ML23069A286
Letter Sequence Request | |
---|---|
CAC:001028, (Approved, Closed) EPID:L-2022-LLA-0079, Tn America, LLC, Application for Amendment 18 to Standardized NUHOMS Certificate of Compliance No. 1004 for Spent Fuel Storage Casks, Revision 0 (Approved, Closed) | |
Initiation
Administration Questions
Answers Results
Other: L-23-005, Independent Spent Fuel Storage Installation License Renewal Application, Revision 1 (Cac/Epid No. 001028/L-2022-RNW-0007), ML19150A559, ML19182A107, ML20002A442, ML20009D008, ML20010D564, ML20015A450, ML20015A451, ML20015A454, ML20028E845, ML20028E846, ML20049A082, ML20052E146, ML20052E154, ML20065N281, ML20071F156, ML20076D696, ML20099A180, ML20104C015, ML20104C018, ML20104C019, ML20105A135, ML20105A136, ML20105A137, ML20105A138, ML20105A139, ML20105A173, ML20111A240, ML20136A050, ML20136A051, ML20150A335, ML20150A421, ML20155K741, ML20155K743, ML20155K744, ML20161A088, ML20163A702, ML20163A703, ML20163A704, ML20181A211, ML20181A212, ML20192A328, ML20192A329, ML20212L768, ML20212L769, ML20261H420, ML20269A259, ML20279A577, ML20279A586, ML20289A493... further results | |
MONTHYEARML20052D9362018-07-0303 July 2018
[Table View]Response to Nrg Request for Additional Information (RAI) Regarding NAC Magnastor Cask Loaded to Incorrect Helium Backfill Density Project stage: Request ML18267A2142018-08-29029 August 2018, 25 September 2018 Package: Summary of August 29, 2018, Public Meeting with Interim Storage Partners to Discuss Consolidated Emergency Response Plan for Its Proposed WCS Consolidated Interim Storage Facility (W/Enclosure 1 and 2) Project stage: Request ML18267A2112018-09-25025 September 2018 Memorandum to A. Rivera-Varona Summary of August 29, 2018, Public Meeting with Interim Storage Partners to Discuss Consolidated Emergency Response Plan for Its Proposed WCS Consolidated Interim Storage Facility (W/Enclosure 1 and 2) Project stage: Meeting ML18320A1842018-11-16016 November 2018 Letter to J. Isakson Interim Storage Partners' License Application to Construct and Operate the Waste Control Specialists Consolidated Interim Storage Facility, Andrews County, Texas, Dkt No. 72-1050 - First RAI, Part 1 (W/Enclosure 1) Project stage: RAI ML19032A2302019-02-0404 February 2019 Summary of Closed Public Meeting to Discuss RAI Issued in Connection with Nrc'S Review of the Interim Storage Partner Consolidated Isfs Application for a Facility at Andrews County, Texas (W/Encl. 1&2) Project stage: RAI ML19065A0192019-03-0606 March 2019 Letter to J. Isakson Interim Storage Partners Llc'S License Application to Construct and Operate the WCS Consolidated Interim Storage Facility, Andrews County, Texas, Docket No. 72.1050 - First Request for RAI Part 2 (W/Enclosure 1) Project stage: RAI ML19072A1562019-03-14014 March 2019 Summary of Partially Closed Public Meeting to Discuss Request for Additional Information Issued in Connection with Nrc'S Review of the ISP Cisf Application for a Facility at Andrew'S County, Tx (W/Encl. 1&2) Project stage: RAI ML19126A0682019-04-0303 April 2019, 6 May 2019 Summary of April 16, 2019, Partially Closed Public Meeting to Discuss RAI Issued in Connection with Nrc'S Review of the ISP Consolidated Isf Application for a Facility at Andrews County, Texas Project stage: Request ML19105B2172019-04-19019 April 2019 Memorandum to C. Regan Summary of March 20, 2019, Public Meeting to Discuss Request for Additional Information Issued in Connection with Nrc'S Review of the Interim Storage Partners Consolidated Isf Application (W/Enclosures 1 and 2) Project stage: RAI ML19120A4282019-04-23023 April 2019 Letter to J. Isakson Interim Storage Partners Llc'S License Application to Construct and Operate the Waste Control Specialists Consolidated Interim Storage Facility, Andrews County, Texas, Dkt No. 72-1050 - First RAI (W/Enclosure) Project stage: RAI ML19126A0662019-05-0606 May 2019 Memorandum to C. Regan Summary of April 16, 2019, Partially Closed Public Meeting to Discuss RAI Issued in Connection with Nrc'S Review of the ISP Consolidated Isf Application for a Facility at Andrews County, Texas (W/Enclosure 1 & 2) Project stage: RAI ML20015A4502019-05-31031 May 2019 Sprint Andrews County Disposal Facility, Andrews County, Texas- Railroad Commission of Texas Commercial Processing and Disposal Facility Permit Application Project stage: Other ML19150A5592019-06-0303 June 2019 Letter to J. Isakson Site Audit Plan for Interim Storage Partners Proposed Application for a Site-Specific License of an Away-from-Reactor Independent Spent Fuel Storage Installation Project stage: Other ML19182A1072019-07-0101 July 2019 Letter to J. Isakson Interim Storage Partners Llc'S Application for a Specific ISFSI for the Waste Control Specialists Consolidated Interim Storage Facility for Spent Nuclear Fuel - Revised Review Schedule Project stage: Other ML20015A4512019-08-22022 August 2019 Report No. R1432-01, Acoustical Analysis of ISP Cisf Project stage: Other ML20015A4542019-11-30030 November 2019 Socioeconomic Impacts of the Proposed Spent Nuclear Fuel Consolidated Interim Storage Facility, Andrews County, Texas, Revision 5 Project stage: Other ML19357A1762019-12-18018 December 2019 NAC International - Submission of a Request to Renew the U.S. Nuclear Regulatory Commission Certificate of Compliance No. 1025 for the NAC-MPC Cask System Project stage: Request ML19354A7142019-12-20020 December 2019 Approval of Tn America Request for Withholding Information from Public Disclosure for Coc 1029 Renewal Request for Supplemental Information Responses (CAC No. 001028) Project stage: Withholding Request Acceptance ML20002A4422019-12-20020 December 2019 International _Affidavit Project stage: Other ML19360A0472019-12-26026 December 2019 Internationals Application for Specific Independent Spent Fuel Storage Installation License for the Hi-Store Consolidated Interim Storage Facility for Spent Nuclear Fuel - Request for Clarification of Responses Related to Emergency Response Project stage: Approval ML20009D0512020-01-0606 January 2020 Notification of NRC Acceptance of the Standardized Advanced NUHOMS CoC 1029 Renewal Application for Review Project stage: Acceptance Review ML20009D0082020-01-0606 January 2020 Acknowledgement of NRC Receipt of CoC 1025 (NAC-MPC) Renewal Application Project stage: Other ML20015A4522020-01-0606 January 2020 Interim Storage Partners LLC - Submittal of Supplemental Information in Support of RAI, Part 3 - Clarification Related to the Response to RAI AQ-6 Project stage: Supplement ML19354B6372020-01-0707 January 2020 Exemption Request for NAC Magnastor Cask Loaded to Incorrect Helium Backfill Density Request for Additional Information Project stage: RAI ML20010D5642020-01-10010 January 2020 Proprietary Determination Letter for HI-STAR 100 CoC Renewal Submittals Project stage: Other ML20028E8462020-01-17017 January 2020 Enclosure 3 - RAIs and Responses Project stage: Other ML20028E8452020-01-17017 January 2020 Enclosure 1 - Affidavits Project stage: Other ML20031D0562020-01-29029 January 2020 Interim Storage Partners, LLC - Submittal of ISP Updated Draft Responses for Rals NP-8-1, NP-8-2 and Associated SAR Markups from First Request for Additional Information, Part 2, Docket 72-1050 Cac/Epid 001028/L-2017-NEW-0002 Project stage: Draft Request ML20049A0822020-01-31031 January 2020 International - HI-STORM 100 Storage CoC Renewal Application Project stage: Other ML20049A0812020-01-31031 January 2020 Holtec International - HI-STORM 100 Storage CoC Renewal Application Project stage: Request ML20034E8352020-02-0303 February 2020 Letter-Materials Request for Additional Information Clarification with Enclosure Project stage: RAI ML20034E9872020-02-11011 February 2020 Meeting Summary - Meeting with Westinghouse Electric Company, LLC, Pre-Application Amendment No. 5 of Storage CoC No. 1026 for the Fuelsolutions Spent Fuel Management System, November 21, 2019 Project stage: Meeting ML20052D9962020-02-14014 February 2020 Interim Storage Partners, LLC - Submission of ISP Responses for RAIs and Associated Document Markups from First Request for Additional Information, Part 2, Docket 72-1050 Cac/Epid 001028/L-2017-NEW-0002 Project stage: Request ML20052E1462020-02-17017 February 2020 Interim Storage Partners, LLC - Submittal of Revision 3 of the Environmental Report for the WCS CISF, Docket 72-1050 Cac/Epid 001028/L-2017-NEW-0002 Project stage: Other ML20052E1542020-02-17017 February 2020 WCS Consolidated Interim Spent Fuel Storage Facility Environmental Report, Revision 3 - Part 2 of 3 Project stage: Other ML20064F6162020-02-29029 February 2020 January 15, 2020, Summary of Meeting with Holtec International, Inc., to Discuss the Upcoming Submittal of the Application for Renewal of the Storage Certificate of Compliance No. 1014 for the HI-Storm 100 Cask System Project stage: Meeting ML20063M0152020-03-0303 March 2020 HI-STORM 100 Renewal Presubmittal Meeting (Holtec Slides, 1-15-20) Project stage: Meeting ML20064E6222020-03-0303 March 2020 U.S. Nuclear Regulatory Commission Approval of NAC International Request for Withholding Information from Public Disclosure for Coc 1025 Renewal (CAC No. 001028) Project stage: Withholding Request Acceptance ML20071F1562020-03-0505 March 2020 Interim Storage Partners, LLC - Affidavit Project stage: Other ML20065J4272020-03-0505 March 2020 Submittal of Renewal Application for the TN-32 Dry Storage Cask - CoC 1021 Project stage: Request ML20071F1532020-03-0505 March 2020 Interim Storage Partners, LLC - Supplemental Information in Support of NRCs Environmental Review Project stage: Supplement ML20071J0552020-03-0505 March 2020 Notice of Cancelled Meeting with the U.S. Department of Energy, Idaho Operations Office to Discuss the Upcoming Submittal of the Application for Renewal of the Idaho Spent Fuel Facility License (SNM-2512) Project stage: Meeting ML20066K5782020-03-0606 March 2020 Acceptance Review of Request for Amendment No. 7 to Certificate of Compliance No. 1032 for the HI-STORM Flood/Wind Multipurpose Canister Storage System Project stage: Acceptance Review ML20065L3442020-03-0606 March 2020 Amendment No. 15 to Certificate of Compliance No. 1014 for the Hi-Storm 100 Multipurpose Canister Storage System - Request for Additional Information Project stage: RAI ML20065N2812020-03-0909 March 2020 ISFSI Preamble-License Renewal Order Project stage: Other ML20076D6962020-03-11011 March 2020 Interim Storage Partners, LLC - Submittal of Clarifications to Support NRCs Continued Review of the Safety Case for the WCS CISF Project stage: Other ML20104C0202020-03-30030 March 2020 International - HI-STORM Umax Amendment 4 Responses to Requests for Additional Information - Supplemental Information Project stage: Supplement ML20104C0152020-03-30030 March 2020 International - Amendment No. 4 to the HI-STORM Umax Canister Storage System Project stage: Other ML20104C0182020-03-30030 March 2020 International - HI-STORM Umax Amendment 4 FSAR - Changed Pages Project stage: Other ML20104C0192020-03-30030 March 2020 International - Affidavit for Kimberly Manzione Project stage: Other 2019-07-01 |
ML23069A286 | |
Person / Time | |
---|---|
Site: | 07201004 |
Issue date: | 01/20/2023 |
From: | Orano TN Americas |
To: | Office of Nuclear Material Safety and Safeguards |
Shared Package | |
ML23020A920 | List: |
References | |
E-61864, EPID L-2022-LLA-0079, CAC 001028 | |
Download: ML23069A286 (1) | |
Similar Documents at 07201004 | |
---|---|
Category:License-Application for Dry Cask ISFSI DKT 72
MONTHYEARML24310A0972024-11-0505 November 2024
[Table view]Tn Americas, LLC, Proposed Certificate of Compliance No. 1004 Amendment 19, Revision 0 Markup ML24310A0982024-11-0505 November 2024 Tn Americas, LLC, Application for Amendment 19 to Standardized NUHOMS Certificate of Compliance No. 1004 for Spent Fuel Storage Casks, Revision 0 ML23069A2852023-01-20020 January 2023 Blended Cement Impact Evaluation on Renewed CoC 1004 ML23069A2862023-01-20020 January 2023 Description of Amendment 18 Changes Not Related to Request for Additional Information ML23069A2872023-01-20020 January 2023 Amendment 18 to Standardized NUHOMS Certificate of Compliance No. 1004 for Spent Fuel Storage Casks Non-Proprietary Safety Analysis Report Page Changes RA-22-0261, Independent Spent Fuel Storage Installation (ISFSI) Registration for Use of General License Spent Fuel Casks2022-09-15015 September 2022 Independent Spent Fuel Storage Installation (ISFSI) Registration for Use of General License Spent Fuel Casks ML20308A4942020-12-21021 December 2020 Proposed CoC 1004 Amendment No. 17 Appendix C ML20308A4922020-12-21021 December 2020 Proposed CoC 1004 Amendment No. 17 Appendix B Figures ML20308A4912020-12-21021 December 2020 Proposed CoC 1004 Amendment No. 17 Appendix B Tables ML20308A4902020-12-21021 December 2020 Proposed CoC 1004 Amendment No. 17 Appendix B Text ML20308A4892020-12-21021 December 2020 Proposed CoC 1004 Amendment No. 17 Appendix B Table of Content ML20308A4882020-12-21021 December 2020 Proposed CoC 1004 Amendment No. 17 Appendix a 3F0118-02, 30-Day Spent Fuel Cask Registration and Certification of Permanent Removal of All Spent Fuel Assemblies from the Spent Fuel Pools2018-01-15015 January 2018 30-Day Spent Fuel Cask Registration and Certification of Permanent Removal of All Spent Fuel Assemblies from the Spent Fuel Pools L-17-328, Spent Fuel Storage Casks Registration2017-11-13013 November 2017 Spent Fuel Storage Casks Registration L-17-316, Spent Fuel Storage Casks Registration2017-10-31031 October 2017 Spent Fuel Storage Casks Registration 3F1017-01, 30-Day Spent Fuel Cask Registration2017-10-16016 October 2017 30-Day Spent Fuel Cask Registration BSEP 17-0076, Registration for Use of General License Spent Fuel Casks2017-09-0606 September 2017 Registration for Use of General License Spent Fuel Casks NMP1L3167, General License 30-Day Cask Registration Notification and Thermal Performance Assessment2017-07-0707 July 2017 General License 30-Day Cask Registration Notification and Thermal Performance Assessment PLA-7521, Registration for the Use of Dry Fuel Storage Module D-16 and Thermal Performance Assessment2016-09-29029 September 2016 Registration for the Use of Dry Fuel Storage Module D-16 and Thermal Performance Assessment RNP-RA/16-0075, ISFSI - Registration of Use of Two Spent Fuel Casks2016-09-13013 September 2016 ISFSI - Registration of Use of Two Spent Fuel Casks ML16238A1692016-08-25025 August 2016 Registration of Use of Casks to Store Spent Fuel ONS-2016-056, Registration for Use of General License Spent Fuel Cask Numbers 139 and 1402016-06-30030 June 2016 Registration for Use of General License Spent Fuel Cask Numbers 139 and 140 BSEP 16-0041, Independent Spent Fuel Storage Installation (ISFSI) Registration for Use of General License Spent Fuel Cask2016-06-0606 June 2016 Independent Spent Fuel Storage Installation (ISFSI) Registration for Use of General License Spent Fuel Cask BSEP 16-0036, Registration for Use of General License Spent Fuel Cask2016-05-12012 May 2016 Registration for Use of General License Spent Fuel Cask PLA-7395, Registration for the Use of Dry Fuel Storage Module E-132015-10-26026 October 2015 Registration for the Use of Dry Fuel Storage Module E-13 ONS-2015-093, Registration for Use of General License Spent Fuel Cask Number 1382015-08-24024 August 2015 Registration for Use of General License Spent Fuel Cask Number 138 ML15233A1562015-08-21021 August 2015 Registration of Use of Casks to Store Spent Fuel ML15216A3702015-07-28028 July 2015 ISFSI - General License 30-day Cask Registration Notification and Thermal Performance Assessment ML15204A0082015-07-23023 July 2015 Registration of Use of Casks to Store Spent Fuel ONS-2015-080, Registration for Use of General License Spent Fuel Cask Numbers 136 and 1372015-07-16016 July 2015 Registration for Use of General License Spent Fuel Cask Numbers 136 and 137 PLA-7276, Registration for the Use of Dry Fuel Storage Module D-102015-01-13013 January 2015 Registration for the Use of Dry Fuel Storage Module D-10 PLA-7260, Registration for the Use of Dry Fuel Storage Module D-92014-12-11011 December 2014 Registration for the Use of Dry Fuel Storage Module D-9 PLA-7258, Registration for the Use of Dry Fuel Storage Module E-102014-12-0303 December 2014 Registration for the Use of Dry Fuel Storage Module E-10 PLA-7251, Registration for the Use of Dry Fuel Storage Module E-82014-11-0606 November 2014 Registration for the Use of Dry Fuel Storage Module E-8 BSEP 14-0098, Independent Spent Fuel Storage Installation (ISFSI) - Registration and Use of Casks to Store Spent Fuel2014-08-28028 August 2014 Independent Spent Fuel Storage Installation (ISFSI) - Registration and Use of Casks to Store Spent Fuel ML14239A4962014-08-22022 August 2014 General License 30-day Cask Registration Notification and Thermal Performance Assessment ONS-2014-106, Registration for Use of General License Spent Fuel Cask Number 1342014-07-31031 July 2014 Registration for Use of General License Spent Fuel Cask Number 134 RS-14-219, Registration of Use of Casks to Store Spent Fuel2014-07-14014 July 2014 Registration of Use of Casks to Store Spent Fuel ML13261A3032013-09-12012 September 2013 ISFSI - General License 30-day Cask Registration Notification and Thermal Performance Assessment ML0926502932009-09-11011 September 2009 Independent Spent Fuel Storage Installation - Cask Registration for Spent Fuel Storage PLA-6560, Registration for the Use of Dry Fuel Storage Module B-172009-09-10010 September 2009 Registration for the Use of Dry Fuel Storage Module B-17 ML0906505962009-02-26026 February 2009 Registration for Use of General License Spent Fuel Cask Number 104 PLA-6456, PPL Susquehanna, LLC - Registration for the Use of Dry Fuel Storage Module B2008-11-24024 November 2008 PPL Susquehanna, LLC - Registration for the Use of Dry Fuel Storage Module B PLA-6444, Registration for the Use of Dry Fuel Storage Module B-14 PLA-64442008-10-30030 October 2008 Registration for the Use of Dry Fuel Storage Module B-14 PLA-6444 ML0825200152008-09-0303 September 2008 Registration for Use of General License Spent Fuel Cask Number 101 PLA-5955, Registration for the Use of Dry Fuel Storage Module B-6 - PLA-59552005-09-19019 September 2005 Registration for the Use of Dry Fuel Storage Module B-6 - PLA-5955 PLA-5947, Registration for the Use of Dry Fuel Storage Module B-52005-09-15015 September 2005 Registration for the Use of Dry Fuel Storage Module B-5 RA-05-0089, Independent Spent Fuel Storage Installation, Registration of Use of Spent Fuel Casks2005-09-0606 September 2005 Independent Spent Fuel Storage Installation, Registration of Use of Spent Fuel Casks ML0510102832005-03-11011 March 2005 Submittal of Registration for Independent Spent Fuel Storage Installation Casks and Notification of Thermal Performance for First System in Place PLA-5830, Registration for the Use of Dry Fuel Storage Module C-8 PLA-58302004-11-18018 November 2004 Registration for the Use of Dry Fuel Storage Module C-8 PLA-5830 2024-11-05 |
Text
Enclosure 7 to E-61864 Page 1 of 1 DESCRIPTION OF AMENDMENT 18 CHANGES NOT RELATED TO RAIs INTRODUCTION The scope of Amendment 18 to the Standardized NUHOMS Certificate of Compliance (CoC)
No. 1004 has been modified as described below.
Change No. 1:
An additional scope item has been added to allow use of a blended Portland-Limestone cement that would be certified to the requirements of ASTM C595. The reason for this change is that the cement supplier, as of January 2023, will no longer provide cement in accordance with ASTM C150 as the supplier is transitioning to a cement with a smaller carbon footprint that includes 10%
limestone. This change supports continued HSM fabrication activities.
In support of this additional scope, changes have been made to UFSAR Sections 4.2, Storage Structures; 4.10, References; P.4.4.8, Evaluation of HSM-H Performance; Chapters R.3, Evaluation of HSM Model 152 Concrete Components with Temperature exceeding Code Limits; R.4, Evaluation of HSM Model 152 Concrete Temperatures; V.3, Evaluation of HSM Model 202 Concrete Components with Temperature exceeding Code Limits; and V.4, Table V.4-2 Notes.
Change No. 2:
An editorial correction has been made to delete a duplicate word (the) in the revised table notes associated with Appendix B Technical Specifications Section 3.1.3 as provided in the initial submittal.
Change No. 3:
In support of the submittal associated with Amendment 16, Revision 6 (see ML19255E934), the response associated with Request for Additional Information (RAI) Sh-1 deleted certain notes (examples) that were no longer applicable to Technical Specification (TS) Fuel Qualification Tables 1-7k and 1-7m. The examples themselves were deleted, but the lead-in sentences before the deleted examples were inadvertently not deleted as intended. Accordingly, the sentences below the bullets have been deleted from the Notes for Tables 1-7k and 1-7m to correct this.