1.0                                                                       USE AND APPLICATION .......................................................................................... 1.1-1 1.1                                                                       Definitions..................................................................................................................... 1.1-1 1.2                                                                         Logical Connectors ....................................................................................................... 1.2-1 1.3                                                                         Completion Times ......................................................................................................... 1.3-1 1.4                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               Frequency ...................................................................................................................... 1.4-1
1.0 USE AND APPLICATION.......................................................................................... 1.1-1 1.1 Definitions..................................................................................................................... 1.1-1 1.2 Logical Connectors....................................................................................................... 1.2-1 1.3 Completion Times......................................................................................................... 1.3-1 1.4 Frequency...................................................................................................................... 1.4-1


2.0                                                                                 FUNCTIONAL AND OPERATING LIMITS ............................................................. 2.0-1 2.1                                                                         Functional and Operating Limits .................................................................................. 2.0-1 2.2                                                                         Functional and Operating Limits Violations ................................................................. 2.0-1
2.0 FUNCTIONAL AND OPERATING LIMITS............................................................. 2.0-1 2.1 Functional and Operating Limits.................................................................................. 2.0-1 2.2 Functional and Operating Limits Violations................................................................. 2.0-1


3.0 LIMITING CONDITION FOR OPERATION (LCO) APPLICABILITY ................... 3.0-1
3.0 LIMITING CONDITION FOR OPERATION (LCO) APPLICABILITY................... 3.0-1


3.0                                                                           SURVEILLANCE REQUIREMENT (SR) APPLICABILITY ................................... 3.0-2
3.0 SURVEILLANCE REQUIREMENT (SR) APPLICABILITY................................... 3.0-2


3.1                                                                         CANISTER INTEGRITY ............................................................................................. 3.1-1 3.1.1                                     W74 Canister Helium Backfill Density ........................................................................ 3.1-1 3.1.2                                     Canister Vacuum Drying Pressure ................................................................................ 3.1-2 3.1.3                                     Canister Leak Rate ........................................................................................................ 3.1-3 3.1.4                                     Hydraulic Ram Force During Horizontal Canister Transfer ......................................... 3.1-4 3.1.5                                     W74 Canister Vertical Time Limit in Transfer Cask .................................................... 3.1-5
3.1 CANISTER INTEGRITY............................................................................................. 3.1-1 3.1.1 W74 Canister Helium Backfill Density........................................................................ 3.1-1 3.1.2 Canister Vacuum Drying Pressure................................................................................ 3.1-2 3.1.3 Canister Leak Rate........................................................................................................ 3.1-3 3.1.4 Hydraulic Ram Force During Horizontal Canister Transfer......................................... 3.1-4 3.1.5 W74 Canister Vertical Time Limit in Transfer Cask.................................................... 3.1-5


3.2                                                                         CANISTER RADIATION PROTECTION ..................................................................           3.2-1 3.2.1                                     Canister Surface Contamination ................................................................................... 3.2-1
3.2 CANISTER RADIATION PROTECTION.................................................................. 3.2-1 3.2.1 Canister Surface Contamination................................................................................... 3.2-1


3.3                                                                         STORAGE CASK INTEGRITY .................................................................................. 3.3-1 3.3.1                                     Storage Cask Air Inlet and Outlet Openings ................................................................. 3.3-1 3.3.2                                     Storage Cask Temperatures During Storage ................................................................. 3.3-2 3.3.3                                     Storage Cask Temperatures During Horizontal Transfer.............................................. 3.3-4
3.3 STORAGE CASK INTEGRITY.................................................................................. 3.3-1 3.3.1 Storage Cask Air Inlet and Outlet Openings................................................................. 3.3-1 3.3.2 Storage Cask Temperatures During Storage................................................................. 3.3-2 3.3.3 Storage Cask Temperatures During Horizontal Transfer.............................................. 3.3-4


3.4                                                                       TRANSFER CASK INTEGRITY ................................................................................ 3.4-1 3.4.1                                     Transfer Cask Structural Shell Temperature ................................................................. 3.4-1
3.4 TRANSFER CASK INTEGRITY................................................................................ 3.4-1 3.4.1 Transfer Cask Structural Shell Temperature................................................................. 3.4-1


3.5                                                                         TRANSFER CASK RADIATION PROTECTION ..................................................... 3.5-1 3.5.1                                     Transfer Cask Surface Contamination .......................................................................... 3.5-1
3.5 TRANSFER CASK RADIATION PROTECTION..................................................... 3.5-1 3.5.1 Transfer Cask Surface Contamination.......................................................................... 3.5-1


4.0                                                                         DESIGN FEATURES ................................................................................................... 4.0-1 4.1                                                                         Storage System .............................................................................................................. 4.0-1 4.2                                                                         Storage Pad ................................................................................................................... 4.0-2 4.3                                                                         Site Specific Parameters and Analyses ......................................................................... 4.0-2
4.0 DESIGN FEATURES................................................................................................... 4.0-1 4.1 Storage System.............................................................................................................. 4.0-1 4.2 Storage Pad................................................................................................................... 4.0-2 4.3 Site Specific Parameters and Analyses......................................................................... 4.0-2


FuelSolutions' W74 Canister               Renewed Amendment 0 TABLE OF CONTENTS Page
FuelSolutions' W74 Canister Renewed Amendment 0 TABLE OF CONTENTS Page


5.0                                                                         ADMINISTRATIVE CONTROLS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .                         5.0-1
5.0 ADMINISTRATIVE CONTROLS...................................... 5.0-1


5.1                                                                         Training Modules   . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .             5.0-1 5.2 Preoperational Testing and Training Exercises           . . . . . . . . . . . . . . . . . . . . . . . . . . . . .           5.0-1 5.3                                                                         Programs         . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .                       5.0-1 5.4                                                                         Special Requirements for First System in Place       . . . . . . . . . . . . . . . . . . . . . . . . . . . .                         5.0-1
5.1 Training Modules.................................................... 5.0-1 5.2 Preoperational Testing and Training Exercises............................. 5.0-1 5.3 Programs.......................................................... 5.0-1 5.4 Special Requirements for First System in Place............................ 5.0-1


LIST OF TABLES
LIST OF TABLES


Table 2.1-1       FuelSolutions' W74 Loading Specification W74-1       . . . . . . . . . . . . . . . . . . . .                               2.0-2 Table 2.1-2       Fuel Assemblies Acceptable for Storage in the FuelSolutions' W74 Canister 2.0-3 Table 2.1-3                   Fuel Cooling Table W74-1-A .............................................................................. 2.0-4 Table 4.1-1       FuelSolutions' W74 Canister ASME Code Requirements Compliance Summary .......................................................................................... 4.0-3
Table 2.1-1 FuelSolutions' W74 Loading Specification W74-1.................... 2.0-2 Table 2.1-2 Fuel Assemblies Acceptable for Storage in the FuelSolutions' W74 Canister 2.0-3 Table 2.1-3 Fuel Cooling Table W74-1-A.............................................................................. 2.0-4 Table 4.1-1 FuelSolutions' W74 Canister ASME Code Requirements Compliance Summary.......................................................................................... 4.0-3


FuelSolutions' W74 Canister               Renewed Amendment 0 Definitions 1.1
FuelSolutions' W74 Canister Renewed Amendment 0 Definitions 1.1


1.0 USE AND APPLICATION 1.1 Definitions
1.0 USE AND APPLICATION 1.1 Definitions
Line 67: Line 67:
NOTE The defined terms of this section appear in capitalized type and are applicable throughout these Technical Specifications and Bases.
NOTE The defined terms of this section appear in capitalized type and are applicable throughout these Technical Specifications and Bases.


Term Definition ACTIONS                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   ACTIONS shall be that part of a Specification that prescribes Required Actions to be taken under designated Conditions within specified Completion Times.
Term Definition ACTIONS ACTIONS shall be that part of a Specification that prescribes Required Actions to be taken under designated Conditions within specified Completion Times.
CANISTER                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                           The CANISTER is the storage container for SFAs approved for use at the ISFSI.
CANISTER The CANISTER is the storage container for SFAs approved for use at the ISFSI.
INDEPENDENT SPENT FUEL                                                                     The facility within the perimeter fence licensed for STORAGE INSTALLATION (ISFSI)                                                               storage of spent fuel within CANISTERs.
INDEPENDENT SPENT FUEL The facility within the perimeter fence licensed for STORAGE INSTALLATION (ISFSI) storage of spent fuel within CANISTERs.


INTACT FUEL                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   Fuel assemblies with no known or suspected cladding defects greater than hairline cracks or pinhole leaks.
INTACT FUEL Fuel assemblies with no known or suspected cladding defects greater than hairline cracks or pinhole leaks.
LOADING OPERATIONS                                                                                                                                                                                                                                                                                                                             LOADING OPERATIONS include all licensed activities on a CANISTER while it is being loaded with fuel assemblies. LOADING OPERATIONS begin when the first fuel assembly is placed in the CANISTER and end when the CANISTER outer closure plate to shell weld examination is complete.
LOADING OPERATIONS LOADING OPERATIONS include all licensed activities on a CANISTER while it is being loaded with fuel assemblies. LOADING OPERATIONS begin when the first fuel assembly is placed in the CANISTER and end when the CANISTER outer closure plate to shell weld examination is complete.
SPENT FUEL ASSEMBLIES (SFAs)                                                                           Irradiated nuclear fuel assemblies that are to be placed in a CANISTER for dry storage.
SPENT FUEL ASSEMBLIES (SFAs) Irradiated nuclear fuel assemblies that are to be placed in a CANISTER for dry storage.
SPENT FUEL STORAGE SYSTEM                                                                   The storage components including the CANISTER, (SFSS)                                                                                     STORAGE CASK, and TRANSFER CASK.
SPENT FUEL STORAGE SYSTEM The storage components including the CANISTER, (SFSS) STORAGE CASK, and TRANSFER CASK.


STORAGE CASK                                                                                                                                                                                                                                                                                                                                                                                                                                                                                     The cask that provides a shielded, ventilated storage environment for the loaded CANISTER. This cask is used for TRANSFER OPERATIONS.
STORAGE CASK The cask that provides a shielded, ventilated storage environment for the loaded CANISTER. This cask is used for TRANSFER OPERATIONS.
STORAGE OPERATIONS                                                                                                                                                                                                                                                                                                           STORAGE OPERATIONS include all licensed activities that are performed at the ISFSI while a CANISTER containing spent fuel is sitting inside a STORAGE CASK on a storage pad within the ISFSI.
STORAGE OPERATIONS STORAGE OPERATIONS include all licensed activities that are performed at the ISFSI while a CANISTER containing spent fuel is sitting inside a STORAGE CASK on a storage pad within the ISFSI.


FuelSolutions' W74 Canister     Renewed 1.1-1                                                                                                                                         Amendment 0 Definitions 1.1 1.1 Definitions
FuelSolutions' W74 Canister Renewed 1.1-1 Amendment 0 Definitions 1.1 1.1 Definitions


Term Definition TRANSFER CASK                                                                                                                                                                                                                                                                                                                                                                                                                             The cask that is used for SFA LOADING OPERATIONS and UNLOADING OPERATIONS, and for TRANSFER OPERATIONS.
Term Definition TRANSFER CASK The cask that is used for SFA LOADING OPERATIONS and UNLOADING OPERATIONS, and for TRANSFER OPERATIONS.
TRANSFER OPERATIONS                                                                                                                                                                                                                                                                                   TRANSFER OPERATIONS include all licensed activities that are performed on a CANISTER loaded with one or more fuel assemblies when it is being moved to and from the ISFSI.
TRANSFER OPERATIONS TRANSFER OPERATIONS include all licensed activities that are performed on a CANISTER loaded with one or more fuel assemblies when it is being moved to and from the ISFSI.


For movement to the ISFSI, TRANSFER OPERATIONS begin when the CANISTER outer closure plate to shell weld inspection is complete and end when the CANISTER is in the STORAGE CASK in its storage position on the storage pad within the ISFSI.
For movement to the ISFSI, TRANSFER OPERATIONS begin when the CANISTER outer closure plate to shell weld inspection is complete and end when the CANISTER is in the STORAGE CASK in its storage position on the storage pad within the ISFSI.


For movement from the ISFSI, TRANSFER OPERATIONS begin when the STORAGE CASK is moved and end when the CANISTER is moved into a transportation cask or spent fuel building.
For movement from the ISFSI, TRANSFER OPERATIONS begin when the STORAGE CASK is moved and end when the CANISTER is moved into a transportation cask or spent fuel building.
UNLOADING OPERATIONS                                                                                                                                                                                                                                                         UNLOADING OPERATIONS include all licensed activities on a CANISTER to be unloaded of the contained fuel assemblies. UNLOADING OPERATIONS begin when the CANISTER is ready to initiate removal of the CANISTER outer closure plate and end when the last fuel assembly is removed from the CANISTER.
UNLOADING OPERATIONS UNLOADING OPERATIONS include all licensed activities on a CANISTER to be unloaded of the contained fuel assemblies. UNLOADING OPERATIONS begin when the CANISTER is ready to initiate removal of the CANISTER outer closure plate and end when the last fuel assembly is removed from the CANISTER.


FuelSolutions' W74 Canister     Renewed 1.1-2                                                                         Amendment 0 Logical Connectors 1.2 1.0 USE AND APPLICATION
FuelSolutions' W74 Canister Renewed 1.1-2 Amendment 0 Logical Connectors 1.2 1.0 USE AND APPLICATION


1.2 Logical Connectors
1.2 Logical Connectors


PURPOSE                                                                                                                                                                                                                                                                                                                                                                                                           The purpose of this section is to explain the meaning of logical connectors.
PURPOSE The purpose of this section is to explain the meaning of logical connectors.
Logical connectors are used in Technical Specifications (TS) to discriminate between, and yet connect, discrete Conditions, Required Actions, Completion Times, Surveillances, and Frequencies. The only logical connectors that appear in TS are AND and OR. The physical arrangement of these connectors constitutes logical conventions with specific meanings.
Logical connectors are used in Technical Specifications (TS) to discriminate between, and yet connect, discrete Conditions, Required Actions, Completion Times, Surveillances, and Frequencies. The only logical connectors that appear in TS are AND and OR. The physical arrangement of these connectors constitutes logical conventions with specific meanings.
BACKGROUND Several levels of logic may be used to state Required Actions.
BACKGROUND Several levels of logic may be used to state Required Actions.
These levels are identified by the placement (or nesting) of the logical connectors and by the number assigned to each Required Action. The first level of logic is identified by the first digit of the num ber assigned to a Require Action and the placement of the logical connector in the first level of nesting (i.e., left justified with the number of the Required Action).
These levels are identified by the placement (or nesting) of the logical connectors and by the number assigned to each Required Action. The first level of logic is identified by the first digit of the num ber assigned to a Require Action and the placement of the logical connector in the first level of nesting (i.e., left justified with the number of the Required Action).
The successive levels of logic are identified by additional digits of the Required Action number and by successive indentations of the logical connectors.
The successive levels of logic are identified by additional digits of the Required Action number and by successive indentations of the logical connectors.
When logical connectors are used to state a Condition, Completion Time, Surveillance, or Frequency, only the first level of logic is used, and the logical connector is left justified with the statement of the Condition, Completion Time, Surveillance, or Frequency.
When logical connectors are used to state a Condition, Completion Time, Surveillance, or Frequency, only the first level of logic is used, and the logical connector is left justified with the statement of the Condition, Completion Time, Surveillance, or Frequency.
EXAMPLES The following examples illustrate the use of logical connectors.
EXAMPLES The following examples illustrate the use of logical connectors.
EXAMPLE 1.2-1 ACTIONS COMPLETION CONDITION           REQUIRED ACTION                   TIME A. LCO not met                                 A.1           Verify...
EXAMPLE 1.2-1 ACTIONS COMPLETION CONDITION REQUIRED ACTION TIME A. LCO not met A.1 Verify...


AND A.2           Restore...
AND A.2 Restore...


In this example the logical connector AND is used to indicate that when in Condition A, both Required Actions A.1 and A.2 must be completed.
In this example the logical connector AND is used to indicate that when in Condition A, both Required Actions A.1 and A.2 must be completed.


FuelSolutions' W74 Canister     Renewed 1.2-1                                             Amendment 0 Logical Connectors 1.2 1.2 Logical Connectors
FuelSolutions' W74 Canister Renewed 1.2-1 Amendment 0 Logical Connectors 1.2 1.2 Logical Connectors


EXAMPLES                         EXAMPLE 1.2-2 (continued)                       ACTIONS
EXAMPLES EXAMPLE 1.2-2 (continued) ACTIONS


COMPLETION CONDITION           REQUIRED ACTION                   TIME A. LCO not met   A.1 Stop...
COMPLETION CONDITION REQUIRED ACTION TIME A. LCO not met A.1 Stop...


OR A.2.1                 Verify...
OR A.2.1 Verify...
AND A.2.2.1                                     Reduce...
AND A.2.2.1 Reduce...
OR A.2.2.2                                       Perform...
OR A.2.2.2 Perform...
OR A.3                                                                                                             Remove...
OR A.3 Remove...


This example represents a more complicated use of logical connectors.           Required Actions A.1, A.2, and A.3 are alternative choices, only one of which must be performed as indicated by the use of the logical connector OR and the left justified placement.             Any one of these three Actions may be chosen.             If A.2 is chosen, then both A.2.1 and A.2.2 must be performed as indicated by the logical connector AND.             Required Action A.2.2 is met by performing A.2.2.1 or A.2.2.2. The indented position of the logical connector OR indicates that A.2.2.1 and A.2.2.2 are alternative choices, only one of which must be performed.
This example represents a more complicated use of logical connectors. Required Actions A.1, A.2, and A.3 are alternative choices, only one of which must be performed as indicated by the use of the logical connector OR and the left justified placement. Any one of these three Actions may be chosen. If A.2 is chosen, then both A.2.1 and A.2.2 must be performed as indicated by the logical connector AND. Required Action A.2.2 is met by performing A.2.2.1 or A.2.2.2. The indented position of the logical connector OR indicates that A.2.2.1 and A.2.2.2 are alternative choices, only one of which must be performed.


FuelSolutions' W74 Canister     Renewed 1.2-2                                             Amendment 0 Completion Times 1.3 1.0 USE AND APPLICATION
FuelSolutions' W74 Canister Renewed 1.2-2 Amendment 0 Completion Times 1.3 1.0 USE AND APPLICATION


1.3 Completion Times
1.3 Completion Times


PURPOSE                                                                                                                                                                                                                                                                                                                                                                                     The purpose of this section is to establish the Completion Time convention and to provide guidance for its use.
PURPOSE The purpose of this section is to establish the Completion Time convention and to provide guidance for its use.
BACKGROUND                                                                                                                                                                                                                                                                                               Limiting Conditions for Operation (LCOs) specify the lowest functional capability or performance levels of equipment required for safe operation of the facility. The ACTIONS associated with an LCO state Conditions that typically describe the ways in which the requirements of the LCO can fail to be met. Specified with each stated Condition are Required Action(s) and Completion Time(s).
BACKGROUND Limiting Conditions for Operation (LCOs) specify the lowest functional capability or performance levels of equipment required for safe operation of the facility. The ACTIONS associated with an LCO state Conditions that typically describe the ways in which the requirements of the LCO can fail to be met. Specified with each stated Condition are Required Action(s) and Completion Time(s).
DESCRIPTION                                                                                                                                                                                                                                                                                         The Completion Time is the amount of time allowed for completing a Required Action. It is referenced to the time of discovery of a situation (e.g., equipment or variable not within limits) that requires entering an ACTIONS Condition unless otherwise specified, providing the facility is in a specified condition stated in the Applicability of the LCO. Required Actions must be completed prior to the expiration of the specified Completion Time. An ACTIONS Condition remains in effect and the Required Actions apply until the Condition no longer exists or the facility is not within the LCO Applicability.
DESCRIPTION The Completion Time is the amount of time allowed for completing a Required Action. It is referenced to the time of discovery of a situation (e.g., equipment or variable not within limits) that requires entering an ACTIONS Condition unless otherwise specified, providing the facility is in a specified condition stated in the Applicability of the LCO. Required Actions must be completed prior to the expiration of the specified Completion Time. An ACTIONS Condition remains in effect and the Required Actions apply until the Condition no longer exists or the facility is not within the LCO Applicability.
Once a Condition has been entered, subsequent subsystems, components, or variables expressed in the Condition, discovered to be not within limits, will not result in separate entry into the Condition unless specifically stated.             The Required Actions of the Condition continue to apply to each additional failure, with Completion Times based on initial entry into the Condition.
Once a Condition has been entered, subsequent subsystems, components, or variables expressed in the Condition, discovered to be not within limits, will not result in separate entry into the Condition unless specifically stated. The Required Actions of the Condition continue to apply to each additional failure, with Completion Times based on initial entry into the Condition.


FuelSolutions' W74 Canister     Renewed 1.3-1                                                                           Amendment 0 Completion Times 1.3 1.3 Completion Times
FuelSolutions' W74 Canister Renewed 1.3-1 Amendment 0 Completion Times 1.3 1.3 Completion Times


EXAMPLES The following examples illustrate the use of Completion Times with different types of Conditions and changing Conditions.
EXAMPLES The following examples illustrate the use of Completion Times with different types of Conditions and changing Conditions.
EXAMPLE 1.3-1 ACTIONS COMPLETION CONDITION       REQUIRED ACTION               TIME B. Required       B.1                                               Perform Action 12 hours Action and         B.1.
EXAMPLE 1.3-1 ACTIONS COMPLETION CONDITION REQUIRED ACTION TIME B. Required B.1 Perform Action 12 hours Action and B.1.
associated   AND Completion Time not     B.2                                               Perform Action 36 hours met.               B.2.
associated AND Completion Time not B.2 Perform Action 36 hours met. B.2.


Condition B has two Required Actions. Each Required Action has its own separate Completi on Time.             Each Completion Time is referenced to the time that Condition B is entered.
Condition B has two Required Actions. Each Required Action has its own separate Completi on Time. Each Completion Time is referenced to the time that Condition B is entered.
The Required Actions of Condition B are to complete action B.1 within 12 hours AND complete action B.2 within 36 hours.
The Required Actions of Condition B are to complete action B.1 within 12 hours AND complete action B.2 within 36 hours.
A total of 12 hours is allowed for completing action B.1 and a total of 36 hours (not 48 hours) is allowed for completing action B.2 from the time that condition B was entered.             If action B.1 is completed within 6 hours, the time allowed for completing action B.2 is the next 30 hours because the total time allowed for completing action B.2 is 36 hours.
A total of 12 hours is allowed for completing action B.1 and a total of 36 hours (not 48 hours) is allowed for completing action B.2 from the time that condition B was entered. If action B.1 is completed within 6 hours, the time allowed for completing action B.2 is the next 30 hours because the total time allowed for completing action B.2 is 36 hours.


FuelSolutions' W74 Canister     Renewed 1.3-2                                 Amendment 0 Completion Times 1.3 1.3 Completion Times
FuelSolutions' W74 Canister Renewed 1.3-2 Amendment 0 Completion Times 1.3 1.3 Completion Times


EXAMPLES                     EXAMPLE 1.3-2 (continued)                 ACTIONS
EXAMPLES EXAMPLE 1.3-2 (continued) ACTIONS


COMPLETION CONDITION       REQUIRED ACTION               TIME A. One system A.1 Restore system           7 days not within         to within limit.
COMPLETION CONDITION REQUIRED ACTION TIME A. One system A.1 Restore system 7 days not within to within limit.
limit.
limit.
B. Required       B.1                                               Perform Action 12 hours Action and         B.1.
B. Required B.1 Perform Action 12 hours Action and B.1.
associated   AND Completion Time not     B.2                                               Perform Action 36 hours met.               B.2.
associated AND Completion Time not B.2 Perform Action 36 hours met. B.2.


When it is determined that a system does not meet the LCO, Condition A is entered. If the system is not restored within 7 days, Condition B is also entered and the Completion Time clocks for Required Actions B.1 and B.2 start. If the system is restored after Condition B is entered, Condition A and B are exited, and therefore, the Required Actions of Condition B may be terminated.
When it is determined that a system does not meet the LCO, Condition A is entered. If the system is not restored within 7 days, Condition B is also entered and the Completion Time clocks for Required Actions B.1 and B.2 start. If the system is restored after Condition B is entered, Condition A and B are exited, and therefore, the Required Actions of Condition B may be terminated.


FuelSolutions' W74 Canister     Renewed 1.3-3                                 Amendment 0 Completion Times 1.3 1.3 Completion Times
FuelSolutions' W74 Canister Renewed 1.3-3 Amendment 0 Completion Times 1.3 1.3 Completion Times


EXAMPLES                     EXAMPLE 1.3-3 (continued)                 ACTIONS
EXAMPLES EXAMPLE 1.3-3 (continued) ACTIONS


NOTE Separate Condition entry is allowed for each component.
NOTE Separate Condition entry is allowed for each component.


COMPLETION CONDITION                                                     REQUIRED ACTION TIME A. LCO not         A.1 Restore             4 hours met.               compliance with LCO.
COMPLETION CONDITION REQUIRED ACTION TIME A. LCO not A.1 Restore 4 hours met. compliance with LCO.
B. Required       B.1                                               Perform Action 12 hours Action and         B.1.
B. Required B.1 Perform Action 12 hours Action and B.1.
associated   AND Completion Time not     B.2                                               Perform Action 36 hours met.               B.2.
associated AND Completion Time not B.2 Perform Action 36 hours met. B.2.


The Note above the ACTIONS Table is a method of modifying the Completion Time tracking.             If this method of modifying the Completion Time tracking were only applicable to a specific Condition, the Note would appear in that Condition rather than at the top of the ACTIONS Table.
The Note above the ACTIONS Table is a method of modifying the Completion Time tracking. If this method of modifying the Completion Time tracking were only applicable to a specific Condition, the Note would appear in that Condition rather than at the top of the ACTIONS Table.
The Note allows Condition A to be entered separately for each component, and Completion Times tracked on a per component basis.           When a component does not meet the LCO, Condition A is entered and its Completion Time starts. If it is determined that subsequent components do not meet the LCO, Condition A is entered for each component and separate Completion Times start and are tracked for each component.
The Note allows Condition A to be entered separately for each component, and Completion Times tracked on a per component basis. When a component does not meet the LCO, Condition A is entered and its Completion Time starts. If it is determined that subsequent components do not meet the LCO, Condition A is entered for each component and separate Completion Times start and are tracked for each component.


IMMEDIATE When Immediately is used as a Completion Time, the COMPLETION TIME Required Action should be pursued without delay and in a controlled manner.
IMMEDIATE When Immediately is used as a Completion Time, the COMPLETION TIME Required Action should be pursued without delay and in a controlled manner.


FuelSolutions' W74 Canister     Renewed 1.3-4                                 Amendment 0 Frequency 1.4 1.0 USE AND APPLICATION
FuelSolutions' W74 Canister Renewed 1.3-4 Amendment 0 Frequency 1.4 1.0 USE AND APPLICATION


1.4 Frequency
1.4 Frequency


PURPOSE                                                                                                                                                                                                                                                                                                                                                                                                         The purpose of this section is to define the proper use and application of Frequency requirements.
PURPOSE The purpose of this section is to define the proper use and application of Frequency requirements.
DESCRIPTION                                                                                                                                                                                                                                                                                               Each Surveillance Requirement (SR) has a specified Frequency in which the surveillance must be met in order to meet the associated Limiting Condition for Operation (LCO). An understanding of the correct application of the specified Frequency is necessary for compliance with the SR.
DESCRIPTION Each Surveillance Requirement (SR) has a specified Frequency in which the surveillance must be met in order to meet the associated Limiting Condition for Operation (LCO). An understanding of the correct application of the specified Frequency is necessary for compliance with the SR.
The specified Frequency is referred to throughout this section and each of the Specifications of Section 3.0, Surveillance Requirement (SR) Applicability. The specified Frequency consists of the requirements of the Frequency column of each SR, as well as certain Notes in the Surveillance column that modify performance requirements.
The specified Frequency is referred to throughout this section and each of the Specifications of Section 3.0, Surveillance Requirement (SR) Applicability. The specified Frequency consists of the requirements of the Frequency column of each SR, as well as certain Notes in the Surveillance column that modify performance requirements.
Situations where a Surveillance could be required (i.e., its Frequency could expire), but where it is not possible or not desired that it be performed until sometime after the associated LCO is within its Applicability, represent potential SR 3.0.4 conflicts. To avoid these conflicts, the SR (i.e., the Surveillance or the Frequency) is stated such that it is only required when it can be and should be performed. With an SR satisfied, SR 3.0.4 imposes no restriction.
Situations where a Surveillance could be required (i.e., its Frequency could expire), but where it is not possible or not desired that it be performed until sometime after the associated LCO is within its Applicability, represent potential SR 3.0.4 conflicts. To avoid these conflicts, the SR (i.e., the Surveillance or the Frequency) is stated such that it is only required when it can be and should be performed. With an SR satisfied, SR 3.0.4 imposes no restriction.
The use of met or performed in these instances conveys specific meaning. A Surveillance is met only when the acceptance criteria are satisfied. Known failure of the requirements of a Surveillance, even without a Surveillance specifically being performed,   constitutes a Surveillance not met.
The use of met or performed in these instances conveys specific meaning. A Surveillance is met only when the acceptance criteria are satisfied. Known failure of the requirements of a Surveillance, even without a Surveillance specifically being performed, constitutes a Surveillance not met.


FuelSolutions' W74 Canister     Renewed 1.4-1                                                                 Amendment 0 Frequency 1.4 1.4                                                 Frequency
FuelSolutions' W74 Canister Renewed 1.4-1 Amendment 0 Frequency 1.4 1.4 Frequency


EXAMPLES The following examples illustrate the various ways that Frequencies are specified:
EXAMPLES The following examples illustrate the various ways that Frequencies are specified:
EXAMPLE 1.4-1 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY Verify pressure within   limit.                                                                                                                                                                                                                                                                                                                                                                                         12   hours Example 1.4-1 contains the type of SR most often encountered in the Technical Specifications (TS). The Frequency specifies an interval (12 hours) during which the associated Surveillance must be performed at least one time. Performance of the Surveillance initiates the subsequent interval. Although the Frequency is stated as 12 hours, an extension of the time interval to 1.25 times the interval specified in the Frequency is allowed by SR 3.0.2 for operational flexibility. The measurement of this interval continues at all times, even when the SR is not required to be met per SR 3.0.1 (such as when it is determined the equipment does not meet the LCO, a variable is outside specified limits, or the unit is outside the Applicability of the LCO). If the interval specified by SR 3.0.2 is exceeded while the cask is in a condition sp ecified in the Applicability of the LCO, the LCO is not met in accordance with SR 3.0.1.
EXAMPLE 1.4-1 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY Verify pressure within limit. 12 hours Example 1.4-1 contains the type of SR most often encountered in the Technical Specifications (TS). The Frequency specifies an interval (12 hours) during which the associated Surveillance must be performed at least one time. Performance of the Surveillance initiates the subsequent interval. Although the Frequency is stated as 12 hours, an extension of the time interval to 1.25 times the interval specified in the Frequency is allowed by SR 3.0.2 for operational flexibility. The measurement of this interval continues at all times, even when the SR is not required to be met per SR 3.0.1 (such as when it is determined the equipment does not meet the LCO, a variable is outside specified limits, or the unit is outside the Applicability of the LCO). If the interval specified by SR 3.0.2 is exceeded while the cask is in a condition sp ecified in the Applicability of the LCO, the LCO is not met in accordance with SR 3.0.1.
If the interval as specified by SR 3.0.2 is exceeded while the unit is not in a condition specified in the Applicability of the LCO for which performance of the SR is required, the Surveillance must be performed within the Frequency requirements of SR 3.0.2 prior to entry into the specified condition.           Failure to do so would result in a violation of SR 3.0.4.
If the interval as specified by SR 3.0.2 is exceeded while the unit is not in a condition specified in the Applicability of the LCO for which performance of the SR is required, the Surveillance must be performed within the Frequency requirements of SR 3.0.2 prior to entry into the specified condition. Failure to do so would result in a violation of SR 3.0.4.


FuelSolutions' W74 Canister     Renewed 1.4-2                                                                                                                                                   Amendment 0 Frequency 1.4 1.4                                                 Frequency
FuelSolutions' W74 Canister Renewed 1.4-2 Amendment 0 Frequency 1.4 1.4 Frequency


EXAMPLES                                                                                                     EXAMPLE 1.4-2 (continued)                                                                                                   SURVEILLANCE REQUIREMENTS
EXAMPLES EXAMPLE 1.4-2 (continued) SURVEILLANCE REQUIREMENTS


SURVEILLANCE FREQUENCY Verify flow is within limits.                                                                                                                                                                                                                                                                                                           Once within 12 hours prior to starting activity AND 24 hours thereafter Example 1.4-2 has two Frequencies. The first is a one-time performance Frequency, and the second is of the type shown in Example 1.4-1. The logical connector AND indicates that both Frequency requirements must be met. Each time the example activity is to be performed, the Surveillance must be performed prior to starting the activity.
SURVEILLANCE FREQUENCY Verify flow is within limits. Once within 12 hours prior to starting activity AND 24 hours thereafter Example 1.4-2 has two Frequencies. The first is a one-time performance Frequency, and the second is of the type shown in Example 1.4-1. The logical connector AND indicates that both Frequency requirements must be met. Each time the example activity is to be performed, the Surveillance must be performed prior to starting the activity.
The use of once indicates a single performance will satisfy the specified Frequency (assumi ng no other Frequencies are connected by AND). This type of Frequency does not qualify for the 25% extension allowed by SR 3.0.2.
The use of once indicates a single performance will satisfy the specified Frequency (assumi ng no other Frequencies are connected by AND). This type of Frequency does not qualify for the 25% extension allowed by SR 3.0.2.
Thereafter indicates future performances must be established per SR 3.0.2, but only after a specified condition is first met (i.e., the once performance in this example). If the specified activity is canceled or not pe rformed, the measurement of both intervals stops.             New intervals start upon preparing to restart the specified activity.
Thereafter indicates future performances must be established per SR 3.0.2, but only after a specified condition is first met (i.e., the once performance in this example). If the specified activity is canceled or not pe rformed, the measurement of both intervals stops. New intervals start upon preparing to restart the specified activity.


FuelSolutions' W74 Canister     Renewed 1.4-3                                                                                                                                                                                                                                                             Amendment 0 Functional and Operating Limits 2.0
FuelSolutions' W74 Canister Renewed 1.4-3 Amendment 0 Functional and Operating Limits 2.0


2.0 FUNCTIONAL AND OPERATING LIMITS
2.0 FUNCTIONAL AND OPERATING LIMITS


2.1 Functional and Operating Limits 2.1.1                                     Fuel to be Stored in the FuelSolutions' W74 CANISTER.
2.1 Functional and Operating Limits 2.1.1 Fuel to be Stored in the FuelSolutions' W74 CANISTER.
SFAs meeting the limits specified in Table 2.1-1 may be stored in a W74 CANISTER.
SFAs meeting the limits specified in Table 2.1-1 may be stored in a W74 CANISTER.


2.2                         Functional and Operating Limits Violations If any Functional and Operating Limits are violated, the following actions shall be completed.
2.2 Functional and Operating Limits Violations If any Functional and Operating Limits are violated, the following actions shall be completed.
These actions are not a substitute for the re porting requirements contained in 10CFR72.75.
These actions are not a substitute for the re porting requirements contained in 10CFR72.75.
2.2.1                                     The affected fuel assemblies shall be placed in a safe condition without delay and in a controlled manner.
2.2.1 The affected fuel assemblies shall be placed in a safe condition without delay and in a controlled manner.
2.2.2                                     The NRC Operations Center shall be notified within 24 hours.
2.2.2 The NRC Operations Center shall be notified within 24 hours.
2.2.3                                     A special report will be provided to NRC within 30 days that describes the cause of the violation, the actions to restore compliance, and the actions to prevent recurrence.
2.2.3 A special report will be provided to NRC within 30 days that describes the cause of the violation, the actions to restore compliance, and the actions to prevent recurrence.


FuelSolutions' W74 Canister     Renewed 2.0-1                                           Amendment 0 Functional and Operating Limits 2.0 2.0 Functional and Operating Limits
FuelSolutions' W74 Canister Renewed 2.0-1 Amendment 0 Functional and Operating Limits 2.0 2.0 Functional and Operating Limits


Table 2.1-1 FuelSolutions' W74 Loading Specification W74-1
Table 2.1-1 FuelSolutions' W74 Loading Specification W74-1


W74-1 Payload Configuration                               Full Loading of 64 Intact Fuel Assemblies Parameter                                                   Limit/Specification
W74-1 Payload Configuration Full Loading of 64 Intact Fuel Assemblies Parameter Limit/Specification


Payload
Payload


== Description:==
== Description:==
                                                                                                                                                                                                                                      < 64 Big Rock Point BWR fuel assemblies, as defined in Table 2.1-2. If less than 64 fuel assemblies are loaded, a dummy fuel assembly shall be placed into each empty CANISTER basket guide tube.             Each dummy fuel assembly shall be the approximate weight and size of the actual fuel being loaded.
< 64 Big Rock Point BWR fuel assemblies, as defined in Table 2.1-2. If less than 64 fuel assemblies are loaded, a dummy fuel assembly shall be placed into each empty CANISTER basket guide tube. Each dummy fuel assembly shall be the approximate weight and size of the actual fuel being loaded.
Maximum Weight per                           485 pounds Assembly:
Maximum Weight per 485 pounds Assembly:
Heat Load Limit per                         388 watts Assembly:
Heat Load Limit per 388 watts Assembly:


Cladding Material/Condition:                                                               Intact zircaloy-clad fuel assemblies with no known or suspected cladding defects greater than hairline cracks or pinhole leaks. Partial fuel assemblies, i.e., fuel assemblies from which fuel rods are missing, must not be loaded into the CANISTER unless dummy fuel rods are inserted into the assembly in the locations of the missing rods. The dummy fuel rods shall displace an amount of water equal to that displaced by the original fuel rods.
Cladding Material/Condition: Intact zircaloy-clad fuel assemblies with no known or suspected cladding defects greater than hairline cracks or pinhole leaks. Partial fuel assemblies, i.e., fuel assemblies from which fuel rods are missing, must not be loaded into the CANISTER unless dummy fuel rods are inserted into the assembly in the locations of the missing rods. The dummy fuel rods shall displace an amount of water equal to that displaced by the original fuel rods.
Initial Enrichment:                                                                                                                                                                                                                                                                                   < 4.10 w/o 235U.             The maximum acceptable enrichments shall not exceed the enrichments defined in Table 2.1-2.
Initial Enrichment: < 4.10 w/o 235U. The maximum acceptable enrichments shall not exceed the enrichments defined in Table 2.1-2.
Burnup: < 40,000 MWd/MTU.
Burnup: < 40,000 MWd/MTU.
Cooling Time:                                                                                                                                                                                                                                                                                                                                                                                       The minimum   acceptable cooling time varies by fuel assembly class and enrichment, as a function of burnup. The effects of the maximum acceptable decay heat, initial uranium content, and gamma and neutron sources are incorporated into the minimum cooling time determination. Fuel assemblies shall not be stored with less than the minimum acceptable cooling time indicated in Table 2.1-3.
Cooling Time: The minimum acceptable cooling time varies by fuel assembly class and enrichment, as a function of burnup. The effects of the maximum acceptable decay heat, initial uranium content, and gamma and neutron sources are incorporated into the minimum cooling time determination. Fuel assemblies shall not be stored with less than the minimum acceptable cooling time indicated in Table 2.1-3.


FuelSolutions' W74 Canister     Renewed 2.0-2                                                                   Amendment 0
FuelSolutions' W74 Canister Renewed 2.0-2 Amendment 0


Functional and Operating Limits 2.0 Functional       and       Operating       Limits
Functional and Operating Limits 2.0 Functional and Operating Limits


Table 2.1-3 Fuel Cooling Table W74-1-A
Table 2.1-3 Fuel Cooling Table W74-1-A


APPLICABILITY:
APPLICABILITY:
Canister:                                                                                                                                                                                                                                                                                                                                                                                                                                                                         FuelSolutions' W74-M and W74-T Canisters Loading Specification:                                                                                                                                                                                                                                                   W74-1-A
Canister: FuelSolutions' W74-M and W74-T Canisters Loading Specification: W74-1-A


== Description:==
== Description:==
Up to 64 fuel assemblies SNF Assemblies:                                                                                                                                                                                                                                                                                                                                                   Valid for all BRP assemblies as indicated in Table 2.1-2.
Up to 64 fuel assemblies SNF Assemblies: Valid for all BRP assemblies as indicated in Table 2.1-2.
Cobalt Content:                                                                                                                                                                                                           2.9 g in active fuel region
Cobalt Content: 2.9 g in active fuel region


QUALIFICATION BASES:
QUALIFICATION BASES:
Storage Cask Dose Rate                                                                                                               50 mrem/hr Canister Heat Load                                                                                                                                                                     24.8 kW/Canister, and   0.216 kW/inch-Canister Maximum                                                                   Required Minimum Cooling Time (yr.)(1,2)
Storage Cask Dose Rate 50 mrem/hr Canister Heat Load 24.8 kW/Canister, and 0.216 kW/inch-Canister Maximum Required Minimum Cooling Time (yr.)(1,2)
Burnup                                                                     Minimum Initial Enrichment (w/o 235U)
Burnup Minimum Initial Enrichment (w/o 235U)
(MWd/MTU)(1)                                         1.5 2.0 2.5 3.0 3.5 4.0
(MWd/MTU)(1) 1.5 2.0 2.5 3.0 3.5 4.0


15,000 3.2 3.1 3.1 3.0 3.0 3.0 20,000 3.4 3.3 3.2 3.2 3.1 3.1 25,000 3.6 3.5 3.4 3.4 3.3 3.3 30,000 3.8 3.7 3.6 3.5 3.5 3.4 32,000 3.9 3.8 3.7 3.6 3.5 3.5 34,000 4.2 3.9 3.8 3.7 3.6 3.5 36,000 4.8 4.4 4.1 3.9 3.8 3.7 38,000 5.2 4.8 4.5 4.2 4.0 3.9 40,000 5.6 5.3 4.9 4.6 4.3 4.1
15,000 3.2 3.1 3.1 3.0 3.0 3.0 20,000 3.4 3.3 3.2 3.2 3.1 3.1 25,000 3.6 3.5 3.4 3.4 3.3 3.3 30,000 3.8 3.7 3.6 3.5 3.5 3.4 32,000 3.9 3.8 3.7 3.6 3.5 3.5 34,000 4.2 3.9 3.8 3.7 3.6 3.5 36,000 4.8 4.4 4.1 3.9 3.8 3.7 38,000 5.2 4.8 4.5 4.2 4.0 3.9 40,000 5.6 5.3 4.9 4.6 4.3 4.1


Notes:
Notes:
(1)                                 Rounding:           round up to next highest burnup, round down to next lowest enrichment.
(1) Rounding: round up to next highest burnup, round down to next lowest enrichment.


(2)                               Enrichments less than 1.5% or greater than the criticality limit presented in Section 6.1 of the FuelSolutions' W74 Canister Storage SAR are not qualified.
(2) Enrichments less than 1.5% or greater than the criticality limit presented in Section 6.1 of the FuelSolutions' W74 Canister Storage SAR are not qualified.


FuelSolutions' W74 Canister               Renewed 2.0-4                                                                                                                                                 Amendment 0 LCO Applicability 3.0 3.0                         LIMITING CONDITION FOR OPERATION (LCO) APPLICABILITY
FuelSolutions' W74 Canister Renewed 2.0-4 Amendment 0 LCO Applicability 3.0 3.0 LIMITING CONDITION FOR OPERATION (LCO) APPLICABILITY


LCO 3.0.1                                                                                 LCOs shall be met during specified conditions in the Applicability, except as provided in LCO 3.0.2.
LCO 3.0.1 LCOs shall be met during specified conditions in the Applicability, except as provided in LCO 3.0.2.
LCO 3.0.2                                                                               Upon discovery of a failure to meet an LCO, the Required Actions of the associated Conditions shall be met, except as provided in LCO 3.0.5.
LCO 3.0.2 Upon discovery of a failure to meet an LCO, the Required Actions of the associated Conditions shall be met, except as provided in LCO 3.0.5.
If the LCO is met or is no longer applicable prior to expiration of the specified Completion Time(s), completion of the Re quired Action(s) is not required, unless otherwise stated.
If the LCO is met or is no longer applicable prior to expiration of the specified Completion Time(s), completion of the Re quired Action(s) is not required, unless otherwise stated.


LCO 3.0.3                                                                           Not applicable to an SFSS.
LCO 3.0.3 Not applicable to an SFSS.


LCO 3.0.4                                                                               When an LCO is not met, entry into a specified condition in the Applicability shall not be made except when the associated ACTIONS to be entered permit continued operation in the specified condition in the Applicability for an unlimited period of time. This Specification shall not prevent changes in specified conditions in the Applicability that are required to comply with ACTIONS or that are related to the unloading of a CANISTER.
LCO 3.0.4 When an LCO is not met, entry into a specified condition in the Applicability shall not be made except when the associated ACTIONS to be entered permit continued operation in the specified condition in the Applicability for an unlimited period of time. This Specification shall not prevent changes in specified conditions in the Applicability that are required to comply with ACTIONS or that are related to the unloading of a CANISTER.
LCO 3.0.5                                                                               Equipment removed from service or not in service in compliance with ACTIONS may be returned to service under administrative control solely to perform testing required to demonstrate it meets the LCO or that other equipment meets the LCO.
LCO 3.0.5 Equipment removed from service or not in service in compliance with ACTIONS may be returned to service under administrative control solely to perform testing required to demonstrate it meets the LCO or that other equipment meets the LCO.
This is an exception to LCO 3.0.2 for the system returned to service under administrative control to perform the testing.
This is an exception to LCO 3.0.2 for the system returned to service under administrative control to perform the testing.
LCO 3.0.6                                                                         Not applicable to an SFSS.
LCO 3.0.6 Not applicable to an SFSS.
LCO 3.0.7                                                                               Not applicable to an SFSS.
LCO 3.0.7 Not applicable to an SFSS.


FuelSolutions' W74 Canister               Renewed 3.0-1                                                   Amendment 0 LCO Applicability 3.0 3.0 SURVEILLANCE REQUIREMENT (SR) APPLICABILITY
FuelSolutions' W74 Canister Renewed 3.0-1 Amendment 0 LCO Applicability 3.0 3.0 SURVEILLANCE REQUIREMENT (SR) APPLICABILITY


SR 3.0.1                                                                                                             SRs shall be met during the specified conditions in the Applicability for individual LCOs, unless otherwise stated in the SR. Failure to meet a Surveillance, whether such failure is experienced during the performance of the Surveillance or between performances of the Surveillance, shall be failure to meet the LCO. Failure to perform a Surveillance within the specified Frequency shall be failure to meet the LCO except as provided in SR 3.0.3. Surveillances do not have to be performed on equipment or variables outside specified limits.
SR 3.0.1 SRs shall be met during the specified conditions in the Applicability for individual LCOs, unless otherwise stated in the SR. Failure to meet a Surveillance, whether such failure is experienced during the performance of the Surveillance or between performances of the Surveillance, shall be failure to meet the LCO. Failure to perform a Surveillance within the specified Frequency shall be failure to meet the LCO except as provided in SR 3.0.3. Surveillances do not have to be performed on equipment or variables outside specified limits.
SR 3.0.2                                                                                                             The specified Frequency for each SR is met if the Surveillance is performed within 1.25 times the interval specified in the Frequency, as measured from the previous performance or a measured from the time a specified condition of the Frequency is   met.
SR 3.0.2 The specified Frequency for each SR is met if the Surveillance is performed within 1.25 times the interval specified in the Frequency, as measured from the previous performance or a measured from the time a specified condition of the Frequency is met.
For Frequencies specified as once, the above interval extension does not apply.
For Frequencies specified as once, the above interval extension does not apply.
If a Completion Time requires periodic performance on a once per basis, the above Frequency extension applies to each performance after the initial performance.
If a Completion Time requires periodic performance on a once per basis, the above Frequency extension applies to each performance after the initial performance.
Exceptions to this Specification are stated in the individual Specifications.
Exceptions to this Specification are stated in the individual Specifications.


SR 3.0.3                                                                                                             If it is discovered that a Surveillance was not performed within its specified Frequency, then compliance with the requirement to declare the LCO not met may be delayed, from the time of discovery, up to 24 hours or up to the limit of the specified Frequency, whichever is less. This delay period is permitted to allow performance of the Surveillance.
SR 3.0.3 If it is discovered that a Surveillance was not performed within its specified Frequency, then compliance with the requirement to declare the LCO not met may be delayed, from the time of discovery, up to 24 hours or up to the limit of the specified Frequency, whichever is less. This delay period is permitted to allow performance of the Surveillance.
If the Surveillance is not performed within the delay period, the LCO must immediately be   declared not   met, and the applicable Condition(s) must be entered.
If the Surveillance is not performed within the delay period, the LCO must immediately be declared not met, and the applicable Condition(s) must be entered.
When the Surveillance is performed within the delay period and the Surveillance is not met, the LCO must immediately be declared not met, and the applicable Condition(s) must be entered.
When the Surveillance is performed within the delay period and the Surveillance is not met, the LCO must immediately be declared not met, and the applicable Condition(s) must be entered.


SR 3.0.4                                                                                                               Entry into a specified condition in the Applicability of an LCO shall not be made unless the LCOs Surveillances have been met within their specified Frequency.
SR 3.0.4 Entry into a specified condition in the Applicability of an LCO shall not be made unless the LCOs Surveillances have been met within their specified Frequency.
This provision shall not prevent entry into specified conditions in the Applicability that are required to comply with ACTIONS or that are related to the unloading of a CANISTER.
This provision shall not prevent entry into specified conditions in the Applicability that are required to comply with ACTIONS or that are related to the unloading of a CANISTER.


FuelSolutions' W74 Canister               Renewed 3.0-2                                         Amendment 0 W74 Canister Helium Backfill Density 3.1.1 3.1 CANISTER INTEGRITY 3.1.1         W74 Canister Helium Backfill Density
FuelSolutions' W74 Canister Renewed 3.0-2 Amendment 0 W74 Canister Helium Backfill Density 3.1.1 3.1 CANISTER INTEGRITY 3.1.1 W74 Canister Helium Backfill Density


LCO 3.1.1                                                                                                                                                                                                                                                                                                                                                                                                   The CANISTER helium backfill density shall be in the range of 0.0374 g-moles/liter to 0.0401 g-moles/liter.
LCO 3.1.1 The CANISTER helium backfill density shall be in the range of 0.0374 g-moles/liter to 0.0401 g-moles/liter.
APPLICABILITY: During LOADING OPERATIONS.
APPLICABILITY: During LOADING OPERATIONS.
ACTIONS
ACTIONS
Line 281: Line 281:
NOTE Separate Condition entry is allowed for each CANISTER.
NOTE Separate Condition entry is allowed for each CANISTER.


COMPLETION CONDITION                                                                                                                                                                                               REQUIRED ACTION TIME A. CANISTER helium                             A.1     Establish CANISTER helium                 48 hours backfill quantity limit is                       backfill quantity within limit.
COMPLETION CONDITION REQUIRED ACTION TIME A. CANISTER helium A.1 Establish CANISTER helium 48 hours backfill quantity limit is backfill quantity within limit.
not met.
not met.
B.                                             Required Action and B.1         Remove all fuel assemblies 30 days associated Completion                           from CANISTER.
B. Required Action and B.1 Remove all fuel assemblies 30 days associated Completion from CANISTER.
Time are not met.
Time are not met.


Line 292: Line 292:
SURVEILLANCE FREQUENCY
SURVEILLANCE FREQUENCY


SR 3.1.1.1                                                                                                                                                                                                               Verify CANISTER helium backfill quantity is Within 24 hours after within limit.                                                           verifying CANISTER cavity vacuum drying pressure is within limit.
SR 3.1.1.1 Verify CANISTER helium backfill quantity is Within 24 hours after within limit. verifying CANISTER cavity vacuum drying pressure is within limit.


FuelSolutions' W74 Canister     Renewed 3.1-1                                                                       Amendment 0 Canister Vacuum Drying Pressure 3.1.2 3.1 CANISTER INTEGRITY 3.1.2 Canister Vacuum Drying Pressure
FuelSolutions' W74 Canister Renewed 3.1-1 Amendment 0 Canister Vacuum Drying Pressure 3.1.2 3.1 CANISTER INTEGRITY 3.1.2 Canister Vacuum Drying Pressure


See the Storage System Technical Specification for the applicable LCO.
See the Storage System Technical Specification for the applicable LCO.


FuelSolutions' W74 Canister     Renewed 3.1-2           Amendment 0 Canister Leak Rate 3.1.3 3.1 CANISTER INTEGRITY 3.1.3 Canister Leak Rate
FuelSolutions' W74 Canister Renewed 3.1-2 Amendment 0 Canister Leak Rate 3.1.3 3.1 CANISTER INTEGRITY 3.1.3 Canister Leak Rate


See the Storage System Technical Specification for the applicable LCO.
See the Storage System Technical Specification for the applicable LCO.


FuelSolutions' W74 Canister     Renewed 3.1-3           Amendment 0 Hydraulic Ram Force During Horizontal Canister Transfer 3.1.4 3.1 CANISTER INTEGRITY 3.1.4                     Hydraulic Ram Force During Horizontal Canister Transfer
FuelSolutions' W74 Canister Renewed 3.1-3 Amendment 0 Hydraulic Ram Force During Horizontal Canister Transfer 3.1.4 3.1 CANISTER INTEGRITY 3.1.4 Hydraulic Ram Force During Horizontal Canister Transfer


See the Storage System Technical Specification for the applicable LCO.
See the Storage System Technical Specification for the applicable LCO.


FuelSolutions' W74 Canister     Renewed 3.1-4                   Amendment 0 W74 Canister Vertical Time Limit in Transfer Cask 3.1.5 3.1 CANISTER INTEGRITY 3.1.5 W74 Canister Vertical Time Limit in Transfer Cask
FuelSolutions' W74 Canister Renewed 3.1-4 Amendment 0 W74 Canister Vertical Time Limit in Transfer Cask 3.1.5 3.1 CANISTER INTEGRITY 3.1.5 W74 Canister Vertical Time Limit in Transfer Cask


LCO 3.1.5                                                                                                                                                                                                                                                                                                                                   For vertical TRANSFER OPERATIONS, the CANISTER transfer out of the TRANSFER CASK shall be completed within 8 hours after draining the annulus water from the TRANSFER CASK. For horizontal TRANSFER OPERATIONS, the movement of the TRANSFER CASK to the horizontal position on the transfer trailer shall be completed within 8 hours after draining the annulus water from the TRANSFER CASK.
LCO 3.1.5 For vertical TRANSFER OPERATIONS, the CANISTER transfer out of the TRANSFER CASK shall be completed within 8 hours after draining the annulus water from the TRANSFER CASK. For horizontal TRANSFER OPERATIONS, the movement of the TRANSFER CASK to the horizontal position on the transfer trailer shall be completed within 8 hours after draining the annulus water from the TRANSFER CASK.
APPLICABILITY: During TRANSFER OPERATIONS.
APPLICABILITY: During TRANSFER OPERATIONS.
ACTIONS
ACTIONS
Line 314: Line 314:
NOTE Separate Condition entry is allowed for each CANISTER.
NOTE Separate Condition entry is allowed for each CANISTER.


COMPLETION CONDITION                                                                                                                                                                                               REQUIRED ACTION TIME A.                                           CANISTER time limit in A.1                   Fill annulus with water. 7 hours.
COMPLETION CONDITION REQUIRED ACTION TIME A. CANISTER time limit in A.1 Fill annulus with water. 7 hours.
drained annulus TRANSFER CASK is not met.                                   AND A.2                   Maintain filled annulus. 24 hours.
drained annulus TRANSFER CASK is not met. AND A.2 Maintain filled annulus. 24 hours.


SURVEILLANCE REQUIREMENTS
SURVEILLANCE REQUIREMENTS
Line 321: Line 321:
SURVEILLANCE FREQUENCY
SURVEILLANCE FREQUENCY


SR 3.1.5.1                                                                                                                                                                                                     Verify TRANSFER CASK operations with Within 8 hours after CANISTER in vertical orientation and annulus                     completion of drained are completed within time limit.                         TRANSFER CASK/
SR 3.1.5.1 Verify TRANSFER CASK operations with Within 8 hours after CANISTER in vertical orientation and annulus completion of drained are completed within time limit. TRANSFER CASK/
CANISTER annulus draining.
CANISTER annulus draining.


FuelSolutions' W74 Canister     Renewed 3.1-5                                                             Amendment 0 Canister Surface Contamination 3.2.1 3.2 CANISTER RADIATION PROTECTION 3.2.1 Canister Surface Contamination
FuelSolutions' W74 Canister Renewed 3.1-5 Amendment 0 Canister Surface Contamination 3.2.1 3.2 CANISTER RADIATION PROTECTION 3.2.1 Canister Surface Contamination


See the Storage System Technical Specification for the applicable LCO.
See the Storage System Technical Specification for the applicable LCO.


FuelSolutions' W74 Canister     Renewed 3.2-1           Amendment 0 Storage Cask Air Inlet and Outlet Openings 3.3.1 3.3                       STORAGE CASK INTEGRITY 3.3.1                       Storage Cask Air Inlet and Outlet Openings
FuelSolutions' W74 Canister Renewed 3.2-1 Amendment 0 Storage Cask Air Inlet and Outlet Openings 3.3.1 3.3 STORAGE CASK INTEGRITY 3.3.1 Storage Cask Air Inlet and Outlet Openings


See the Storage System Technical Specification for the applicable LCO.
See the Storage System Technical Specification for the applicable LCO.


FuelSolutions' W74 Canister     Renewed 3.3-1                         Amendment 0 Storage Cask Temperatures During Storage 3.3.2 3.3                       STORAGE CASK INTEGRITY 3.3.2                       Storage Cask Temperatures During Storage
FuelSolutions' W74 Canister Renewed 3.3-1 Amendment 0 Storage Cask Temperatures During Storage 3.3.2 3.3 STORAGE CASK INTEGRITY 3.3.2 Storage Cask Temperatures During Storage


LCO 3.3.2                                                                                                                                                                                                                                                                                                                                                                           The temperature of a STORAGE CASK with a W74 CANISTER containing fuel assemblies, as indicated by the liner thermocouple, shall meet the following limits:
LCO 3.3.2 The temperature of a STORAGE CASK with a W74 CANISTER containing fuel assemblies, as indicated by the liner thermocouple, shall meet the following limits:
: a.                                                                   The measured temperature shall not exceed 143&deg;F (62&deg;C) under normal ambient conditions (average ambient temperature up to 100&deg;F (38&deg;C)).
: a. The measured temperature shall not exceed 143&deg;F (62&deg;C) under normal ambient conditions (average ambient temperature up to 100&deg;F (38&deg;C)).
: b.                                                                 The measured temperature shall not exceed 169&deg;F (76&deg;C) under off-normal ambient conditions (average ambient temperature up to 125&deg;F (52&deg;C)).
: b. The measured temperature shall not exceed 169&deg;F (76&deg;C) under off-normal ambient conditions (average ambient temperature up to 125&deg;F (52&deg;C)).
: c.                                                             The differential temperature between two successive daily measurements shall not exceed the corresponding differential ambient temperature plus 83&deg;F (46&deg;C).
: c. The differential temperature between two successive daily measurements shall not exceed the corresponding differential ambient temperature plus 83&deg;F (46&deg;C).
APPLICABILITY: During STORAGE OPERATIONS.
APPLICABILITY: During STORAGE OPERATIONS.
ACTIONS NOTE Separate Condition entry is allowed for each STORAGE CASK.
ACTIONS NOTE Separate Condition entry is allowed for each STORAGE CASK.


COMPLETION CONDITION                                                                                                                                                                                                 REQUIRED ACTION TIME A. STORAGE CASK                                                                     A.1 Administratively verify                                                                     24 hours concrete temperature                                                                     correct fuel loading.
COMPLETION CONDITION REQUIRED ACTION TIME A. STORAGE CASK A.1 Administratively verify 24 hours concrete temperature correct fuel loading.
exceeds the specified limit.                                             AND A.2                                       Visually check all STORAGE 24 hours CASK inlet and outlet screens for debris blockage in accordance with LCO 3.3.1.
exceeds the specified limit. AND A.2 Visually check all STORAGE 24 hours CASK inlet and outlet screens for debris blockage in accordance with LCO 3.3.1.
AND A.3                                             Check the thermocouple and 24 hours related instrumentation to assure they are functioning properly.
AND A.3 Check the thermocouple and 24 hours related instrumentation to assure they are functioning properly.
AND (continued)
AND (continued)


FuelSolutions' W74 Canister     Renewed 3.3-2                                                                                                                                                                 Amendment 0 Storage Cask Temperatures During Storage 3.3.2 3.3.2                               Storage Cask Temperatures During Storage
FuelSolutions' W74 Canister Renewed 3.3-2 Amendment 0 Storage Cask Temperatures During Storage 3.3.2 3.3.2 Storage Cask Temperatures During Storage


COMPLETION CONDITION                                                                                                                                                                             REQUIRED ACTION TIME A.4                                 Repair or replace 48 hours thermocouple and related instrumentation as necessary.
COMPLETION CONDITION REQUIRED ACTION TIME A.4 Repair or replace 48 hours thermocouple and related instrumentation as necessary.
AND A.5                                 Perform visual inspection of                   48 hours the STORAGE CASK vent channels by removing the debris screens and using visual aids as necessary.             If no obstruction is found, the interior of the STORAGE CASK, including the guide rails and heat shield, is to be visually inspected for ventilation obstructions using remote inspection tools or by temporarily removing the STORAGE CASK top cover.
AND A.5 Perform visual inspection of 48 hours the STORAGE CASK vent channels by removing the debris screens and using visual aids as necessary. If no obstruction is found, the interior of the STORAGE CASK, including the guide rails and heat shield, is to be visually inspected for ventilation obstructions using remote inspection tools or by temporarily removing the STORAGE CASK top cover.
B.                                       Required Actions and           B.1                                       Initiate actions to cool the           96 hours associated Completion                                                       cask to within the limit.
B. Required Actions and B.1 Initiate actions to cool the 96 hours associated Completion cask to within the limit.
Times are not met.                                             AND B.2                                             Return CANISTER to the fuel     30 days building and remove all fuel assemblies.
Times are not met. AND B.2 Return CANISTER to the fuel 30 days building and remove all fuel assemblies.


SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.3.2.1                                                                                                                   Verify that the STORAGE CASK temperatures are 24 hours within limit.
SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.3.2.1 Verify that the STORAGE CASK temperatures are 24 hours within limit.
NOTE Daily cask temperatures can be expected to vary slightly due to changes in the ambient temperature.
NOTE Daily cask temperatures can be expected to vary slightly due to changes in the ambient temperature.
This is acceptable as long as the temperatures remain within the specified limit.
This is acceptable as long as the temperatures remain within the specified limit.


FuelSolutions' W74 Canister     Renewed 3.3-3                                                                                                                                   Amendment 0 Storage Cask Temperatures During Horizontal Transfer 3.3.3 3.3 STORAGE CASK INTEGRITY 3.3.3                       Storage Cask Temperatures During Horizontal Transfer
FuelSolutions' W74 Canister Renewed 3.3-3 Amendment 0 Storage Cask Temperatures During Horizontal Transfer 3.3.3 3.3 STORAGE CASK INTEGRITY 3.3.3 Storage Cask Temperatures During Horizontal Transfer


LCO 3.3.3                                                                                                                                                                                                                                                                                                                                                                         The measured temperature of a STORAGE CASK with a W74 CANISTER containing fuel assemblies, as indicated by the liner thermocouple, shall not exceed 185&deg;F (85&deg;C).
LCO 3.3.3 The measured temperature of a STORAGE CASK with a W74 CANISTER containing fuel assemblies, as indicated by the liner thermocouple, shall not exceed 185&deg;F (85&deg;C).
APPLICABILITY: During TRANSFER OPERATIONS.
APPLICABILITY: During TRANSFER OPERATIONS.
ACTIONS NOTE Separate Condition entry is allowed for each STORAGE CASK.
ACTIONS NOTE Separate Condition entry is allowed for each STORAGE CASK.


COMPLETION CONDITION                                                                                                                                                                                               REQUIRED ACTION                                                                                               TIME A. STORAGE CASK                                                                                                                                         A.1                                                               Transfer the CANISTER                                                                                 24 hours concrete temperature limit                                                                                                                                       into the TRANSFER CASK.
COMPLETION CONDITION REQUIRED ACTION TIME A. STORAGE CASK A.1 Transfer the CANISTER 24 hours concrete temperature limit into the TRANSFER CASK.
is not met.
is not met.
B.                                                 Required Actions and                                                                                                                                                               B.1                                                                                   Inspect the STORAGE                                                                                                                                                                 5 days associated Completion CASK for damage.
B. Required Actions and B.1 Inspect the STORAGE 5 days associated Completion CASK for damage.
Times are not met.
Times are not met.
B.2.1                                           If no damage, transfer                                                                                                                                                                                     7 days CANISTER to STORAGE CASK.
B.2.1 If no damage, transfer 7 days CANISTER to STORAGE CASK.
OR B.2.2 If damaged, transfer                                     21 days CANISTER to new STORAGE CASK.
OR B.2.2 If damaged, transfer 21 days CANISTER to new STORAGE CASK.
C.                                                                                                     Required Actions and                             C.1                                                                           Return CANISTER to the                                                                     30 days associated Completion                                                                                                                                   fuel building and remove all Time are not met.                                                                                                                                       fuel assemblies.
C. Required Actions and C.1 Return CANISTER to the 30 days associated Completion fuel building and remove all Time are not met. fuel assemblies.


SURVEILLANCE REQUIREMENTS
SURVEILLANCE REQUIREMENTS


SURVEILLANCE FREQUENCY SR 3.3.3.1                                                                                                                                                                                               After the STORAGE CASK is downended to                                                                   30 minutes the horizontal orientation, monitor and record STORAGE CASK concrete temperature as indicated by the STORAGE CASK side wall thermocouple.
SURVEILLANCE FREQUENCY SR 3.3.3.1 After the STORAGE CASK is downended to 30 minutes the horizontal orientation, monitor and record STORAGE CASK concrete temperature as indicated by the STORAGE CASK side wall thermocouple.


FuelSolutions' W74 Canister     Renewed 3.3-4                                                                                                                                                                                                                                                                                                                                 Amendment 0 Transfer Cask Structural Shell Temperature 3.4.1 3.4 TRANSFER CASK INTEGRITY 3.4.1Transfer Cask Structural Shell Temperature
FuelSolutions' W74 Canister Renewed 3.3-4 Amendment 0 Transfer Cask Structural Shell Temperature 3.4.1 3.4 TRANSFER CASK INTEGRITY 3.4.1Transfer Cask Structural Shell Temperature


See the Storage System Technical Specification for the applicable LCO.
See the Storage System Technical Specification for the applicable LCO.


FuelSolutions' W74 Canister               Renewed 3.4-1       Amendment 0 Transfer Cask Surface Contamination 3.5.1 3.5                       TRANSFER CASK RADIATION PROTECTION 3.5.1Transfer Cask Surface Contamination
FuelSolutions' W74 Canister Renewed 3.4-1 Amendment 0 Transfer Cask Surface Contamination 3.5.1 3.5 TRANSFER CASK RADIATION PROTECTION 3.5.1Transfer Cask Surface Contamination


See the Storage System Technical Specification for the applicable LCO.
See the Storage System Technical Specification for the applicable LCO.


FuelSolutions' W74 Canister               Renewed 3.5-1           Amendment 0 Design Features 4.0 4.0 DESIGN FEATURES
FuelSolutions' W74 Canister Renewed 3.5-1 Amendment 0 Design Features 4.0 4.0 DESIGN FEATURES


The specifications in this section include the design characteristics of special importance to each of the physical barriers and the maintenance of safety margins in the storage system component design. The principal objective of this category is to describe the design envelope which might constrain any physical changes to essential equipment. Included in this category are the site environmental parameters which provide the base s for design, but are not inherently suited for description as LCOs.
The specifications in this section include the design characteristics of special importance to each of the physical barriers and the maintenance of safety margins in the storage system component design. The principal objective of this category is to describe the design envelope which might constrain any physical changes to essential equipment. Included in this category are the site environmental parameters which provide the base s for design, but are not inherently suited for description as LCOs.
4.1 Storage System 4.1.1                                       Storage Cask 4.1.1.1 Structural Performance See the Storage System Technical Specification Section 4.1.1.1 for discussion of STORAGE CASK structural performance features.
4.1 Storage System 4.1.1 Storage Cask 4.1.1.1 Structural Performance See the Storage System Technical Specification Section 4.1.1.1 for discussion of STORAGE CASK structural performance features.
4.1.1.2 Codes and Standards See the Storage System Technical Specification Section 4.1.1.2 for discussion of codes and standards applicable to the STORAGE CASK.
4.1.1.2 Codes and Standards See the Storage System Technical Specification Section 4.1.1.2 for discussion of codes and standards applicable to the STORAGE CASK.
4.1.1.3 Fabrication Exceptions to Codes, Standards, and Criteria See the Storage System Technical Specification Section 4.1.1.3 for discussion of exceptions to codes, standards, and criteria.
4.1.1.3 Fabrication Exceptions to Codes, Standards, and Criteria See the Storage System Technical Specification Section 4.1.1.3 for discussion of exceptions to codes, standards, and criteria.
4.1.2                                       Transfer Cask 4.1.2.1 Structural Performance See the Storage System Technical Specification Section 4.1.2.1 for discussion of TRANSFER CASK structural performance features.
4.1.2 Transfer Cask 4.1.2.1 Structural Performance See the Storage System Technical Specification Section 4.1.2.1 for discussion of TRANSFER CASK structural performance features.
4.1.2.2 Codes and Standards See the Storage System Technical Specification Section 4.1.2.2 for discussion of codes and standards applicable to the TRANSFER CASK.
4.1.2.2 Codes and Standards See the Storage System Technical Specification Section 4.1.2.2 for discussion of codes and standards applicable to the TRANSFER CASK.
4.1.2.3 Fabrication Exceptions to Codes, Standards, and Criteria See the Storage System Technical Specification Section 4.1.2.3 for discussion of exceptions to codes, standards, and criteria.
4.1.2.3 Fabrication Exceptions to Codes, Standards, and Criteria See the Storage System Technical Specification Section 4.1.2.3 for discussion of exceptions to codes, standards, and criteria.
4.1.3                                   Canister 4.1.3.1 Criticality The design of the W74 CANISTER, including spatial constraints on adjacent assemblies (minimum basket cell opening of 6.85 inches square) and the boron content of the basket neutron absorber material (minimum 1.0 weight percent natural boron) shall assure that fuel assemblies are maintained in a subcritical condition with a keff less than 0.95 under all c onditions of operation.
4.1.3 Canister 4.1.3.1 Criticality The design of the W74 CANISTER, including spatial constraints on adjacent assemblies (minimum basket cell opening of 6.85 inches square) and the boron content of the basket neutron absorber material (minimum 1.0 weight percent natural boron) shall assure that fuel assemblies are maintained in a subcritical condition with a keff less than 0.95 under all c onditions of operation.


FuelSolutions' W74 Canister     Renewed 4.0-1                                     Amendment 0 Design Features 4.0 4.0 Design Features
FuelSolutions' W74 Canister Renewed 4.0-1 Amendment 0 Design Features 4.0 4.0 Design Features


4.1.3.2                                           Structural Performance The CANISTER has been evaluated for a side drop resulting in a lateral gravitational (g) loading of 60 g and an end drop resulting in an axial gravitational loading of 50 g.
4.1.3.2 Structural Performance The CANISTER has been evaluated for a side drop resulting in a lateral gravitational (g) loading of 60 g and an end drop resulting in an axial gravitational loading of 50 g.
The maximum weight of a loaded, dried, and sealed W74 CANISTER is 85,000 pounds.             The maximum CANISTER weight includes 32 SFAs in each basket, plus four damaged fuel cans at the support tube locations in each basket.
The maximum weight of a loaded, dried, and sealed W74 CANISTER is 85,000 pounds. The maximum CANISTER weight includes 32 SFAs in each basket, plus four damaged fuel cans at the support tube locations in each basket.
The W74 CANISTER thermal rating of 26.4 kW is determined by the minimum heat load qualification in th e STORAGE and TRANSFER CASKS.
The W74 CANISTER thermal rating of 26.4 kW is determined by the minimum heat load qualification in th e STORAGE and TRANSFER CASKS.
4.1.3.3                                       Codes and Standards The FuelSolutions' W74 CANISTER shell structural components are designed in accordance with Subsection NB of the ASME Code, and the basket structural components are designed in accordance with Subsection NG of the ASME Code.
4.1.3.3 Codes and Standards The FuelSolutions' W74 CANISTER shell structural components are designed in accordance with Subsection NB of the ASME Code, and the basket structural components are designed in accordance with Subsection NG of the ASME Code.
Exceptions to the code are listed in Table 4.1-1.
Exceptions to the code are listed in Table 4.1-1.
4.1.3.4                                         Fabrication Exceptions to Codes, Standards, and Criteria Proposed alternatives to Subsections NB and NG of the ASME Code, including exceptions allowed by Section 4.1.3.3, may be used when authorized by the Director of the Office of Nuclear Material Safety and Safeguards or Designee.
4.1.3.4 Fabrication Exceptions to Codes, Standards, and Criteria Proposed alternatives to Subsections NB and NG of the ASME Code, including exceptions allowed by Section 4.1.3.3, may be used when authorized by the Director of the Office of Nuclear Material Safety and Safeguards or Designee.
The applicant should demonstrate that:
The applicant should demonstrate that:
: 1.                         The proposed alternatives would provide an acceptable level of quality and safety, or
: 1. The proposed alternatives would provide an acceptable level of quality and safety, or
: 2.                       Compliance with the specified requirements of ASME Code, Section III, would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety.
: 2. Compliance with the specified requirements of ASME Code, Section III, would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety.
Requests for exception in accordance with this section should be submitted in accordance with 10CFR72.4.
Requests for exception in accordance with this section should be submitted in accordance with 10CFR72.4.
4.2 Storage Pad Constraints on the storage pad are discussed in Section 4.2 of the Storage System Technical Specification.
4.2 Storage Pad Constraints on the storage pad are discussed in Section 4.2 of the Storage System Technical Specification.
4.3                         Site Specific Parameters and Analyses See the Storage System Technical Specification Section 4.3 for discussion of site specific parameters and analyses.
4.3 Site Specific Parameters and Analyses See the Storage System Technical Specification Section 4.3 for discussion of site specific parameters and analyses.


FuelSolutions' W74 Canister               Renewed 4.0-2                                         Amendment 0
FuelSolutions' W74 Canister Renewed 4.0-2 Amendment 0


Administrative Controls 5.0 5.0 ADMINISTRATIVE CONTROLS
Administrative Controls 5.0 5.0 ADMINISTRATIVE CONTROLS
Line 419: Line 419:
5.3 Programs 5.3.1-5.3.5 See the Storage System Technical Specification for the applicable information.
5.3 Programs 5.3.1-5.3.5 See the Storage System Technical Specification for the applicable information.
5.3.6 Vacuum Drying Program The FuelSolutions' W74 CANISTER has been evaluated for allowable fuel cladding temperature during LOADING and STORAGE OPERATIONS. During LOADING OPERATIONS, the fuel cladding temperature is limited to 400&deg;C to assure cladding integrity.
5.3.6 Vacuum Drying Program The FuelSolutions' W74 CANISTER has been evaluated for allowable fuel cladding temperature during LOADING and STORAGE OPERATIONS. During LOADING OPERATIONS, the fuel cladding temperature is limited to 400&deg;C to assure cladding integrity.
This program shall establish administrative controls and procedures to assure that the spent fuel cladding does not exceed the temperature limit during LOADING OPERATIONS. For a CANISTER loaded with fuel with a total heat load of 24.8 kW, the initial vacuum drying cycle shall be limited to 7 hours. If the vacuum drying LCO 3.1.2 has not been satisfied, the CANISTER shall be backfilled with helium for 4 hours, vacuum dried for 4 hours, backfilled for 4 hours, etc., until the LCO is met.
This program shall establish administrative controls and procedures to assure that the spent fuel cladding does not exceed the temperature limit during LOADING OPERATIONS. For a CANISTER loaded with fuel with a total heat load of 24.8 kW, the initial vacuum drying cycle shall be limited to 7 hours. If the vacuum drying LCO 3.1.2 has not been satisfied, the CANISTER shall be backfilled with helium for 4 hours, vacuum dried for 4 hours, backfilled for 4 hours, etc., until the LCO is met.
For a heat load of 12.2 kW or lower, there is no time limit on the initial vacuum drying cycle.
For a heat load of 12.2 kW or lower, there is no time limit on the initial vacuum drying cycle.
For heat loads greater than 12.2 kW but less than 24.8 kW, the program shall either use the 24.8 kW requirements, or establish suitable time limits to maintain the cladding temperature to less than or equal to 400&deg;C for the specific CANISTER heat load.
For heat loads greater than 12.2 kW but less than 24.8 kW, the program shall either use the 24.8 kW requirements, or establish suitable time limits to maintain the cladding temperature to less than or equal to 400&deg;C for the specific CANISTER heat load.
Line 428: Line 428:
The calculation and comparison need not be reported to the NRC for STORAGE CASKS that are subsequently loaded with lesser loads then the latest reported case. Cask users may satisfy these requirements by referencing validation test reports submitted to the NRC by other users.
The calculation and comparison need not be reported to the NRC for STORAGE CASKS that are subsequently loaded with lesser loads then the latest reported case. Cask users may satisfy these requirements by referencing validation test reports submitted to the NRC by other users.


FuelSolutions' W74 Canister                                                                                                                   5.0-1     Renewed Amendment 0}}
FuelSolutions' W74 Canister 5.0-1 Renewed Amendment 0}}

Revision as of 13:59, 4 October 2024

05 Renewed CoC No. 1026, Amendment No. 0, Appendix C – Fuelsolutions W74 Canister Technical Specifications
ML24141A259
Person / Time
Site: 07201026
Issue date: 05/23/2024
From:
Storage and Transportation Licensing Branch
To:
Westinghouse
Shared Package
ML24141A254 List:
References
EPID L 2020-RNW-0035, CAC 001028
Download: ML24141A259 (1)


Text

TECHNICAL SPECIFICATION

FOR THE FuelSolutions' W74 CANISTER

to be used concurrent with

the attached Storage System Technical Specification

Renewed Amendment 0

Appendix C TABLE OF CONTENTS Page

1.0 USE AND APPLICATION.......................................................................................... 1.1-1 1.1 Definitions..................................................................................................................... 1.1-1 1.2 Logical Connectors....................................................................................................... 1.2-1 1.3 Completion Times......................................................................................................... 1.3-1 1.4 Frequency...................................................................................................................... 1.4-1

2.0 FUNCTIONAL AND OPERATING LIMITS............................................................. 2.0-1 2.1 Functional and Operating Limits.................................................................................. 2.0-1 2.2 Functional and Operating Limits Violations................................................................. 2.0-1

3.0 LIMITING CONDITION FOR OPERATION (LCO) APPLICABILITY................... 3.0-1

3.0 SURVEILLANCE REQUIREMENT (SR) APPLICABILITY................................... 3.0-2

3.1 CANISTER INTEGRITY............................................................................................. 3.1-1 3.1.1 W74 Canister Helium Backfill Density........................................................................ 3.1-1 3.1.2 Canister Vacuum Drying Pressure................................................................................ 3.1-2 3.1.3 Canister Leak Rate........................................................................................................ 3.1-3 3.1.4 Hydraulic Ram Force During Horizontal Canister Transfer......................................... 3.1-4 3.1.5 W74 Canister Vertical Time Limit in Transfer Cask.................................................... 3.1-5

3.2 CANISTER RADIATION PROTECTION.................................................................. 3.2-1 3.2.1 Canister Surface Contamination................................................................................... 3.2-1

3.3 STORAGE CASK INTEGRITY.................................................................................. 3.3-1 3.3.1 Storage Cask Air Inlet and Outlet Openings................................................................. 3.3-1 3.3.2 Storage Cask Temperatures During Storage................................................................. 3.3-2 3.3.3 Storage Cask Temperatures During Horizontal Transfer.............................................. 3.3-4

3.4 TRANSFER CASK INTEGRITY................................................................................ 3.4-1 3.4.1 Transfer Cask Structural Shell Temperature................................................................. 3.4-1

3.5 TRANSFER CASK RADIATION PROTECTION..................................................... 3.5-1 3.5.1 Transfer Cask Surface Contamination.......................................................................... 3.5-1

4.0 DESIGN FEATURES................................................................................................... 4.0-1 4.1 Storage System.............................................................................................................. 4.0-1 4.2 Storage Pad................................................................................................................... 4.0-2 4.3 Site Specific Parameters and Analyses......................................................................... 4.0-2

FuelSolutions' W74 Canister Renewed Amendment 0 TABLE OF CONTENTS Page

5.0 ADMINISTRATIVE CONTROLS...................................... 5.0-1

5.1 Training Modules.................................................... 5.0-1 5.2 Preoperational Testing and Training Exercises............................. 5.0-1 5.3 Programs.......................................................... 5.0-1 5.4 Special Requirements for First System in Place............................ 5.0-1

LIST OF TABLES

Table 2.1-1 FuelSolutions' W74 Loading Specification W74-1.................... 2.0-2 Table 2.1-2 Fuel Assemblies Acceptable for Storage in the FuelSolutions' W74 Canister 2.0-3 Table 2.1-3 Fuel Cooling Table W74-1-A.............................................................................. 2.0-4 Table 4.1-1 FuelSolutions' W74 Canister ASME Code Requirements Compliance Summary.......................................................................................... 4.0-3

FuelSolutions' W74 Canister Renewed Amendment 0 Definitions 1.1

1.0 USE AND APPLICATION 1.1 Definitions

NOTE The defined terms of this section appear in capitalized type and are applicable throughout these Technical Specifications and Bases.

Term Definition ACTIONS ACTIONS shall be that part of a Specification that prescribes Required Actions to be taken under designated Conditions within specified Completion Times.

CANISTER The CANISTER is the storage container for SFAs approved for use at the ISFSI.

INDEPENDENT SPENT FUEL The facility within the perimeter fence licensed for STORAGE INSTALLATION (ISFSI) storage of spent fuel within CANISTERs.

INTACT FUEL Fuel assemblies with no known or suspected cladding defects greater than hairline cracks or pinhole leaks.

LOADING OPERATIONS LOADING OPERATIONS include all licensed activities on a CANISTER while it is being loaded with fuel assemblies. LOADING OPERATIONS begin when the first fuel assembly is placed in the CANISTER and end when the CANISTER outer closure plate to shell weld examination is complete.

SPENT FUEL ASSEMBLIES (SFAs) Irradiated nuclear fuel assemblies that are to be placed in a CANISTER for dry storage.

SPENT FUEL STORAGE SYSTEM The storage components including the CANISTER, (SFSS) STORAGE CASK, and TRANSFER CASK.

STORAGE CASK The cask that provides a shielded, ventilated storage environment for the loaded CANISTER. This cask is used for TRANSFER OPERATIONS.

STORAGE OPERATIONS STORAGE OPERATIONS include all licensed activities that are performed at the ISFSI while a CANISTER containing spent fuel is sitting inside a STORAGE CASK on a storage pad within the ISFSI.

FuelSolutions' W74 Canister Renewed 1.1-1 Amendment 0 Definitions 1.1 1.1 Definitions

Term Definition TRANSFER CASK The cask that is used for SFA LOADING OPERATIONS and UNLOADING OPERATIONS, and for TRANSFER OPERATIONS.

TRANSFER OPERATIONS TRANSFER OPERATIONS include all licensed activities that are performed on a CANISTER loaded with one or more fuel assemblies when it is being moved to and from the ISFSI.

For movement to the ISFSI, TRANSFER OPERATIONS begin when the CANISTER outer closure plate to shell weld inspection is complete and end when the CANISTER is in the STORAGE CASK in its storage position on the storage pad within the ISFSI.

For movement from the ISFSI, TRANSFER OPERATIONS begin when the STORAGE CASK is moved and end when the CANISTER is moved into a transportation cask or spent fuel building.

UNLOADING OPERATIONS UNLOADING OPERATIONS include all licensed activities on a CANISTER to be unloaded of the contained fuel assemblies. UNLOADING OPERATIONS begin when the CANISTER is ready to initiate removal of the CANISTER outer closure plate and end when the last fuel assembly is removed from the CANISTER.

FuelSolutions' W74 Canister Renewed 1.1-2 Amendment 0 Logical Connectors 1.2 1.0 USE AND APPLICATION

1.2 Logical Connectors

PURPOSE The purpose of this section is to explain the meaning of logical connectors.

Logical connectors are used in Technical Specifications (TS) to discriminate between, and yet connect, discrete Conditions, Required Actions, Completion Times, Surveillances, and Frequencies. The only logical connectors that appear in TS are AND and OR. The physical arrangement of these connectors constitutes logical conventions with specific meanings.

BACKGROUND Several levels of logic may be used to state Required Actions.

These levels are identified by the placement (or nesting) of the logical connectors and by the number assigned to each Required Action. The first level of logic is identified by the first digit of the num ber assigned to a Require Action and the placement of the logical connector in the first level of nesting (i.e., left justified with the number of the Required Action).

The successive levels of logic are identified by additional digits of the Required Action number and by successive indentations of the logical connectors.

When logical connectors are used to state a Condition, Completion Time, Surveillance, or Frequency, only the first level of logic is used, and the logical connector is left justified with the statement of the Condition, Completion Time, Surveillance, or Frequency.

EXAMPLES The following examples illustrate the use of logical connectors.

EXAMPLE 1.2-1 ACTIONS COMPLETION CONDITION REQUIRED ACTION TIME A. LCO not met A.1 Verify...

AND A.2 Restore...

In this example the logical connector AND is used to indicate that when in Condition A, both Required Actions A.1 and A.2 must be completed.

FuelSolutions' W74 Canister Renewed 1.2-1 Amendment 0 Logical Connectors 1.2 1.2 Logical Connectors

EXAMPLES EXAMPLE 1.2-2 (continued) ACTIONS

COMPLETION CONDITION REQUIRED ACTION TIME A. LCO not met A.1 Stop...

OR A.2.1 Verify...

AND A.2.2.1 Reduce...

OR A.2.2.2 Perform...

OR A.3 Remove...

This example represents a more complicated use of logical connectors. Required Actions A.1, A.2, and A.3 are alternative choices, only one of which must be performed as indicated by the use of the logical connector OR and the left justified placement. Any one of these three Actions may be chosen. If A.2 is chosen, then both A.2.1 and A.2.2 must be performed as indicated by the logical connector AND. Required Action A.2.2 is met by performing A.2.2.1 or A.2.2.2. The indented position of the logical connector OR indicates that A.2.2.1 and A.2.2.2 are alternative choices, only one of which must be performed.

FuelSolutions' W74 Canister Renewed 1.2-2 Amendment 0 Completion Times 1.3 1.0 USE AND APPLICATION

1.3 Completion Times

PURPOSE The purpose of this section is to establish the Completion Time convention and to provide guidance for its use.

BACKGROUND Limiting Conditions for Operation (LCOs) specify the lowest functional capability or performance levels of equipment required for safe operation of the facility. The ACTIONS associated with an LCO state Conditions that typically describe the ways in which the requirements of the LCO can fail to be met. Specified with each stated Condition are Required Action(s) and Completion Time(s).

DESCRIPTION The Completion Time is the amount of time allowed for completing a Required Action. It is referenced to the time of discovery of a situation (e.g., equipment or variable not within limits) that requires entering an ACTIONS Condition unless otherwise specified, providing the facility is in a specified condition stated in the Applicability of the LCO. Required Actions must be completed prior to the expiration of the specified Completion Time. An ACTIONS Condition remains in effect and the Required Actions apply until the Condition no longer exists or the facility is not within the LCO Applicability.

Once a Condition has been entered, subsequent subsystems, components, or variables expressed in the Condition, discovered to be not within limits, will not result in separate entry into the Condition unless specifically stated. The Required Actions of the Condition continue to apply to each additional failure, with Completion Times based on initial entry into the Condition.

FuelSolutions' W74 Canister Renewed 1.3-1 Amendment 0 Completion Times 1.3 1.3 Completion Times

EXAMPLES The following examples illustrate the use of Completion Times with different types of Conditions and changing Conditions.

EXAMPLE 1.3-1 ACTIONS COMPLETION CONDITION REQUIRED ACTION TIME B. Required B.1 Perform Action 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Action and B.1.

associated AND Completion Time not B.2 Perform Action 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> met. B.2.

Condition B has two Required Actions. Each Required Action has its own separate Completi on Time. Each Completion Time is referenced to the time that Condition B is entered.

The Required Actions of Condition B are to complete action B.1 within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> AND complete action B.2 within 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />.

A total of 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> is allowed for completing action B.1 and a total of 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> (not 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />) is allowed for completing action B.2 from the time that condition B was entered. If action B.1 is completed within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, the time allowed for completing action B.2 is the next 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br /> because the total time allowed for completing action B.2 is 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />.

FuelSolutions' W74 Canister Renewed 1.3-2 Amendment 0 Completion Times 1.3 1.3 Completion Times

EXAMPLES EXAMPLE 1.3-2 (continued) ACTIONS

COMPLETION CONDITION REQUIRED ACTION TIME A. One system A.1 Restore system 7 days not within to within limit.

limit.

B. Required B.1 Perform Action 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Action and B.1.

associated AND Completion Time not B.2 Perform Action 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> met. B.2.

When it is determined that a system does not meet the LCO, Condition A is entered. If the system is not restored within 7 days, Condition B is also entered and the Completion Time clocks for Required Actions B.1 and B.2 start. If the system is restored after Condition B is entered, Condition A and B are exited, and therefore, the Required Actions of Condition B may be terminated.

FuelSolutions' W74 Canister Renewed 1.3-3 Amendment 0 Completion Times 1.3 1.3 Completion Times

EXAMPLES EXAMPLE 1.3-3 (continued) ACTIONS

NOTE Separate Condition entry is allowed for each component.

COMPLETION CONDITION REQUIRED ACTION TIME A. LCO not A.1 Restore 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> met. compliance with LCO.

B. Required B.1 Perform Action 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Action and B.1.

associated AND Completion Time not B.2 Perform Action 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> met. B.2.

The Note above the ACTIONS Table is a method of modifying the Completion Time tracking. If this method of modifying the Completion Time tracking were only applicable to a specific Condition, the Note would appear in that Condition rather than at the top of the ACTIONS Table.

The Note allows Condition A to be entered separately for each component, and Completion Times tracked on a per component basis. When a component does not meet the LCO, Condition A is entered and its Completion Time starts. If it is determined that subsequent components do not meet the LCO, Condition A is entered for each component and separate Completion Times start and are tracked for each component.

IMMEDIATE When Immediately is used as a Completion Time, the COMPLETION TIME Required Action should be pursued without delay and in a controlled manner.

FuelSolutions' W74 Canister Renewed 1.3-4 Amendment 0 Frequency 1.4 1.0 USE AND APPLICATION

1.4 Frequency

PURPOSE The purpose of this section is to define the proper use and application of Frequency requirements.

DESCRIPTION Each Surveillance Requirement (SR) has a specified Frequency in which the surveillance must be met in order to meet the associated Limiting Condition for Operation (LCO). An understanding of the correct application of the specified Frequency is necessary for compliance with the SR.

The specified Frequency is referred to throughout this section and each of the Specifications of Section 3.0, Surveillance Requirement (SR) Applicability. The specified Frequency consists of the requirements of the Frequency column of each SR, as well as certain Notes in the Surveillance column that modify performance requirements.

Situations where a Surveillance could be required (i.e., its Frequency could expire), but where it is not possible or not desired that it be performed until sometime after the associated LCO is within its Applicability, represent potential SR 3.0.4 conflicts. To avoid these conflicts, the SR (i.e., the Surveillance or the Frequency) is stated such that it is only required when it can be and should be performed. With an SR satisfied, SR 3.0.4 imposes no restriction.

The use of met or performed in these instances conveys specific meaning. A Surveillance is met only when the acceptance criteria are satisfied. Known failure of the requirements of a Surveillance, even without a Surveillance specifically being performed, constitutes a Surveillance not met.

FuelSolutions' W74 Canister Renewed 1.4-1 Amendment 0 Frequency 1.4 1.4 Frequency

EXAMPLES The following examples illustrate the various ways that Frequencies are specified:

EXAMPLE 1.4-1 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY Verify pressure within limit. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Example 1.4-1 contains the type of SR most often encountered in the Technical Specifications (TS). The Frequency specifies an interval (12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />) during which the associated Surveillance must be performed at least one time. Performance of the Surveillance initiates the subsequent interval. Although the Frequency is stated as 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />, an extension of the time interval to 1.25 times the interval specified in the Frequency is allowed by SR 3.0.2 for operational flexibility. The measurement of this interval continues at all times, even when the SR is not required to be met per SR 3.0.1 (such as when it is determined the equipment does not meet the LCO, a variable is outside specified limits, or the unit is outside the Applicability of the LCO). If the interval specified by SR 3.0.2 is exceeded while the cask is in a condition sp ecified in the Applicability of the LCO, the LCO is not met in accordance with SR 3.0.1.

If the interval as specified by SR 3.0.2 is exceeded while the unit is not in a condition specified in the Applicability of the LCO for which performance of the SR is required, the Surveillance must be performed within the Frequency requirements of SR 3.0.2 prior to entry into the specified condition. Failure to do so would result in a violation of SR 3.0.4.

FuelSolutions' W74 Canister Renewed 1.4-2 Amendment 0 Frequency 1.4 1.4 Frequency

EXAMPLES EXAMPLE 1.4-2 (continued) SURVEILLANCE REQUIREMENTS

SURVEILLANCE FREQUENCY Verify flow is within limits. Once within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> prior to starting activity AND 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> thereafter Example 1.4-2 has two Frequencies. The first is a one-time performance Frequency, and the second is of the type shown in Example 1.4-1. The logical connector AND indicates that both Frequency requirements must be met. Each time the example activity is to be performed, the Surveillance must be performed prior to starting the activity.

The use of once indicates a single performance will satisfy the specified Frequency (assumi ng no other Frequencies are connected by AND). This type of Frequency does not qualify for the 25% extension allowed by SR 3.0.2.

Thereafter indicates future performances must be established per SR 3.0.2, but only after a specified condition is first met (i.e., the once performance in this example). If the specified activity is canceled or not pe rformed, the measurement of both intervals stops. New intervals start upon preparing to restart the specified activity.

FuelSolutions' W74 Canister Renewed 1.4-3 Amendment 0 Functional and Operating Limits 2.0

2.0 FUNCTIONAL AND OPERATING LIMITS

2.1 Functional and Operating Limits 2.1.1 Fuel to be Stored in the FuelSolutions' W74 CANISTER.

SFAs meeting the limits specified in Table 2.1-1 may be stored in a W74 CANISTER.

2.2 Functional and Operating Limits Violations If any Functional and Operating Limits are violated, the following actions shall be completed.

These actions are not a substitute for the re porting requirements contained in 10CFR72.75.

2.2.1 The affected fuel assemblies shall be placed in a safe condition without delay and in a controlled manner.

2.2.2 The NRC Operations Center shall be notified within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

2.2.3 A special report will be provided to NRC within 30 days that describes the cause of the violation, the actions to restore compliance, and the actions to prevent recurrence.

FuelSolutions' W74 Canister Renewed 2.0-1 Amendment 0 Functional and Operating Limits 2.0 2.0 Functional and Operating Limits

Table 2.1-1 FuelSolutions' W74 Loading Specification W74-1

W74-1 Payload Configuration Full Loading of 64 Intact Fuel Assemblies Parameter Limit/Specification

Payload

Description:

< 64 Big Rock Point BWR fuel assemblies, as defined in Table 2.1-2. If less than 64 fuel assemblies are loaded, a dummy fuel assembly shall be placed into each empty CANISTER basket guide tube. Each dummy fuel assembly shall be the approximate weight and size of the actual fuel being loaded.

Maximum Weight per 485 pounds Assembly:

Heat Load Limit per 388 watts Assembly:

Cladding Material/Condition: Intact zircaloy-clad fuel assemblies with no known or suspected cladding defects greater than hairline cracks or pinhole leaks. Partial fuel assemblies, i.e., fuel assemblies from which fuel rods are missing, must not be loaded into the CANISTER unless dummy fuel rods are inserted into the assembly in the locations of the missing rods. The dummy fuel rods shall displace an amount of water equal to that displaced by the original fuel rods.

Initial Enrichment: < 4.10 w/o 235U. The maximum acceptable enrichments shall not exceed the enrichments defined in Table 2.1-2.

Burnup: < 40,000 MWd/MTU.

Cooling Time: The minimum acceptable cooling time varies by fuel assembly class and enrichment, as a function of burnup. The effects of the maximum acceptable decay heat, initial uranium content, and gamma and neutron sources are incorporated into the minimum cooling time determination. Fuel assemblies shall not be stored with less than the minimum acceptable cooling time indicated in Table 2.1-3.

FuelSolutions' W74 Canister Renewed 2.0-2 Amendment 0

Functional and Operating Limits 2.0 Functional and Operating Limits

Table 2.1-3 Fuel Cooling Table W74-1-A

APPLICABILITY:

Canister: FuelSolutions' W74-M and W74-T Canisters Loading Specification: W74-1-A

Description:

Up to 64 fuel assemblies SNF Assemblies: Valid for all BRP assemblies as indicated in Table 2.1-2.

Cobalt Content: 2.9 g in active fuel region

QUALIFICATION BASES:

Storage Cask Dose Rate 50 mrem/hr Canister Heat Load 24.8 kW/Canister, and 0.216 kW/inch-Canister Maximum Required Minimum Cooling Time (yr.)(1,2)

Burnup Minimum Initial Enrichment (w/o 235U)

(MWd/MTU)(1) 1.5 2.0 2.5 3.0 3.5 4.0

15,000 3.2 3.1 3.1 3.0 3.0 3.0 20,000 3.4 3.3 3.2 3.2 3.1 3.1 25,000 3.6 3.5 3.4 3.4 3.3 3.3 30,000 3.8 3.7 3.6 3.5 3.5 3.4 32,000 3.9 3.8 3.7 3.6 3.5 3.5 34,000 4.2 3.9 3.8 3.7 3.6 3.5 36,000 4.8 4.4 4.1 3.9 3.8 3.7 38,000 5.2 4.8 4.5 4.2 4.0 3.9 40,000 5.6 5.3 4.9 4.6 4.3 4.1

Notes:

(1) Rounding: round up to next highest burnup, round down to next lowest enrichment.

(2) Enrichments less than 1.5% or greater than the criticality limit presented in Section 6.1 of the FuelSolutions' W74 Canister Storage SAR are not qualified.

FuelSolutions' W74 Canister Renewed 2.0-4 Amendment 0 LCO Applicability 3.0 3.0 LIMITING CONDITION FOR OPERATION (LCO) APPLICABILITY

LCO 3.0.1 LCOs shall be met during specified conditions in the Applicability, except as provided in LCO 3.0.2.

LCO 3.0.2 Upon discovery of a failure to meet an LCO, the Required Actions of the associated Conditions shall be met, except as provided in LCO 3.0.5.

If the LCO is met or is no longer applicable prior to expiration of the specified Completion Time(s), completion of the Re quired Action(s) is not required, unless otherwise stated.

LCO 3.0.3 Not applicable to an SFSS.

LCO 3.0.4 When an LCO is not met, entry into a specified condition in the Applicability shall not be made except when the associated ACTIONS to be entered permit continued operation in the specified condition in the Applicability for an unlimited period of time. This Specification shall not prevent changes in specified conditions in the Applicability that are required to comply with ACTIONS or that are related to the unloading of a CANISTER.

LCO 3.0.5 Equipment removed from service or not in service in compliance with ACTIONS may be returned to service under administrative control solely to perform testing required to demonstrate it meets the LCO or that other equipment meets the LCO.

This is an exception to LCO 3.0.2 for the system returned to service under administrative control to perform the testing.

LCO 3.0.6 Not applicable to an SFSS.

LCO 3.0.7 Not applicable to an SFSS.

FuelSolutions' W74 Canister Renewed 3.0-1 Amendment 0 LCO Applicability 3.0 3.0 SURVEILLANCE REQUIREMENT (SR) APPLICABILITY

SR 3.0.1 SRs shall be met during the specified conditions in the Applicability for individual LCOs, unless otherwise stated in the SR. Failure to meet a Surveillance, whether such failure is experienced during the performance of the Surveillance or between performances of the Surveillance, shall be failure to meet the LCO. Failure to perform a Surveillance within the specified Frequency shall be failure to meet the LCO except as provided in SR 3.0.3. Surveillances do not have to be performed on equipment or variables outside specified limits.

SR 3.0.2 The specified Frequency for each SR is met if the Surveillance is performed within 1.25 times the interval specified in the Frequency, as measured from the previous performance or a measured from the time a specified condition of the Frequency is met.

For Frequencies specified as once, the above interval extension does not apply.

If a Completion Time requires periodic performance on a once per basis, the above Frequency extension applies to each performance after the initial performance.

Exceptions to this Specification are stated in the individual Specifications.

SR 3.0.3 If it is discovered that a Surveillance was not performed within its specified Frequency, then compliance with the requirement to declare the LCO not met may be delayed, from the time of discovery, up to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or up to the limit of the specified Frequency, whichever is less. This delay period is permitted to allow performance of the Surveillance.

If the Surveillance is not performed within the delay period, the LCO must immediately be declared not met, and the applicable Condition(s) must be entered.

When the Surveillance is performed within the delay period and the Surveillance is not met, the LCO must immediately be declared not met, and the applicable Condition(s) must be entered.

SR 3.0.4 Entry into a specified condition in the Applicability of an LCO shall not be made unless the LCOs Surveillances have been met within their specified Frequency.

This provision shall not prevent entry into specified conditions in the Applicability that are required to comply with ACTIONS or that are related to the unloading of a CANISTER.

FuelSolutions' W74 Canister Renewed 3.0-2 Amendment 0 W74 Canister Helium Backfill Density 3.1.1 3.1 CANISTER INTEGRITY 3.1.1 W74 Canister Helium Backfill Density

LCO 3.1.1 The CANISTER helium backfill density shall be in the range of 0.0374 g-moles/liter to 0.0401 g-moles/liter.

APPLICABILITY: During LOADING OPERATIONS.

ACTIONS

NOTE Separate Condition entry is allowed for each CANISTER.

COMPLETION CONDITION REQUIRED ACTION TIME A. CANISTER helium A.1 Establish CANISTER helium 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> backfill quantity limit is backfill quantity within limit.

not met.

B. Required Action and B.1 Remove all fuel assemblies 30 days associated Completion from CANISTER.

Time are not met.

SURVEILLANCE REQUIREMENTS

NOTE The helium used for backfill shall have a minimum purity of 99.995%.

SURVEILLANCE FREQUENCY

SR 3.1.1.1 Verify CANISTER helium backfill quantity is Within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after within limit. verifying CANISTER cavity vacuum drying pressure is within limit.

FuelSolutions' W74 Canister Renewed 3.1-1 Amendment 0 Canister Vacuum Drying Pressure 3.1.2 3.1 CANISTER INTEGRITY 3.1.2 Canister Vacuum Drying Pressure

See the Storage System Technical Specification for the applicable LCO.

FuelSolutions' W74 Canister Renewed 3.1-2 Amendment 0 Canister Leak Rate 3.1.3 3.1 CANISTER INTEGRITY 3.1.3 Canister Leak Rate

See the Storage System Technical Specification for the applicable LCO.

FuelSolutions' W74 Canister Renewed 3.1-3 Amendment 0 Hydraulic Ram Force During Horizontal Canister Transfer 3.1.4 3.1 CANISTER INTEGRITY 3.1.4 Hydraulic Ram Force During Horizontal Canister Transfer

See the Storage System Technical Specification for the applicable LCO.

FuelSolutions' W74 Canister Renewed 3.1-4 Amendment 0 W74 Canister Vertical Time Limit in Transfer Cask 3.1.5 3.1 CANISTER INTEGRITY 3.1.5 W74 Canister Vertical Time Limit in Transfer Cask

LCO 3.1.5 For vertical TRANSFER OPERATIONS, the CANISTER transfer out of the TRANSFER CASK shall be completed within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> after draining the annulus water from the TRANSFER CASK. For horizontal TRANSFER OPERATIONS, the movement of the TRANSFER CASK to the horizontal position on the transfer trailer shall be completed within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> after draining the annulus water from the TRANSFER CASK.

APPLICABILITY: During TRANSFER OPERATIONS.

ACTIONS

NOTE Separate Condition entry is allowed for each CANISTER.

COMPLETION CONDITION REQUIRED ACTION TIME A. CANISTER time limit in A.1 Fill annulus with water. 7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br />.

drained annulus TRANSFER CASK is not met. AND A.2 Maintain filled annulus. 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

SURVEILLANCE REQUIREMENTS

SURVEILLANCE FREQUENCY

SR 3.1.5.1 Verify TRANSFER CASK operations with Within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> after CANISTER in vertical orientation and annulus completion of drained are completed within time limit. TRANSFER CASK/

CANISTER annulus draining.

FuelSolutions' W74 Canister Renewed 3.1-5 Amendment 0 Canister Surface Contamination 3.2.1 3.2 CANISTER RADIATION PROTECTION 3.2.1 Canister Surface Contamination

See the Storage System Technical Specification for the applicable LCO.

FuelSolutions' W74 Canister Renewed 3.2-1 Amendment 0 Storage Cask Air Inlet and Outlet Openings 3.3.1 3.3 STORAGE CASK INTEGRITY 3.3.1 Storage Cask Air Inlet and Outlet Openings

See the Storage System Technical Specification for the applicable LCO.

FuelSolutions' W74 Canister Renewed 3.3-1 Amendment 0 Storage Cask Temperatures During Storage 3.3.2 3.3 STORAGE CASK INTEGRITY 3.3.2 Storage Cask Temperatures During Storage

LCO 3.3.2 The temperature of a STORAGE CASK with a W74 CANISTER containing fuel assemblies, as indicated by the liner thermocouple, shall meet the following limits:

a. The measured temperature shall not exceed 143°F (62°C) under normal ambient conditions (average ambient temperature up to 100°F (38°C)).
b. The measured temperature shall not exceed 169°F (76°C) under off-normal ambient conditions (average ambient temperature up to 125°F (52°C)).
c. The differential temperature between two successive daily measurements shall not exceed the corresponding differential ambient temperature plus 83°F (46°C).

APPLICABILITY: During STORAGE OPERATIONS.

ACTIONS NOTE Separate Condition entry is allowed for each STORAGE CASK.

COMPLETION CONDITION REQUIRED ACTION TIME A. STORAGE CASK A.1 Administratively verify 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> concrete temperature correct fuel loading.

exceeds the specified limit. AND A.2 Visually check all STORAGE 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> CASK inlet and outlet screens for debris blockage in accordance with LCO 3.3.1.

AND A.3 Check the thermocouple and 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> related instrumentation to assure they are functioning properly.

AND (continued)

FuelSolutions' W74 Canister Renewed 3.3-2 Amendment 0 Storage Cask Temperatures During Storage 3.3.2 3.3.2 Storage Cask Temperatures During Storage

COMPLETION CONDITION REQUIRED ACTION TIME A.4 Repair or replace 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> thermocouple and related instrumentation as necessary.

AND A.5 Perform visual inspection of 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> the STORAGE CASK vent channels by removing the debris screens and using visual aids as necessary. If no obstruction is found, the interior of the STORAGE CASK, including the guide rails and heat shield, is to be visually inspected for ventilation obstructions using remote inspection tools or by temporarily removing the STORAGE CASK top cover.

B. Required Actions and B.1 Initiate actions to cool the 96 hours0.00111 days <br />0.0267 hours <br />1.587302e-4 weeks <br />3.6528e-5 months <br /> associated Completion cask to within the limit.

Times are not met. AND B.2 Return CANISTER to the fuel 30 days building and remove all fuel assemblies.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.3.2.1 Verify that the STORAGE CASK temperatures are 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> within limit.

NOTE Daily cask temperatures can be expected to vary slightly due to changes in the ambient temperature.

This is acceptable as long as the temperatures remain within the specified limit.

FuelSolutions' W74 Canister Renewed 3.3-3 Amendment 0 Storage Cask Temperatures During Horizontal Transfer 3.3.3 3.3 STORAGE CASK INTEGRITY 3.3.3 Storage Cask Temperatures During Horizontal Transfer

LCO 3.3.3 The measured temperature of a STORAGE CASK with a W74 CANISTER containing fuel assemblies, as indicated by the liner thermocouple, shall not exceed 185°F (85°C).

APPLICABILITY: During TRANSFER OPERATIONS.

ACTIONS NOTE Separate Condition entry is allowed for each STORAGE CASK.

COMPLETION CONDITION REQUIRED ACTION TIME A. STORAGE CASK A.1 Transfer the CANISTER 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> concrete temperature limit into the TRANSFER CASK.

is not met.

B. Required Actions and B.1 Inspect the STORAGE 5 days associated Completion CASK for damage.

Times are not met.

B.2.1 If no damage, transfer 7 days CANISTER to STORAGE CASK.

OR B.2.2 If damaged, transfer 21 days CANISTER to new STORAGE CASK.

C. Required Actions and C.1 Return CANISTER to the 30 days associated Completion fuel building and remove all Time are not met. fuel assemblies.

SURVEILLANCE REQUIREMENTS

SURVEILLANCE FREQUENCY SR 3.3.3.1 After the STORAGE CASK is downended to 30 minutes the horizontal orientation, monitor and record STORAGE CASK concrete temperature as indicated by the STORAGE CASK side wall thermocouple.

FuelSolutions' W74 Canister Renewed 3.3-4 Amendment 0 Transfer Cask Structural Shell Temperature 3.4.1 3.4 TRANSFER CASK INTEGRITY 3.4.1Transfer Cask Structural Shell Temperature

See the Storage System Technical Specification for the applicable LCO.

FuelSolutions' W74 Canister Renewed 3.4-1 Amendment 0 Transfer Cask Surface Contamination 3.5.1 3.5 TRANSFER CASK RADIATION PROTECTION 3.5.1Transfer Cask Surface Contamination

See the Storage System Technical Specification for the applicable LCO.

FuelSolutions' W74 Canister Renewed 3.5-1 Amendment 0 Design Features 4.0 4.0 DESIGN FEATURES

The specifications in this section include the design characteristics of special importance to each of the physical barriers and the maintenance of safety margins in the storage system component design. The principal objective of this category is to describe the design envelope which might constrain any physical changes to essential equipment. Included in this category are the site environmental parameters which provide the base s for design, but are not inherently suited for description as LCOs.

4.1 Storage System 4.1.1 Storage Cask 4.1.1.1 Structural Performance See the Storage System Technical Specification Section 4.1.1.1 for discussion of STORAGE CASK structural performance features.

4.1.1.2 Codes and Standards See the Storage System Technical Specification Section 4.1.1.2 for discussion of codes and standards applicable to the STORAGE CASK.

4.1.1.3 Fabrication Exceptions to Codes, Standards, and Criteria See the Storage System Technical Specification Section 4.1.1.3 for discussion of exceptions to codes, standards, and criteria.

4.1.2 Transfer Cask 4.1.2.1 Structural Performance See the Storage System Technical Specification Section 4.1.2.1 for discussion of TRANSFER CASK structural performance features.

4.1.2.2 Codes and Standards See the Storage System Technical Specification Section 4.1.2.2 for discussion of codes and standards applicable to the TRANSFER CASK.

4.1.2.3 Fabrication Exceptions to Codes, Standards, and Criteria See the Storage System Technical Specification Section 4.1.2.3 for discussion of exceptions to codes, standards, and criteria.

4.1.3 Canister 4.1.3.1 Criticality The design of the W74 CANISTER, including spatial constraints on adjacent assemblies (minimum basket cell opening of 6.85 inches square) and the boron content of the basket neutron absorber material (minimum 1.0 weight percent natural boron) shall assure that fuel assemblies are maintained in a subcritical condition with a keff less than 0.95 under all c onditions of operation.

FuelSolutions' W74 Canister Renewed 4.0-1 Amendment 0 Design Features 4.0 4.0 Design Features

4.1.3.2 Structural Performance The CANISTER has been evaluated for a side drop resulting in a lateral gravitational (g) loading of 60 g and an end drop resulting in an axial gravitational loading of 50 g.

The maximum weight of a loaded, dried, and sealed W74 CANISTER is 85,000 pounds. The maximum CANISTER weight includes 32 SFAs in each basket, plus four damaged fuel cans at the support tube locations in each basket.

The W74 CANISTER thermal rating of 26.4 kW is determined by the minimum heat load qualification in th e STORAGE and TRANSFER CASKS.

4.1.3.3 Codes and Standards The FuelSolutions' W74 CANISTER shell structural components are designed in accordance with Subsection NB of the ASME Code, and the basket structural components are designed in accordance with Subsection NG of the ASME Code.

Exceptions to the code are listed in Table 4.1-1.

4.1.3.4 Fabrication Exceptions to Codes, Standards, and Criteria Proposed alternatives to Subsections NB and NG of the ASME Code, including exceptions allowed by Section 4.1.3.3, may be used when authorized by the Director of the Office of Nuclear Material Safety and Safeguards or Designee.

The applicant should demonstrate that:

1. The proposed alternatives would provide an acceptable level of quality and safety, or
2. Compliance with the specified requirements of ASME Code,Section III, would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety.

Requests for exception in accordance with this section should be submitted in accordance with 10CFR72.4.

4.2 Storage Pad Constraints on the storage pad are discussed in Section 4.2 of the Storage System Technical Specification.

4.3 Site Specific Parameters and Analyses See the Storage System Technical Specification Section 4.3 for discussion of site specific parameters and analyses.

FuelSolutions' W74 Canister Renewed 4.0-2 Amendment 0

Administrative Controls 5.0 5.0 ADMINISTRATIVE CONTROLS

5.1 Training Modules

See the Storage System Technical Specification for the applicable information.

5.2 Preoperational Testing and Training Exercises See the Storage System Technical Specification for the applicable information.

5.3 Programs 5.3.1-5.3.5 See the Storage System Technical Specification for the applicable information.

5.3.6 Vacuum Drying Program The FuelSolutions' W74 CANISTER has been evaluated for allowable fuel cladding temperature during LOADING and STORAGE OPERATIONS. During LOADING OPERATIONS, the fuel cladding temperature is limited to 400°C to assure cladding integrity.

This program shall establish administrative controls and procedures to assure that the spent fuel cladding does not exceed the temperature limit during LOADING OPERATIONS. For a CANISTER loaded with fuel with a total heat load of 24.8 kW, the initial vacuum drying cycle shall be limited to 7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br />. If the vacuum drying LCO 3.1.2 has not been satisfied, the CANISTER shall be backfilled with helium for 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />, vacuum dried for 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />, backfilled for 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />, etc., until the LCO is met.

For a heat load of 12.2 kW or lower, there is no time limit on the initial vacuum drying cycle.

For heat loads greater than 12.2 kW but less than 24.8 kW, the program shall either use the 24.8 kW requirements, or establish suitable time limits to maintain the cladding temperature to less than or equal to 400°C for the specific CANISTER heat load.

5.3.7 Cladding Oxide Thickness Measurement Program Not applicable for the W74 CANISTER.

5.3.8 (reserved) 5.3.9 Aging Management Program See the Storage System Technical Specification for the applicable information.

5.4 Special Requirements for First System in Place The heat transfer characteristics of the cask system will be recorded by temperature measurements of the first STORAGE CASK placed in service with a heat load equal to or greater than 10kW. In accordance with 10CFR72.4, a letter report summarizing the results of the measurements shall be submitted to the NRC.

For each cask subsequently loaded with a higher heat load (up to the 24.8 kW limit), the calculation and measured temperature data shall be reported to the NRC at every 2 kW increase.

The calculation and comparison need not be reported to the NRC for STORAGE CASKS that are subsequently loaded with lesser loads then the latest reported case. Cask users may satisfy these requirements by referencing validation test reports submitted to the NRC by other users.

FuelSolutions' W74 Canister 5.0-1 Renewed Amendment 0