DCL-24-052, Responses to NRC Requests for Additional Information on the Diablo Canyon Power Plant License Renewal Application Environmental Report
From kanterella
(Redirected from ML24137A314)
Jump to navigation
Jump to search
ML24137A314 | |
Person / Time | |
---|---|
Site: | Diablo Canyon |
Issue date: | 05/16/2024 |
From: | Zawalick M Pacific Gas & Electric Co |
To: | Office of Nuclear Reactor Regulation, Document Control Desk |
References | |
DCL-24-052 | |
Download: ML24137A314 (1) | |
Similar Documents at Diablo Canyon | |
---|---|
Category:Letter type:DCL
MONTHYEARDCL-24-095, CFR 50.46 Annual Report of Emergency Core Cooling System Evaluation Model Changes for Peak Cladding Temperature for 20232024-11-0606 November 2024
[Table view]CFR 50.46 Annual Report of Emergency Core Cooling System Evaluation Model Changes for Peak Cladding Temperature for 2023 DCL-24-103, Pg&Es Voluntary Submittal of Information Related to 10 CFR 2.206 Petition Regarding Seismic Core Damage Frequency for DCPP, Units 1 and 22024-10-24024 October 2024 Pg&Es Voluntary Submittal of Information Related to 10 CFR 2.206 Petition Regarding Seismic Core Damage Frequency for DCPP, Units 1 and 2 DCL-24-092, Supplement and Annual Update License Renewal Application, Amendment 12024-10-14014 October 2024 Supplement and Annual Update License Renewal Application, Amendment 1 DCL-24-098, Material Status Report for the Period Ending August 31, 20242024-10-0909 October 2024 Material Status Report for the Period Ending August 31, 2024 DCL-24-091, Response to Request for Additional Information by the Office of Nuclear Reactor Regulation2024-10-0303 October 2024 Response to Request for Additional Information by the Office of Nuclear Reactor Regulation DCL-24-087, License Renewal - Historic and Cultural Resources Reference Documents (Redacted)2024-09-12012 September 2024 License Renewal - Historic and Cultural Resources Reference Documents (Redacted) DCL-24-083, CFR Part 21 Notification: Commercially Dedicated Snubber Valve Not Properly Heat Treated2024-09-0909 September 2024 CFR Part 21 Notification: Commercially Dedicated Snubber Valve Not Properly Heat Treated DCL-24-078, Pre-Notice of Disbursement from Decommissioning Trust2024-09-0303 September 2024 Pre-Notice of Disbursement from Decommissioning Trust DCL-24-082, Decommissioning Draft Biological Assessment and Draft Essential Fish Habitat Assessment2024-08-28028 August 2024 Decommissioning Draft Biological Assessment and Draft Essential Fish Habitat Assessment DCL-24-077, Responses to NRC Requests for Additional Information on Diablo Canyon Power License Renewal Application Severe Accident2024-08-15015 August 2024 Responses to NRC Requests for Additional Information on Diablo Canyon Power License Renewal Application Severe Accident DCL-24-075, Response to Request for Additional Information for License Amendment Request 23-02, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power React2024-08-0808 August 2024 Response to Request for Additional Information for License Amendment Request 23-02, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power React DCL-24-079, DC-2024-07 Post Exam Comments Analysis2024-08-0202 August 2024 DC-2024-07 Post Exam Comments Analysis DCL-24-070, License Amendment Request 24-03 Revision to Technical Specification 5.5.16 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies2024-07-31031 July 2024 License Amendment Request 24-03 Revision to Technical Specification 5.5.16 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies DCL-24-071, Core Operating Limits Report for Unit 2 Cycle 252024-07-22022 July 2024 Core Operating Limits Report for Unit 2 Cycle 25 DCL-2024-523, Submittal of Report on Discharge Self-Monitoring2024-07-18018 July 2024 Submittal of Report on Discharge Self-Monitoring DCL-2024-527, Sea Turtle Stranding Report (Loggerhead Sea Turtle) Diablo Canyon Power Plant2024-07-0101 July 2024 Sea Turtle Stranding Report (Loggerhead Sea Turtle) Diablo Canyon Power Plant DCL-24-066, Request to Extend the Nrg Approval of Alternative for Use of Full Structural Weld Overlay, REP-RHR-SWOL2024-06-27027 June 2024 Request to Extend the Nrg Approval of Alternative for Use of Full Structural Weld Overlay, REP-RHR-SWOL DCL-24-052, Responses to NRC Requests for Additional Information on the Diablo Canyon Power Plant License Renewal Application Environmental Report2024-05-16016 May 2024 Responses to NRC Requests for Additional Information on the Diablo Canyon Power Plant License Renewal Application Environmental Report DCL-24-051, One Hundred Eighty Day Steam Generator Report for Twenty-Fourth Refueling Outage2024-05-0808 May 2024 One Hundred Eighty Day Steam Generator Report for Twenty-Fourth Refueling Outage DCL-24-047, 2023 Annual Non-radiological Environmental Operating Report2024-05-0101 May 2024 2023 Annual Non-radiological Environmental Operating Report DCL-24-049, 2023 Annual Radiological Environmental Operating Report2024-05-0101 May 2024 2023 Annual Radiological Environmental Operating Report DCL-24-048, O CFR 50.59 and 1 O CFR 72.48 Summary Report for the Period of January 1, 2022, Through December 31, 20232024-04-30030 April 2024 O CFR 50.59 and 1 O CFR 72.48 Summary Report for the Period of January 1, 2022, Through December 31, 2023 DCL-24-027, 2023 Annual Radioactive Effluent Release Report2024-04-28028 April 2024 2023 Annual Radioactive Effluent Release Report DCL-24-045, Annual Report of Occupational Radiation Exposure for 20232024-04-24024 April 2024 Annual Report of Occupational Radiation Exposure for 2023 DCL-24-042, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-04-17017 April 2024 Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations DCL-24-022, Notification of Changes to Decommissioning Schedule2024-04-0202 April 2024 Notification of Changes to Decommissioning Schedule DCL-24-023, Revised Certification of Permanent Cessation of Power Operations2024-04-0202 April 2024 Revised Certification of Permanent Cessation of Power Operations DCL-24-031, Decommissioning Funding Report2024-03-27027 March 2024 Decommissioning Funding Report DCL-24-032, 2024 Annual Statement of Insurance for Pacific Gas and Electric Company’S Diablo Canyon Power Plant2024-03-27027 March 2024 2024 Annual Statement of Insurance for Pacific Gas and Electric Company’S Diablo Canyon Power Plant DCL-24-028, Request for Enforcement Discretion Regarding Compliance with Technical Specification 3.0.3, Limiting Condition for Operation Applicability2024-03-21021 March 2024 Request for Enforcement Discretion Regarding Compliance with Technical Specification 3.0.3, Limiting Condition for Operation Applicability DCL-24-018, License Amendment Request 24-01 Revision to Technical Specification 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR)2024-02-28028 February 2024 License Amendment Request 24-01 Revision to Technical Specification 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR) DCL-2024-507, 2023 Annual Report on Discharge Self-Monitoring2024-02-27027 February 2024 2023 Annual Report on Discharge Self-Monitoring DCL-24-020, Nuclear Material Transaction Report for New Fuel2024-02-21021 February 2024 Nuclear Material Transaction Report for New Fuel DCL-24-014, Owners Activity Report for Unit 1 Twenty-Fourth Refueling Outage2024-02-12012 February 2024 Owners Activity Report for Unit 1 Twenty-Fourth Refueling Outage DCL-24-013, Nuclear Material Transaction Report for New Fuel2024-02-0707 February 2024 Nuclear Material Transaction Report for New Fuel DCL-24-010, Nuclear Material Transaction Report for New Fuel2024-01-29029 January 2024 Nuclear Material Transaction Report for New Fuel DCL-2024-502, 2023 Annual Sea Turtle Report for Diablo Canyon Power Plant (DCPP)2024-01-25025 January 2024 2023 Annual Sea Turtle Report for Diablo Canyon Power Plant (DCPP) DCL-2024-501, Sea Turtle Stranding Report (Green Sea Turtle)2024-01-24024 January 2024 Sea Turtle Stranding Report (Green Sea Turtle) DCL-2024-500, Transmittal of the 4th Quarter of 2023 Report on Discharge Self-Monitoring2024-01-18018 January 2024 Transmittal of the 4th Quarter of 2023 Report on Discharge Self-Monitoring DCL-24-008, Schedule Considerations for Review of the DCPP License Renewal Application2024-01-17017 January 2024 Schedule Considerations for Review of the DCPP License Renewal Application DCL-24-009, Nuclear Material Transaction Report for New Fuel2024-01-17017 January 2024 Nuclear Material Transaction Report for New Fuel DCL-24-004, Supplement to License Amendment Request 23-01 Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2024-01-15015 January 2024 Supplement to License Amendment Request 23-01 Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b DCL-23-129, Nuclear Material Transaction Report for New Fuel2023-12-27027 December 2023 Nuclear Material Transaction Report for New Fuel DCL-23-122, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-14014 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation DCL-23-128, Emergency Plan Update2023-12-13013 December 2023 Emergency Plan Update DCL-23-125, Core Operating Limits Report for Unit 1 Cycle 252023-12-0606 December 2023 Core Operating Limits Report for Unit 1 Cycle 25 DCL-23-121, Supplement to License Amendment Request 23-03, Revision to Technical Specification3.7.8, Auxiliary Saltwater System2023-11-16016 November 2023 Supplement to License Amendment Request 23-03, Revision to Technical Specification3.7.8, Auxiliary Saltwater System DCL-23-120, License Amendment Request 23-03 Revision to Technical Specification 3.7.8, Auxiliary Saltwater (Asw) System2023-11-14014 November 2023 License Amendment Request 23-03 Revision to Technical Specification 3.7.8, Auxiliary Saltwater (Asw) System DCL-23-118, License Renewal Application2023-11-0707 November 2023 License Renewal Application DCL-2023-520, Discharge Self-Monitoring at Diablo Canyon Power Plant (DCPP)2023-10-19019 October 2023 Discharge Self-Monitoring at Diablo Canyon Power Plant (DCPP) 2024-09-09 Category:Response to Request for Additional Information (RAI) MONTHYEARDCL-24-091, Response to Request for Additional Information by the Office of Nuclear Reactor Regulation2024-10-0303 October 2024
[Table view]Response to Request for Additional Information by the Office of Nuclear Reactor Regulation DCL-24-077, Responses to NRC Requests for Additional Information on Diablo Canyon Power License Renewal Application Severe Accident2024-08-15015 August 2024 Responses to NRC Requests for Additional Information on Diablo Canyon Power License Renewal Application Severe Accident DCL-24-075, Response to Request for Additional Information for License Amendment Request 23-02, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power React2024-08-0808 August 2024 Response to Request for Additional Information for License Amendment Request 23-02, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power React DCL-24-052, Responses to NRC Requests for Additional Information on the Diablo Canyon Power Plant License Renewal Application Environmental Report2024-05-16016 May 2024 Responses to NRC Requests for Additional Information on the Diablo Canyon Power Plant License Renewal Application Environmental Report L-24-004, Independent Spent Fuel Storage Installation - Responses to NRC Requests for Additional Information on the Diablo Canyon Independent Spent Fuel Storage Installation License Renewal Application (Cac/Epid 001028/L-2022-RNW-0007)2024-04-30030 April 2024 Independent Spent Fuel Storage Installation - Responses to NRC Requests for Additional Information on the Diablo Canyon Independent Spent Fuel Storage Installation License Renewal Application (Cac/Epid 001028/L-2022-RNW-0007) DCL-23-035, Response to Request for Additional Information on Request Regarding Senior Reactor Operator License Application2023-04-24024 April 2023 Response to Request for Additional Information on Request Regarding Senior Reactor Operator License Application DCL-23-024, Independent Spent Fuel Storage Installation, Response to Nrg Request for Additional Information for Revision to License Amendment Request 22-01 Request for Approval of Alternative Security Measures for Early Warning System2023-04-0404 April 2023 Independent Spent Fuel Storage Installation, Response to Nrg Request for Additional Information for Revision to License Amendment Request 22-01 Request for Approval of Alternative Security Measures for Early Warning System DCL-23-020, Responses to NRC Questions Regarding License Renewal Efforts2023-03-17017 March 2023 Responses to NRC Questions Regarding License Renewal Efforts DCL-22-058, Responses to NRC Requests for Additional Information on LAR 20-03, Proposed Technical Specifications and Revised License Conditions for the Permanently Defueled Condition2022-07-20020 July 2022 Responses to NRC Requests for Additional Information on LAR 20-03, Proposed Technical Specifications and Revised License Conditions for the Permanently Defueled Condition ML22172A1642022-06-21021 June 2022 Response to Public Follow-up Question Regarding Unit 1 Reactor Vessel Neutron Embrittlement Coupon Testing - June 21, 2022 DCL-22-018, Independent Spent Fuel Storage Installation Responses to NRC Requests for Additional Information on License Amendment Request 21-04, Proposed Changes to the Emergency Plan for Post-Shutdown and Permanently.2022-03-23023 March 2022 Independent Spent Fuel Storage Installation Responses to NRC Requests for Additional Information on License Amendment Request 21-04, Proposed Changes to the Emergency Plan for Post-Shutdown and Permanently. DCL-21-060, Response to Request for Additional Information on License Amendment Request 21-03, Request for Revision to Technical Specification 3.8.1, AC Sources - Operating, to Support Diesel Fuel Oil Transfer System.2021-09-14014 September 2021 Response to Request for Additional Information on License Amendment Request 21-03, Request for Revision to Technical Specification 3.8.1, AC Sources - Operating, to Support Diesel Fuel Oil Transfer System. DCL-21-048, Response to Request for Additional Information on Emergency License Amendment Request 21-05, Revision to Technical Specification 3.7.8, Auxiliary Saltwater (Asw) System2021-07-0707 July 2021 Response to Request for Additional Information on Emergency License Amendment Request 21-05, Revision to Technical Specification 3.7.8, Auxiliary Saltwater (Asw) System DCL-21-040, Responses to NRC Requests for Additional Information on LAR 20-03, Proposed Technical Specifications and Revised License Conditions for the Permanently Defueled Condition2021-05-13013 May 2021 Responses to NRC Requests for Additional Information on LAR 20-03, Proposed Technical Specifications and Revised License Conditions for the Permanently Defueled Condition DCL-21-034, Response to Request for Additional Information on Final Supplemental Response to Generic Letter 20042021-04-15015 April 2021 Response to Request for Additional Information on Final Supplemental Response to Generic Letter 2004 DCL-20-088, Response to NRC Request for Additional Information Regarding Diablo Canyon Unit 2 Fall 2019 Steam Generator Tube Inspection Report2020-10-16016 October 2020 Response to NRC Request for Additional Information Regarding Diablo Canyon Unit 2 Fall 2019 Steam Generator Tube Inspection Report DCL-20-072, Response to Additional NRC Request for Additional Information Regarding License Amendment Request 20-01, Exigent Request for Revision to Technical Specification 3.7.5, Auxiliary Feedwater System2020-08-20020 August 2020 Response to Additional NRC Request for Additional Information Regarding License Amendment Request 20-01, Exigent Request for Revision to Technical Specification 3.7.5, Auxiliary Feedwater System DCL-20-069, Response to NRC Request for Additional Information Regarding License Amendment Request 20-01, Exigent Request for Revision to Technical Specification 3.7.5, Auxiliary Feedwater System2020-08-18018 August 2020 Response to NRC Request for Additional Information Regarding License Amendment Request 20-01, Exigent Request for Revision to Technical Specification 3.7.5, Auxiliary Feedwater System DCL-20-068, Response to NRC Request for Additional Information Regarding License Amendment Request 20-01, Exigent Request for Revision to Technical Specification 3.7.5, Auxiliary Feedwater System2020-08-16016 August 2020 Response to NRC Request for Additional Information Regarding License Amendment Request 20-01, Exigent Request for Revision to Technical Specification 3.7.5, Auxiliary Feedwater System DCL-20-012, Response to NRC Request for Additional Information Regarding Diablo Canyon Power Plant, Units 1 and 2 - Post-Shutdown Decommissioning Activities Report2020-03-11011 March 2020 Response to NRC Request for Additional Information Regarding Diablo Canyon Power Plant, Units 1 and 2 - Post-Shutdown Decommissioning Activities Report DCL-19-088, Supplemental Information Response to NRC Request for Additional Information Regarding 'License Amendment Request 19-01, Proposed Changes to the Intake Structure Physical Security Classification'2019-10-24024 October 2019 Supplemental Information Response to NRC Request for Additional Information Regarding 'License Amendment Request 19-01, Proposed Changes to the Intake Structure Physical Security Classification' DCL-19-056, Response to NRC Request for Additional Information (Supplemental) Regarding License Amendment Request 18-01, Request to Revise Emergency Plan Response Organization Staffing and Augmentation.2019-07-0303 July 2019 Response to NRC Request for Additional Information (Supplemental) Regarding License Amendment Request 18-01, Request to Revise Emergency Plan Response Organization Staffing and Augmentation. DCL-19-039, Response to NRC Request for Additional Information Regarding License Amendment Request 18-01, Request to Revise Emergency Plan Response Organization Staffing and Augmentation2019-05-0202 May 2019 Response to NRC Request for Additional Information Regarding License Amendment Request 18-01, Request to Revise Emergency Plan Response Organization Staffing and Augmentation ML19074A1092019-03-14014 March 2019 Response to Letter Dated February 26, 2019, Requesting NRC Opinion on Potential Impacts Due to Pacific Gas and Electric Company'S Bankruptcy Filing DCL-17-108, Spent Fuel Pool Evaluation Supplemental Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f)Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi..2017-12-18018 December 2017 Spent Fuel Pool Evaluation Supplemental Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f)Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi.. ML17324B3442017-11-20020 November 2017 Response to NRC Request for Additional Information Regarding Request for Approval of Alternative for Application of Full Structural Weld Overlay, REP-RHRSWOL, Units 1 and 2 DCL-17-073, Supplement to License Amendment Request 16-04 Revision 6. Development of Emergency Action Levels for Non-Passive Reactors.2017-08-17017 August 2017 Supplement to License Amendment Request 16-04 Revision 6. Development of Emergency Action Levels for Non-Passive Reactors. DCL-17-060, Response to NRC Request for Additional Information Regarding Relief Requests NDE-SLH U2, NDE-LSL U2, NDE-LHC U2, NDE-LHM U2, and NDE-ONV U22017-06-21021 June 2017 Response to NRC Request for Additional Information Regarding Relief Requests NDE-SLH U2, NDE-LSL U2, NDE-LHC U2, NDE-LHM U2, and NDE-ONV U2 ML17179A0192017-06-21021 June 2017 PG&E Response to NRC Request for Additional Information Regarding License Amendment Request 16-04, Request to Adopt Emergency Action Level Schemes Pursuant to NEI 99-01, Revision 6, 'Development of Emergency Action Levels for Non-Passive .. DCL-16-114, Response to Generic Letter 2016-012016-11-0303 November 2016 Response to Generic Letter 2016-01 DCL-16-101, Diablo Canyon, Units 1 and 2, Response to NRC Request for Additional Information Regarding License Amendment Request 15-03, Application of Alternative Source Term2016-10-0606 October 2016 Diablo Canyon, Units 1 and 2, Response to NRC Request for Additional Information Regarding License Amendment Request 15-03, Application of Alternative Source Term ML16287A7552016-10-0606 October 2016 Technical Assessment Implementation of Alternative Source Terms Summary of Dose Analyses and Results Revision 4 DCL-16-101, Response to NRC Request for Additional Information Regarding License Amendment Request 15-03, Application of Alternative Source Term2016-10-0606 October 2016 Response to NRC Request for Additional Information Regarding License Amendment Request 15-03, Application of Alternative Source Term DCL-16-094, Response to NRC Request for Additional Information Regarding License Amendment Request 16-02, License Amendment Request to Revise Technical Specification 3.4.12, 'Low Temperature Overpressure Protection (LTOP) System'.2016-09-28028 September 2016 Response to NRC Request for Additional Information Regarding License Amendment Request 16-02, License Amendment Request to Revise Technical Specification 3.4.12, 'Low Temperature Overpressure Protection (LTOP) System'. DCL-16-062, Response to RAI Regarding License Amendment Request 13-02, Revision to Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 1, 'Provide Risk-Informed Extended Completion Times - Ritstf..2016-07-0707 July 2016 Response to RAI Regarding License Amendment Request 13-02, Revision to Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 1, 'Provide Risk-Informed Extended Completion Times - Ritstf.. DCL-16-044, Response to NRC Request for Additional Information Regarding License Amendment Request 15-03, Application of Alternative Source Term.2016-04-21021 April 2016 Response to NRC Request for Additional Information Regarding License Amendment Request 15-03, Application of Alternative Source Term. DCL-16-023, Response to NRC Letter Dated February 2, 2016, Requests for Additional Information for the Review of the License Renewal Application - Set 39.2016-02-25025 February 2016 Response to NRC Letter Dated February 2, 2016, Requests for Additional Information for the Review of the License Renewal Application - Set 39. DCL-16-019, Response to NRC Request for Additional Information Regarding License Amendment Request 15-03, Application of Alternative Source Term.2016-02-10010 February 2016 Response to NRC Request for Additional Information Regarding License Amendment Request 15-03, Application of Alternative Source Term. ML16039A3662016-02-0808 February 2016 Units and 2 - Updated Response to Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 Flooding. Part 1 of 2 DCL-16-016, Units and 2 - Updated Response to Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 Flooding. Part 2 of 22016-02-0808 February 2016 Units and 2 - Updated Response to Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 Flooding. Part 2 of 2 DCL-16-015, Response to NRC Request for Additional Information Regarding License Amendment Request 15-03, Application of Alternative Source Term.2016-02-0101 February 2016 Response to NRC Request for Additional Information Regarding License Amendment Request 15-03, Application of Alternative Source Term. DCL-16-013, Response to NRC Request for Additional Information Regarding Relief Request NDE-FWNS-U1/U22016-01-27027 January 2016 Response to NRC Request for Additional Information Regarding Relief Request NDE-FWNS-U1/U2 DCL-16-012, Clarifications to Environmental Request for Additional Information Responses for the Review of the License Renewal Application2016-01-26026 January 2016 Clarifications to Environmental Request for Additional Information Responses for the Review of the License Renewal Application ML16049A0112016-01-25025 January 2016 Attachment 2 - Pacific Gas and Electric Company Diablo Canyon Power Plant Units 1 and 2, Process Protection System (PPS) Replacement Interface Requirements Specification Nuclear Safety-Related, Rev 9 DCL-16-011, Pacific Gas & Electric Company Diablo Canyon Units 1 and 2 - Response to Request for Additional Information and Submittal of Advanced Logic System Phase 2 Documents for the License Amendment Request for Process Protection System Replaceme2016-01-25025 January 2016 Pacific Gas & Electric Company Diablo Canyon Units 1 and 2 - Response to Request for Additional Information and Submittal of Advanced Logic System Phase 2 Documents for the License Amendment Request for Process Protection System Replacement ML16049A0092016-01-25025 January 2016 Pacific Gas & Electric Company Diablo Canyon Units 1 and 2 - Response to Request for Additional Information and Submittal of Advanced Logic System Phase 2 Documents for the License Amendment Request for Process Protection System Replacement DCL-16-011, Attachment 2 - Pacific Gas and Electric Company Diablo Canyon Power Plant Units 1 and 2, Process Protection System (PPS) Replacement Interface Requirements Specification Nuclear Safety-Related, Rev 92016-01-25025 January 2016 Attachment 2 - Pacific Gas and Electric Company Diablo Canyon Power Plant Units 1 and 2, Process Protection System (PPS) Replacement Interface Requirements Specification Nuclear Safety-Related, Rev 9 DCL-15-156, Response to NRC Request for Additional Information - National Fire Protection Association Standard 805 and Supplement2015-12-31031 December 2015 Response to NRC Request for Additional Information - National Fire Protection Association Standard 805 and Supplement ML15355A5502015-12-21021 December 2015 Transmittal of Response to NRC Request for Additional Information Dated October 1, 2015, and November 13, 2015, Regarding Recommendation 2.1 of the Near-Term Task Force Seismic Hazard and Screening Report DCL-15-154, Response to NRC Request for Additional Information Dated October 1, 2015, and November 13, 2015, Regarding Recommendation 2.1 of the Near-Term Task Force Seismic Hazard and Screening Report2015-12-21021 December 2015 Response to NRC Request for Additional Information Dated October 1, 2015, and November 13, 2015, Regarding Recommendation 2.1 of the Near-Term Task Force Seismic Hazard and Screening Report 2024-08-08 |