| | Issue date | Site | Title | Topic |
|---|
| IR 05000361/2026002 | 28 April 2026 | San Onofre | NRC Inspection Report 05000361/2026002 and 05000362/2026002 | High Radiation Area Locked High Radiation Area Process Control Program |
| ML26106A306 | 14 April 2026 | South Texas San Onofre | 2025 Radioactive Effluent Release Report | Grab sample Offsite Dose Calculation Manual Process Control Program |
| ML26089A141 | 24 March 2026 | San Onofre | (Songs), Units 2 and 3 - Annual Corporate Financial Reports | |
| ML26085A234 | 19 March 2026 | San Onofre | Independent Spent Fuel Storage Installation - 10 CFR 50.82(a)(8)(v and VII) and 10 CFR 72.30(c) Decommissioning Financial Assurance Status Report 2025 | |
| IR 05000206/2026001 | 19 February 2026 | San Onofre | NRC Inspection Report 05000206/2026001, 05000361/2026001, and 05000362/2026001 | |
| IR 05000003/1961020 | 1 December 2025 | Indian Point San Onofre | NRC Inspection Report 0500036120/25005, 05000362/2025005 | |
| IR 05000361/2025004 | 24 September 2025 | San Onofre | NRC Inspection Report 050-00361/2025-004, 050-00362/2025-004 | High Radiation Area Locked High Radiation Area Deep Dose Equivalent Fire Protection Program Fire Watch |
| IR 05000361/2025003 | 26 June 2025 | San Onofre | NRC Inspection Report 05000361/2025003; 05000362/2025003 | Annual Radioactive Effluent Release Report Notice of Violation Process Control Program Fire Protection Program Scaffolding |
| ML25149A031 | 1 May 2025 | San Onofre | Analytical Data Summary Report for Samples Collected from the Multipurpose Handling Facility at the San Onofre, Dated May 1, 2025 | |
| ML25122A175 | 30 April 2025 | San Onofre | (Songs), Units 1, 2, and 3 - 2024 Annual Radioactive Effluent Release Report | Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program Chernobyl |