Letter Sequence Approval |
|---|
CAC:001028, SR 3.5.1.2 Notation (Approved, Closed) EPID:L-2021-LLA-0053, Attachment 2: Updated Summary of Proposed Changes (non-proprietary) (Approved, Closed) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, ... further results|Request]]
- Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, ... further results|Supplement]]
Administration
- Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance
- Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, ... further results|Meeting]]
Results
- Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, ... further results|Approval]]
Other: L-18-006, ISFSI - Site-Specific License Renewal Application, Revision 0, July 2018, L-23-005, Independent Spent Fuel Storage Installation License Renewal Application, Revision 1 (Cac/Epid No. 001028/L-2022-RNW-0007), ML17311A450, ML18018A018, ML18022A077, ML18022A078, ML18022A079, ML18087A056, ML18087A057, ML18087A058, ML18087A059, ML18087A060, ML18087A061, ML18087A062, ML18100A185, ML18100A188, ML18100A190, ML18100A191, ML18100A193, ML18101A024, ML18108A052, ML18131A047, ML18131A048, ML18141A561, ML18141A562, ML18141A563, ML18141A564, ML18141A565, ML18141A567, ML18179A258, ML18179A260, ML18179A266, ML18201A455, ML18205A179, ML18222A351, ML18228A530, ML18228A531, ML18228A532, ML18228A533, ML18234A012, ML18248A121, ML18255A093, ML18255A094, ML18255A096, ML18255A097, ML18255A098, ML18255A101, ML18255A102, ML18324A577, ML18324A594... further results
|
MONTHYEARML19255E7911997-05-31031 May 1997 Enclosure 1 - Ecological Assessment of the Low Level Waste Depository, Andrews County, Tx Project stage: Other ML19255E7952004-10-25025 October 2004 Enclosure 2 - Habitat Characterization and Rare Species Survey for the Proposed Low Level Waste Repository, Andrews County, Tx Project stage: Other ML19255E7982007-03-16016 March 2007 Enclosure 3 - Supplemental Survey to Ecological Assessment of the Low Level Waste Depository, Andrews County, Texas Project stage: Supplement ML19337B5182007-03-16016 March 2007 Enclosure 10 - Applicable Sections of LLRW License Project stage: Other ML19217A2112007-04-30030 April 2007 Enclosure 1 - Report on Mapping of a Trench Through Pedogenic Calcrete (Caliche) Across a Drainage and Possible Lineament, Waste Control Specialists Disposal Site, Andrews County, Tx (Public) Project stage: Other ML19255E8002008-07-0303 July 2008 Enclosure 4 - Environmental Assessment Report Prepared for Application for Renewal of Radioactive Material License R04971 Waste Control Specialists LLC Andrews County, Texas Project stage: Request ML19217A2142008-07-28028 July 2008 Enclosure 4 - Report on Activities to Satisfy Byproduct RML Conditions 41A, 41C, and 43, July 2008 (Public) Project stage: Other ML19217A2132011-02-22022 February 2011 Enclosure 3 - Oag Water Levels: Empirical and Modeled Relationships Between Precipitation and Infiltration, 2011 (Public) Project stage: Other ML18100A1882013-04-11011 April 2013 Enclosure 7 - Procedure 12751-MNGP-QP-9.201, Revision 0, Visual Weld Examination Project stage: Other ML18100A1852013-04-11011 April 2013 Enclosure 6 - Procedure 12751-MNGP-OPS-01, Revision 0, Spent Fuel Cask Welding: 61BT/BTH NUHOMS Canisters Project stage: Other ML18100A1912014-01-30030 January 2014 Enclosure 9 - Structural Integrity Associates, Inc. Report 130415.402, Revision 0, Review of Trivis Inc. Welding Procedures Used for Field Welds on the Transnuclear NUHOMS 61BTH Type 1 & 2 Transportable Canister for BWR Fuel Project stage: Other ML18100A1902014-05-22022 May 2014 Enclosure 8 - Structural Integrity Associates, Inc. Report 130415.403, Revision 2, Assessment of Monticello Spent Fuel Canister Closure Plate Welds Based on Welding Video Records Project stage: Other ML18011A1582017-12-22022 December 2017 International HI-STORE Cis (Consolidated Interim Storage Facility) License Application Responses to Safeguards Related Requests for Supplemental Information Project stage: Supplement ML17249A1572018-01-11011 January 2018, 16 January 2018 Package: Vermont Yankee Nuclear Power Station ISFSI Environmental Assessment and Finding of No Significant Impact Related to Issuance of Exemption to Allow a New Loading Pattern and Loading Fuel Cooled for at Least 2 Years Project stage: Request ML18022A1512018-01-16016 January 2018 Memo to A. Hsia Summary of December 12, 2017, Meeting with Pacific Gas & Electric Company to Discuss the Upcoming Submittal of the Application for Renewal of the Humboldt Bay Independent Spent Fuel Storage Installation License Project stage: Meeting ML18022A1532018-01-16016 January 2018 Enclosure 2: Agenda (Memo to A. Hsia Summary of December 12, 2017, Meeting with Pacific Gas & Electric Company to Discuss the Upcoming Submittal of the Application for Renewal of the Humboldt Bay ISFSI License) Project stage: Meeting ML18022A1522018-01-16016 January 2018 Enclosure 1: Meeting Attendees (Memo to A. Hsia Summary of December 12, 2017, Meeting with Pacific Gas & Electric Company to Discuss the Upcoming Submittal of the Application for Renewal of the Humboldt Bay ISFSI License) Project stage: Meeting ML17249A1592018-01-16016 January 2018 Letter to C. C. Chappell Vermont Yankee Nuclear Power Station ISFSI Environmental Assessment and Finding of No Significant Impact Related to Issuance of Exemption to Allow a New Loading Pattern and Loading Fuel Cooled for at Least 2 Years Project stage: Approval ML18022A1542018-01-16016 January 2018 Enclosure 3: Handout-PG&E Presentation on Humboldt Bay ISFSI LRA (Memo to A. Hsia Summary of December 12, 2017, Meeting) Project stage: Meeting ML18018A0182018-01-17017 January 2018 Letter to K. Manzione Application for Holtec International HI-STORM Umax Multipurpose Canister Storage System License Amendment Request No. 3 to Certificate of Compliance No. 1040 - Accepted for Review Project stage: Other ML18018A0192018-01-17017 January 2018 Enclosurequest for Additional Information (Ltr to K. Manzione Application for Holtec International HI-STORM Umax Multipurpose Canister Storage System License Amendment Request No. 3 to Certificate of Compliance No. 1040-Accepted for Review) Project stage: RAI ML18022A6122018-01-19019 January 2018 Letter to K. Manzione Amendment No. 4 to Certificate of Compliance No. 1032 for the HI-STORM Flood/Wind Multipurpose Canister Storage System-Request for Additional Information Project stage: RAI ML18018B2972018-01-19019 January 2018 Federal Registered Notice: Correction of Certificate of Compliance No. 1004, Renewed Amendments No. 11, Revision 1 and No. 13, Revision 1 Project stage: Request ML18022A0772018-01-22022 January 2018 Letter to J. Bondre Correction to Tn Americas LLC Technical Specifications for Renewed Amendments No. 11, Revision 1 and No. 13, Revision 1 to Standardized NUHOMS Certificate of Compliance No. 1004 for Spent Fuel Storage Casks Project stage: Other ML18022A0782018-01-22022 January 2018 Enclosure 1: Revised Title for Figure 1-5 Corrected Technical Specifications for Certificate of Compliance No. 1004 Renewed Amendment No. 11, Revision 1 Enclosure 1 Project stage: Other ML18022A0762018-01-22022 January 2018 Package: Correction to Title of Figure 1-15 in Technical Specifications for Certificate of Compliance 1004 Renewed Amendments No. 11, Revision 1 and No. 13, Revision 1 Project stage: Request ML18022A0792018-01-22022 January 2018 Enclosure 2: Revised Title for Figure 1-5 Corrected Technical Specifications for Certificate of Compliance No. 1004 Renewed Amendment No. 13, Revision 1 Project stage: Other ML18024A2732018-01-24024 January 2018 Letter to D. G. Stoddard U.S. NRC Approval of Virginia Electric and Power Company Request for Withholding Information from Public Disclosure for North Anna Power Station ISFSI (Cac/Epid Nos. 001028/L-2017-RNW-0010 and 000993/L-2017-LNE-0008 Project stage: Withholding Request Acceptance ML18031A4572018-01-31031 January 2018 Submittal Date for Response to NRCs Requests for Additional Information (Rais) for License Amendment Request 1032-4 to HI-STORM FW CoC No. 1032 (CAC No. 001028) Project stage: Request ML17311A4502018-01-31031 January 2018 ISFSI License Renewal Final Environmental Assessment Project stage: Other ML18036A2222018-02-0101 February 2018 International - Transmittal of HI-STORM Umax License Amendment Request No. 3 - Administrative RAI Response Project stage: Request ML17298A1342018-02-0202 February 2018 Letter to C. C. Chappell Vermont Yankee Nuclear Power Station Independent Spent Fuel Storage Installation, Issuance of Exemption (CAC No.: 001028, Docket Nos. 50-271, 72-59, and 72-1014; EPID L-2017-LLE-0005) Project stage: Approval ML17298A1352018-02-0202 February 2018 Safety Evaluation Report (Letter to C. C. Chappell Vermont Yankee Nuclear Power Station Independent Spent Fuel Storage Installation, Issuance of Exemption (CAC No.: 001028, Docket Nos. 50-271, 72-59, and 72-1014; EPID L-2017-LLE-0005) Project stage: Approval ML18031A2242018-02-0606 February 2018 Enclosure 1: Preamble-SNM-2507 License Renewal Order (Letter to D. G. Stoddard Issuance of Renewed Materials License No. SNM-2507 for the North Anna Power Station Independent Spent Fuel Storage Installation) Project stage: Approval ML18031A2282018-02-0606 February 2018 Enclosure 2: Safety Evaluation Report (Letter to D. G. Stoddard Issuance of Renewed Materials License No. SNM-2507 for the North Anna Power Station ISFSI) Project stage: Approval ML18031A2252018-02-0606 February 2018 Enclosurenewed License SNM-2507 (Letter to D. G. Stoddard Issuance of Renewed Materials License No. SNM-2507 for the North Anna Power Station Independent Spent Fuel Storage Installation) Project stage: Approval ML18031A2222018-02-0606 February 2018 Letter to D. G. Stoddard Issuance of Renewed Materials License No. SNM-2507 for the North Anna Power Station Independent Spent Fuel Storage Installation (Cac/Epid Nos. 001028/L-2017-RNW-0010 and 000993/L-2017-LNE-0008) Project stage: Approval ML18031A2272018-02-0606 February 2018 Enclosurenewed License SNM-2507 Technical Specifications (Letter to D. G. Stoddard Issuance of Renewed Materials License No. SNM-2507 for the North Anna Power Station ISFSI) Project stage: Approval ML18031A2312018-02-0808 February 2018 Federal Register Notice - Notice of Issuance for License Renewal (Letter to D. G. Stoddard Issuance of Renewed Materials License No. SNM-2507 for the North Anna Power Station ISFSI) Project stage: Approval ML18053A2222018-02-15015 February 2018 Application for Amendment 1 to the NUHOMS Eos System, Revision O (Docket No. 72-1042) Project stage: Request ML18053A2332018-02-15015 February 2018 Enclosure 4: CoC 1042 Amendment 1 Proposed Technical Specifications, Revision 0 Project stage: Request ML18053A2342018-02-15015 February 2018 Enclosure 6: Proposed Amendment 1, Revision 0 Changes to the NUHOMS Eos System Updated Final Safety Analysis Report, Chapters 1 to 14 Project stage: Request ML18058A0562018-02-23023 February 2018 Letter to J. Giddens Request for Additional Information Regarding Entergy Operations, Inc.S Decommissioning Funding Plan Update Project stage: RAI ML18058A6072018-02-23023 February 2018 HI-2177565, Rev 0, Holtec International & Eddy Lea Energy Alliance (Elea) Cis Facility - Decommissioning Cost Estimate and Funding Plan Project stage: Request ML18057A2182018-02-23023 February 2018 Enclosurequest for Additional Information (Letter to A. Zaremba Request for Additional Information for Review of Duke Energys Decommissioning Funding Plan Update) Project stage: RAI ML18058A0572018-02-23023 February 2018 Enclosurequest for Additional Information (Letter to J. Giddens Request for Additional Information Regarding Entergy Operations, Inc.S Decommissioning Funding Plan Update) Project stage: RAI ML18058A0232018-02-23023 February 2018 Letter to G. Van Noordennen Request for Additional Information Regarding Zionsolutions, LLCs Decommissioning Funding Plan Update for Zion Independent Spent Fuel Storage Installation Project stage: RAI ML18057A2172018-02-23023 February 2018 Letter to A. Zaremba Request for Additional Information for Review of Duke Energys Decommissioning Funding Plan Update Project stage: RAI ML18058A0242018-02-23023 February 2018 Enclosurequest for Additional Information (Letter to G. Van Noordennen Request for Additional Information Regarding Zionsolutions, LLCs Decommissioning Funding Plan Update for Zion Independent Spent Fuel Storage Installation) Project stage: RAI ML18058A6082018-02-23023 February 2018 HI-2177593, Rev 0, Holtec International & Eddy Lea Energy Alliance (Elea) Underground CISF - Financial Assurance & Project Life Cycle Cost Estimates Project stage: Request 2018-01-11
[Table View] |
Text
Attachment 1 Structural Clarification Questions for FW Amendment 7, February 16, 2024 Submittal
- 1. Provide additional justification that the MPC-32ML and MPC-37-CBS fuel baskets, both analyzed for the tipover accident condition using an enhanced LS-DYNA finite element analysis (FEA) model in a Version E overpack, bound the stress analysis results of the remaining fuel basket/overpack pairings currently presented in the SAR.
In order to demonstrate that the presented basket/overpack selection criteria consistently selects the basket that produces the maximum stresses, the applicant is requested to 1) perform additional studies, by employing the enhanced FEA model on a targeted sample of basket/overpack pairings, to validate that the Beta parameter consistently determines/correlates to the magnitude of basket stresses, and 2) create a new method, to replace the basket permanent deflection value, of indicating the dynamic response of the basket used to choose the overpack pairing. Alternatively, the applicant may analyze all basket/overpack pairings using the enhanced FEA model to determine the resulting stresses without attempting to develop a methodology for selecting the bounding baskets for stress analysis.
In SAR section 2.2.8, the applicant introduced a Beta parameter for all baskets in the FW system, as tabulated in Table 2.2.15, which is intended to predict the basket that will produce the most limiting stress results. Although it is not specifically stated in the SAR, the LS-DYNA model employed to produce the limiting basket stress results is actually an enhanced model that incorporates three major changes to the chosen basket models, as described in section G.2 of report HI-2200503, revision 8. The Beta parameter is based on basket-specific geometry and static fuel assembly weight. Therefore, the effects of the dynamic response of the basket in specific overpack pairings is not addressed in this method of determination of the bounding fuel baskets. Furthermore, there is no indication of what action is to be taken for the introduction of a revised or new overpack.
In response to NRC staff concerns raised after the January 26 coordination meeting regarding the Beta parameter not addressing the dynamic response of the fuel basket in different overpacks, the applicant indicated that the magnitudes of basket maximum permanent deflection results are indicative of the basket dynamic response in different overpacks, where a higher permanent deflection value would reflect a higher dynamic energy input. Therefore, presumably based on this assumption, the applicant chose to reanalyze the baskets with higher permanent deflection values in the Version E overpack.
As a means of validating the applicants statement, the staff reviewed the basket deflection and stress results as well as the associated deceleration results for all basket/overpack pairings submitted by the applicant in November 2023. The staff has summarized the following observations, which should be addressed in justifying the bounding fuel basket determination.
- a. The baskets with the 10 highest maximum stress results are not associated with the MPC-32ML and MPC-37-CBS baskets, which Holtec chose as limiting based on the Beta value. Therefore, there does not appear to be a direct correlation between the magnitude of the Beta parameter and the resulting basket stresses.
2
- b. The two largest maximum permanent deflection values do appear to correspond to the two baskets chosen as limiting, however, there does not appear to be a direct correlation between these deflection values and the maximum reported stresses.
- c. The maximum deceleration values for the lids of the Version E overpack system appear to range from 48 to 69 gs, whereas those of the Version UVH appear to range from 86 to 90 gs, and those of the Standard version fall somewhere in between. It is noted that the maximum deceleration of the MPC-37-CBS basket in the Version E overpack, chosen as the limiting CBS-type fuel basket for stress determination, is 48 gs. Although the staff recognizes that the dynamic response of any one component of a more complex structural system is not intuitively predictable, the magnitude of the dynamic impact energy input to each unique cask system via the overpack during the tipover event is generally indicative of the impact energy levels imparted to the internal cask components, including the fuel baskets. Therefore, the magnitudes of the dynamic impact for each basket/overpack pairing should be further considered in choosing any limiting cask system for stress analysis. Additionally, the applicant should add explicit instructions regarding the analytical requirements for the introduction of a new or revised overpack paired with an existing or new fuel basket.
Based on the items listed above, the staff concludes that the applicant has not provided sufficient justification to conclude that the basket/overpack pairings chosen by the Beta factor and maximum permanent deflection criteria reliably produce the most limiting stress results.
This information is needed to determine compliance with the regulatory requirements in 10 CFR 72.236(b).
- 2. Justify how the methodology for selecting the bounding baskets for detailed stress analysis accounts for changes to components of the storage system (e.g., the overpack) other than the basket panel slenderness and fuel assembly weight.
In SAR section 2.2.8, the applicant introduced a methodology for selecting the bounding baskets for detailed stress analysis. There are currently two screening criteria that determine if a basket is bounding and whether a detailed stress analysis must be performed using an enhanced FEA model. After discussing the screening criteria, the SAR then states that this detailed stress analysis shall be performed for the storage overpack that caused the maximum permanent deflection of fuel baskets. The staff is concerned that the overpack could affect which baskets experience the most critical stresses, and thus the overpack should be considered in determining which baskets are bounding. By accounting for the overpack after determining the bounding basket, the applicant could be neglecting to analyze a basket and overpack combination that results in the most critical stress results.
For each basket/overpack pairing, an LS-DYNA model must be constructed and analyzed for the tipover condition to verify that the design criteria for the overpack, MPC, and fuel basket permanent deflection limit is met. It appears to staff that once this FEA model is created, the determination of the resulting basket stresses for each basket/overpack pairing would be readily available and provide a much more direct and accurate indication of which pairing produces the maximum basket stress than the maximum permanent deflection results (as discussed in Question 1). These maximum stress results would then provide a direct comparison with the design acceptance criteria of 90% of true ultimate strength. If the
3 stress criterion is not met in this initial FEA model, the fuel basket would be analyzed using the enhanced model, as described in section G.2 of Report HI-2200503, revision 8.
This information is needed to determine compliance with the regulatory requirements in 10 CFR 72.236(b).
- 3. Describe the enhanced FEA model and the selection of the bounding basket in a prominent place in the SAR and calculations, presenting only the new analysis models used for the determination of basket stress results. Also, since some legacy figures of the original FEA model must remain to support the existing presented permanent deflection results, these must be labeled appropriately to distinguish them from any new figures.
Currently, the statements of intent in sections 2.2.8, 3.4.4.1.4, and 3.I of the latest revision of the SAR that rely on the current stress results of the limiting baskets, MPC-32ML and MPC-37-CBS, do not clearly convey that the existing stress (and strain) results for other baskets presented in previous SAR revisions are superseded by those of the limiting baskets. To eliminate confusion for current and future users of the SAR, this new information must be prominently and clearly communicated, and further clarifying language should be added to explain that the existing FEA models for all baskets are still used as the basis for reported permanent deflection results.
New figures depicting the basket temperature zones associated with the enhanced FEA model must be added to the SAR, and the existing ones supporting the legacy permanent deflection results must be clearly labeled to distinguish between them. The previous basket stress contours that are no longer valid must be removed from the SAR, and any tables presenting basket strain results must be corrected to remove these results, as they are no longer pertinent or valid (e.g., table 3.I.3.9).
Similarly, the design reports supporting the basket tipover designs must be revised for clarification purposes. Currently, only the report for the Version E overpack tipover analysis, HI-2200503, is revised and submitted to add appendix G. The other appendices of this report as well as the other design reports documenting the standard and Version UVH overpack tipover analyses (i.e., HI-2094353, HI-2166998, and HI-2210313) must also be revised to communicate the change in the method of basket stress determination, as well as remove existing erroneous and superseded results. Current examples of portions of HI-2200503 that require further revision are the main body and appendices C, D and F.
These requested clarifications serve to prevent any confusion as to which tipover models and results form the licensing basis.
This information is needed to determine compliance with the regulatory requirements in 10 CFR 72.11(a).
- 4. Correct or justify the true stress-strain curve values determined for Metamic-HT basket material at 180 °C.
Appendix B of report HI-2200503, revision 8, presents the determination of true stress-strain curves for the Metamic-HT basket material for use in the LS-DYNA model. For the material at 180 °C, it is stated that the input parameters are interpolated from the minimum guaranteed values presented in the Metamic-HT Source Book for 200 °C and ambient
4 temperature. In Appendix B, ambient is defined as 30 °C, while the Source Book states that ambient is 40 °C.
This information is needed to determine compliance with the regulatory requirements in 10 CFR 72.236(l).
- 5. Administrative errors that warrant attention, but are not necessary for the staff to make a regulatory finding:
- a. Provide a copy of the revised DS-331 document for staff review. SAR reference 2.2.12 indicates that the current revision of this document is Revision 2. However, Revision 3 was submitted for staff review in August 2023. In December 2023, the staff advised that several errors were present in this revision, specifically the definition of the true ultimate strength values for Metamic-HT. Please correct these errors and resubmit for review, as well as updating reference 2.2.12 to the correct revision number.
- b. In Table 2.2.5, the w value of 10.81 lbf/in entered for the MPC-32ML fuel basket should be 11.22 lbf/in.