Enclosurequest for Additional Information (Letter to K. Cimorelli Request for Additional Information Regarding Susquehanna Nuclear, LLCs Decommissioning Funding Plan Update for Susquehanna Steam Electric Station Independent Spent Fuel Stora
ML18352B183
Person / Time
Site: Susquehanna Talen Energy icon.png
Issue date: 12/13/2018
From: Pamela Longmire
Spent Fuel Licensing Branch
To: Cimorelli K
Susquehanna
Longmire P
Shared Package
ML18352B182 List:
References
CAC 001028, EPID L-2017-FPR-0067
Download: ML18352B183 (1)


Text

Enclosure REQUEST FOR ADDITIONAL INFORMATION REGARDING SUSQUEHANNA NUCLEAR, LLCS AND ALLEGHENY ELECTIC COOPERATIVE, INC.S DECOMMISSIONING FUND PLAN UPDATE FOR THE SUSQUEHANNA STEAM ELECTRIC STATION INDEPENDENT SPENT FUEL STORAGE INSTALLATION DOCKET NO. 72-28 Regulatory Requirement Pursuant to Title 10 of the Code of Federal Regulations (10 CFR) 72.30(c), at the time of license renewal and at intervals not to exceed 3 years, the decommissioning funding plan (DFP) required to be submitted by 10 CFR 72.30(b) must be resubmitted with adjustments as necessary to account for changes in costs and the extent of contamination. The DFP must update the information submitted with the original or prior approved plan. In addition, the DFP must also specifically consider the effect of the following events on decommissioning costs, as required by 10 CFR 72.30(c)(1)-(4): (1) spills of radioactive material producing additional residual radioactivity in onsite subsurface material, (2) facility modifications, (3) changes in authorized possession limits, and (4) actual remediation costs that exceed the previous cost estimate.

=

Background===

By letters dated December 16, 2015, Susquehanna Nuclear, LLCs (Susquehanna) and Allegheny Electric Cooperative, Inc.s (Allegheny) submitted, for U.S. Nuclear Regulatory Commission (NRC) staff review and approval, a decommissioning fund plan update (DFP Update) for the independent spent fuel storage installation at Susquehanna Steam Electric Station (Agencywide Documents Access and Management System Accession Nos. ML15350A071 and ML16032A339). The NRC staff reviewed Susquehannas and Alleghenys DFP update and believes Susquehannas and Alleghenys submittal were not sufficient to meet the intent of the requirement in 72.30(c). The DFP update does not provide sufficient information to allow the NRC to determine that the events listed in 10 CFR 72.30(c)(1)-

(4) have been specifically considered.

RAI 1

Provide a revised DFP that includes information on the effect on decommissioning costs, of each of the events listed in 10 CFR 72.30(c)(1)-(4): (1) spills of radioactive material producing additional residual radioactivity in onsite subsurface material, (2) facility modifications, (3) changes in authorized possession limits, and (4) actual remediation costs that exceed the previous cost estimate.