Letter Sequence Other |
|---|
CAC:001028, SR 3.5.1.2 Notation (Approved, Closed) EPID:L-2021-LLA-0053, Attachment 2: Updated Summary of Proposed Changes (non-proprietary) (Approved, Closed) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, ... further results|Request]]
- Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, ... further results|Supplement]]
Administration
- Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance
- Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, ... further results|Meeting]]
Results
- Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, ... further results|Approval]]
Other: L-18-006, ISFSI - Site-Specific License Renewal Application, Revision 0, July 2018, L-23-005, Independent Spent Fuel Storage Installation License Renewal Application, Revision 1 (Cac/Epid No. 001028/L-2022-RNW-0007), ML17311A450, ML18018A018, ML18022A077, ML18022A078, ML18022A079, ML18087A056, ML18087A057, ML18087A058, ML18087A059, ML18087A060, ML18087A061, ML18087A062, ML18100A185, ML18100A188, ML18100A190, ML18100A191, ML18100A193, ML18101A024, ML18108A052, ML18131A047, ML18131A048, ML18141A561, ML18141A562, ML18141A563, ML18141A564, ML18141A565, ML18141A567, ML18179A258, ML18179A260, ML18179A266, ML18201A455, ML18205A179, ML18222A351, ML18228A530, ML18228A531, ML18228A532, ML18228A533, ML18234A012, ML18248A121, ML18255A093, ML18255A094, ML18255A096, ML18255A097, ML18255A098, ML18255A101, ML18255A102, ML18324A577, ML18324A594... further results
|
MONTHYEARML19255E7911997-05-31031 May 1997 Enclosure 1 - Ecological Assessment of the Low Level Waste Depository, Andrews County, Tx Project stage: Other ML19255E7952004-10-25025 October 2004 Enclosure 2 - Habitat Characterization and Rare Species Survey for the Proposed Low Level Waste Repository, Andrews County, Tx Project stage: Other ML19255E7982007-03-16016 March 2007 Enclosure 3 - Supplemental Survey to Ecological Assessment of the Low Level Waste Depository, Andrews County, Texas Project stage: Supplement ML19337B5182007-03-16016 March 2007 Enclosure 10 - Applicable Sections of LLRW License Project stage: Other ML19217A2112007-04-30030 April 2007 Enclosure 1 - Report on Mapping of a Trench Through Pedogenic Calcrete (Caliche) Across a Drainage and Possible Lineament, Waste Control Specialists Disposal Site, Andrews County, Tx (Public) Project stage: Other ML19255E8002008-07-0303 July 2008 Enclosure 4 - Environmental Assessment Report Prepared for Application for Renewal of Radioactive Material License R04971 Waste Control Specialists LLC Andrews County, Texas Project stage: Request ML19217A2142008-07-28028 July 2008 Enclosure 4 - Report on Activities to Satisfy Byproduct RML Conditions 41A, 41C, and 43, July 2008 (Public) Project stage: Other ML19217A2132011-02-22022 February 2011 Enclosure 3 - Oag Water Levels: Empirical and Modeled Relationships Between Precipitation and Infiltration, 2011 (Public) Project stage: Other ML18100A1882013-04-11011 April 2013 Enclosure 7 - Procedure 12751-MNGP-QP-9.201, Revision 0, Visual Weld Examination Project stage: Other ML18100A1852013-04-11011 April 2013 Enclosure 6 - Procedure 12751-MNGP-OPS-01, Revision 0, Spent Fuel Cask Welding: 61BT/BTH NUHOMS Canisters Project stage: Other ML18100A1912014-01-30030 January 2014 Enclosure 9 - Structural Integrity Associates, Inc. Report 130415.402, Revision 0, Review of Trivis Inc. Welding Procedures Used for Field Welds on the Transnuclear NUHOMS 61BTH Type 1 & 2 Transportable Canister for BWR Fuel Project stage: Other ML18100A1902014-05-22022 May 2014 Enclosure 8 - Structural Integrity Associates, Inc. Report 130415.403, Revision 2, Assessment of Monticello Spent Fuel Canister Closure Plate Welds Based on Welding Video Records Project stage: Other ML18011A1582017-12-22022 December 2017 International HI-STORE Cis (Consolidated Interim Storage Facility) License Application Responses to Safeguards Related Requests for Supplemental Information Project stage: Supplement ML17249A1572018-01-11011 January 2018, 16 January 2018 Package: Vermont Yankee Nuclear Power Station ISFSI Environmental Assessment and Finding of No Significant Impact Related to Issuance of Exemption to Allow a New Loading Pattern and Loading Fuel Cooled for at Least 2 Years Project stage: Request ML18022A1512018-01-16016 January 2018 Memo to A. Hsia Summary of December 12, 2017, Meeting with Pacific Gas & Electric Company to Discuss the Upcoming Submittal of the Application for Renewal of the Humboldt Bay Independent Spent Fuel Storage Installation License Project stage: Meeting ML18022A1532018-01-16016 January 2018 Enclosure 2: Agenda (Memo to A. Hsia Summary of December 12, 2017, Meeting with Pacific Gas & Electric Company to Discuss the Upcoming Submittal of the Application for Renewal of the Humboldt Bay ISFSI License) Project stage: Meeting ML18022A1522018-01-16016 January 2018 Enclosure 1: Meeting Attendees (Memo to A. Hsia Summary of December 12, 2017, Meeting with Pacific Gas & Electric Company to Discuss the Upcoming Submittal of the Application for Renewal of the Humboldt Bay ISFSI License) Project stage: Meeting ML17249A1592018-01-16016 January 2018 Letter to C. C. Chappell Vermont Yankee Nuclear Power Station ISFSI Environmental Assessment and Finding of No Significant Impact Related to Issuance of Exemption to Allow a New Loading Pattern and Loading Fuel Cooled for at Least 2 Years Project stage: Approval ML18022A1542018-01-16016 January 2018 Enclosure 3: Handout-PG&E Presentation on Humboldt Bay ISFSI LRA (Memo to A. Hsia Summary of December 12, 2017, Meeting) Project stage: Meeting ML18018A0182018-01-17017 January 2018 Letter to K. Manzione Application for Holtec International HI-STORM Umax Multipurpose Canister Storage System License Amendment Request No. 3 to Certificate of Compliance No. 1040 - Accepted for Review Project stage: Other ML18018A0192018-01-17017 January 2018 Enclosurequest for Additional Information (Ltr to K. Manzione Application for Holtec International HI-STORM Umax Multipurpose Canister Storage System License Amendment Request No. 3 to Certificate of Compliance No. 1040-Accepted for Review) Project stage: RAI ML18022A6122018-01-19019 January 2018 Letter to K. Manzione Amendment No. 4 to Certificate of Compliance No. 1032 for the HI-STORM Flood/Wind Multipurpose Canister Storage System-Request for Additional Information Project stage: RAI ML18018B2972018-01-19019 January 2018 Federal Registered Notice: Correction of Certificate of Compliance No. 1004, Renewed Amendments No. 11, Revision 1 and No. 13, Revision 1 Project stage: Request ML18022A0772018-01-22022 January 2018 Letter to J. Bondre Correction to Tn Americas LLC Technical Specifications for Renewed Amendments No. 11, Revision 1 and No. 13, Revision 1 to Standardized NUHOMS Certificate of Compliance No. 1004 for Spent Fuel Storage Casks Project stage: Other ML18022A0782018-01-22022 January 2018 Enclosure 1: Revised Title for Figure 1-5 Corrected Technical Specifications for Certificate of Compliance No. 1004 Renewed Amendment No. 11, Revision 1 Enclosure 1 Project stage: Other ML18022A0762018-01-22022 January 2018 Package: Correction to Title of Figure 1-15 in Technical Specifications for Certificate of Compliance 1004 Renewed Amendments No. 11, Revision 1 and No. 13, Revision 1 Project stage: Request ML18022A0792018-01-22022 January 2018 Enclosure 2: Revised Title for Figure 1-5 Corrected Technical Specifications for Certificate of Compliance No. 1004 Renewed Amendment No. 13, Revision 1 Project stage: Other ML18024A2732018-01-24024 January 2018 Letter to D. G. Stoddard U.S. NRC Approval of Virginia Electric and Power Company Request for Withholding Information from Public Disclosure for North Anna Power Station ISFSI (Cac/Epid Nos. 001028/L-2017-RNW-0010 and 000993/L-2017-LNE-0008 Project stage: Withholding Request Acceptance ML18031A4572018-01-31031 January 2018 Submittal Date for Response to NRCs Requests for Additional Information (Rais) for License Amendment Request 1032-4 to HI-STORM FW CoC No. 1032 (CAC No. 001028) Project stage: Request ML17311A4502018-01-31031 January 2018 ISFSI License Renewal Final Environmental Assessment Project stage: Other ML18036A2222018-02-0101 February 2018 International - Transmittal of HI-STORM Umax License Amendment Request No. 3 - Administrative RAI Response Project stage: Request ML17298A1342018-02-0202 February 2018 Letter to C. C. Chappell Vermont Yankee Nuclear Power Station Independent Spent Fuel Storage Installation, Issuance of Exemption (CAC No.: 001028, Docket Nos. 50-271, 72-59, and 72-1014; EPID L-2017-LLE-0005) Project stage: Approval ML17298A1352018-02-0202 February 2018 Safety Evaluation Report (Letter to C. C. Chappell Vermont Yankee Nuclear Power Station Independent Spent Fuel Storage Installation, Issuance of Exemption (CAC No.: 001028, Docket Nos. 50-271, 72-59, and 72-1014; EPID L-2017-LLE-0005) Project stage: Approval ML18031A2242018-02-0606 February 2018 Enclosure 1: Preamble-SNM-2507 License Renewal Order (Letter to D. G. Stoddard Issuance of Renewed Materials License No. SNM-2507 for the North Anna Power Station Independent Spent Fuel Storage Installation) Project stage: Approval ML18031A2282018-02-0606 February 2018 Enclosure 2: Safety Evaluation Report (Letter to D. G. Stoddard Issuance of Renewed Materials License No. SNM-2507 for the North Anna Power Station ISFSI) Project stage: Approval ML18031A2252018-02-0606 February 2018 Enclosurenewed License SNM-2507 (Letter to D. G. Stoddard Issuance of Renewed Materials License No. SNM-2507 for the North Anna Power Station Independent Spent Fuel Storage Installation) Project stage: Approval ML18031A2222018-02-0606 February 2018 Letter to D. G. Stoddard Issuance of Renewed Materials License No. SNM-2507 for the North Anna Power Station Independent Spent Fuel Storage Installation (Cac/Epid Nos. 001028/L-2017-RNW-0010 and 000993/L-2017-LNE-0008) Project stage: Approval ML18031A2272018-02-0606 February 2018 Enclosurenewed License SNM-2507 Technical Specifications (Letter to D. G. Stoddard Issuance of Renewed Materials License No. SNM-2507 for the North Anna Power Station ISFSI) Project stage: Approval ML18031A2312018-02-0808 February 2018 Federal Register Notice - Notice of Issuance for License Renewal (Letter to D. G. Stoddard Issuance of Renewed Materials License No. SNM-2507 for the North Anna Power Station ISFSI) Project stage: Approval ML18053A2222018-02-15015 February 2018 Application for Amendment 1 to the NUHOMS Eos System, Revision O (Docket No. 72-1042) Project stage: Request ML18053A2332018-02-15015 February 2018 Enclosure 4: CoC 1042 Amendment 1 Proposed Technical Specifications, Revision 0 Project stage: Request ML18053A2342018-02-15015 February 2018 Enclosure 6: Proposed Amendment 1, Revision 0 Changes to the NUHOMS Eos System Updated Final Safety Analysis Report, Chapters 1 to 14 Project stage: Request ML18058A0562018-02-23023 February 2018 Letter to J. Giddens Request for Additional Information Regarding Entergy Operations, Inc.S Decommissioning Funding Plan Update Project stage: RAI ML18058A6072018-02-23023 February 2018 HI-2177565, Rev 0, Holtec International & Eddy Lea Energy Alliance (Elea) Cis Facility - Decommissioning Cost Estimate and Funding Plan Project stage: Request ML18057A2182018-02-23023 February 2018 Enclosurequest for Additional Information (Letter to A. Zaremba Request for Additional Information for Review of Duke Energys Decommissioning Funding Plan Update) Project stage: RAI ML18058A0572018-02-23023 February 2018 Enclosurequest for Additional Information (Letter to J. Giddens Request for Additional Information Regarding Entergy Operations, Inc.S Decommissioning Funding Plan Update) Project stage: RAI ML18058A0232018-02-23023 February 2018 Letter to G. Van Noordennen Request for Additional Information Regarding Zionsolutions, LLCs Decommissioning Funding Plan Update for Zion Independent Spent Fuel Storage Installation Project stage: RAI ML18057A2172018-02-23023 February 2018 Letter to A. Zaremba Request for Additional Information for Review of Duke Energys Decommissioning Funding Plan Update Project stage: RAI ML18058A0242018-02-23023 February 2018 Enclosurequest for Additional Information (Letter to G. Van Noordennen Request for Additional Information Regarding Zionsolutions, LLCs Decommissioning Funding Plan Update for Zion Independent Spent Fuel Storage Installation) Project stage: RAI ML18058A6082018-02-23023 February 2018 HI-2177593, Rev 0, Holtec International & Eddy Lea Energy Alliance (Elea) Underground CISF - Financial Assurance & Project Life Cycle Cost Estimates Project stage: Request 2018-01-11
[Table View] |
Text
HOLTEC INTERNATIONAL COPYRIGHTED MATERIAL REPORT HI-2114830 Proposed Revision 10F 2-31 A, B, C, D = Polynomial coefficients listed in Table 2.1.9 or Table 2.1.10 Minimum cooling time must also meet limits specified in Tables 2.1.1a and 2.1.1b. If the calculated Ct is less than the cooling time limits in Tables 2.1.1a or 2.1.1b, the minimum cooling time in table is used.
For the assembly array/class 10x10J in the MPC-89, an adjustment to the assembly-average burnup used in the above equation is required. This is discussed in Section 2.1.6.4.
For MPC-37 and MPC-89, the coefficients for above equation for the assembly in an individual cell depend on the heat load limit in that cell, Table 2.1.10 lists the coefficients for several heat load limit ranges. Note that the heat load limits are only used for the lookup of the coefficients in that table, and do not imply any equivalency. Specifically, meeting heat load limits is not a substitute for meeting burnup and cooling time limits, and vice versa.
Non-fuel hardware, as defined in the Glossary, has been evaluated and is also authorized for storage in the PWR MPCs as specified in Table 2.1.1b.
2.1.6.2 Radiological Parameters for Spent Fuel and Non-fuel Hardware in MPC-37P and MPC-44 MPC-37P is authorized to store CE15x15 spent fuel with burnup - cooling time combinations as given in Table 2.1.12. MPC-44 is authorized to store 14x14 spent fuel with burnup - cooling time combinations as given in Table 2.1.12.
The burnup and cooling time for every fuel assembly loaded into the MPC-37P and MPC-44 must satisfy the following equation:
Bu + E
- where, Ct
= Minimum cooling time (years),
Bu
= Assembly-average burnup (MWd/mtU),
A, B, C, D, E
= Polynomial coefficients listed in Table 2.1.12.
2.1.6.3 Alternative Radiological Parameters for Spent Fuel in the MPC-37 and MPC-37P As an alternative to the radiological parameters for the MPC-37 and MPC-37P defined in Sections 2.1.6.1 and 2.1.6.2, it is permissible to use the parameters in Tables 2.1.13 and 2.1.14.
These tables also define minimum cooling time as a function of burnup, but instead of specifying Holtec Letter 5018099 Attachment 2 1 of 5
HOLTEC INTERNATIONAL COPYRIGHTED MATERIAL REPORT HI-2114830 Proposed Revision 10F 2-32 those through polynomials, the limits are directly specified in the tables. All assemblies in a single MPC must either meet the limits from Subsections 2.1.6.1 and 2.1.6.2, or the limits in those tables. A combination is not permitted.
2.1.6.4 Radiological Parameters for Assembly Array/Class 10x10J lLoaded according to the Patterns in Tables 1.2.4a, 1.2.4.b or 1.2.4.c For array/class 10x10J, modified or additional requirements must be met, to account for the higher uranium mass of this assembly type compared to the design basis assembly. This is to ensure that when any cask is loaded with one or more 10x10J assemblies, dose rates around the cask are still below a cask loaded with design basis fuel. The adjustment or requirements depends on the storage pattern that is used, as discussed below.
When loading assemblies corresponding to array/class 10x10J according to Table 1.2.4b, i.e. in one of the alternative patterns in Figure 1.2.6 or 1.2.7, the burnup of the assembly used in the equation needs to be increased before use. This will result in a larger required cooling time, hence reduced source terms, that offsets the effect of the higher uranium mass. The level of increase is specified in a note to Table 2.1.10. This increase is only required for the array/class 10x10J, not for any other assemblies, even if they are located in the same basket and pattern.
When loading assemblies corresponding to array/class 10x10J according to Table 1.2.4a, the explicit burnup and cooling time combination requirements from Table 2.1.15 must be applied.
This table already considers the effect of the increase uranium mass, so no further adjustments are necessary. This table only applies to the array/class 10x10J, not to any other assemblies, even if they are located in the same basket and pattern, and such other assemblies do not have any corresponding burnup and cooling time requirements.
For assembly class 10x10J loaded in the MPC-89 according to Table 1.2.4a the radiological parameters in Table 2.1.156 must be applied.
Holtec Letter 5018099 Attachment 2 2 of 5
HOLTEC INTERNATIONAL COPYRIGHTED MATERIAL REPORT HI-2114830 Rev. 10F9 13-9 assembly is acceptable for loading in the MPC-89, but it is limited to the cells depicted in Figure 2.1.2 Fuel Assembly Number 2 is not acceptable for loading in the MPC-89. Fuel Assembly 2 is limited to the cell locations for DFCs in the MPC-89 (Figure 2.1.2). These cells, which are a subset of Region 3, have a decay heat limit lower than the decay heat of the assembly. This assembly will need additional cooling time (reduction in decay heat) to be acceptable for loading in the MPC-89.
Fuel Assembly Number 3 is acceptable for loading in Regions 1, 2 or 3 of the MPC-89.
Fuel Assembly Number 4 is acceptable for loading in Region 2 of the MPC-89 only. The fuel assembly is limited to these locations due to the total heat load of the fuel assembly.
Example 3 In this example, it will be assumed that the MPC-89 is being loaded with array/class 10x10J fuel in the alternative storage patterns in Table 1.2.4b (Figures 1.2.6 and 1.2.7).
Table 13.2.3 provides four hypothetical fuel assemblies in the 10x10J array/class that will be evaluated for acceptability. The decay heat values and the fuel classification in Table 13.2.3 are determined by the user. The other information is taken from the fuel assembly and reactor operating records.
Note that the acceptability evaluations below only apply to assembly array/class 10x10J. Other assemblies, even if they are located in the same cask and pattern, would be evaluated using the polynomial coefficients in Table 2.1.10 with no additional adjustment.
Fuel Assembly Number 1 is acceptable for loading, but only when using the storage patterns in Figures 1.2.6b and 1.2.7b. The assembly is damaged, i.e. must be placed in a DFC, and only the locations permitted for a DFC in the patterns can be used. The assembly is not acceptable for loading in the storage patterns in Figures 1.2.6a and 1.2.7a because the heat load of the fuel assembly exceeds the assembly decay heat limit for the storage cells permitted for DFCs.
Figures 1.2.6b and 1.2.7b provide the storage patterns with the higher decay heat limits in all DFC cells than the decay heat of the assembly. Assuming the maximum allowable heat load limit of 1.46 kW in Figure 1.2.7b, the minimum required cooling time is calculated as discussed in Paragraph 2.1.6.1, using the polynomial coefficients in Table 2.1.10 with the appropriate adjustment per Note 2 of Table 2.1.10. The determined minimum cooling time of 1.24 years is lower than the assembly cooling time, hence it is acceptable for loading in MPC-89 using the storage patterns in Figures 1.2.6b and 1.2.7b.
Fuel Assembly Number 2 is not acceptable for loading. This assembly is not acceptable for loading in the storage patterns in Figures 1.2.6 and 1.2.7 because the heat load of the fuel assembly exceeds the assembly decay heat limit for the storage cells permitted for DFCs.
Holtec Letter 5018099 Attachment 2 3 of 5
HOLTEC INTERNATIONAL COPYRIGHTED MATERIAL REPORT HI-2114830 Rev. 10F9 13-10 Fuel Assembly Number 3 is acceptable for loading. The calculations of the minimum required cooling time, which are performed as discussed in Paragraph 2.1.6.1, using the polynomial coefficients in Table 2.1.10 with the appropriate adjustment per Note 2 of Table 2.1.10, demonstrate that Fuel Assembly 3 would be acceptable for loading into any cell of the storage patterns in Figures 1.2.6 and 1.2.7 that is permitted for fuel storage. However, some cells in Figure 1.2.7 have a decay heat limit lower than the decay heat of the assembly. Therefore, Fuel Assembly 3 is acceptable for loading in all storage cells of Figure 1.2.6 as well as all storage cells with a decay heat limit not less than the assembly decay heat of Figure 1.2.7, except the storage cells required to be empty.
Fuel Assembly Number 4 is acceptable for loading. Fuel Assembly 4 is acceptable for loading in the storage cells of Figures 1.2.6 and 1.2.7 with a decay heat limit higher than the decay heat of the assembly. The calculated minimum required cooling times for these cells, which are determined as discussed in Paragraph 2.1.6.1, using the polynomial coefficients in Table 2.1.10 with the appropriate adjustment per Note 2 of Table 2.1.10, are lower than the assembly cooling time.
Example 4 In this example, it will be assumed that the MPC-89 is being loaded with array/class 10x10J fuel in the regionalized storage pattern in Figure 1.2.2 with heat loads from Table 1.2.4a.
The same four hypothetical assemblies as those for Example 3 are used, shown in Table 13.2.3.
Note that the acceptability evaluations below only apply to assembly array/class 10x10J. Other assemblies, even if they are located in the same cask and pattern, do not have a corresponding table with any explicit burnup and cooling time requirements, hence they would be evaluated as outlined in Example 2, and only the general limits (maximum burnup, minimum cooling time) listed in Table 2.1.1a would apply.
Fuel Assembly Number 1 is not acceptable for loading. Fuel Assembly 1 is limited to the cell locations for DFCs in MPC-89 (Figure 2.1.2). These cells, which are a subset of Region 3, have a decay heat limit higher than the decay heat of the assembly. However, the fuel assembly burnup and cooling time do not satisfy the Region 3 qualification requirements in Table 2.1.15.
Therefore, the assembly is not acceptable for loading in MPC-89 and requires additional cooling time to be acceptable for loading under Table 1.2.4a.
Fuel Assembly Number 2 is not acceptable for loading. Fuel Assembly 2 is limited to the cell locations for DFCs in MPC-89 (Figure 2.1.2). These cells, which are a subset of Region 3, have a decay heat limit lower than the decay heat of the assembly. Therefore, the assembly is not acceptable for loading in MPC-89 and requires additional cooling time (reduction in decay heat) to be acceptable for loading under Table 1.2.4a.
Fuel Assembly Number 3 is acceptable for loading. The decay heat of Fuel Assembly 3 is lower than the decay heat limits in Regions 1, 2 and 3 of Table 1.2.4a. Also, the fuel assembly burnup Holtec Letter 5018099 Attachment 2 4 of 5
HOLTEC INTERNATIONAL COPYRIGHTED MATERIAL REPORT HI-2114830 Rev. 10F9 13-11 and cooling time satisfy the qualification requirements for Regions 1, 2 and 3 in Table 2.1.15.
Therefore, it is acceptable for loading in Regions 1, 2 or 3 of MPC-89 under Table 1.2.4a.
Fuel Assembly Number 4 is acceptable for loading. Fuel Assembly 4 is acceptable for loading in Region 2 of MPC-89 only. The fuel assembly is limited to these locations due to the decay heat of the fuel assembly. The fuel assembly burnup and cooling time satisfy the qualification requirements for Region 2 in Table 2.1.15.
Holtec Letter 5018099 Attachment 2 5 of 5