ML20052E049

From kanterella
Jump to navigation Jump to search

Interim Storage Partners, LLC, Submission of ISP Responses for RAIs and Associated Document Markups from First Request for Additional Information, Part 2
ML20052E049
Person / Time
Site: Consolidated Interim Storage Facility
Issue date: 02/14/2020
From: Isakson J
Consolidated Interim Storage Facility
To:
Division of Fuel Management
Shared Package
ML20052E047 List:
References
E-55865, CAC 001028, EPID L-2017-NEW-00012
Download: ML20052E049 (3)


Text

P.O. Box 1129

  • interimstoragepartners.com February 14, 2020 E-55865 Director, Division of Fuel Management Office of Nuclear Material Safety and Safeguards U. S. Nuclear Regulatory Commission Attn: Document Control Desk One White Flint North 11555 Rockville Pike Rockville, MD 20852

Subject:

Submission of ISP Responses for RAIs and Associated Document Markups from First Request for Additional Information, Part 2, Docket 72-1050 CAC/EPID 001028/L-2017-NEW-0002

Reference:

1. Letter from John-Chau Nguyen (NRC) to Jeffery D. Isakson, Interim Storage Partners LLCs License Application To Construct And Operate The Waste Control Specialists Consolidated Interim Storage Facility, Andrews County, Texas, Docket No. 72-1050 - First Request For Additional Information, Part 2, dated March 6, 2019
2. Letter from Jack Boshoven to Document Control Desk (NRC),

Submission of ISP Draft Responses for Several RAIs and Associated Document Markups from First Request For Additional Information, Part 2, Docket 72-1050 CAC/EPID 001028/L-2017-NEW-0002, E-54658, dated July 26, 2019

3. Letter from Jeffery D. Isakson to Document Control Desk (NRC),

Submission of ISP Draft Responses for RAIs and Associated Document Markups from Part 2 CHB Cat B Design DRAFT Docket 72-1050 CAC/EPID 001028/L-2017-NEW-0002, E-55622, dated December 9, 2019 Interim Storage Partners LLC (ISP) hereby submits final responses to RAIs from the First Request for Additional Information; Part 2 issued March 6, 2019 (Reference [1]) to support the continued review of the Licensing Application. Contained in this submittal are the responses; including revised safety analysis report (SAR) pages, which incorporate comments from our September 12, 2019 meeting with the NRC discussing

Document Control Desk our draft responses (References [2] and [3]) to several of these RAls.

The following enclosures are being submitted:

E-55865 Page 2 of 3

  • provides a proprietary version of the responses to the RAls.
  • provides a public version of Enclosure 2 (RAI responses).
  • provides SAR changed pages (Public).

Should you have any questions regarding this submission, please contact Mr. Jack Boshoven, of my staff, by telephone at (410) 910-6955, or by email at jack.boshoven@orano.group.

Sincerely, Jeffery D. Isakson Chief Executive Officer/President Interim Storage Partners LLC cc:

John-Chau Nguyen, Senior Project Manager, U.S. NRC Jack Boshoven, ISP LLC Elicia Sanchez, ISP LLC

Enclosures:

1.

Affidavit Pursuant to 10 CFR 2.390

a.

Interim Storage Partners

b.

NAC International

2.

RAI Responses (Proprietary Version)

3.

RAI Responses (Public Version)

4.

SAR Changed Pages (Public)

Document Control Desk E-55865 Page 3 of 3 Document Components:

001 PUBLIC Transmittal Letter.pdf, 576,906 bytes 002 PUBLIC Encl 1 Affidavits.pdf, 2,391,145 bytes 003 SUNSI Encl 2 RAI Responses.pdf, 393,454 bytes, Proprietary 004 PUBLIC Encl 3 RAI Responses.pdf, 164,525 bytes 005 PUBLIC Encl 4 SAR Changed Pages.pdf, 10,031,493 bytes OSM#1 (Entire Submittal):

001 PUBLIC Transmittal Letter.pdf, 576,906 bytes 002 PUBLIC Encl 1 Affidavits.pdf, 2,391,145 bytes 003 SUNSI Encl 2 RAI Responses.pdf, 393,454 bytes, Proprietary 004 PUBLIC Encl 3 RAI Responses.pdf, 164,525 bytes 005 PUBLIC Encl 4 SAR Changed Pages.pdf, 10,031,493 bytes OSM#2 (Public Information Only):

001 PUBLIC Transmittal Letter.pdf, 576,906 bytes 002 PUBLIC Encl 1 Affidavits.pdf, 2,391,145 bytes 004 PUBLIC Encl 3 RAI Responses.pdf, 164,525 bytes 005 PUBLIC Encl 4 SAR Changed Pages.pdf, 10,031,493 bytes