ML21068A071

From kanterella
Jump to navigation Jump to search

Letter: Fermi - Close-out Letter
ML21068A071
Person / Time
Site: 07200071
Issue date: 04/07/2021
From: John Mckirgan
Storage and Transportation Licensing Branch
To: Peter Dietrich
DTE Electric Company
Jacobs C
References
CAC 001028, EPID L-2017-FPR-0025
Download: ML21068A071 (3)


Text

April 7, 2021 Peter Dietrich Senior Vice President and Chief Nuclear Officer DTE Energy Company 6400 N. Dixie Highway Newport, MI 48166

SUBJECT:

U.S. NUCLEAR REGULATORY COMMISSION ANALYSIS OF DTE ELECTRIC COMPANYS INITIAL DECOMMISSIONING FUNDING PLAN FOR THE FERMI-2 INDEPENDENT SPENT FUEL STORAGE INSTALLATION

Dear Mr. Dietrich:

By letter dated July 2, 2014, DTE Electric Company (DTE) submitted, for U.S. Nuclear Regulatory Commission (NRC) staff review and approval, an initial decommissioning funding plan (DFP) for the independent spent fuel storage installation (ISFSI) at Fermi-2 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML14183B584).

In accordance with Title 10 of the Code of Federal Regulations (10 CFR), Section 72.30(b), and using NUREG-1757, Vol. 3, Rev. 1, Consolidated Decommissioning Guidance, the NRC staff reviewed DTEs initial DFP, including the initial decommissioning cost estimate (DCE) and the method of assuring funds for decommissioning.

Pursuant to 10 CFR 72.30(b), each holder of, or applicant for, a license under Part 72 must submit for NRC review and approval a DFP containing information on how reasonable assurance will be provided that funds will be available to decommission its ISFSIs. The DFP must contain a detailed DCE, in an amount reflecting: (1) the cost of an independent contractor to perform all decommissioning activities, (2) an adequate contingency factor, and (3) the cost of meeting the 10 CFR 20.1402 unrestricted use criteria (or the cost of meeting the 10 CFR 20.1403 restricted use criteria, provided the licensee can demonstrate its ability to meet these criteria). The licensees DFP must also identify and justify using the key assumptions contained in the DCE. Further, the DFP must describe the method of assuring funds for ISFSI decommissioning, including means for adjusting cost estimates and associated funding levels periodically over the life of the ISFSI. Additionally, the DFP must specify the volume of onsite subsurface material containing residual radioactivity that will require remediation to meet the criteria for license termination, and contain a certification that financial assurance for ISFSI decommissioning has been provided in the amount of the DCE.

The NRC staff reviewed and analyzed the information submitted by DTE on how reasonable assurance will be provided that funds will be available to decommission the ISFSI, including the amount of the DCE and the method of assuring funds for decommissioning.

In its 2014 initial DFP, DTE estimated the total costs to decommission the ISFSI to unrestricted use, in 2014 dollars. The DCE provided for Fermi-2 was $7,988,500.

Based on its financial analysis of DTEs submittal, the NRC staff finds that the DCE submitted for 2014: (1) is based on reasonable costs of a third-party contractor; (2) includes an adequate contingency factor; (3) reflects the cost of meeting the 10 CFR 20.1402 criteria for unrestricted use; and (4) is based on reasonable and documented assumptions. Therefore, the NRC finds that the 2014 DCE adequately estimates the cost, to carry out required ISFSI decommissioning activities prior to license termination, and that the 2014 DCE is acceptable.

In the initial DFP, DTE relied on an external sinking fund in the form of a trust as financial assurance for its ISFSI decommissioning, a method authorized by 10 CFR 50.75(e)(1)(ii)(A) and 10 CFR 72.30(e)(5). This is allowed because the Fermi-2 ISFSI belongs to a licensee with a power reactor license under part 50. The NRC staff reviewed the licensees initial DFP, and finds that the aggregate dollar amount of the licensees financial instrument provides adequate financial assurance to cover its cost estimates, and therefore, that this financial instrument are acceptable.

Based on its financial analyses, the NRC staff finds that the initial DFP contains the information required by 10 CFR 72.30(b) and that DTE has provided reasonable assurance that funds will be available to decommission the ISFSI at Fermi-2.

In addition to the NRC staffs review of DTEs initial DFP, the NRC staff completed an environmental review. The NRC staff published a summary of the results of the environmental review in the Federal Register in April 2021 for the ISFSI at Fermi-2. The environmental assessment and finding of no significant impact for this ISFSI is available in https://www.regulations.gov under the Docket ID: NRC-2021-0063. The NRC staff determined there was no environmental impact from the NRC staffs review and approval of DTEs initial DFP.

If you have any questions regarding this matter, please contact me at (301) 415-5722 or John.McKirgan@nrc.gov.

Sincerely, John McKirgan, Chief Storage and Transportation Licensing Branch Division of Fuel Management Office of Nuclear Material Safety and Safeguards Docket No.: 72-71 License No.: SFGL-58 CAC No.: 001028 EPID No.: L-2017-FPR-0025 John B.

McKirgan Digitally signed by John B.

McKirgan Date: 2021.04.07 11:07:55

-04'00'

ML21068A071

  • concurrence via email OFFICE NMSS/DFM NMSS/DFM
  • NMSS/STLB NAME CJacobs SFigueroa NMertz JMcKirgan DATE 3/8/2021 3/9/21 3/24/21 4/6/2021