ML19045A346

From kanterella
Jump to navigation Jump to search

Enclosucorrected Technical Specification Page (Letter to W. Fowler Correction to NAC International Technical Specifications for Amendment No. 7 to Magnastor Storage Systems for Certificate of Compliance No. 1031)
ML19045A346
Person / Time
Site: 07201031
Issue date: 03/08/2019
From: John Mckirgan
Spent Fuel Licensing Branch
To: Fowler W
NAC International
White B
Shared Package
ML19045A345 List:
References
CAC 001028, EPID L-2018-LLA-0561
Download: ML19045A346 (1)


Text

Certificate of Compliance No. 1031 A5-1 Amendment No. 7 5.0 ADMINISTRATIVE CONTROLS AND PROGRAMS 5.1 Radioactive Effluent Control Program 5.1.1 A program shall be established and maintained to implement the requirements of 10 CFR 72.44 (d) or 10 CFR 72.126, as appropriate.

5.1.2 The MAGNASTOR SYSTEM does not create any radioactive materials or have any radioactive waste treatment systems. Therefore, specific operating procedures for the control of radioactive effluents are not required. LCO 3.3.2, TSC Surface Contamination, provides assurance that excessive surface contamination is not available for release as a radioactive effluent.

5.1.3 This program includes an environmental monitoring program. Each general license user may incorporate MAGNASTOR SYSTEM operations into their environmental monitoring program for 10 CFR Part 50 operations.

5.2 TSC Loading, Unloading, and Preparation Program A program shall be established to implement the FSAR, Chapter 9 general procedural guidance for loading fuel and components into the TSC, unloading fuel and components from the TSC, and preparing the TSC and CONCRETE CASK for storage. The requirements of the program for loading and preparing the TSC shall be completed prior to removing the TSC from the 10 CFR 50 structure. The program requirements for UNLOADING OPERATIONS shall be maintained until all spent fuel is removed from the spent fuel pool and TRANSPORT OPERATIONS have been completed on the last CONCRETE CASK. The program shall provide for evaluation and control of the following requirements during the applicable operation:

a. Verify that no TRANSFER CASK handling or CONCRETE CASK handling using the lifting lugs occurs when the ambient temperature is

< 0°F. This limit is NOT applicable to the stainless steel MTC or PMTC.

b. The water temperature of a water-filled, or partially filled, loaded TSC shall be shown by analysis and/or measurement to be less than boiling at all times.
c. Verify that the drying time, cavity vacuum pressure, and component and gas temperatures ensure that the fuel cladding temperature limit of 400°C is not exceeded during TSC preparation activities, including TRANSFER OPERATIONS, and that the TSC is adequately dry. For fuel with burnup

> 45 GWd/MTU, limit cooling cycles to 10 for temperature changes greater than 65ºC.

d. Verify that the helium backfill purity and mass assure adequate heat transfer and preclude fuel cladding corrosion.
e. The integrity of the inner port cover welds to the closure lid at the vent port and at the drain port shall be verified in accordance with the procedures in Section 9.1.1 for the MTC or 9.4.1 for the PMTC.

(continued)