ML20212L768
Letter Sequence Other | |
---|---|
CAC:001028, (Approved, Closed) EPID:L-2017-FPR-0015, Environmental Assessment and Finding of No Significant Impact and NRC Financial Analysis for Exelon Generation Company Decommissioning Funding Plan Submitted in Accordance with 10 CFR 72.30(b) for Clinton Power Station Unit 1 ISFSI (Open) | |
Initiation
Administration Questions
Answers Results
Other: L-23-005, Independent Spent Fuel Storage Installation License Renewal Application, Revision 1 (Cac/Epid No. 001028/L-2022-RNW-0007), ML19150A559, ML19182A107, ML20002A442, ML20009D008, ML20010D564, ML20015A450, ML20015A451, ML20015A454, ML20028E845, ML20028E846, ML20049A082, ML20052E146, ML20052E154, ML20065N281, ML20071F156, ML20076D696, ML20099A180, ML20104C015, ML20104C018, ML20104C019, ML20105A135, ML20105A136, ML20105A137, ML20105A138, ML20105A139, ML20105A173, ML20111A240, ML20136A050, ML20136A051, ML20150A335, ML20150A421, ML20155K741, ML20155K743, ML20155K744, ML20161A088, ML20163A702, ML20163A703, ML20163A704, ML20181A211, ML20181A212, ML20192A328, ML20192A329, ML20212L768, ML20212L769, ML20261H420, ML20269A259, ML20279A577, ML20279A586, ML20289A493... further results | |
MONTHYEARML20052D9362018-07-0303 July 2018
[Table View]Response to Nrg Request for Additional Information (RAI) Regarding NAC Magnastor Cask Loaded to Incorrect Helium Backfill Density Project stage: Request ML18267A2142018-08-29029 August 2018, 25 September 2018 Package: Summary of August 29, 2018, Public Meeting with Interim Storage Partners to Discuss Consolidated Emergency Response Plan for Its Proposed WCS Consolidated Interim Storage Facility (W/Enclosure 1 and 2) Project stage: Request ML18267A2112018-09-25025 September 2018 Memorandum to A. Rivera-Varona Summary of August 29, 2018, Public Meeting with Interim Storage Partners to Discuss Consolidated Emergency Response Plan for Its Proposed WCS Consolidated Interim Storage Facility (W/Enclosure 1 and 2) Project stage: Meeting ML18320A1842018-11-16016 November 2018 Letter to J. Isakson Interim Storage Partners' License Application to Construct and Operate the Waste Control Specialists Consolidated Interim Storage Facility, Andrews County, Texas, Dkt No. 72-1050 - First RAI, Part 1 (W/Enclosure 1) Project stage: RAI ML19032A2302019-02-0404 February 2019 Summary of Closed Public Meeting to Discuss RAI Issued in Connection with Nrc'S Review of the Interim Storage Partner Consolidated Isfs Application for a Facility at Andrews County, Texas (W/Encl. 1&2) Project stage: RAI ML19065A0192019-03-0606 March 2019 Letter to J. Isakson Interim Storage Partners Llc'S License Application to Construct and Operate the WCS Consolidated Interim Storage Facility, Andrews County, Texas, Docket No. 72.1050 - First Request for RAI Part 2 (W/Enclosure 1) Project stage: RAI ML19072A1562019-03-14014 March 2019 Summary of Partially Closed Public Meeting to Discuss Request for Additional Information Issued in Connection with Nrc'S Review of the ISP Cisf Application for a Facility at Andrew'S County, Tx (W/Encl. 1&2) Project stage: RAI ML19126A0682019-04-0303 April 2019, 6 May 2019 Summary of April 16, 2019, Partially Closed Public Meeting to Discuss RAI Issued in Connection with Nrc'S Review of the ISP Consolidated Isf Application for a Facility at Andrews County, Texas Project stage: Request ML19105B2172019-04-19019 April 2019 Memorandum to C. Regan Summary of March 20, 2019, Public Meeting to Discuss Request for Additional Information Issued in Connection with Nrc'S Review of the Interim Storage Partners Consolidated Isf Application (W/Enclosures 1 and 2) Project stage: RAI ML19120A4282019-04-23023 April 2019 Letter to J. Isakson Interim Storage Partners Llc'S License Application to Construct and Operate the Waste Control Specialists Consolidated Interim Storage Facility, Andrews County, Texas, Dkt No. 72-1050 - First RAI (W/Enclosure) Project stage: RAI ML19126A0662019-05-0606 May 2019 Memorandum to C. Regan Summary of April 16, 2019, Partially Closed Public Meeting to Discuss RAI Issued in Connection with Nrc'S Review of the ISP Consolidated Isf Application for a Facility at Andrews County, Texas (W/Enclosure 1 & 2) Project stage: RAI ML20015A4502019-05-31031 May 2019 Sprint Andrews County Disposal Facility, Andrews County, Texas- Railroad Commission of Texas Commercial Processing and Disposal Facility Permit Application Project stage: Other ML19150A5592019-06-0303 June 2019 Letter to J. Isakson Site Audit Plan for Interim Storage Partners Proposed Application for a Site-Specific License of an Away-from-Reactor Independent Spent Fuel Storage Installation Project stage: Other ML19182A1072019-07-0101 July 2019 Letter to J. Isakson Interim Storage Partners Llc'S Application for a Specific ISFSI for the Waste Control Specialists Consolidated Interim Storage Facility for Spent Nuclear Fuel - Revised Review Schedule Project stage: Other ML20015A4512019-08-22022 August 2019 Report No. R1432-01, Acoustical Analysis of ISP Cisf Project stage: Other ML20015A4542019-11-30030 November 2019 Socioeconomic Impacts of the Proposed Spent Nuclear Fuel Consolidated Interim Storage Facility, Andrews County, Texas, Revision 5 Project stage: Other ML19357A1762019-12-18018 December 2019 NAC International - Submission of a Request to Renew the U.S. Nuclear Regulatory Commission Certificate of Compliance No. 1025 for the NAC-MPC Cask System Project stage: Request ML19354A7142019-12-20020 December 2019 Approval of Tn America Request for Withholding Information from Public Disclosure for Coc 1029 Renewal Request for Supplemental Information Responses (CAC No. 001028) Project stage: Withholding Request Acceptance ML20002A4422019-12-20020 December 2019 International _Affidavit Project stage: Other ML19360A0472019-12-26026 December 2019 Internationals Application for Specific Independent Spent Fuel Storage Installation License for the Hi-Store Consolidated Interim Storage Facility for Spent Nuclear Fuel - Request for Clarification of Responses Related to Emergency Response Project stage: Approval ML20009D0512020-01-0606 January 2020 Notification of NRC Acceptance of the Standardized Advanced NUHOMS CoC 1029 Renewal Application for Review Project stage: Acceptance Review ML20009D0082020-01-0606 January 2020 Acknowledgement of NRC Receipt of CoC 1025 (NAC-MPC) Renewal Application Project stage: Other ML20015A4522020-01-0606 January 2020 Interim Storage Partners LLC - Submittal of Supplemental Information in Support of RAI, Part 3 - Clarification Related to the Response to RAI AQ-6 Project stage: Supplement ML19354B6372020-01-0707 January 2020 Exemption Request for NAC Magnastor Cask Loaded to Incorrect Helium Backfill Density Request for Additional Information Project stage: RAI ML20010D5642020-01-10010 January 2020 Proprietary Determination Letter for HI-STAR 100 CoC Renewal Submittals Project stage: Other ML20028E8462020-01-17017 January 2020 Enclosure 3 - RAIs and Responses Project stage: Other ML20028E8452020-01-17017 January 2020 Enclosure 1 - Affidavits Project stage: Other ML20031D0562020-01-29029 January 2020 Interim Storage Partners, LLC - Submittal of ISP Updated Draft Responses for Rals NP-8-1, NP-8-2 and Associated SAR Markups from First Request for Additional Information, Part 2, Docket 72-1050 Cac/Epid 001028/L-2017-NEW-0002 Project stage: Draft Request ML20049A0822020-01-31031 January 2020 International - HI-STORM 100 Storage CoC Renewal Application Project stage: Other ML20049A0812020-01-31031 January 2020 Holtec International - HI-STORM 100 Storage CoC Renewal Application Project stage: Request ML20034E8352020-02-0303 February 2020 Letter-Materials Request for Additional Information Clarification with Enclosure Project stage: RAI ML20034E9872020-02-11011 February 2020 Meeting Summary - Meeting with Westinghouse Electric Company, LLC, Pre-Application Amendment No. 5 of Storage CoC No. 1026 for the Fuelsolutions Spent Fuel Management System, November 21, 2019 Project stage: Meeting ML20052D9962020-02-14014 February 2020 Interim Storage Partners, LLC - Submission of ISP Responses for RAIs and Associated Document Markups from First Request for Additional Information, Part 2, Docket 72-1050 Cac/Epid 001028/L-2017-NEW-0002 Project stage: Request ML20052E1462020-02-17017 February 2020 Interim Storage Partners, LLC - Submittal of Revision 3 of the Environmental Report for the WCS CISF, Docket 72-1050 Cac/Epid 001028/L-2017-NEW-0002 Project stage: Other ML20052E1542020-02-17017 February 2020 WCS Consolidated Interim Spent Fuel Storage Facility Environmental Report, Revision 3 - Part 2 of 3 Project stage: Other ML20064F6162020-02-29029 February 2020 January 15, 2020, Summary of Meeting with Holtec International, Inc., to Discuss the Upcoming Submittal of the Application for Renewal of the Storage Certificate of Compliance No. 1014 for the HI-Storm 100 Cask System Project stage: Meeting ML20063M0152020-03-0303 March 2020 HI-STORM 100 Renewal Presubmittal Meeting (Holtec Slides, 1-15-20) Project stage: Meeting ML20064E6222020-03-0303 March 2020 U.S. Nuclear Regulatory Commission Approval of NAC International Request for Withholding Information from Public Disclosure for Coc 1025 Renewal (CAC No. 001028) Project stage: Withholding Request Acceptance ML20071J0552020-03-0505 March 2020 Notice of Cancelled Meeting with the U.S. Department of Energy, Idaho Operations Office to Discuss the Upcoming Submittal of the Application for Renewal of the Idaho Spent Fuel Facility License (SNM-2512) Project stage: Meeting ML20071F1562020-03-0505 March 2020 Interim Storage Partners, LLC - Affidavit Project stage: Other ML20065J4272020-03-0505 March 2020 Submittal of Renewal Application for the TN-32 Dry Storage Cask - CoC 1021 Project stage: Request ML20071F1532020-03-0505 March 2020 Interim Storage Partners, LLC - Supplemental Information in Support of NRCs Environmental Review Project stage: Supplement ML20066K5782020-03-0606 March 2020 Acceptance Review of Request for Amendment No. 7 to Certificate of Compliance No. 1032 for the HI-STORM Flood/Wind Multipurpose Canister Storage System Project stage: Acceptance Review ML20065L3442020-03-0606 March 2020 Amendment No. 15 to Certificate of Compliance No. 1014 for the Hi-Storm 100 Multipurpose Canister Storage System - Request for Additional Information Project stage: RAI ML20065N2812020-03-0909 March 2020 ISFSI Preamble-License Renewal Order Project stage: Other ML20076D6962020-03-11011 March 2020 Interim Storage Partners, LLC - Submittal of Clarifications to Support NRCs Continued Review of the Safety Case for the WCS CISF Project stage: Other ML20104C0182020-03-30030 March 2020 International - HI-STORM Umax Amendment 4 FSAR - Changed Pages Project stage: Other ML20104C0192020-03-30030 March 2020 International - Affidavit for Kimberly Manzione Project stage: Other ML20104C0152020-03-30030 March 2020 International - Amendment No. 4 to the HI-STORM Umax Canister Storage System Project stage: Other ML20104C0202020-03-30030 March 2020 International - HI-STORM Umax Amendment 4 Responses to Requests for Additional Information - Supplemental Information Project stage: Supplement 2019-07-01 |
ML20212L768 | |
Person / Time | |
---|---|
Site: | Clinton |
Issue date: | 10/29/2020 |
From: | Bernie White Storage and Transportation Licensing Branch |
To: | |
White B | |
Shared Package | |
ML20212L744 | List: |
References | |
CAC 001028, EPID L-2017-FPR-0015 | |
Download: ML20212L768 (2) | |
Similar Documents at Clinton | |
---|---|
Category:Memoranda
MONTHYEARML24214A1402024-08-0505 August 2024
[Table view]July 24, 2024, Summary of the Public Meeting Regarding Clinton Power Station, Unit 1, Partial Site Release ML24135A3712024-05-21021 May 2024 Memo from Awaldron to Skoenick Transmitting Meeting Summary ML21277A2472021-11-0505 November 2021 Notification of Significant Licensing Action - Proposed Issuance of Order Approving the Transfer of Licenses for Which a Hearing Has Been Requested - Exelon Generation Company, LLC; Et. Al ML20212L7682020-10-29029 October 2020 Memo to File: Final Environmental Assessment, Finding of No Significant Impacts, NRC Financial Analysis for Exelon Generation Company, Initial Decommissioning Funding Plan Submitted in Accordance with 10 CFR 72.30(B) for Clinton Power Stati ML20239A8252020-08-25025 August 2020 Summary of the August 4, 2020 Public Webinar to Discuss the NRC 2019 End-Of-Cycle Plant Performance Assessment of Clinton Power Station, Unit 1 IR 05000461/20190122019-09-25025 September 2019 NRC Inspection of Temporary Instruction 2515/194, Implementation of Industry Initiative Associated with the Open Phase Condition Design Vulnerabilities in Electric Power Systems Report 05000461/2019012 ML18158A1702018-06-0707 June 2018 Special Inspection Team Charter for Inoperability of the Clinton Power Station Division 1 and Division 2 Emergency Diesel Generators ML17142A2382017-05-25025 May 2017 OEDO-17-00280 - Briefing Package for Drop-In Visit on June 9, 2017, by Senior Management of Exelon Generation Company, LLC with Chairman Svinicki, Commissioner Baran, and Commissioner Burns ML16209A5182016-08-0303 August 2016 Staff Review of Clinton Power Stations Physical Security Plan Revision 14 for the Verfication of Additional Security Measures (EA-14-045) Implementation (CAC No. L25120) ML16155A4242016-05-27027 May 2016 Memo T Mossman, NSIR, Technical Assistance Request - Review of Physical Security Plan for the Clinton Power Station Independent Spent Fuel Storage Installation (CAC No. L25120) ML16075A3292016-03-16016 March 2016 OEDO-16-00165 - Briefing Package for Drop-In Visit on March 23, 2016, by Senior Management of Exelon Generation Company, LLC with the NRC Executive Director for Operations ML13190A3522013-07-10010 July 2013 Notice of Forthcoming Teleconference with Exelon Generation Company, LLC ML12348A6962012-12-17017 December 2012 1/3/2013 - Notice of Forthcoming Meeting with Exelon Generation Company, LLC, to Discuss Requests for Additional Information Regarding Exelon Physical Security Plans ML12325A4062012-11-26026 November 2012 Final Response to Task Interface Agreement 2012-06, Clinton Power Station Technical Specification 3.6.4.3 Compliance During Operations with the Potential for Draining the Reactor Vessel ML12156A0952012-06-0404 June 2012 Forthcoming Public Meeting to Discuss the Application for Partial Site Release of Clinton Power Station (6/14/2012) ML12136A3662012-05-16016 May 2012 6/13/2012 - Notice of Forthcoming Public Meeting to Discuss the Application for Partial Site Release of Clinton Power Station ML12095A3612012-04-0404 April 2012 2010 Clinton Power Station Initial License Examination Revised Written Examination Forms ML1208602902012-03-26026 March 2012 Notice of Forthcoming Public Meeting with Exelon Generation to Discuss Future Fleet Submittal Regarding Licensed Operator Eligibility Requirements ML1018901872010-08-27027 August 2010 Final Response to Task Interface Agreement - Single-Failure-Proof Design for RPV Head Strongback, Dryer/Separator Strongback, and RPV Head Lifting Lugs at Clinton Power Station ML1011001012010-04-19019 April 2010 Task Interface Agreement - Evaluation of Application of Technical Specification Surveillance Requirement 3.0.3, Surveillance Requirement Applicability, at Clinton Power Station (TIA 2010-001) ML0933707072009-12-0404 December 2009 Cancelled Notice of Meeting with Clinton to Discuss Format for License Amendment Request That Will Supersede the Current Letter Request for Approval for a Decrease in Effectiveness of Emergency Plan ML0926801972009-09-29029 September 2009 Notice of Pre-application Meeting to Discuss Egc'S Plants to Submit Power Uprate Requests for Various Units in Its Reactor Fleet ML0918908262009-07-0909 July 2009 Meeting Notice with Exelon Generation Company, LLC, to Discuss Clinton Power Station Request for Amendment to TS Section 3.3.6.1 Primary Containment and Drywell Isolation Instrument to Eliminate Requirements for Main Steam Line Isolation ML0914901422009-06-0909 June 2009 Notice of Meeting with Exelon Generation Company on Licensing Practices and Processes ML0810600322008-04-15015 April 2008 Notice of Revised Meeting with Exelon Generation Company, LLC to Discuss Licensing Activities for Braidwood, Byron, Clinton, Dresden, LaSalle, Limerick, Oyster Creek, Peach Bottom, Quad Cities, and Three Mile Island ML0808605822008-04-0808 April 2008 Notice of Meeting with Exelon Generation Company, LLC (Exelon), to Discuss Licensing Activities ML0807400842008-03-14014 March 2008 Draft Regulatory Guide for Comment ML0633504172006-12-0101 December 2006 Y020060250 - Clinton, Oyster Creek, and Three Mile Island, Memo Review of Notice of Distribution from Decommissioning Trust ML0511604182005-04-21021 April 2005 4/21/05, Braidwood and Byron Stations, Units 1 and 2 - Summary of April 12, 2005, Telephone Conference Regarding the Emergency Plan for the Above Facilities (TAC Nos. MC6669 Thru MC6684) ML0232903632004-09-29029 September 2004 RAI Data for Incorporation Into Power Uprate Review Standard ML0417400862004-06-21021 June 2004 All Region III Facility Training Managers Revised NRC Form 398 - Personal Qualification Statement Licensee ML0406903682004-04-0505 April 2004 Request for Conforming Administrative License Amendments to Reflect Amergen Energy Company, LLC Ownership Changes ML0333805262003-12-0303 December 2003 Notice of Public Meeting to Discuss Environmental Scoping Process for Clinton Early Site Permit Review ML0323800472003-08-25025 August 2003 Results of the Clinton Power Station Unit 1 SDP Phase 2 Notebook Benchmarking Visit ML0324005922003-05-24024 May 2003 May 10-11, 2000, Summary of NRC Senior Management Meeting to Review Performance of Operating Nuclear Power Plants and Materials Facilities Licensed by Nrc. Partially Withheld ML0305902362003-02-28028 February 2003 Regulatory Commission'S Review Process for Exelon'S ESP Application for the Clinton Site ML0305600672003-02-26026 February 2003 Clinton Public Meeting - Publishing of Federal Register Notice for Public Meeting ML0210505942002-04-17017 April 2002 Notice of Meeting with Exelon Generation Company to Discuss Aspects of Security Orders ML0212006172002-03-18018 March 2002 Enclosures to 03/18/2002 Meeting Summary NRC Generic Letter 1989-111989-06-30030 June 1989 NRC Generic Letter 1989-011: Resolution of Generic Issue 101 Boiling Water Reactor Water Level Redundancy 2024-08-05 |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 October 29, 2020 MEMORANDUM TO: File FROM:
Bernard White, Senior Project Manager Storage and Transportation Licensing Branch Division of Fuel Management Office of Nuclear Material Safety and Safeguards
SUBJECT:
FINAL ENVIRONMENTAL ASSESSMENT, FINDING OF NO SIGNIFICANT IMPACTS, AND NRC FINANCIAL ANALYSIS FOR EXELON GENERATION COMPANY, LLCS INITIAL DECOMMISSIONING FUNDING PLAN SUBMITTED IN ACCORDANCE WITH 10 CFR 72.30(B) FOR CLINTON POWER STATION INDEPENDENT SPENT FUEL STORAGE INSTALLATION The subject documents related to the 2016 initial decommissioning funding plan for the Clinton Power Station, Unit 1 Independent Spent Fuel Storage Installation were approved this date and are attached for record purposes.
Docket No.: 72-1046 License No.: SFGL-62
Enclosures:
- 1. Environmental Assessment and Finding of No Significant Impacts (ADAMS Accession No. ML20212L769).
- 2. U.S. Nuclear Regulatory Commissions Analysis of Exelon Generation Company, LLCs Initial Decommissioning Funding Plan for Clinton Power Station, Unit 1 Independent Spent Fuel Storage Installation. October 2020. (ADAMS Accession No. ML20260H376).
Bernard H. White Digitally signed by Bernard H.
White Date: 2020.10.30 11:35:53 -04'00'
SUBJECT:
FINAL ENVIRONMENTAL ASSESSMENT, FINDING OF NO SIGNIFICANT IMPACTS, AND NRC FINANCIAL ANALYSIS FOR EXELON GENERATION COMPANY, LLCS INITIAL DECOMMISSIONING FUNDING PLAN SUBMITTED IN ACCORDANCE WITH 10 CFR 72.30(B) FOR CLINTON POWER STATION INDEPENDENT SPENT FUEL STORAGE INSTALLATION DOCUMENT DATED: ____________________
DISTRIBUTION:
DFM r/f ADAMS Package No.: ML20212L744 Memo: ML20212L768
Enclosures:
ML20212L769; ML20260H376 OFFICE NMSS/DFM: PM NMSS/DFM: LA OGC (NLO)
NMSS/DFM: PM NMSS/STLB: BC NAME RGladney WWheatley PJehle BWhite JMcKirgan DATE 08/28/2020 7/30/2020 10/14/2020 10/21/2020 10/29/2020 OFFICIAL RECORD COPY