs Decommissioning Funding Plan Update for Zion Independent Spent Fuel Storage Installation) Project stage: RAI ML18057A2182018-02-23023 February 2018 Enclosurequest for Additional Information (Letter to A. Zaremba Request for Additional Information for Review of Duke Energys Decommissioning Funding Plan Update) Project stage: RAI ML18058A0562018-02-23023 February 2018 Letter to J. Giddens Request for Additional Information Regarding Entergy Operations, Inc.S Decommissioning Funding Plan Update Project stage: RAI ML18058A6082018-02-23023 February 2018 HI-2177593, Rev 0, Holtec International & Eddy Lea Energy Alliance (Elea) Underground CISF - Financial Assurance & Project Life Cycle Cost Estimates Project stage: Request ML18058A0232018-02-23023 February 2018 Letter to G. Van Noordennen Request for Additional Information Regarding Zionsolutions, LLCs Decommissioning Funding Plan Update for Zion Independent Spent Fuel Storage Installation Project stage: RAI ML18057A2172018-02-23023 February 2018 Letter to A. Zaremba Request for Additional Information for Review of Duke Energys Decommissioning Funding Plan Update Project stage: RAI 2018-01-11
[Table View] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 January 17, 2018 Ms. Kimberly Manzione Licensing Manager Holtec International Holtec Technology Campus 1 Holtec Boulevard Camden, NJ 08104
SUBJECT:
APPLICATION FOR HOLTEC INTERNATIONAL HI-STORM UMAX MULTIPURPOSE CANISTER STORAGE SYSTEM LICENSE AMENDMENT REQUEST NO. 3 TO CERTIFICATE OF COMPLIANCE NO. 1040 -
ACCEPTED FOR REVIEW
Dear Ms. Manzione:
By letter dated August 30, 2016 (Agencywide Documents Access Management System, (ADAMS) Accession Number, ML16250A393), Holtec International (Holtec) submitted an application for amendment to the certificate of compliance (CoC) for the HI-STORM UMAX multipurpose canister storage system requesting to accommodate non-Holtec canisters (e.g.,
NUHOMS 24PT1-DSC). The calculation packages that support the amendment request were submitted under a separate letter dated September 9, 2016 (ML16258A213). By letter dated November 2, 2016 (ML16313A170), Holtec supplemented the amendment request. As a result of staffs formal request for supplemental information, letter dated January 23, 2017 (ML17023A058), and the public meeting held on June 7, 2017 (meeting summary, letter dated July 7, 2017, ML17188A274), Holtec again supplemented the application by letters dated, March 3, 2017 (ML17067A060), June 29, 2017 (ML17187A176), and August 4, 2017 (ML17229B196). Staff performed an acceptance review of Holtecs application to determine if the application contains sufficient technical information in scope and depth to allow the staff to complete the detailed technical review.
This letter acknowledges acceptance of Holtecs application. The application appears to contain the information needed to start our technical review. However, we have identified an early request for additional information (RAI). The RAI is provided as an enclosure to this letter. We expect a response to the administrative RAI without delay and response to the thermal RAI within forty-five (45) days from the date of this letter. If Holtec is unable to meet the due date, please inform us in writing at your earliest convenience, but no later than a week prior to the due date. You should also include a new proposed submittal date and the reasons for the delay to assist us in re-scheduling your review.
We have established a schedule for the review. The schedule allows for staff to issue a comprehensive RAI package by May 15, 2018. The schedule allows for staff to issue the CoC/staff evaluation report in October 2018, based on the applicant responding to RAIs by July 29, 2018. If no additional RAI is needed, and based on the staffs evaluation, the
approval may be issued at approximately that time. In general, no additional changes to the application should be submitted except for changes resulting from your response to a RAI.
If you have any questions regarding this matter, please contact me at (301) 415-7465.
Sincerely,
/RA J. Nguyen Acting for/
Pamela Longmire, Ph.D.
Division of Spent Fuel Management Office of Nuclear Material Safety and Safeguards Docket No.: 72-1040 CAC No.: 001028 EPID: L-2017-LLA-0033
Enclosure:
Request for Additional Information
APPLICATION FOR HOLTEC INTERNATIONAL HI-STORM UMAX MULTIPURPOSE CANISTER STORAGE SYSTEM LICENSE AMENDMENT REQUEST NO. 3 TO CERTIFICATE OF COMPLIANCE NO. 1040 - ACCEPTED FOR REVIEW, DOCUMENT DATE: JANUARY 17, 2018 DISTRIBUTION:
SFM R/F JTapp ARigato EGoldfeiz CBajwa JSolis JSmith DTarantino YDiaz-Sanabria PSilva TTate MRahimi G:/SFST/HI-STORM UMAX/Amendment 3/Letters to applicant/Acceptance Letter.docx G:/SFST/HI-STORM UMAX/Amendment 3/Letters to applicant/RAI-staggered(1).docx ADAMS Package No.: ML18018A017 C = COVER E = COVER & ENCLOSURE N = NO COPY OFC NMSS/DSFM NMSS/DSFM NMSS/DSFM NAME PLongmire WWheatley MRahimi DATE 12/21/2017 1/11/2018 1/17/2018 OFFICIAL RECORD COPY