Ameren Missouris Intent to Adopt Revision 1 to Amendment 0 of Certificate of Compliance No. 1040 as Applicable to the ISFSI at the Callaway Plant Site
ML24178A113
Person / Time
Site: HI-STORM 100, Callaway
Issue date: 06/06/2024
From: Beck J
Ameren Missouri, Callaway Energy Center
To: Manzione K
Holtec, Office of Nuclear Material Safety and Safeguards
References
CAC 001028, EPID L-2023-LLA-0070 UO 2024-0002
Download: ML24178A113 (1)


Text

-

4IfletCli Callaway Plant MISSOURI UO 2024-0002 June 6, 2024 10 CFR 72.212 Kimberly Manzione Director of Licensing NMSS Projects, Holtec International Krishna P. $ingh Technology Campus 1 Holtec Blvd Camden, NJ 08104 AMEREN MISSOURIS INTENT TO ADOPT REVISION 1 TO AMENDMENT 0 OF CERTIFICATE OF COMPLIANCE NO. 1040 AS APPLICABLE TO THE ISFSI AT THE CALLAWAY PLANT SITE Ms. Manzione:

It is our understanding that Holtec International (Holtec) has submitted an updated Revision 1 to Amendment 0 of Certificate of Compliance (CoC) 1040 to remove the exemption from taking dose rate measurement on previously loaded Vertical Ventilated Modules (\\7VM)s. The proposed revision is applicable to the HI-STORM UMAX system and pertains to the dose rate measurements required to be taken on the VVM lid when loading casks for storage. Specifically, the dose rate limit applicable to these measurements would be changed to a new/corrected value in section/Technical Specification 5.3.4 of Appendix A, and the precise locations for where the measurements are to be taken on the lid would also be revised in section/Technical Specification 5.3.8 of Appendix A.

As a general licensee for operation of the HI-STORM UMAX-based independent spent fuel storage installation (ISfSI) located on the site of the Callaway Energy Center (Callaway Plant), Ameren Missouri (Union Electric) is submitting this letter to inform you that we intend to adopt proposed Revision 1 to Amendment 0 of CoC 1040. Ameren will also take measurements at the new locations on all VVMs loaded prior to the effective date of CoC 1040 Amendment 0 Revision 1. This letter serves as documentation of our voluntary adoption and support of the revision. It is also our understanding that a 180-day implementation period has been requested for implementation the CoC revision by general licensees.

$315 County Road 459 Steedman, MO 65077 AmerenMissouri.com

UO 2024-0002 Date June 6, 2024 Page 2 of 2 Please let us know of any changes made to the proposed CoC revision, if any, after submittal to the NRC. For any questions or to provide any additional information following this letter, please contact Tom Elwood at 314-225-1905.

cc:

Mauricio Ahumada, Holtec International Index and send hardcopy to QA File A160.0802 Electronic distribution for the following: