Letter Sequence Request |
---|
CAC:001028, (Approved, Closed) EPID:L-2021-LLA-0053, License Amendment Request to Revise ISFSI Technical Specification 4.4 to Allow Use of a Code Alternative to ASME Code, NB-5130, Examination of Weld Edge Preparation Surfaces, for the TN-40HT (Approved, Closed) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, ... further results|Request]]
- Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement
Administration
- Withholding Request Acceptance, Withholding Request Acceptance
- Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting
Results
- Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, ... further results|Approval]]
Other: L-23-005, Independent Spent Fuel Storage Installation License Renewal Application, Revision 1 (Cac/Epid No. 001028/L-2022-RNW-0007), ML19276D398, ML20014E677, ML20065N277, ML20065N278, ML20065N280, ML20065N281, ML20065N285, ML20071F156, ML20076D696, ML20094G482, ML20099A180, ML20104C015, ML20104C016, ML20104C018, ML20104C019, ML20105A135, ML20105A136, ML20105A137, ML20105A138, ML20105A139, ML20105A173, ML20111A240, ML20115E377, ML20136A049, ML20136A050, ML20136A051, ML20150A300, ML20150A335, ML20150A421, ML20155K741, ML20155K742, ML20155K743, ML20155K744, ML20160A040, ML20161A088, ML20163A702, ML20163A703, ML20163A704, ML20181A211, ML20181A212, ML20192A328, ML20192A329, ML20212L768, ML20212L769, ML20212L878, ML20223A036, ML20224A287, ML20260H376, ML20261H420... further results
|
MONTHYEARML20115E3782019-10-0303 October 2019 Independent Spent Fuel Storage Installation Exemption Safety Evaluation Report Project stage: Approval ML19276D3982019-10-0303 October 2019 Exemption Request to Load and Store Spent Fuel in HI-STORM FW Spent Fuel Casks Utilizing Amendment 1, Revision 1 to CoC No. 1032 Project stage: Other ML20014E6772020-01-0909 January 2020 Fws List of Threatened and Endangered Species That May Occur with Respect to the McGuire Exemption Request Project stage: Other ML20015A3142020-01-14014 January 2020 Package: Exemption Request McGuire Nuclear Facility Project stage: Request ML20049A0812020-01-31031 January 2020 Holtec International - HI-STORM 100 Storage CoC Renewal Application Project stage: Request ML20055F3372020-02-20020 February 2020 Conversation Record - Clarification Call (02/20/2020) on RAI 1 for CoC 1040 Umax Amendment 4 Project stage: RAI ML20064F6162020-02-29029 February 2020 January 15, 2020, Summary of Meeting with Holtec International, Inc., to Discuss the Upcoming Submittal of the Application for Renewal of the Storage Certificate of Compliance No. 1014 for the HI-Storm 100 Cask System Project stage: Meeting ML20064E6222020-03-0303 March 2020 U.S. Nuclear Regulatory Commission Approval of NAC International Request for Withholding Information from Public Disclosure for Coc 1025 Renewal (CAC No. 001028) Project stage: Withholding Request Acceptance ML20063M0152020-03-0303 March 2020 HI-STORM 100 Renewal Presubmittal Meeting (Holtec Slides, 1-15-20) Project stage: Meeting ML20071F1562020-03-0505 March 2020 Interim Storage Partners, LLC - Affidavit Project stage: Other ML20065K2162020-03-0505 March 2020 Notice of Meeting with U.S. Department of Energy, Idaho Operations Office to Discuss the Upcoming Submittal of the Application for Renewal of the Idaho Spent Fuel Facility License (SNM-2512) Project stage: Meeting ML20071J0552020-03-0505 March 2020 Notice of Cancelled Meeting with the U.S. Department of Energy, Idaho Operations Office to Discuss the Upcoming Submittal of the Application for Renewal of the Idaho Spent Fuel Facility License (SNM-2512) Project stage: Meeting ML20071F1532020-03-0505 March 2020 Interim Storage Partners, LLC - Supplemental Information in Support of Nrc'S Environmental Review Project stage: Supplement ML20065L3442020-03-0606 March 2020 Amendment No. 15 to Certificate of Compliance No. 1014 for the Hi-Storm 100 Multipurpose Canister Storage System - Request for Additional Information Project stage: RAI ML20066K5782020-03-0606 March 2020 Acceptance Review of Request for Amendment No. 7 to Certificate of Compliance No. 1032 for the HI-STORM Flood/Wind Multipurpose Canister Storage System Project stage: Acceptance Review ML20065N2852020-03-0909 March 2020 ISFSI Renewed Technical Specifications Project stage: Other ML20065N2772020-03-0909 March 2020 ISFSI Renewal Cover Letter Project stage: Other ML20065N2812020-03-0909 March 2020 ISFSI Preamble-License Renewal Order Project stage: Other ML20076D6962020-03-11011 March 2020 Interim Storage Partners, LLC - Submittal of Clarifications to Support Nrc'S Continued Review of the Safety Case for the WCS CISF Project stage: Other ML20065N2782020-03-11011 March 2020 ISFSI FRN Notice of Issuance for License Renewal Project stage: Other ML20071D9942020-03-11011 March 2020 Submittal of HI-STAR 100 Updated FSAR, Revision 4 Project stage: Request ML20104C0152020-03-30030 March 2020 International - Amendment No. 4 to the HI-STORM Umax Canister Storage System Project stage: Other ML20104C0202020-03-30030 March 2020 International - HI-STORM Umax Amendment 4 Responses to Requests for Additional Information - Supplemental Information Project stage: Supplement ML20104C0162020-03-30030 March 2020 International - Proposed HI-STORM Umax CoC Amendment 4 Appendix a - Changed Pages Project stage: Other ML20104C0182020-03-30030 March 2020 International - HI-STORM Umax Amendment 4 FSAR - Changed Pages Project stage: Other ML20104C0192020-03-30030 March 2020 International - Affidavit for Kimberly Manzione Project stage: Other ML20091L0642020-03-31031 March 2020 Enclosure 1 - Request for Additional Information - Non-Proprietary Project stage: RAI ML20104C0482020-03-31031 March 2020 International - HI-STORM Umax Amendment 3 Responses to Requests for Additional Information Project stage: Response to RAI ML20091L0632020-03-31031 March 2020 Transmittal Letter - CoC 1042 Amendment Number 2 Request for Additional Information Project stage: RAI ML20105A1352020-03-31031 March 2020 Enclosure 1 - Affidavits Project stage: Other ML20065N2802020-03-31031 March 2020 ISFSI License Renewal SER Project stage: Other ML20101P3992020-03-31031 March 2020 Interim Storage Partners, LLC - Submittal of Draft Responses for Several Rals and Associated Document Markups from First Request for Additional Information, Parts 1, 2 and Clarifications Project stage: Draft Request ML20105A1732020-04-0606 April 2020 Interim Storage Partners, LLC - Affidavits Project stage: Other ML20099A1802020-04-0606 April 2020 Application for Renewal of the Certificate of Compliance No. 1014 for the Hi-Storm 100 Storage Cask System Accepted for Review (Cac/Epid Nos. 001028/L-2020-RNW-0007) Project stage: Other ML20105A1392020-04-0707 April 2020 Enclosure 8 - Referenced Documents Project stage: Other ML20105A1372020-04-0707 April 2020 Enclosure 5 - La Changed Pages Project stage: Other ML20105A1342020-04-0707 April 2020 Submission of ISP Responses for RAIs and Associated Document Markups from First Request for Additional Information, Parts 2, 3, and 4 Project stage: Request ML20105A1722020-04-0707 April 2020 Interim Storage Partners, LLC - Submittal of Supplemental Information in Support of RAI, Part 3 Project stage: Supplement ML20105A1362020-04-0707 April 2020 Enclosure 3 - RAIs and Responses Project stage: Other ML20105A1382020-04-0707 April 2020 Enclosure 7 - SAR Changed Pages Project stage: Other ML20100F2952020-04-0909 April 2020 Tn Americas LLC - Submittal of Renewal Application for the TN-68 Dry Storage Cask - CoC 1027 Project stage: Request ML20104A0402020-04-10010 April 2020 Request for Additional Information for HI-STAR 100 CoC Renewal Application Project stage: RAI ML20111A2392020-04-13013 April 2020 Attachment 1: HI-STORM Umax Amendment 4 RAI Supplemental Response (non-proprietary) Project stage: Supplement ML20111A2382020-04-13013 April 2020 International - HI-STORM Umax Amendment 4 Responses to Requests for Additional Information - Supplemental Information Project stage: Supplement ML20111A2402020-04-13013 April 2020 Attachment 2: Proposed HI-STORM Umax CoC Amendment 4 Appendix a - Changed Pages (non-proprietary) Project stage: Other ML20094G4822020-04-15015 April 2020 GEH-Morris QAP Rev 4 Approval Project stage: Other ML20092L1732020-04-17017 April 2020 Safety Evaluation Report for the Pacific Gas and Electric Company Humboldt Bay Independent Spent Fuel Storage Installation Quality Assurance Plan HBI-L6 Revision 0 Project stage: Approval ML20128J2922020-04-27027 April 2020, 28 April 2020 International, Submittal of Responses to Nrc,S 1st Round RAIs for HI-STORM 100 Amendment Number 15 Project stage: Request ML20128J2932020-04-28028 April 2020 International, Submittal of Responses to Nrc,S 1st Round RAIs for HI-STORM 100 Amendment Number 15 Project stage: Request ML20120A2282020-04-29029 April 2020 Tn Americas LLC, Response to the Request for Additional Information to Application for Certificate of Compliance No. 1042, Amendment No. 2, to NUHOMS Eos System, (Docket No. 72-1042, CAC No. 001028 EPID: L-2019-LLA-0078)- Request for Extens Project stage: Request 2020-03-06
[Table View] |
|
---|
Category:Report
MONTHYEARML24100A0322024-04-0808 April 2024 Attachment 4: HI-STORM FW FSAR Proposed Revision 10L, Changed Pages ML24079A3202024-03-11011 March 2024 Attachment 1 - Conversation Record HI-STORM FW Storage System Amendment 7: Structural Clarification Questions ML24018A0852024-01-31031 January 2024 Safety Determination of a Potential Structural Failure of the Full Basket During Accident Conditions for the HI-STORM 100 and HI-STORM Flood/Wind Dry Cask Storage Systems ML23321A2472023-11-17017 November 2023 Attachment 1: Holtec International - Summary of Additional Clarifications/Changes Submitted for Review ML23170A0292023-06-19019 June 2023 International, Final Safety Analysis Report on the HI-Storm FW MPC Storage System ML23072A4292023-03-13013 March 2023 Attachment 2: Holtec International, HI-STORM 100 Amendment 9 CoC Reorganization ML22258A2582022-09-15015 September 2022 International, HI-STORM FW FSAR Proposed Revision 10D, Changed Pages ML22258A2532022-09-15015 September 2022 International, MPC-37P Bect Alternatives Write-up ML22258A2562022-09-15015 September 2022 International, HI-STORM FW Amendment 7 Certificate of Compliance Appendix B, Changed Pages ML22210A1482022-07-29029 July 2022 Attachment 2: Updated Summary of Proposed Changes (non-proprietary) ML22210A1502022-07-29029 July 2022 Attachment 4: HI-STORM FW FSAR Proposed Revision 10C, Changed Pages (non-proprietary) ML22210A1492022-07-29029 July 2022 Attachment 3: HI-STORM FW FSAR Proposed Revision 10C, Changed Pages ML21288A5282021-10-15015 October 2021 Attachment 6: HI-STORM FW FSAR Proposed Revision 10A, Changed Pages ML21211A6122021-07-30030 July 2021 Attachment 3: Proposed Changed Page of HI-STORM FW FSAR ML21155A0292021-06-0404 June 2021 Corrected Attachment 6: Proposed Rev. 9 to Report HI-2114830 ML20356A3322020-12-21021 December 2020 Attachment 4 - Acceptance Tests and Maintenance ML20280A7772020-10-0606 October 2020 List of Previous Holtec Applications Which Justify Use of Q/I ML20225A1962020-08-12012 August 2020 Attachment 6: HI-STORM FW FSAR Proposed Revision 7 Revised Pages (non-proprietary) ML20225A1912020-08-12012 August 2020 Attachment 1: HI-STORM FW Amendment 7 Summary of Proposed Changes ML20205L5972020-08-10010 August 2020 Transmittal Letter: Application for the Model Hi-Storm FW Storage System, Amendment No. 6 - Accepted for Review 2024-04-08
[Table view] Category:Technical
MONTHYEARML24100A0322024-04-0808 April 2024 Attachment 4: HI-STORM FW FSAR Proposed Revision 10L, Changed Pages ML23321A2472023-11-17017 November 2023 Attachment 1: Holtec International - Summary of Additional Clarifications/Changes Submitted for Review ML23170A0292023-06-19019 June 2023 International, Final Safety Analysis Report on the HI-Storm FW MPC Storage System ML22210A1502022-07-29029 July 2022 Attachment 4: HI-STORM FW FSAR Proposed Revision 10C, Changed Pages (non-proprietary) ML22210A1482022-07-29029 July 2022 Attachment 2: Updated Summary of Proposed Changes (non-proprietary) ML22210A1492022-07-29029 July 2022 Attachment 3: HI-STORM FW FSAR Proposed Revision 10C, Changed Pages ML21288A5282021-10-15015 October 2021 Attachment 6: HI-STORM FW FSAR Proposed Revision 10A, Changed Pages ML21211A6122021-07-30030 July 2021 Attachment 3: Proposed Changed Page of HI-STORM FW FSAR ML21155A0292021-06-0404 June 2021 Corrected Attachment 6: Proposed Rev. 9 to Report HI-2114830 ML20356A3322020-12-21021 December 2020 Attachment 4 - Acceptance Tests and Maintenance ML20225A1912020-08-12012 August 2020 Attachment 1: HI-STORM FW Amendment 7 Summary of Proposed Changes ML20225A1962020-08-12012 August 2020 Attachment 6: HI-STORM FW FSAR Proposed Revision 7 Revised Pages (non-proprietary) 2024-04-08
[Table view] |
Text
Attachment 2 to Holtec Letter 5018096 Amendment Request 1032-7 CONTINUED
SUMMARY
OF PROPOSED CHANGES This is an update from Attachment 3 to Holtec Letter 5018091. All changes to the CoC and FSAR are marked in the subsequent attachments. Changes that have occurred as part of prior applications are not marked as changes.
Proposed Change #1 Addition of a new variant of the HI-STORM FW Overpack, called HI -STORM FW UVH, where the UVH stands for unventilated with high density concrete for shielding. The overpack is a simplified version of the HI-STORM FW System wherei n the overpacks inlet and outlet air passages have been removed, resulting in a complete cessation of ventilation in the space between the cask cavity and the stored multi-purpose canister (MPC) during the systems operation. To compensate for the removal of the inlet and outlet vents, the total allowable heat load of an MPC is reduced, and higher thermal conductivity concrete is employed to increase system heat transfer capabilities. Other features include full depth rib plates between the overpacks inner and outer shells that enhance the overpacks thermal performance, the use of higher density concrete that enhance the overpacks shielding performance, and a drain assembly to assist in short term operations such as evacuating the overpacks annulus cavity air. These features are denoted in the licensing drawing (No. 11897 Rev. 1) and FSAR. Related to this change is the increased temperature limits for the MPC baseplate and the Overpack Inner Shell. The MPC baseplate temperature is increased from 400°F to 440°F, while the Overpack Inner Shell temperature limits are added to Table 2.2.3 for normal conditions, short-term events, and off-normal/accident conditions.
Reason for Proposed Change #1 The HI-STORM FW UVH is needed to serve as a low-dose MPC storage system wherein the external environment around the canister is sought to be controlled, such as to protect from stress corrosion cracking.
Justification for Proposed Change #1 The new overpack has been evaluated for MPC-37, MPC-89, and new MPC-44 (Proposed Change #7), and is fully described in the provided Supplement I to the FSAR. This supplement provides the necessary information and analyses to support the HI-STORM FW Version UVH.
The supplement identifies the areas which are impacted by the new overpack design, and each chapter also lists the sections that are unaffected by the new design. The new overpack is structurally, thermally, and shielding qualified to meet all the requirements of 10CFR72. There is no change to the criticality or confinement evaluation, since the MPCs are unchanged from previous HI-STORM FW amendments. Ad ditionally, the temperature increases for the MPC baseplate and Overpack Inner Sh ell have been analyzed for all conditions in Chapter 3 of the FSAR.
Proposed Change #2 Modify vent and drain penetrations to include the option of second port cover plate.
Reason for Proposed Change #2 The addition of a second cover plate for these penetrations removes the need to do field helium leak testing of these cover plates.
Attachment 2 to Holtec Letter 5018096 Amendment Request 1032-7 CONTINUED
SUMMARY
OF PROPOSED CHANGES Justification for Proposed Change #2 See attached Licensing Memorandum: Proposed design change for MPC Lid Port Covers to improve ALARA and ruggedness of the MPC f or increased reliability of confinement integrity.
The HI-STORM FW CoC, MPC drawings, and FSAR Chapter 9 and 10 have been updated to include this change.
Proposed Change #3 Allow automated equipment to perform leak test of the MPC materials and welds in the fabrication shop.
Justification for Proposed Change #3 The acceptance criteria for the leakage test will remains unchanged when implementing the automated process. By automating the leakage testing process, there will be more reliable and repeatable testing and eliminate possibility for human error. The current testing relies on Level III qualifications, which requires a large amount of training, of which not many personnel are qualified. The HI-STORM FW FSAR Chapter 8 and 10 have been updated to include this change.
Proposed Change #4 Change the hydrostatic pressure test of the MPC acceptance criteria to be examination for leakage only. Remove post hydrostatic test Liquid Penetrant (PT) examination.
Reason for Proposed Change #4 The post hydrostatic pressure test PT examination is not an ASME Code requirement and causes incurred dose without corresponding safety benefit.
Justification for Proposed Change #4 The HI-STORM FW CoC, and FSAR Chapter 9 and 10 have been updated to include this change.
Proposed Change #5 Inclusion of the ability to run a CFD analysis to evaluate site-specific fire scenarios.
Reason for Proposed Change #5 The CFD analysis allows for an alternate and accurate modeling of site-specific fire, using the models that are already approved for normal conditions. Additionally, this change also allows for more robust evaluations of site-specific fires that could be larger than that evaluated in the FSAR.
Attachment 2 to Holtec Letter 5018096 Amendment Request 1032-7 CONTINUED
SUMMARY
OF PROPOSED CHANGES Justification for Proposed Change #5 FSAR Section 4.6 has been updated to include this change. The acceptance criteria and the thermal model adopted for analysis remain unchanged when implementing the CFD method.
Proposed Change #6 Use updated methodology for tornado missile stability calculations for freestanding HI-STORMs and HI-TRACs. Clarify the weights to be used for varying heights of HI-TRACs.
Reason for Proposed Change #6 The change updates the methodology for tornado missile stability analysis to consider changing restoring arm as a cask lifts up and rotates. Also, to provide weight information for HI-TRACs that may be loaded with less than the maximum fuel assemblies.
Justification for Proposed Change #6 Structural analysis, as outlined in the updated Chapter 3, shows that all safety factors remain acceptable with the new analysis method and provides additional information on HI-TRAC loaded weights for clarity.
Proposed Change #7 Addition of a new MPC, called MPC -44. This MPC holds 44 PWR fuel assemblies of certain 14x14 fuel class. Burnup credit calculations are not included for loading considerations of this new MPC.
Reason for Proposed Change #7 This change allows for a higher capacity canister for PWR fuel assemblies that are of a certain size. For sites that utilize these fuel classes the higher capacity canister allows for fewer loadings.
Justification for Proposed Change #7 The MPC-44 is fully analyzed by all disciplines for both the Version E overpack (ventilated) and unventilated overpacks by structural, thermal, shielding, and criticality.
The enclosure vessel is unchanged, and all analyses demonstrate that the canister meets the same acceptance criteria as the existing canisters.
Proposed Change #8 Addition of a new MPC, called MPC -37P. This MPC holds 37 PWR fuel assemblies of certain 15x15 fuel class. Burnup credit calculations are added to the criticality chapter for loading considerations of this new MPC.
Attachment 2 to Holtec Letter 5018096 Amendment Request 1032-7 CONTINUED
SUMMARY
OF PROPOSED CHANGES Reason for Proposed Change #8 This change allows for the same capacity canister for PWR fuel as currently qualified, but with assemblies that are of a certain size and heat loads, required for certain sites.
Justification for Proposed Change #8 The MPC-37P design is shown to be comparative to the MPC-37 for structural and criticality analyses for the Version E (ventilated) overpack and is fully analyzed for the Version E overpack by thermal and shielding. The enclosure vessel is unchanged, and all analyses demonstrate that the canister meets the same acceptance criteria as the existing canisters.
Proposed Change #9 Add HI-DRIP ancillary system. HI-DRIP is an optional ancillary system designed to prevent water within the MPC from boiling during loading/unloading operations while the loaded MPC is in the HI-TRAC transfer cask. FSAR Section 1.2.1.7 describes the HI-DRIP system.
Reason for Proposed Change #9 The HI-DRIP system has potential use during the period when the loaded MPC is full of water and is out of the pool. The HI-DRIP is used to provide additional cooling for the MPC in the HI-TRAC during the interval after it has been lifted out of the fuel pool and is subject to surface decontamination, lid welding and related operations which precede the evacuation of water from the MPC followed by activation of the Forced Gas Dehydrator (FGD). This time period is termed fuel packaging. As such, HI-DRIP is essentially a device to provide additional cooling of the MPCs water during the period it is full of water and out of the pool.
Justification for Proposed Change #9 The area of safety that requires consideration, for the HI-DRIP system is thermal.
Thermal analysis of the use of the HI-DRIP system is summarized in Section 1.2. The optional use of the HI-DRIP system is shown to be acceptable.
Proposed Change #10 Inclusion of the ability to run approved CFD analysis to evaluate site-specific calculations for the burial under debris accident scenario.
Reason for Proposed Change #10 The CFD analysis allows for an alternate and accurate modeling of a burial under debris accident using the models that are already approved for normal conditions, and the appropriate thermal properties of site specific possible debris.
Justification for Proposed Change #10 FSAR Section 4.6 has been updated to include this change. The thermal accident acceptance criteria and the thermal model adopted for analysis remain unchanged when implementing the CFD method.
Attachment 2 to Holtec Letter 5018096 Amendment Request 1032-7 CONTINUED
SUMMARY
OF PROPOSED CHANGES
Proposed Change #11 Inclusion of the ability to use water without glycol in the HI-TRAC water jacket during transfer operations below 32°F based on the site specific MPC total heat loads. This is provided as an optional method rather than the use of glycol.
Reason for Proposed Change #11 To provide an alternate means to prevent freezing of the water in the HI-TRAC water jacket at temperatures below 32°F. Additionally, removal of glycol use within the HI-TRAC water jacket removes any concerns of glycol leaking into the spent fuel pool during loading operations.
Justification for Proposed Change #11 FSAR Section 1.2, 2.0, 3.4, 5.3, 8.8, 9.2, 9.4, and 12.1 have been updated to include this change.
Thermal analyses have been added to Chapter 4 to provide the methodology for site-specific calculations to determine the MPCs minimum acceptable heat load. The example calculation also demonstrates that an MPC with a specified minimum heat load ensure that the neutron shielding material in the HI-TRAC water jacket stays above its freezing point under low environmental temperatures.
Proposed Cha nge #12 Add new 10x10 fuel type to approved contents, named 10x10J. This change is shown in the marked changes in the CoC.
Reason for Proposed Change #12 This proposed change allows storage of additional fuel types in the HI-STORM FW System.
Justification for Proposed Change #12 Criticality analyses of the new fuel was performed, and the results of these analyses have been added to Chapter 6. The new fuel type was determined to be bounded by the design basis fuel already analyzed in the FSAR for thermal, structural, and shielding; therefore, no additional analyses were required for the HI-STORM FW System. A marked copy of FSAR Chapters 2 and 6 are provided to show the changes.
Proposed Change #13 Update bounding fuel variables for 8x8F and 11x11A BWR fuel types in CoC Appendix B.
Reason for Proposed Change #13 This proposed change allows storage of additional fuel in the HI-STORM FW System.
Attachment 2 to Holtec Letter 5018096 Amendment Request 1032-7 CONTINUED
SUMMARY
OF PROPOSED CHANGES Justification for Proposed Change #13 Criticality analyses of the updated fuel was performed, and the results of these analyses have been added to Chapter 6. The changes to the CoC Appendix B table also include a new note to clarify an existing dimension listed for the 11x11A fuel. The updated fuel types were determined to remain bounded by the design basis fuel already analyzed in the FSAR for thermal, structural, and shielding; therefore, no additional analyses were required for the HI-STORM FW System. Marked pages of FSAR Chapters 2 and 6 are provided to show the changes.
Attachment 2 to Holtec Letter 5018096 Amendment Request 1032-7 CONTINUED
SUMMARY
OF PROPOSED CHANGES
Editorial Changes
- Update the statements in FSAR Section 3.2 related to CG eccentricities in the evaluation of lifting devices. The previous FSAR commitment does not stem from any requirement in NUREG-0612 or ANSI N14.6. This FSAR requirement is unnecessary since ANSI N14.6 mandates increased design factors of 6 and 10 with respect to material yield and ultimate strength, which adequately compensates for small CG variations.
- Deleted Appendices 3.A to 3.C and added references to calculation packages [3.4.13] and
[3.4.15] where applicable.
- Update CoC Appendix B Section 2.5 to clarify the equation burn up and cooling time qualification requirements (with applicable Table 2.5-2), only apply to the alternative loading patterns shown in Figures 2.3-1 through 2.3-13, and do not apply to the original loading patterns of Table 2.1-1.