Interim Storage Partners, LLC, Submittal of ISP Revised Responses for RAI NP-15-7 Cac/Epid 001028/L-2017-NEW-0002
ML20028D891
Person / Time
Site: Consolidated Interim Storage Facility
Issue date: 01/22/2020
From: Isakson J
Consolidated Interim Storage Facility
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards
Shared Package
ML20028D890 List:
References
E-55866, CAC 001028, EPID L-2017-NEW-0002, RAI NP-15-7
Download: ML20028D891 (3)


Text

'

  • ~

~ **

INTERIM STORAGE PARTNERS January 22, 2020 E-55866 Director, Division of Fuel Management Office of Nuclear Material Safety and Safeguards U. S. Nuclear Regulatory Commission Attn: Document Control Desk One White Flint North 11555 Rockville Pike Rockville, MD 20852

Subject:

Submission of ISP Revised Responses for RAI NP-15-7, Docket 72-1050 CAC/EPID 001028/L-2017-NEW-0002

Reference:

1.

Letter from John-Chau Nguyen (NRC) to Jeffery D. Isakson, "Interim Storage Partners' License Application to Construct and Operate the Waste Control Specialists Consolidated Interim Storage Facility, Andrews County, Texas, Docket 72-1050 - First Request for Additional Information, Part 1," dated November 16, 2018

2.

Letter from Jeff Isakson to Document Control Desk (NRC),

"Submittal of Partial Response to First RAI, Part 1, Docket 72-1050 CAC/EPID 001028/L-2017-NEW-0002," E-54257, dated May 31,

2019 Interim Storage Partners LLC hereby submits a revised response to RAI NP-15-7 from the First Request for Additional Information; Part 1 issued November 16, 2018 (Reference [1]) and originally responded to in Reference [2]. Contained in this submittal is the revised response; including revised safety analysis report (SAR) pages. In Reference [2], ISP referenced Tables in Revision 10 of the NAC-MPC Final Safety Analysis Report, dated January 2014. However, that SAR revision did not specifically address the quality classification applicable to coatings and sealants. In the enclosures to this letter, ISP has revised the WCS CISF SAR to directly include the quality categories of the coatings and sealants and revised the response to the RAI to indicate this change.

P.O. Box 1129

  • interimstoragepartners. com

Document Control Desk The following enclosures are being submitted:

  • provides a revised response to the RAI NP-15-7 (public).

E-55866 Page 2 of 3

  • provides the SAR changed pages associated with the RAI response Should you have any questions regarding this submission, please contact Mr. Jack Boshoven, of my staff, by telephone at (410) 910-6955, or by email at jack.boshoven@orano.group.

Jeffery D. Isakson Chief Executive Officer/President Interim Storage Partners LLC cc:

John-Chau Nguyen, Senior Project Manager, U.S. NRC Jack Boshoven, ISP LLC Elicia Sanchez, ISP LLC

Enclosures:

1.

RAI Responses (Public)

2.

SAR Changed Pages (Public)

Document Control Desk E-55866 Page 3 of 3 Document Components:

001 PUBLIC Transmittal Letter.pdf, 520,932 bytes 002 PUBLIC Encl 1 RAI Responses.pdf, 95,795 bytes 003 PUBLIC Encl 2 SAR Change Pages.pdf, 725,050 bytes OSM#1 (Entire Submittal except native files):

001 PUBLIC Transmittal Letter.pdf, 520,932 bytes 002 PUBLIC Encl 1 RAI Responses.pdf, 95,795 bytes 003 PUBLIC Encl 2 SAR Change Pages.pdf, 725,050 bytes