Letter Sequence Other |
|---|
CAC:001028, SR 3.5.1.2 Notation (Approved, Closed) EPID:L-2019-LLA-0078, Tn Americas, LLC Application for Amendment 2 to NUHOMS Eos Certificate of Compliance No. 1042, Revision 0 (Open) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, ... further results|Request]]
- Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, ... further results|Supplement]]
Administration
- Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance
- Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, ... further results|Meeting]]
Results
- Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, ... further results|Approval]]
Other: L-18-006, ISFSI - Site-Specific License Renewal Application, Revision 0, July 2018, L-23-005, Independent Spent Fuel Storage Installation License Renewal Application, Revision 1 (Cac/Epid No. 001028/L-2022-RNW-0007), ML17311A450, ML18018A018, ML18022A077, ML18022A078, ML18022A079, ML18087A056, ML18087A057, ML18087A058, ML18087A059, ML18087A060, ML18087A061, ML18087A062, ML18100A185, ML18100A188, ML18100A190, ML18100A191, ML18100A193, ML18101A024, ML18108A052, ML18131A047, ML18131A048, ML18141A561, ML18141A562, ML18141A563, ML18141A564, ML18141A565, ML18141A567, ML18179A258, ML18179A260, ML18179A266, ML18201A455, ML18205A179, ML18222A351, ML18228A530, ML18228A531, ML18228A532, ML18228A533, ML18234A012, ML18248A121, ML18255A093, ML18255A094, ML18255A096, ML18255A097, ML18255A098, ML18255A101, ML18255A102, ML18324A577, ML18324A594... further results
|
MONTHYEARML19255E7911997-05-31031 May 1997 Enclosure 1 - Ecological Assessment of the Low Level Waste Depository, Andrews County, Tx Project stage: Other ML19255E7952004-10-25025 October 2004 Enclosure 2 - Habitat Characterization and Rare Species Survey for the Proposed Low Level Waste Repository, Andrews County, Tx Project stage: Other ML19337B5182007-03-16016 March 2007 Enclosure 10 - Applicable Sections of LLRW License Project stage: Other ML19255E7982007-03-16016 March 2007 Enclosure 3 - Supplemental Survey to Ecological Assessment of the Low Level Waste Depository, Andrews County, Texas Project stage: Supplement ML19217A2112007-04-30030 April 2007 Enclosure 1 - Report on Mapping of a Trench Through Pedogenic Calcrete (Caliche) Across a Drainage and Possible Lineament, Waste Control Specialists Disposal Site, Andrews County, Tx (Public) Project stage: Other ML19255E8002008-07-0303 July 2008 Enclosure 4 - Environmental Assessment Report Prepared for Application for Renewal of Radioactive Material License R04971 Waste Control Specialists LLC Andrews County, Texas Project stage: Request ML19217A2142008-07-28028 July 2008 Enclosure 4 - Report on Activities to Satisfy Byproduct RML Conditions 41A, 41C, and 43, July 2008 (Public) Project stage: Other ML19217A2132011-02-22022 February 2011 Enclosure 3 - Oag Water Levels: Empirical and Modeled Relationships Between Precipitation and Infiltration, 2011 (Public) Project stage: Other ML18100A1882013-04-11011 April 2013 Enclosure 7 - Procedure 12751-MNGP-QP-9.201, Revision 0, Visual Weld Examination Project stage: Other ML18100A1852013-04-11011 April 2013 Enclosure 6 - Procedure 12751-MNGP-OPS-01, Revision 0, Spent Fuel Cask Welding: 61BT/BTH NUHOMS Canisters Project stage: Other ML18100A1912014-01-30030 January 2014 Enclosure 9 - Structural Integrity Associates, Inc. Report 130415.402, Revision 0, Review of Trivis Inc. Welding Procedures Used for Field Welds on the Transnuclear NUHOMS 61BTH Type 1 & 2 Transportable Canister for BWR Fuel Project stage: Other ML18100A1902014-05-22022 May 2014 Enclosure 8 - Structural Integrity Associates, Inc. Report 130415.403, Revision 2, Assessment of Monticello Spent Fuel Canister Closure Plate Welds Based on Welding Video Records Project stage: Other ML18011A1582017-12-22022 December 2017 International HI-STORE Cis (Consolidated Interim Storage Facility) License Application Responses to Safeguards Related Requests for Supplemental Information Project stage: Supplement ML17249A1572018-01-11011 January 2018, 16 January 2018 Package: Vermont Yankee Nuclear Power Station ISFSI Environmental Assessment and Finding of No Significant Impact Related to Issuance of Exemption to Allow a New Loading Pattern and Loading Fuel Cooled for at Least 2 Years Project stage: Request ML18022A1532018-01-16016 January 2018 Enclosure 2: Agenda (Memo to A. Hsia Summary of December 12, 2017, Meeting with Pacific Gas & Electric Company to Discuss the Upcoming Submittal of the Application for Renewal of the Humboldt Bay ISFSI License) Project stage: Meeting ML18022A1542018-01-16016 January 2018 Enclosure 3: Handout-PG&E Presentation on Humboldt Bay ISFSI LRA (Memo to A. Hsia Summary of December 12, 2017, Meeting) Project stage: Meeting ML18022A1522018-01-16016 January 2018 Enclosure 1: Meeting Attendees (Memo to A. Hsia Summary of December 12, 2017, Meeting with Pacific Gas & Electric Company to Discuss the Upcoming Submittal of the Application for Renewal of the Humboldt Bay ISFSI License) Project stage: Meeting ML18022A1512018-01-16016 January 2018 Memo to A. Hsia Summary of December 12, 2017, Meeting with Pacific Gas & Electric Company to Discuss the Upcoming Submittal of the Application for Renewal of the Humboldt Bay Independent Spent Fuel Storage Installation License Project stage: Meeting ML17249A1592018-01-16016 January 2018 Letter to C. C. Chappell Vermont Yankee Nuclear Power Station ISFSI Environmental Assessment and Finding of No Significant Impact Related to Issuance of Exemption to Allow a New Loading Pattern and Loading Fuel Cooled for at Least 2 Years Project stage: Approval ML18018A0192018-01-17017 January 2018 Enclosurequest for Additional Information (Ltr to K. Manzione Application for Holtec International HI-STORM Umax Multipurpose Canister Storage System License Amendment Request No. 3 to Certificate of Compliance No. 1040-Accepted for Review) Project stage: RAI ML18018A0182018-01-17017 January 2018 Letter to K. Manzione Application for Holtec International HI-STORM Umax Multipurpose Canister Storage System License Amendment Request No. 3 to Certificate of Compliance No. 1040 - Accepted for Review Project stage: Other ML18022A6122018-01-19019 January 2018 Letter to K. Manzione Amendment No. 4 to Certificate of Compliance No. 1032 for the HI-STORM Flood/Wind Multipurpose Canister Storage System-Request for Additional Information Project stage: RAI ML18018B2972018-01-19019 January 2018 Federal Registered Notice: Correction of Certificate of Compliance No. 1004, Renewed Amendments No. 11, Revision 1 and No. 13, Revision 1 Project stage: Request ML18022A0772018-01-22022 January 2018 Letter to J. Bondre Correction to Tn Americas LLC Technical Specifications for Renewed Amendments No. 11, Revision 1 and No. 13, Revision 1 to Standardized NUHOMS Certificate of Compliance No. 1004 for Spent Fuel Storage Casks Project stage: Other ML18022A0762018-01-22022 January 2018 Package: Correction to Title of Figure 1-15 in Technical Specifications for Certificate of Compliance 1004 Renewed Amendments No. 11, Revision 1 and No. 13, Revision 1 Project stage: Request ML18022A0782018-01-22022 January 2018 Enclosure 1: Revised Title for Figure 1-5 Corrected Technical Specifications for Certificate of Compliance No. 1004 Renewed Amendment No. 11, Revision 1 Enclosure 1 Project stage: Other ML18022A0792018-01-22022 January 2018 Enclosure 2: Revised Title for Figure 1-5 Corrected Technical Specifications for Certificate of Compliance No. 1004 Renewed Amendment No. 13, Revision 1 Project stage: Other ML18024A2732018-01-24024 January 2018 Letter to D. G. Stoddard U.S. NRC Approval of Virginia Electric and Power Company Request for Withholding Information from Public Disclosure for North Anna Power Station ISFSI (Cac/Epid Nos. 001028/L-2017-RNW-0010 and 000993/L-2017-LNE-0008 Project stage: Withholding Request Acceptance ML17311A4502018-01-31031 January 2018 ISFSI License Renewal Final Environmental Assessment Project stage: Other ML18031A4572018-01-31031 January 2018 Submittal Date for Response to NRCs Requests for Additional Information (Rais) for License Amendment Request 1032-4 to HI-STORM FW CoC No. 1032 (CAC No. 001028) Project stage: Request ML18036A2222018-02-0101 February 2018 International - Transmittal of HI-STORM Umax License Amendment Request No. 3 - Administrative RAI Response Project stage: Request ML17298A1352018-02-0202 February 2018 Safety Evaluation Report (Letter to C. C. Chappell Vermont Yankee Nuclear Power Station Independent Spent Fuel Storage Installation, Issuance of Exemption (CAC No.: 001028, Docket Nos. 50-271, 72-59, and 72-1014; EPID L-2017-LLE-0005) Project stage: Approval ML17298A1342018-02-0202 February 2018 Letter to C. C. Chappell Vermont Yankee Nuclear Power Station Independent Spent Fuel Storage Installation, Issuance of Exemption (CAC No.: 001028, Docket Nos. 50-271, 72-59, and 72-1014; EPID L-2017-LLE-0005) Project stage: Approval ML18031A2242018-02-0606 February 2018 Enclosure 1: Preamble-SNM-2507 License Renewal Order (Letter to D. G. Stoddard Issuance of Renewed Materials License No. SNM-2507 for the North Anna Power Station Independent Spent Fuel Storage Installation) Project stage: Approval ML18031A2272018-02-0606 February 2018 Enclosurenewed License SNM-2507 Technical Specifications (Letter to D. G. Stoddard Issuance of Renewed Materials License No. SNM-2507 for the North Anna Power Station ISFSI) Project stage: Approval ML18031A2282018-02-0606 February 2018 Enclosure 2: Safety Evaluation Report (Letter to D. G. Stoddard Issuance of Renewed Materials License No. SNM-2507 for the North Anna Power Station ISFSI) Project stage: Approval ML18031A2222018-02-0606 February 2018 Letter to D. G. Stoddard Issuance of Renewed Materials License No. SNM-2507 for the North Anna Power Station Independent Spent Fuel Storage Installation (Cac/Epid Nos. 001028/L-2017-RNW-0010 and 000993/L-2017-LNE-0008) Project stage: Approval ML18031A2252018-02-0606 February 2018 Enclosurenewed License SNM-2507 (Letter to D. G. Stoddard Issuance of Renewed Materials License No. SNM-2507 for the North Anna Power Station Independent Spent Fuel Storage Installation) Project stage: Approval ML18031A2312018-02-0808 February 2018 Federal Register Notice - Notice of Issuance for License Renewal (Letter to D. G. Stoddard Issuance of Renewed Materials License No. SNM-2507 for the North Anna Power Station ISFSI) Project stage: Approval ML18053A2342018-02-15015 February 2018 Enclosure 6: Proposed Amendment 1, Revision 0 Changes to the NUHOMS Eos System Updated Final Safety Analysis Report, Chapters 1 to 14 Project stage: Request ML18053A2222018-02-15015 February 2018 Application for Amendment 1 to the NUHOMS Eos System, Revision O (Docket No. 72-1042) Project stage: Request ML18053A2332018-02-15015 February 2018 Enclosure 4: CoC 1042 Amendment 1 Proposed Technical Specifications, Revision 0 Project stage: Request ML18057A2172018-02-23023 February 2018 Letter to A. Zaremba Request for Additional Information for Review of Duke Energys Decommissioning Funding Plan Update Project stage: RAI ML18058A0242018-02-23023 February 2018 Enclosurequest for Additional Information (Letter to G. Van Noordennen Request for Additional Information Regarding Zionsolutions, LLCs Decommissioning Funding Plan Update for Zion Independent Spent Fuel Storage Installation) Project stage: RAI ML18058A0232018-02-23023 February 2018 Letter to G. Van Noordennen Request for Additional Information Regarding Zionsolutions, LLCs Decommissioning Funding Plan Update for Zion Independent Spent Fuel Storage Installation Project stage: RAI ML18058A6082018-02-23023 February 2018 HI-2177593, Rev 0, Holtec International & Eddy Lea Energy Alliance (Elea) Underground CISF - Financial Assurance & Project Life Cycle Cost Estimates Project stage: Request ML18058A0562018-02-23023 February 2018 Letter to J. Giddens Request for Additional Information Regarding Entergy Operations, Inc.S Decommissioning Funding Plan Update Project stage: RAI ML18058A6072018-02-23023 February 2018 HI-2177565, Rev 0, Holtec International & Eddy Lea Energy Alliance (Elea) Cis Facility - Decommissioning Cost Estimate and Funding Plan Project stage: Request ML18057A2182018-02-23023 February 2018 Enclosurequest for Additional Information (Letter to A. Zaremba Request for Additional Information for Review of Duke Energys Decommissioning Funding Plan Update) Project stage: RAI ML18058A0572018-02-23023 February 2018 Enclosurequest for Additional Information (Letter to J. Giddens Request for Additional Information Regarding Entergy Operations, Inc.S Decommissioning Funding Plan Update) Project stage: RAI 2018-01-11
[Table View] |
Text
Enclosure 5 to E-55201 Proposed Amendment 2, Revision 3 NUHOMS EOS System Updated Final Safety Analysis Report Changed Pages (Public Version)
NUHOMS EOS System Updated Final Safety Analysis Report Rev. TBD, TBD October 2019 Revision 3 72-1042 Amendment 2 Page A.4-36 Appendix A was added in Amendment 1.
Proprietary Information on This Page Withheld Pursuant to 10 CFR 2.390
NUHOMS EOS System Updated Final Safety Analysis Report Rev. TBD, TBD October 2019 Revision 3 72-1042 Amendment 2 Page A.4-37 Appendix A was added in Amendment 1.
Temperatures for LC 1e-S-full-O are also compared with the periodic model (LC 1e-S of Table A.4-14) in Table A.4-33a through Table A.4-33c. Table A.4-33a shows that the maximum fuel cladding temperature of the upper fuel for LC 1e-S-full-O increases compared to the periodic model, but is still lower than the maximum fuel cladding temperature of the lower fuel in the periodic model. The concrete temperatures is higher when compared with LC 1e-S, but is still lower than the design limit. Table A.4-33b shows that the lower compartment component maximum temperatures of LC 1e-S-full-O are all bounded by LC 1e-S but the upper compartment component maximum temperatures are higher. However, the average temperatures of all components in both upper and lower compartments for LC 1e-S-full-O are bounded by LC 1e-S, as shown in Table A.4-33c.
Internal Pressure As shown in Table A.4-33c, the average cavity gas temperatures determined for the medium EOS-37PTH DSCs in the updated full HSM-MX model with HLZC 7 under the normal storage condition are 9 °F and 28 °F lower than those from LC 1e-S for the upper and lower compartments, respectively. Therefore, the maximum internal pressures for LC 1e-S-full-O with HLZC 7 are bounded by those for the LC 1e-S in Section A.4.5. As discussed in Section A.4.5, the maximum internal pressures in Chapter 4, Table 4-45 is bounding for LC 1e-S with HLZC 7. Therefore, the maximum internal pressures in Chapter 4, Table 4-45 remain bounding for those of LC 1e-S-full-O for HLZC 7 for normal, off-normal, and accident conditions.
NUHOMS EOS System Updated Final Safety Analysis Report Rev. TBD, TBD October 2019 Revision 3 72-1042 Amendment 2 Page A.4-39 Appendix A was added in Amendment 1.
Proprietary Information on This Page Withheld Pursuant to 10 CFR 2.390
NUHOMS EOS System Updated Final Safety Analysis Report Rev. TBD, TBD October 2019 Revision 3 72-1042 Amendment 2 Page A.4-40 Appendix A was added in Amendment 1.
A.4.6.5 Temperature Calculations The maximum temperatures of fuel cladding and concrete of the HSM-MX loaded with the EOS-37PTH DSC with HLZC 11 are summarized in Table A.4-36. The maximum fuel cladding and concrete temperatures are 699 °F and 280 °F, within the temperature limits of 752 °F and 300 °F, respectively.
The maximum and average temperatures of key components of the HSM-MX loaded with the EOS-37PTH DSC for the storage conditions are summarized in Table A.4-37 and Table A.4-38, respectively. Average temperatures are calculated based on the volume average temperatures of the elements representing the whole component.
NUHOMS EOS System Updated Final Safety Analysis Report Rev. TBD, TBD October 2019 Revision 3 72-1042 Amendment 2 Page A.4-41 Appendix A was added in Amendment 1.
A.4.6.7 Internal Pressure Calculation
NUHOMS EOS System Updated Final Safety Analysis Report Rev. TBD, TBD October 2019 Revision 3 72-1042 Amendment 2 Page A.4-72 Appendix A was added in Amendment 1.
Proprietary Information on Pages A.4-72 and A.4-73 Withheld Pursuant to 10 CFR 2.390
NUHOMS EOS System Updated Final Safety Analysis Report Rev. TBD, TBD October 2019 Revision 3 72-1042 Amendment 2 Page A.4-74 Appendix A was added in Amendment 1.
Table A.4-34 EOS-37PTH DSC in HSM-MX, Design Load Case for Storage Conditions with HLZC 11 Load Case No.
Description Ambient Temperature (°F)
HLZC 1e-S-full-O for HLZC 11
[ Normal Hot, Steady-State, Side Wind Speed = 15 mph, Two full upper and one full lower compartments, All outlet vents open ]
100 11 Table A.4-35 Summary of Convergence for CFD Model of EOS-37PTH DSC in HSM-MX with HLZC 11 for Storage Conditions
NUHOMS EOS System Updated Final Safety Analysis Report Rev. TBD, TBD October 2019 Revision 3 72-1042 Amendment 2 Page A.4-75 Appendix A was added in Amendment 1.
Table A.4-36 Maximum Fuel Cladding and Concrete Temperatures for EOS-37PTH DSC in HSM-MX with HLZC 11 for Storage Conditions Load Case(1)
Description Max Fuel Cladding Temperature
(°F)
Concrete Temperature (°F)
Upper Fuel Lower Fuel Limit(2)
Maximum Limit(2) 1e-S-full-O for HLZC 7(3)
[
]
700 679 752 281 300 1e-S-full-O for HLZC 11
[
]
699 674 280 LC 1e-S-full-O for HLZC 11 - LC 1e-S-full-O for HLZC 7
-1
-5
-1 Notes:
(1) See Table A.4-33aand Table A.4-34 for the description of the load cases.
(2) The temperature limits are from NUREG-1536 [A.4-1].
(3) The results for the bounding load case LC 1e-S-full-O for HLZC 7 are obtained from Table A.4-33a.
NUHOMS EOS System Updated Final Safety Analysis Report Rev. TBD, TBD October 2019 Revision 3 72-1042 Amendment 2 Page A.4-76 Appendix A was added in Amendment 1.
Proprietary Information on Pages A.4-76 through A.4-78 and A.4-127 through A.4-133 Withheld Pursuant to 10 CFR 2.390
NUHOMS EOS System Updated Final Safety Analysis Report Rev. TBD, TBD October 2019 Revision 3 72-1042 Amendment 2 Page B.4-16 Appendix B is newly added in Amendment 2.
Proprietary Information on This Page Withheld Pursuant to 10 CFR 2.390
NUHOMS EOS System Updated Final Safety Analysis Report Rev. TBD, TBD October 2019 Revision 3 72-1042 Amendment 2 Page B.4-19 Appendix B is newly added in Amendment 2.
B.4.4.2.4 CFD Model of 61BTH Type 2 DSC in HSM-MX B.4.4.2.5 CFD Model of 61BTH Type 2 DSC in HSM-MX with Two Full Upper and One Full Bottom Compartments B.4.4.3 61BTH Type 2 DSC - Storage Conditions Temperature Calculations The maximum temperatures of fuel cladding and concrete of HSM-MX loaded with 61BTH Type 2 DSC for the bounding normal, off-normal, and accident storage conditions are summarized in Table B.4-5.
NUHOMS EOS System Updated Final Safety Analysis Report Rev. TBD, TBD October 2019 Revision 3 72-1042 Amendment 2 Page B.4-32 Appendix B is newly added in Amendment 2.
Proprietary Information on This Page Withheld Pursuant to 10 CFR 2.390
NUHOMS EOS System Updated Final Safety Analysis Report Rev. TBD, TBD October 2019 Revision 3 72-1042 Amendment 2 Page B.4-35 Appendix B is newly added in Amendment 2.
Proprietary Information on This Page Withheld Pursuant to 10 CFR 2.390
NUHOMS EOS System Updated Final Safety Analysis Report Rev. TBD, TBD October 2019 Revision 3 72-1042 Amendment 2 Page B.4-36 Appendix B is newly added in Amendment 2.
Table B.4-5 61BTH Type 2 DSC in HSM-MX, Maximum Fuel Cladding and Concrete Temperatures for Storage Conditions Load Case (1)
Description Max Fuel Cladding Temperature (°F)
Concrete Temperature (°F)
Upper Compartment Lower Compartment Limit Maximum Limit 1a 679 671 752(2) 223 300(2) 1b 679 670 223 1c 682 642 232 2
651 654 1058(2) 204 3
698 711 281 500(2)
Notes:
(1) See Table B.4-1 for the description of the load cases.
(2) The temperature limits are from NUREG-1536 [B.4-1].
NUHOMS EOS System Updated Final Safety Analysis Report Rev. TBD, TBD October 2019 Revision 3 72-1042 Amendment 2 Page B.4-37 Appendix B is newly added in Amendment 2.
Proprietary Information on Pages B.4-37 through B.4-38 and B.4-45 through B.4-47 Withheld Pursuant to 10 CFR 2.390