Intergranular Stress Corrosion Cracking (IGSCC)
Topic |
---|
|
|
All by date | |
ML24358A237 | 18 February 2025 | Fermi | Issuance of Amendment No. 230 Regarding Revision of Final Safety Analysis Report to Allow Use of Risk-Informed Approach for Evaluating Emergency Core Cooling System Strainers | DCL-25-011, ASME Section XI Inservice Inspection Program Request for Alternative NDE-RCSSE- 2R25 Use of Alternate Sizing Qualification Criteria Through a Protective Clad Layer | 12 February 2025 | Diablo Canyon | ASME Section XI Inservice Inspection Program Request for Alternative NDE-RCSSE- 2R25 Use of Alternate Sizing Qualification Criteria Through a Protective Clad Layer | PNP 2025-002, License Amendment Request to Include Leak Before Break Methodology for Primary Coolant System Hot and Cold Leg Piping in Palisades Licensing Basis | 5 February 2025 | Palisades | License Amendment Request to Include Leak Before Break Methodology for Primary Coolant System Hot and Cold Leg Piping in Palisades Licensing Basis | ML24341A135 | 5 December 2024 | Abilene Christian University | 1851-0001-RPT-002, Revision 0, Degradation Management Program for the Abilene Christian University Molten Salt Reactor (Public) | IR 05000275/2024013 | 28 October 2024 | Diablo Canyon | – License Renewal Report 05000275/2024013 and 05000323/2024013 | IR 05000416/2024012 | 17 September 2024 | Grand Gulf | License Renewal Post Approval Phase 2 Inspection Report 05000416/2024012 | ML24239A778 | 26 August 2024 | Perry | Aging Management Audit - Perry Unit 1 - License Renewal Application August 26 2024 | CP-202400319, (CPNPP) - Revision to CPNPP Letter to the NRC, Multiple Relief Requests for Unit 2 Third Ten-Year Inservice Inspection Interval from 10CFR50.55(a) Inspection Requirements Due to Impracticality | 13 August 2024 | Comanche Peak | (CPNPP) - Revision to CPNPP Letter to the NRC, Multiple Relief Requests for Unit 2 Third Ten-Year Inservice Inspection Interval from 10CFR50.55(a) Inspection Requirements Due to Impracticality | NRC-24-0050, Inservice Inspection-Nondestructive Examination (ISI-NDE) Program for the Fourth 10-Year Inspection Interval | 12 August 2024 | Fermi | Inservice Inspection-Nondestructive Examination (ISI-NDE) Program for the Fourth 10-Year Inspection Interval | CP-202400315, (Cpnpp), Multiple Relief Requests for Unit 2 Third Ten-Year Inservice Inspection Interval from 10CFR50.55(a) Inspection Requirements Due to Impracticality | 5 August 2024 | Comanche Peak | (Cpnpp), Multiple Relief Requests for Unit 2 Third Ten-Year Inservice Inspection Interval from 10CFR50.55(a) Inspection Requirements Due to Impracticality |
|
---|