ML23069A237

From kanterella
Jump to navigation Jump to search

Attachment 8: HI-STORM 100 Amendment 19 CoC Reorganization Evaluation Form
ML23069A237
Person / Time
Site: Holtec
Issue date: 03/10/2023
From:
Holtec
To:
Office of Nuclear Material Safety and Safeguards
Shared Package
ML23069A227 List:
References
CAC 001028, CoC No. 1014, EPID L-2022-LLA-0028, 5014959
Download: ML23069A237 (1)


Text

Holtec Letter 5014959 Attachment 8 CoC Condition/Technical Specification Evaluation Form - CoC original the probability of a cask drop would occur if these heavy load handing procedures are not followed.

The possibility of a new or No different kind of accident being created compared to those previously evaluated in the FSAR?

A Significant reduction in No the margin of safety for ISFSI or cask operation?

Evaluation Summary Based on this evaluation these Heavy Load Requirements should be moved to Section 4 of Appendixes B, D, and B-100U - Administrative Controls. Note that this administrative control is applicable to heavy load lifting procedures at the ISFSI. Lifts within the Reactor Building are governed by existing 10 CFR Part 50 license requirements.

However, Appendix B-100U is not being updated at this time. So, to avoid complicating the relationships between the CoC main body and the Appendixes, these requirements will remain in the CoC main body for now.

Page 16 of 35 1 of 3

Holtec Letter 5014959 Attachment 8 CoC Condition/Technical Specification Evaluation Form - CoC original training exercises ensure that the equipment will operate and perform safety functions as designed.

The specifics of dry run training should be performed by the general licensee prior to initial use of the system to load spent fuel. In addition, the general license's training program is subject to NRC inspection.

However, Appendix B-100U is not being updated at this time. So, to avoid complicating the relationships between the CoC main body and the Appendixes, these requirements will remain in the CoC main body for now.

Page 25 of 35 2 of 3

Holtec Letter 5014959 Attachment 8 CoC Condition/Technical Specification Evaluation Form - CoC original and Surveillance Requirements (SRs)

(Selection Criteria)

Section 4 Administrative No Controls A significant increase in No the probability or consequences of an accident previously evaluated in the cask Risk Insight**:

FSAR?

Will removing The possibility of a new or No this different kind of accident requirement being created compared from the CoC/TS to those previously result in evaluated in the FSAR?

A Significant reduction in Yes - if the site 72.212 evaluations are not updated the margin of safety for appropriately when the CoC is renewed, the 72.212 ISFSI or cask operation? may be missing up-to-date information important to safety conclusions.

Evaluation Summary Move to Appendix A, C, and A-100U Section 2 as this information important to the site-specific 72.212 evaluations.

Page 33 of 35 3 of 3