Interim Storage Partners, LLC - Submittal of Revision 3 of the Environmental Report for the WCS CISF, Docket 72-1050 Cac/Epid 001028/L-2017-NEW-0002
ML20052E146
Person / Time
Site: Consolidated Interim Storage Facility
Issue date: 02/17/2020
From: Isakson J
Consolidated Interim Storage Facility
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards
Shared Package
ML20052E144 List:
References
CAC 001028, E-56071, EPID L-2017-NEW-0002, E-56069
Download: ML20052E146 (3)


Text

P.O. Box 1129

  • interimstoragepartners.com February 17, 2020 E-56071 Director, Division of Fuel Management Office of Nuclear Material Safety and Safeguards U. S. Nuclear Regulatory Commission Attn: Document Control Desk One White Flint North 11555 Rockville Pike Rockville, MD 20852

Subject:

Submission of Revision 3 of the Environmental Report for the WCS CISF, Docket 72-1050 CAC/EPID 001028/L-2017-NEW-0002

Reference:

1.

Letter from Jeffery D. Isakson to NRC Document Control Desk, Submittal of Partial Response to First RAI, Part 1, Docket 72-1050 CAC/EPID 001028/L-2017-NEW-0002, E-54257, dated May 31, 2019

2.

Letter from Jeffery D. Isakson to NRC Document Control Desk, Submittal of Responses to Transportation First RAIs, Part 3, Docket 72-1050 CAC/EPID 001028/L-2017-NEW-0002, E-54423, dated June 28, 2019

3.

Letter from Jeffery D. Isakson to NRC Document Control Desk, Submittal of Responses to Transportation First RAIs, Part 3, Docket 72-1050 CAC/EPID 001028/L-2017-NEW-0002, E-55363, dated November 21, 2019

4.

Letter from Jeffery D. Isakson to NRC Document Control Desk, Submittal of Supplemental Information in Support of RAI, Part 3, Docket 72-1050 CAC/EPID 001028/L-2017-NEW-0002, E-55737, dated January 6, 2020 Interim Storage Partners LLC hereby submits Revision 3 of the Environmental Report (ER) for the WCS CISF. Revision 3 incorporates all of the changes submitted via References [1], [2], [3] and [4]. Other than updating of the table of contents and pagination changes, no other changes are made to the ER.

Document Control Desk NRC discussing our draft responses (References [2] and [31) to these RAls.

The following enclosures are being submitted:

  • provides responses to the subset of RAls (Public).
  • provides corresponding SAR change pages (Public).

E-56069 Page 2 of 3 Should you have any questions regarding this submission, please contact Mr. Jack Boshoven, of my staff, by telephone at (410) 910-6955, or by email at jack.boshoven@orano.group.

Sincerely,

~~~

  • Jeffery D. Isakson Chief Executive Officer/President Interim Storage Partners LLC cc:

John-Chau Nguyen, Senior Project Manager, U.S. NRC Jack Boshoven, ISP LLC Elicia Sanchez, ISP LLC

Enclosures:

1.

RAI Responses (Public)

2.

SAR Changed Pages (Public)

Document Control Desk E-56071 Page 3 of 3 Document Components:

001 PUBLIC Transmittal Letter.pdf, 546,363 bytes 002 PUBLIC Encl 1 Affidavit.pdf, 695,030 bytes 003 SUNSI Enc 3 ER Rev 3 01 of 03 Cover to Ch 10.pdf, 24,189,137 bytes, Proprietary 004 SUNSI Enc 3 ER Rev 3 02 of 03 Attach 1-1 to 4-1.pdf, 66,418,114 bytes, Proprietary 005 SUNSI Enc 3 ER Rev 3 03 of 03 Appendix A.pdf, 27,552,140 bytes, Proprietary 006 PUBLIC Enc 3 ER Rev 3 01 of 03 Cover to Ch 10.pdf, 22,887,384 bytes 007 PUBLIC Enc 3 ER Rev 3 02 of 03 Attach 1-1 to 4-1.pdf, 61,938,143 bytes 008 PUBLIC Enc 3 ER Rev 3 03 of 03 Appendix A.pdf, 27,552,140 bytes OSM#1 (Entire Submittal):

001 PUBLIC Transmittal Letter.pdf, 546,363 bytes 002 PUBLIC Encl 1 Affidavit.pdf, 695,030 bytes 003 SUNSI Enc 3 ER Rev 3 01 of 03 Cover to Ch 10.pdf, 24,189,137 bytes, Proprietary 004 SUNSI Enc 3 ER Rev 3 02 of 03 Attach 1-1 to 4-1.pdf, 66,418,114 bytes, Proprietary 005 SUNSI Enc 3 ER Rev 3 03 of 03 Appendix A.pdf, 27,552,140 bytes, Proprietary 006 PUBLIC Enc 3 ER Rev 3 01 of 03 Cover to Ch 10.pdf, 22,887,384 bytes 007 PUBLIC Enc 3 ER Rev 3 02 of 03 Attach 1-1 to 4-1.pdf, 61,938,143 bytes 008 PUBLIC Enc 3 ER Rev 3 03 of 03 Appendix A.pdf, 27,552,140 bytes OSM#2 (Public Information Only):

001 PUBLIC Transmittal Letter.pdf, 546,363 bytes 002 PUBLIC Encl 1 Affidavit.pdf, 695,030 bytes 006 PUBLIC Enc 3 ER Rev 3 01 of 03 Cover to Ch 10.pdf, 22,887,384 bytes 007 PUBLIC Enc 3 ER Rev 3 02 of 03 Attach 1-1 to 4-1.pdf, 61,938,143 bytes 008 PUBLIC Enc 3 ER Rev 3 03 of 03 Appendix A.pdf, 27,552,140 bytes