Letter Sequence Request |
|---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, ... further results|Request]]
- Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, ... further results|Supplement]]
Administration
- Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance
- Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, ... further results|Meeting]]
Results
- Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, ... further results|Approval]]
Other: L-18-006, ISFSI - Site-Specific License Renewal Application, Revision 0, July 2018, L-23-005, Independent Spent Fuel Storage Installation License Renewal Application, Revision 1 (Cac/Epid No. 001028/L-2022-RNW-0007), ML17311A450, ML18018A018, ML18022A077, ML18022A078, ML18022A079, ML18087A056, ML18087A057, ML18087A058, ML18087A059, ML18087A060, ML18087A061, ML18087A062, ML18100A185, ML18100A188, ML18100A190, ML18100A191, ML18100A193, ML18101A024, ML18108A052, ML18131A047, ML18131A048, ML18141A561, ML18141A562, ML18141A563, ML18141A564, ML18141A565, ML18141A567, ML18179A258, ML18179A260, ML18179A266, ML18201A455, ML18205A179, ML18222A351, ML18228A530, ML18228A531, ML18228A532, ML18228A533, ML18234A012, ML18248A121, ML18255A093, ML18255A094, ML18255A096, ML18255A097, ML18255A098, ML18255A101, ML18255A102, ML18324A577, ML18324A594... further results
|
MONTHYEARML19255E7911997-05-31031 May 1997 Enclosure 1 - Ecological Assessment of the Low Level Waste Depository, Andrews County, Tx Project stage: Other ML19255E7952004-10-25025 October 2004 Enclosure 2 - Habitat Characterization and Rare Species Survey for the Proposed Low Level Waste Repository, Andrews County, Tx Project stage: Other ML19337B5182007-03-16016 March 2007 Enclosure 10 - Applicable Sections of LLRW License Project stage: Other ML19255E7982007-03-16016 March 2007 Enclosure 3 - Supplemental Survey to Ecological Assessment of the Low Level Waste Depository, Andrews County, Texas Project stage: Supplement ML19217A2112007-04-30030 April 2007 Enclosure 1 - Report on Mapping of a Trench Through Pedogenic Calcrete (Caliche) Across a Drainage and Possible Lineament, Waste Control Specialists Disposal Site, Andrews County, Tx (Public) Project stage: Other ML19255E8002008-07-0303 July 2008 Enclosure 4 - Environmental Assessment Report Prepared for Application for Renewal of Radioactive Material License R04971 Waste Control Specialists LLC Andrews County, Texas Project stage: Request ML19217A2142008-07-28028 July 2008 Enclosure 4 - Report on Activities to Satisfy Byproduct RML Conditions 41A, 41C, and 43, July 2008 (Public) Project stage: Other ML19217A2132011-02-22022 February 2011 Enclosure 3 - Oag Water Levels: Empirical and Modeled Relationships Between Precipitation and Infiltration, 2011 (Public) Project stage: Other ML18100A1882013-04-11011 April 2013 Enclosure 7 - Procedure 12751-MNGP-QP-9.201, Revision 0, Visual Weld Examination Project stage: Other ML18100A1852013-04-11011 April 2013 Enclosure 6 - Procedure 12751-MNGP-OPS-01, Revision 0, Spent Fuel Cask Welding: 61BT/BTH NUHOMS Canisters Project stage: Other ML18100A1912014-01-30030 January 2014 Enclosure 9 - Structural Integrity Associates, Inc. Report 130415.402, Revision 0, Review of Trivis Inc. Welding Procedures Used for Field Welds on the Transnuclear NUHOMS 61BTH Type 1 & 2 Transportable Canister for BWR Fuel Project stage: Other ML18100A1902014-05-22022 May 2014 Enclosure 8 - Structural Integrity Associates, Inc. Report 130415.403, Revision 2, Assessment of Monticello Spent Fuel Canister Closure Plate Welds Based on Welding Video Records Project stage: Other ML18011A1582017-12-22022 December 2017 International HI-STORE Cis (Consolidated Interim Storage Facility) License Application Responses to Safeguards Related Requests for Supplemental Information Project stage: Supplement ML17249A1572018-01-11011 January 2018, 16 January 2018 Package: Vermont Yankee Nuclear Power Station ISFSI Environmental Assessment and Finding of No Significant Impact Related to Issuance of Exemption to Allow a New Loading Pattern and Loading Fuel Cooled for at Least 2 Years Project stage: Request ML18022A1542018-01-16016 January 2018 Enclosure 3: Handout-PG&E Presentation on Humboldt Bay ISFSI LRA (Memo to A. Hsia Summary of December 12, 2017, Meeting) Project stage: Meeting ML18022A1522018-01-16016 January 2018 Enclosure 1: Meeting Attendees (Memo to A. Hsia Summary of December 12, 2017, Meeting with Pacific Gas & Electric Company to Discuss the Upcoming Submittal of the Application for Renewal of the Humboldt Bay ISFSI License) Project stage: Meeting ML18022A1532018-01-16016 January 2018 Enclosure 2: Agenda (Memo to A. Hsia Summary of December 12, 2017, Meeting with Pacific Gas & Electric Company to Discuss the Upcoming Submittal of the Application for Renewal of the Humboldt Bay ISFSI License) Project stage: Meeting ML18022A1512018-01-16016 January 2018 Memo to A. Hsia Summary of December 12, 2017, Meeting with Pacific Gas & Electric Company to Discuss the Upcoming Submittal of the Application for Renewal of the Humboldt Bay Independent Spent Fuel Storage Installation License Project stage: Meeting ML17249A1592018-01-16016 January 2018 Letter to C. C. Chappell Vermont Yankee Nuclear Power Station ISFSI Environmental Assessment and Finding of No Significant Impact Related to Issuance of Exemption to Allow a New Loading Pattern and Loading Fuel Cooled for at Least 2 Years Project stage: Approval ML18018A0182018-01-17017 January 2018 Letter to K. Manzione Application for Holtec International HI-STORM Umax Multipurpose Canister Storage System License Amendment Request No. 3 to Certificate of Compliance No. 1040 - Accepted for Review Project stage: Other ML18018A0192018-01-17017 January 2018 Enclosurequest for Additional Information (Ltr to K. Manzione Application for Holtec International HI-STORM Umax Multipurpose Canister Storage System License Amendment Request No. 3 to Certificate of Compliance No. 1040-Accepted for Review) Project stage: RAI ML18022A6122018-01-19019 January 2018 Letter to K. Manzione Amendment No. 4 to Certificate of Compliance No. 1032 for the HI-STORM Flood/Wind Multipurpose Canister Storage System-Request for Additional Information Project stage: RAI ML18018B2972018-01-19019 January 2018 Federal Registered Notice: Correction of Certificate of Compliance No. 1004, Renewed Amendments No. 11, Revision 1 and No. 13, Revision 1 Project stage: Request ML18022A0762018-01-22022 January 2018 Package: Correction to Title of Figure 1-15 in Technical Specifications for Certificate of Compliance 1004 Renewed Amendments No. 11, Revision 1 and No. 13, Revision 1 Project stage: Request ML18022A0782018-01-22022 January 2018 Enclosure 1: Revised Title for Figure 1-5 Corrected Technical Specifications for Certificate of Compliance No. 1004 Renewed Amendment No. 11, Revision 1 Enclosure 1 Project stage: Other ML18022A0792018-01-22022 January 2018 Enclosure 2: Revised Title for Figure 1-5 Corrected Technical Specifications for Certificate of Compliance No. 1004 Renewed Amendment No. 13, Revision 1 Project stage: Other ML18022A0772018-01-22022 January 2018 Letter to J. Bondre Correction to Tn Americas LLC Technical Specifications for Renewed Amendments No. 11, Revision 1 and No. 13, Revision 1 to Standardized NUHOMS Certificate of Compliance No. 1004 for Spent Fuel Storage Casks Project stage: Other ML18024A2732018-01-24024 January 2018 Letter to D. G. Stoddard U.S. NRC Approval of Virginia Electric and Power Company Request for Withholding Information from Public Disclosure for North Anna Power Station ISFSI (Cac/Epid Nos. 001028/L-2017-RNW-0010 and 000993/L-2017-LNE-0008 Project stage: Withholding Request Acceptance ML17311A4502018-01-31031 January 2018 ISFSI License Renewal Final Environmental Assessment Project stage: Other ML18031A4572018-01-31031 January 2018 Submittal Date for Response to NRCs Requests for Additional Information (Rais) for License Amendment Request 1032-4 to HI-STORM FW CoC No. 1032 (CAC No. 001028) Project stage: Request ML18036A2222018-02-0101 February 2018 International - Transmittal of HI-STORM Umax License Amendment Request No. 3 - Administrative RAI Response Project stage: Request ML17298A1342018-02-0202 February 2018 Letter to C. C. Chappell Vermont Yankee Nuclear Power Station Independent Spent Fuel Storage Installation, Issuance of Exemption (CAC No.: 001028, Docket Nos. 50-271, 72-59, and 72-1014; EPID L-2017-LLE-0005) Project stage: Approval ML17298A1352018-02-0202 February 2018 Safety Evaluation Report (Letter to C. C. Chappell Vermont Yankee Nuclear Power Station Independent Spent Fuel Storage Installation, Issuance of Exemption (CAC No.: 001028, Docket Nos. 50-271, 72-59, and 72-1014; EPID L-2017-LLE-0005) Project stage: Approval ML18031A2222018-02-0606 February 2018 Letter to D. G. Stoddard Issuance of Renewed Materials License No. SNM-2507 for the North Anna Power Station Independent Spent Fuel Storage Installation (Cac/Epid Nos. 001028/L-2017-RNW-0010 and 000993/L-2017-LNE-0008) Project stage: Approval ML18031A2252018-02-0606 February 2018 Enclosurenewed License SNM-2507 (Letter to D. G. Stoddard Issuance of Renewed Materials License No. SNM-2507 for the North Anna Power Station Independent Spent Fuel Storage Installation) Project stage: Approval ML18031A2272018-02-0606 February 2018 Enclosurenewed License SNM-2507 Technical Specifications (Letter to D. G. Stoddard Issuance of Renewed Materials License No. SNM-2507 for the North Anna Power Station ISFSI) Project stage: Approval ML18031A2242018-02-0606 February 2018 Enclosure 1: Preamble-SNM-2507 License Renewal Order (Letter to D. G. Stoddard Issuance of Renewed Materials License No. SNM-2507 for the North Anna Power Station Independent Spent Fuel Storage Installation) Project stage: Approval ML18031A2282018-02-0606 February 2018 Enclosure 2: Safety Evaluation Report (Letter to D. G. Stoddard Issuance of Renewed Materials License No. SNM-2507 for the North Anna Power Station ISFSI) Project stage: Approval ML18031A2312018-02-0808 February 2018 Federal Register Notice - Notice of Issuance for License Renewal (Letter to D. G. Stoddard Issuance of Renewed Materials License No. SNM-2507 for the North Anna Power Station ISFSI) Project stage: Approval ML18053A2332018-02-15015 February 2018 Enclosure 4: CoC 1042 Amendment 1 Proposed Technical Specifications, Revision 0 Project stage: Request ML18053A2342018-02-15015 February 2018 Enclosure 6: Proposed Amendment 1, Revision 0 Changes to the NUHOMS Eos System Updated Final Safety Analysis Report, Chapters 1 to 14 Project stage: Request ML18053A2222018-02-15015 February 2018 Application for Amendment 1 to the NUHOMS Eos System, Revision O (Docket No. 72-1042) Project stage: Request ML18058A6072018-02-23023 February 2018 HI-2177565, Rev 0, Holtec International & Eddy Lea Energy Alliance (Elea) Cis Facility - Decommissioning Cost Estimate and Funding Plan Project stage: Request ML18058A0242018-02-23023 February 2018 Enclosurequest for Additional Information (Letter to G. Van Noordennen Request for Additional Information Regarding Zionsolutions, LLCs Decommissioning Funding Plan Update for Zion Independent Spent Fuel Storage Installation) Project stage: RAI ML18057A2172018-02-23023 February 2018 Letter to A. Zaremba Request for Additional Information for Review of Duke Energys Decommissioning Funding Plan Update Project stage: RAI ML18058A0232018-02-23023 February 2018 Letter to G. Van Noordennen Request for Additional Information Regarding Zionsolutions, LLCs Decommissioning Funding Plan Update for Zion Independent Spent Fuel Storage Installation Project stage: RAI ML18058A0562018-02-23023 February 2018 Letter to J. Giddens Request for Additional Information Regarding Entergy Operations, Inc.S Decommissioning Funding Plan Update Project stage: RAI ML18057A2182018-02-23023 February 2018 Enclosurequest for Additional Information (Letter to A. Zaremba Request for Additional Information for Review of Duke Energys Decommissioning Funding Plan Update) Project stage: RAI ML18058A6082018-02-23023 February 2018 HI-2177593, Rev 0, Holtec International & Eddy Lea Energy Alliance (Elea) Underground CISF - Financial Assurance & Project Life Cycle Cost Estimates Project stage: Request ML18058A0572018-02-23023 February 2018 Enclosurequest for Additional Information (Letter to J. Giddens Request for Additional Information Regarding Entergy Operations, Inc.S Decommissioning Funding Plan Update) Project stage: RAI 2018-01-11
[Table View] |
Text
Orano TN 7160 Riverwood Drive Suite 200 Columbia, MD 21046 USA Tel: 410-910-6900 Fax: 434-260-8480 Enclosures transmitted herein contain SUNSI. When separated from enclosures, this transmittal document is decontrolled.
May 9, 2025 E-64360 U. S. Nuclear Regulatory Commission Attn: Document Control Desk One White Flint North 11555 Rockville Pike Rockville, MD 20852
Subject:
Proposed Alternatives to NG-4323 and IX QW-191.2.1, Docket 72-1004, Certificate of Compliance No. 1004 In accordance with the provision cited in Condition II.1.d of Certificate of Compliance (CoC) No. 1004, Renewed Amendment 18, TN Americas LLC (TN) requests alternatives to the American Society of Mechanical Engineers (ASME)
Boiler and Pressure Vessel (B&PV) Code Section III, Division 1, for NG-4323 and for IX QW-191.2.1 to CoC Appendix C, Table C-12 for welder qualification.
The alternatives are requested only for Dry Shielded Canister (DSC) S/N BNP-61BTH-2-F-2H-CH52. No other DSCs are included.
Proposed Alternative CoC 1004 renewed Amendment 18 CoC Condition II.1.b, states that DSCs are designed fabricated, tested, and inspected to the maximum practical extent in accordance with ASME B&PV Code Section III, Division 1, Subsections NB, NF, and NG for Class 1 components and supports. The requested code alternatives provide for an alternative that, in lieu of the requirement for NG-4323 and for IX QW-191.2.1, a full ultrasonic testing (UT) evaluation of the joint may be performed to ensure adequacy of the weld as it relates to qualified welding operators.
Justification The UT examination performed on the fuel compartment tubes for the 61BTH Type 2 DSC (S/N BNP-61BTH-2-F-2H-CH52) was done by a company named RRL NDT Consulting, whose procedure specifications required the use of a calibration block, and a GE transducer, which is equivalent to the #4 Image Quality Indicator (IQI) wire size required in Table T-276 (ASME Section V) for the radiographic testing (RT) examination that the UT is in lieu of.
RRL NDT Consulting has since gone out of business, and the associated procedure qualification record (PQR), is no longer available. However, as part of this submittal, a copy of the certification report for the calibration block used in the inspection is provided as Enclosure 3.
E-64360 Document Control Desk Page 2 of 3 The report details the calibration block configuration and reflectors and shows that it is in accordance with ASME Section V, Article 4, Figure T-434.3-1. The certificate shows that the calibration block is made of Type 316 stainless steel. The fuel compartment tubes that were inspected are made of Type 304 stainless steel. Per the ASNT UT level III inspector that performed the actual inspection, the velocity differences in Type 316 vs. Type 304 stainless steel are negligible in short sound paths such as in 10ga material and the discrepancy in material is permissible.
Also, included as Enclosure 4 of this submittal, is the Ultrasonic Inspection Report performed on the 61 fuel compartment tubes in question (S/N BNP-61BTH-2-F-2H-CH52),
which shows that there were no rejectable identifications found. There was one fuel tube that was fabricated which failed to have sufficient penetration depth in the weld; however, this part was scrapped, and no repair procedure was performed. The information about this rejected part can be found in the Non-Conformance Report (NCR) provided as Enclosure 5.
TN Americas LLC proposed code alternatives added to Appendix C, Table C-12 (ASME NG-4323 and ASME Section IX QW-191.2.1) reflect that the scope of their applicability is limited to a single fabricated DSC (S/N BNP-61BTH-2-F-2H-CH52) and is provided in.
TN believes that these proposed alternatives provide an acceptable level of quality and safety. Additionally, the fabrication of this particular DSC had moved beyond these particular welding steps to an extent that compliance with the specified requirements of the ASME Code would result in unusual difficulty without a compensating increase in the level of quality and safety, based on the proposed alternatives.
Enclosures 3, 4, and 5 contain proprietary information, which may not be used for any purpose other than to support NRC staff review of the proposed code alternative. In accordance with 10 CFR 2.390, an affidavit (Enclosure 1) is provided specifically requesting that this proprietary information be withheld from public disclosure. Because Enclosures 3, 4, and 5 are entirely proprietary, no public versions are provided.
NRC approval is respectfully requested when practical to support future use of this particular 61BTH Type 2 basket. If the NRC staff has any questions regarding this submittal, please contact Mr. Doug Yates at (434) 832-3101, or by email at douglas.yates@orano.group.
Sincerely, Prakash Narayanan Chief Technical Officer cc:
John-Chau Nguyen (NRC-DFM)
E-64360 Document Control Desk Page 3 of 3
Enclosures:
- 1. Affidavit Pursuant to 10 CFR 2.390
- 2. Proposed CoC Appendix C ASME Code Alternatives Table C-12
- 3. Calibration Block Certification Report (Proprietary)
- 4. RRL NDT Consulting Ultrasonic Inspection Report (Proprietary)
- 5. TN Americas LLC Fabrication Nonconformance Report (Proprietary) to E-64360 Page 1 of 1 AFFIDAVIT PURSUANT TO 10 CFR 2.390 State of Maryland:
County of HOWARD:
I, Prakash Narayanan, depose and say that I am Chief Technical Officer of TN Americas LLC, duly authorized to execute this affidavit, and have reviewed or caused to have reviewed the information that is identified as proprietary and referenced in the paragraph immediately below. I am submitting this affidavit in conformance with the provisions of 10 CFR 2.390 of the Commissions regulations for withholding this information.
The information for which proprietary treatment is sought is listed below:
- - Calibration Block Certification Report (Proprietary)
- - RRL NDT Consulting Ultrasonic Inspection Report (Proprietary)
- - TN Americas LLC Fabrication Nonconformance Report (Proprietary)
These documents have been appropriately designated as proprietary.
I have personal knowledge of the criteria and procedures utilized by TN Americas LLC in designating information as a trade secret, privileged, or as confidential commercial or financial information.
Pursuant to the provisions of paragraph (b) (4) of Section 2.390 of the Commissions regulations, the following is furnished for consideration by the Commission in determining whether the information sought to be withheld from public disclosure, included in the above referenced documents, should be withheld.
- 1) The information sought to be withheld from public disclosure involves supporting files, all related to the design and fabrication of the Standardized NUHOMS dry spent fuel storage system, which are owned and have been held in confidence by TN Americas LLC.
- 2) The information is of a type customarily held in confidence by TN Americas LLC, and not customarily disclosed to the public. TN Americas LLC has a rational basis for determining the types of information customarily held in confidence by it.
- 3) Public disclosure of the information is likely to cause substantial harm to the competitive position of TN Americas LLC, because the information consists of descriptions of the design and fabrication of dry spent fuel storage systems, the application of which provide a competitive economic advantage. The availability of such information to competitors would enable them to modify their product to better compete with TN Americas LLC, take marketing or other actions to improve their products position or impair the position of TN Americas LLCs product, and avoid developing similar data and analyses in support of their processes, methods or apparatus.
I declare that the statements set forth in this affidavit are true and correct to the best of my knowledge, information, and belief. I declare under penalty of perjury that the foregoing is true and correct.
Executed on: May 9th, 2025 Prakash Narayanan Chief Technical Officer, TN Americas LLC to E-64360 Page 1 of 1 Proposed CoC Appendix C ASME Code Alternatives Table C-12 Reference ASME Code Section/Article Code Requirement Alternatives, Justification & Compensatory Measures NG-4323 Only welders and welding operators who are qualified in accordance with NG-4323 and Section IX shall be used.
Permit the qualification of the welding operator per Section IX QW-305.1 for DSC S/N BNP-61BTH-2-F-2H-CH52, where a minimum of 3 ft (1 m) length of the first production weld(s) is made entirely by the welding operator in accordance with qualified WPS and examined by volumetric NDE.
This alternative is to apply to mechanized and automated welding only and shall exclude performance qualifications using the GMAW Short Circuit process. Examination shall be per Section IX QW-191. Note that the scope of this alternative applies to DSC S/N BNP-61BTH-2-F-2H-CH52 only.
Mechanized welding has a level of inherent consistency that justifies a less stringent set of essential variables. (See Section IX QW-350 and QW-360 and FORM QW-484A and FORM QW-484B). Mechanized welding is more about the understanding of the operational process than the physical coordination control required for manual welding. Additionally, as per Section IX QW-142, Radiographic or Ultrasonic examination per QW-191 may be substituted for mechanical testing of QW-141 for groove-weld performance qualification as permitted in QW-304 to prove the ability of welders to make sound welds.
Section IX QW-191.2.1 (a) The ultrasonic examination in QW-142 for welders and in QW-143 for welding operators may be conducted on test welds in material 1/4 inch (6 mm) thick or greater.
(b) Ultrasonic examinations shall be performed using a written procedure in compliance with Section V, Article 1, T-150 and the requirements of Section V, Article 4 for methods and procedures.
UT examination shall be qualified per Section V Article 4 for DSC S/N BNP-61BTH-2-F-2H-CH52 and the minimum material thickness shall be limited to 0.08 in. (2 mm).
Indications shall not exceed the lesser of 1/2 the weld thickness or Section IX QW-191.2.2(a)-(b). Qualified thickness limits are per Section IX Table QW-451. Note that the scope of this alternative applies to DSC S/N BNP-61BTH-2-F-2H-CH52 only.
Improvements in UT technology have proven reliable down to 1/8 in. (2mm) in thickness. In Section IX QW-191.2, the minimum material thickness was reduced from 1/2 in. to 1/4 in. in 2017 due to improvements in UT technology and performance.
Additionally, examination acceptance criteria are per Section IX of the Code which is more stringent than NG.
to E-64360 Calibration Block Certification Report (Proprietary)
Withheld Pursuant to 10 CFR 2.390 to E-64360 RRL NDT Consulting Ultrasonic Inspection Report (Proprietary)
Withheld Pursuant to 10 CFR 2.390 to E-64360 TN Americas LLC Fabrication Nonconformance Report (Proprietary)
Withheld Pursuant to 10 CFR 2.390