ML20269A259

From kanterella
Jump to navigation Jump to search

Interim Storage Partners, LLC - Revision 5 of the Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan with Updated Cover Sheets, Docket 72-1050 Cac/Epid 001028/L-2017-NEW-0002
ML20269A259
Person / Time
Site: Consolidated Interim Storage Facility
Issue date: 09/19/2020
From: Sanchez E
Consolidated Interim Storage Facility
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards
References
CAC 001028, E-57475, EPID L-2017-NEW-0002
Download: ML20269A259 (2)


Text

Safeguards Information INTERIM STORAGE.

PARTNERS Director, Division of Spent Fuel Management Office of Nuclear Material Safety and Safeguards U. S. Nuclear*Regulatory Commission Attn: Document Control Desk One White Flint North 11555 Rockville Pike Rockville, MD 20852 September 19, 2020 E-57475

Subject:

Revision 5 of the Physical Secu'rity Plan, Training and Qualification Plan, and Safeguards Contingency Plan with Updated Cover Sheets, Docket 72-1050 CAC/EPID 001028/L-2017-NEW-0002.

Reference:

1.

Letter from Elicia B. Sanchez (ISP) to Document Control Desk (NRC Completed Response to RAI Part 1, Physical Security, including Revision 5 of the Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Docket 72-1050 CAC/EPID 001028/L-2017-NEW-0002, E-55056, dated September 18, 2019 Interim Storage Partners LLC (ISP) hereby submits Revision 5 of the Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan with Updated headers to match the references to these documents in Condition 16 of the draft Material License. Other than the updated dates on the heade.rs the documents are identical to those submitted via Reference [1 ]. These changes are considered editorial consistent with the revision page and do not require a revision to the documents.

Safeguards Information When separated from Safeguards lnfo'rmation enclosure(s), this document is decontrolled provided the transmittal document does not otherwise warrant protection from the unauthorized disclosure.

P.O. Box 1129

  • interimstoragepartners.com

Safeguards Information Document Control Desk E-57475 Page 2 of 2 Should you have any questions regarding this submittal, please contact Mr. Jack Boshoven by telephone at (410) 910-6955, or by email at jack.boshoven@orano.group.

Sincerely, E~~L_~

Chief Financial Officer Interim Storage Partners LLC cc:

John (Chau) Nguyen (NRG SFM) - Letter Only Jeff Isakson, ISP/TN Americas - Letter Only Jack Boshoven, ISP/TN Americas - Letter Only

Enclosures:

1..

Consolidat~d Interim Storage Facility Physical s*ecurity Plan, PSP-100, Revision 5 (SGI)

2.

Consolidated Interim Storage Facility Security Training and Qualification Plan, TQP.a700, Revision 5 (SGI)

3.

Consolidated Interim Storage Facility Safeguards Contingency Plan, SCP-300, Revision 5 (SGI)

Safeguards Information When separated from Safeguards Information enclosure(s), this document is decontr~lled provided the transmittal document does not otherwise warrant protection from the unauthorized disclosure.