Letter Sequence Approval |
---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, ... further results|Request]]
- Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, ... further results|Supplement]]
Administration
- Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance
- Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting
Results
- Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, ... further results|Approval]]
Other: L-23-005, Independent Spent Fuel Storage Installation License Renewal Application, Revision 1 (Cac/Epid No. 001028/L-2022-RNW-0007), ML17311A450, ML17318A087, ML18022A077, ML18022A078, ML18022A079, ML18087A058, ML18087A060, ML18087A061, ML18087A062, ML18100A188, ML18100A190, ML18100A191, ML18100A193, ML18101A024, ML18108A052, ML18131A047, ML18141A561, ML18141A562, ML18141A564, ML18141A567, ML18179A258, ML18179A260, ML18179A266, ML18201A455, ML18205A179, ML18228A533, ML18234A012, ML18255A098, ML18255A101, ML18255A102, ML18324A594, ML18347B336, ML18347B337, ML18351A173, ML18351A175, ML18351A176, ML18351A177, ML18351A178, ML18355A373, ML18355A379, ML18355A382, ML18362A303, ML19028A402, ML19028A403, ML19028A404, ML19045A346, ML19070A147, ML19070A148, ML19072A065... further results
|
MONTHYEARML19255E7911997-05-31031 May 1997 Enclosure 1 - Ecological Assessment of the Low Level Waste Depository, Andrews County, Tx Project stage: Other ML19255E7952004-10-25025 October 2004 Enclosure 2 - Habitat Characterization and Rare Species Survey for the Proposed Low Level Waste Repository, Andrews County, Tx Project stage: Other ML19337B5182007-03-16016 March 2007 Enclosure 10 - Applicable Sections of LLRW License Project stage: Other ML19255E7982007-03-16016 March 2007 Enclosure 3 - Supplemental Survey to Ecological Assessment of the Low Level Waste Depository, Andrews County, Texas Project stage: Supplement ML19255E8002008-07-0303 July 2008 Enclosure 4 - Environmental Assessment Report Prepared for Application for Renewal of Radioactive Material License R04971 Waste Control Specialists LLC Andrews County, Texas Project stage: Request ML19217A2142008-07-28028 July 2008 Enclosure 4 - Report on Activities to Satisfy Byproduct RML Conditions 41A, 41C, and 43, July 2008 (Public) Project stage: Other ML19217A2132011-02-22022 February 2011 Enclosure 3 - Oag Water Levels: Empirical and Modeled Relationships Between Precipitation and Infiltration, 2011 (Public) Project stage: Other ML18100A1882013-04-11011 April 2013 Enclosure 7 - Procedure 12751-MNGP-QP-9.201, Revision 0, Visual Weld Examination Project stage: Other ML18100A1912014-01-30030 January 2014 Enclosure 9 - Structural Integrity Associates, Inc. Report 130415.402, Revision 0, Review of Trivis Inc. Welding Procedures Used for Field Welds on the Transnuclear NUHOMS 61BTH Type 1 & 2 Transportable Canister for BWR Fuel Project stage: Other ML18100A1902014-05-22022 May 2014 Enclosure 8 - Structural Integrity Associates, Inc. Report 130415.403, Revision 2, Assessment of Monticello Spent Fuel Canister Closure Plate Welds Based on Welding Video Records Project stage: Other ML17318A0872017-11-0909 November 2017 Intent to Pursue Subsequent License Renewal Project stage: Other BVY 17-041, Supplement to Exemption Request from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 to Support the Dry Fuel Loading Campaign2017-12-0707 December 2017 Supplement to Exemption Request from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 to Support the Dry Fuel Loading Campaign Project stage: Supplement ML18011A1582017-12-22022 December 2017 International HI-STORE Cis (Consolidated Interim Storage Facility) License Application Responses to Safeguards Related Requests for Supplemental Information Project stage: Supplement ML17249A1572018-01-11011 January 2018, 16 January 2018 Package: Vermont Yankee Nuclear Power Station ISFSI Environmental Assessment and Finding of No Significant Impact Related to Issuance of Exemption to Allow a New Loading Pattern and Loading Fuel Cooled for at Least 2 Years Project stage: Request ML17249A1592018-01-16016 January 2018 Letter to C. C. Chappell Vermont Yankee Nuclear Power Station ISFSI Environmental Assessment and Finding of No Significant Impact Related to Issuance of Exemption to Allow a New Loading Pattern and Loading Fuel Cooled for at Least 2 Years Project stage: Approval ML18022A1532018-01-16016 January 2018 Enclosure 2: Agenda (Memo to A. Hsia Summary of December 12, 2017, Meeting with Pacific Gas & Electric Company to Discuss the Upcoming Submittal of the Application for Renewal of the Humboldt Bay ISFSI License) Project stage: Meeting ML18018B2972018-01-19019 January 2018 Federal Registered Notice: Correction of Certificate of Compliance No. 1004, Renewed Amendments No. 11, Revision 1 and No. 13, Revision 1 Project stage: Request ML18022A0782018-01-22022 January 2018 Enclosure 1: Revised Title for Figure 1-5 Corrected Technical Specifications for Certificate of Compliance No. 1004 Renewed Amendment No. 11, Revision 1 Enclosure 1 Project stage: Other ML18022A0772018-01-22022 January 2018 Letter to J. Bondre Correction to Tn Americas LLC Technical Specifications for Renewed Amendments No. 11, Revision 1 and No. 13, Revision 1 to Standardized NUHOMS Certificate of Compliance No. 1004 for Spent Fuel Storage Casks Project stage: Other ML18022A0792018-01-22022 January 2018 Enclosure 2: Revised Title for Figure 1-5 Corrected Technical Specifications for Certificate of Compliance No. 1004 Renewed Amendment No. 13, Revision 1 Project stage: Other ML18024A2732018-01-24024 January 2018 Letter to D. G. Stoddard U.S. NRC Approval of Virginia Electric and Power Company Request for Withholding Information from Public Disclosure for North Anna Power Station ISFSI (Cac/Epid Nos. 001028/L-2017-RNW-0010 and 000993/L-2017-LNE-0008 Project stage: Withholding Request Acceptance ML18031A4572018-01-31031 January 2018 Submittal Date for Response to NRCs Requests for Additional Information (Rais) for License Amendment Request 1032-4 to HI-STORM FW CoC No. 1032 (CAC No. 001028) Project stage: Request ML17311A4502018-01-31031 January 2018 ISFSI License Renewal Final Environmental Assessment Project stage: Other ML17298A1352018-02-0202 February 2018 Safety Evaluation Report (Letter to C. C. Chappell Vermont Yankee Nuclear Power Station Independent Spent Fuel Storage Installation, Issuance of Exemption (CAC No.: 001028, Docket Nos. 50-271, 72-59, and 72-1014; EPID L-2017-LLE-0005) Project stage: Approval ML17298A1342018-02-0202 February 2018 Letter to C. C. Chappell Vermont Yankee Nuclear Power Station Independent Spent Fuel Storage Installation, Issuance of Exemption (CAC No.: 001028, Docket Nos. 50-271, 72-59, and 72-1014; EPID L-2017-LLE-0005) Project stage: Approval ML17298A1332018-02-0202 February 2018 Package: Vermont Yankee Nuclear Power Station Independent Spent Fuel Storage Installation, Issuance of Exemption (CAC No.: 001028, Docket Nos. 50-271, 72-59, and 72-1014; EPID L-2017-LLE-0005) Project stage: Request ML18031A2212018-02-0606 February 2018, 8 February 2018 Package: Issuance of Renewed Materials License No. SNM-2507 for the North Anna Power Station Independent Spent Fuel Storage Installation (Cac/Epid Nos. 001028/L-2017-RNW-0010 and 000993/L-2017-LNE-0008) Project stage: Request ML18031A2272018-02-0606 February 2018 Enclosurenewed License SNM-2507 Technical Specifications (Letter to D. G. Stoddard Issuance of Renewed Materials License No. SNM-2507 for the North Anna Power Station ISFSI) Project stage: Approval ML18031A2242018-02-0606 February 2018 Enclosure 1: Preamble-SNM-2507 License Renewal Order (Letter to D. G. Stoddard Issuance of Renewed Materials License No. SNM-2507 for the North Anna Power Station Independent Spent Fuel Storage Installation) Project stage: Approval ML18031A2222018-02-0606 February 2018 Letter to D. G. Stoddard Issuance of Renewed Materials License No. SNM-2507 for the North Anna Power Station Independent Spent Fuel Storage Installation (Cac/Epid Nos. 001028/L-2017-RNW-0010 and 000993/L-2017-LNE-0008) Project stage: Approval ML18031A2252018-02-0606 February 2018 Enclosurenewed License SNM-2507 (Letter to D. G. Stoddard Issuance of Renewed Materials License No. SNM-2507 for the North Anna Power Station Independent Spent Fuel Storage Installation) Project stage: Approval ML18031A2282018-02-0606 February 2018 Enclosure 2: Safety Evaluation Report (Letter to D. G. Stoddard Issuance of Renewed Materials License No. SNM-2507 for the North Anna Power Station ISFSI) Project stage: Approval ML18031A2312018-02-0808 February 2018 Federal Register Notice - Notice of Issuance for License Renewal (Letter to D. G. Stoddard Issuance of Renewed Materials License No. SNM-2507 for the North Anna Power Station ISFSI) Project stage: Approval ML18057A2162018-02-23023 February 2018 Package: Request for Additional Information for Review of Duke Energy'S Decommissioning Funding Plan Update Project stage: Request ML18058A6082018-02-23023 February 2018 HI-2177593, Rev 0, Holtec International & Eddy Lea Energy Alliance (Elea) Underground CISF - Financial Assurance & Project Life Cycle Cost Estimates Project stage: Request ML18058A6072018-02-23023 February 2018 HI-2177565, Rev 0, Holtec International & Eddy Lea Energy Alliance (Elea) Cis Facility - Decommissioning Cost Estimate and Funding Plan Project stage: Request ML18058A0232018-02-23023 February 2018 Letter to G. Van Noordennen Request for Additional Information Regarding Zionsolutions, LLCs Decommissioning Funding Plan Update for Zion Independent Spent Fuel Storage Installation Project stage: RAI ML18058A0562018-02-23023 February 2018 Letter to J. Giddens Request for Additional Information Regarding Entergy Operations, Inc.S Decommissioning Funding Plan Update Project stage: RAI ML18058A0242018-02-23023 February 2018 Enclosurequest for Additional Information (Letter to G. Van Noordennen Request for Additional Information Regarding Zionsolutions, LLCs Decommissioning Funding Plan Update for Zion Independent Spent Fuel Storage Installation) Project stage: RAI ML18058A0572018-02-23023 February 2018 Enclosurequest for Additional Information (Letter to J. Giddens Request for Additional Information Regarding Entergy Operations, Inc.S Decommissioning Funding Plan Update) Project stage: RAI ML18057A2182018-02-23023 February 2018 Enclosurequest for Additional Information (Letter to A. Zaremba Request for Additional Information for Review of Duke Energys Decommissioning Funding Plan Update) Project stage: RAI ML18057A2172018-02-23023 February 2018 Letter to A. Zaremba Request for Additional Information for Review of Duke Energys Decommissioning Funding Plan Update Project stage: RAI ML18058A0822018-02-27027 February 2018 Letter: RAI for Review of Southern Nuclear Operating Companys Decommissioning Funding Plan Updates for Joseph M. Farley, Unit 1 and 2; Edwin I. Hatch, Units 1 and 2; and Vogtle Electric Generating Plant, Units 1 and 2 ISFSI Project stage: RAI ML18058A0532018-02-27027 February 2018 Letter: Request for Additional Information Regarding Florida Power and Light/Nextera Decommissioning Funding Plan Updates for St. Lucie, Units 1 and 2; Seabrook Station; Duane Arnold Energy Center; and Point Beach Units 1 and 2 ISFSI Project stage: RAI ML18058A0812018-02-27027 February 2018 Enclosurequest for Additional Information(Rai for Review of Southern Nuclear Operating Companys Decommissioning Funding Plan Updates for Joseph M. Farley,Unit 1 and 2;Edwin I. Hatch,Units 1 and 2; and Vogtle Electric Generating Plant, Units Project stage: RAI ML18058A0522018-02-27027 February 2018 Enclosurequest for Additional Information (Letter: RAI Regarding Florida Power and Light/Nextera Decommissioning Funding Plan Updates for St. Lucie, Units 1 & 2; Seabrook Station; Duane Arnold Energy Center; and Point Beach, Units 1 and 2) Project stage: RAI ML18060A3332018-02-28028 February 2018 Letter to S. P. Murray Request for Additional Information Regarding GE-Hitachis Decommissioning Funding Plan Update for Morris ISFSI Project stage: RAI ML18060A0212018-02-28028 February 2018 Enclosurequest for Additional Information (Request for Additional Information Regarding Indiana Michigan Power Companys Decommissioning Funding Update for Donald C Cook Nuclear Plant Units 1 and 2 ISFSI) Project stage: RAI ML18060A1492018-02-28028 February 2018 Letter to T. J. Palmisano Request for Additional Information Regarding Southern California Edisons Decommissioning Funding Plan for San Onofre Nuclear Generating Station ISFSI Project stage: RAI ML18060A1482018-02-28028 February 2018 Enclosurequest for Additional Information (Request for Additional Information Regarding Southern California Edisons Decommissioning Funding Plan for San Onofre Nuclear Generating Station ISFSI) Project stage: RAI 2017-12-07
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 07200011/20244012024-08-16016 August 2024 Security Baseline Inspection Report 07200011/2024401 ML23137A1442023-05-0303 May 2023 Sacramento Municipal Utility District (Smud) - Submittal of 2022 Annual Financial Report ML23115A1722023-03-27027 March 2023 Sacramento Municipal Utility District (Smud), Rancho Seco Report on Financial Assurance Status ML23040A0582023-01-31031 January 2023 Annual Radiological Environmental Operating Report for the Period of January 1, 2022, Through December 31, 2022 ML22203A0552022-06-30030 June 2022 Independent Spent Fuel Storage Installation, Final Safety Analysis Report Update ML22200A0272022-06-29029 June 2022 Independent Spent Fuel Storage Installation, Final Safety Analysis Report, Revision 10 ML22158A2262022-05-25025 May 2022 Smud, Rancho Seco Independent Spent Fuel Storage Installation Biennial 10 CFR 72.48(d)(2) Report ML22125A0972022-04-20020 April 2022 Independent Spent Fuel Storage Installation - 2021 Annual Financial Report IR 07200011/20214012021-12-14014 December 2021 Independent Spent Fuel Storage Installation - NRC Security Inspection Report 07200011/2021401 ML21342A1882021-12-13013 December 2021 Safety Evaluation Report (SER) for the Sacramento Municipal Utility District (Smud) Rancho Seco Quality Manual Revision 5 ML21230A2692021-08-0202 August 2021 Smud, Revised Rancho Seco Quality Manual Request for Approval ML21195A3262021-06-30030 June 2021 Independent Spent Fuel Storage Installation - 2020 Annual Financial Report ML21050A3212021-05-18018 May 2021 The Nuclear Regulatory Commissions Analysis of Sacramento Municipal Utility Districts Initial and Updated Decommissioning Funding Plans for Rancho Seco Nuclear Generating Stations Independent Spent Fuel Storage Installation ML21140A3632021-04-20020 April 2021 Independent Spent Fuel Storage Installation, Annual Radiological Environmental Operating Report for 2020 IR 07200011/20210012021-03-25025 March 2021 Independent Spent Fuel Storage Installation - NRC Inspection Report 07200011/2021-001 ML21131A0962021-03-24024 March 2021 Submittal of Rancho Seco Independent Spent Fuel Storage Installation 10 CFR 73.71 Safeguards Event 55085 60-Day Report ML20342A1942020-09-23023 September 2020 Report of Changes to the Physical Protection Plan (Amendment 9) Transmittal Letter ML20206K9582020-06-29029 June 2020 ISFSI Final Analysis Report, Revision 9 ML20108F5662020-03-31031 March 2020 Report on Financial Assurance Status ML20108F5332020-03-30030 March 2020 Annual Report of Property Insurance Levels ML20066L4962020-03-10010 March 2020 Letter to D. Tallman Final Environmental Assessment for the License Renewal of the U.S. NRC License No.: SNM-2510 for Rancho Seco ISFSI (Dkt No. 72-0011) ML20065N2812020-03-0909 March 2020 ISFSI Preamble-License Renewal Order ML20065N2772020-03-0909 March 2020 ISFSI Renewal Cover Letter ML20044F6012020-02-24024 February 2020 ISFSI Renewal Proprietary Determination Letter for RAI Clarification Submittal 7-12-19 ML20038A1312020-01-23023 January 2020 Request for Minor Editorial and Clarification Revisions for the Technical Review of the Application for Renewal of the Rancho Seco Independent Spent Fuel Storage Installation License No. SNM-2510(CAC/EPID Nos. 001028/L-2018-RNW-0005;000993/ ML19280B7632019-09-30030 September 2019 Letter to D. Tallman Nuclear Regulatory Commission Approval If Sacramento Municipal Utility District Request for Withholding Information from Public Disclosure for Rancho Seco ISFSI IR 07200011/20194012019-09-16016 September 2019 Independent Spent Fuel Storage Installation, Revised Physical Security Requirements for Independent Spent Fuel Storage Installations and Inspection Report 072-00011/2019401 ML19206A5872019-07-25025 July 2019 Independent Spent Fuel Storage Installation, Physical Security Requirements for Independent Spent Fuel Storage Installations and Inspection Report 072-00011/2019401 ML19184A1802019-06-26026 June 2019 Independent Spent Fuel Storage Installation Replacement Files for the Response to Request for Additional Information for Review of the Application for the Renewal of 10 CFR Part 72 Special Nuclear Materials License ML19168A0582019-06-13013 June 2019 Letter to D. Tallman Request for Clarification of Response to Additional Information for the Technical Review of the Application for Renewal of the Rancho Seco Independent Spent Fuel Storage Installation License No. SNM-2510 (W/Enclosure) ML19070A0722019-06-12012 June 2019 Letter to Transmit Draft Rancho Seco ISFSI EA to State of California (Publically Available) ML19121A2622019-04-22022 April 2019 Sacramento Municipal Utility District (Smud) - Rancho Seco Independent Spent Fuel Storage Installation - Response to Request for Additional Information for Review of the Application for Renewal of 10 CFR Part 72 Special ML19184A1822019-04-22022 April 2019 Enclosure 2 - Replacement Transmittal Letter Regarding Response to Request for Additional Information for Review of the Application for the Renewal of 10 CFR Part 72 Special Nuclear Materials ML19025A0822019-01-10010 January 2019 Report of Changes to the Rancho Seco Quality Assurance Program That Do Not Require Prior NRC Approval ML18341A2792019-01-0909 January 2019 Letter to Chairperson of Buena Vista Rancheria of Me-Wuk Indians of California - Tribal Consultation Letter and Enclosure ML19009A4232019-01-0909 January 2019 Letter to Chairman of Colfax-Todds Valley Consolidated Tribe - Tribal Consultation Letter and Enclosure ML19009A4242019-01-0909 January 2019 Letter to Chairperson of Tsi Akim Maidu Tribe - Tribal Consultation Letter and Enclosure ML19009A4252019-01-0909 January 2019 Letter to Chairperson of Ione Band of Miwok Indians - Tribal Consultation Letter and Enclosure ML19009A4262019-01-0909 January 2019 Letter to Chairperson of the Nashville Enterprise Miwok-Maidu-Nishinam Tribe - Tribal Consultation Letter and Enclosure ML19009A4272019-01-0909 January 2019 Letter to Chairperson of the United Auburn Indian Community of the Auburn Rancheria - Tribal Consultation Letter and Enclosure ML19009A4282019-01-0909 January 2019 Letter to the Chairperson of the Shingle Springs Band of Miwok Indians - Tribal Consultation Letter and Enclosure ML19009A4292019-01-0909 January 2019 Letter to the Chairperson of the Wilton Rancheria - Tribal Consultation Letter and Enclosure ML18324A8222018-12-14014 December 2018 Letter to Mr. Kevin Thomas, Acting Regional Manager; Re., Rancho Seco - California Fish and Wildlife Consultation Letter and Enclosure ML18325A0422018-12-14014 December 2018 California Shpo Consultation Letter to J. Polanco and Enclosure ML18302A1582018-11-28028 November 2018 Revised Letter for Termination of Rancho Seco Nuclear Generating Station Operating License DPR-54 and Indemnity Agreement ML18325A1422018-11-20020 November 2018 Letter to D. Tallman Request for Additional Information for Review of the Application for Renewal of the Rancho Seco Independent Spent Fuel Storage Installation License No. SNM-2510 (Cac/Epid Nos. 001028/L-2018-RNW-0005; 000993/L-2018-LNE-0 ML18285A3812018-09-26026 September 2018 Transmittal of Response to Request for Information for Review of the Application for the Renewal of 10 CFR Part 72 Special Nuclear Materials License No. SNM-2510 for the Rancho Seco Independent Spend Fuel Storage Installation ML18261A0312018-09-14014 September 2018 Letter to D. Tallman U.S. NRC Approval of Sacramento Municipal Utility Request for Withholding Information from Public Disclosure for Rancho Seco ISFSI (Cac/Epid Nos. 001028/L-2018-RNW-0005; 000993/L-2018-LNE-0004) ML18261A0222018-09-14014 September 2018 Letter to D. Tallman U.S. NRC Approval of Sacramento Municipal Utility Request for Withholding Information from Public Disclosure for Rancho Seco ISFSI (Cac/Epid Nos. 001028/L-2018-RNW-0005; 000993/L-2018-LNE-0004) ML18261A0102018-09-14014 September 2018 Letter to D. Tallman U.S. NRC Approval of Sacramento Municipal Utility Request for Withholding Information from Public Disclosure for Rancho Seco ISFSI (Cac/Epid Nos. 001028/L-2018-RNW-0005; 000993/L-2018-LNE-0004) 2024-08-16
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 June 13, 2019 Mr. Dan Tallman Manager, Rancho Seco Assets Sacramento Municipal Utility District Rancho Seco Nuclear Generating Station 14440 Twin Cities Road Herald, CA 95638-9799
SUBJECT:
REQUEST FOR CLARIFICATION OF RESPONSE TO ADDITIONAL INFORMATION FOR THE TECHNICAL REVIEW OF THE APPLICATION FOR RENEWAL OF THE RANCHO SECO INDEPENDENT SPENT FUEL STORAGE INSTALLATION LICENSE NO. SNM-2510 (CAC/EPID NOS. 001028/L-2018-RNW-0005; 000993/L-2018-LNE-0004)
Dear Mr. Tallman:
By letter dated March 19, 2018, as supplemented on June 25, 2018, and September 26, 2018, the Sacramento Municipal Utility District (SMUD) submitted an application for renewal of the Rancho Seco Independent Spent Fuel Storage Installation, License No. SNM-2510 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML18221A281). The U.S. Nuclear Regulatory Commission (NRC) staff sent a request for additional information (RAI) related to the technical review of the renewal application on November 20, 2018, to which you responded on April 22, 2019 (ML19121A262).
The NRC staff reviewed SMUDs RAI responses and held a teleconference with SMUD on June 4, 2019, to discuss the responses provided (see June 4, 2019, meeting summary at ADAMS Accession No. ML19165A246). After the discussion, SMUD requested that NRC send its remaining questions related to the RAI responses in writing. The enclosure to this letter provides the remaining information needed by the NRC staff to complete its technical review of the application. We request that you provide this information by July 12, 2019.
Please reference Docket No. 72-11 and CAC/EPID No. 001028/L-2018-RNW-0005 in future correspondence related to this request. The NRC staff is available to clarify these questions and, if necessary, to meet and discuss your proposed responses.
D. Tallman 2
If you have any questions regarding this matter, please contact me at (301) 415-7213 or Wendy.Reed@nrc.gov.
Sincerely,
/RA/
Wendy A. Reed, Chemist Renewals and Materials Branch Division of Spent Fuel Management Office of Nuclear Material Safety and Safeguards Docket No.: 72-11 License No.: SNM-2510 CAC/EPID Nos.: 001028/L-2018-RNW-0005; 000993/L-2018-LNE-0004
Enclosures:
RAI clarification request cc: Rancho Seco ISFSI Service List
Rancho Seco ISFSI Service List cc:
Arlen Orchard, Chief Executive Officer Sacramento Municipal Utility District 6201 S Street P.O. Box 15830 Sacramento, CA 95817 1899 Laura Lewis, Chief Legal Officer Sacramento Municipal Utility District 6201 S Street P.O. Box 15830 Sacramento, CA 95817 1899 Steve Lins, Deputy General Counsel Sacramento Municipal Utility District 6201 S Street P.O. Box 15830 Sacramento, CA 95817 1899 Site Document Control Supervisor Rancho Seco 14440 Twin Cities Road Herald, CA 95638 9799 Commissioners' Office California Energy Commission 1516 Ninth Street (MS 34)
Sacramento, CA 95814 5512 Radiation Program Director California Radiologic Health Branch P.O. Box 997414 (MS 7610)
Sacramento, CA 95899 7414 Sacramento County Board of Supervisors 700 H Street, Suite 2450 Sacramento, CA 95814
ML19168A058 OFFICE NMSS/DSFM/RMB NMSS/DSFM/RMB NMSS/DSFM/CSRB NAME WReed DDunn via email WAllen via email DATE 06/06/2019 06/07/2019 06/07/2019 OFFICE NMSS/DSFM/SFLB NMSS/DSFM/CSRB NMSS/DSFM/RMB NAME WWheatley via email TTate via email MRahimi via email DATE 06/13/2019 06/13/2019 06/12/2019
1 Request for Additional Information Sacramento Municipal Utility District (SMUD)
Docket No. 72-11 License No. SNM-2510 License Renewal This request for clarification of request for additional information (RAI) responses identifies information needed by the NRC staff to complete its technical review of the license renewal application (LRA) and to determine whether the applicant has demonstrated compliance with the regulatory requirements. The requested information is listed by RAI response number.
RAI 2-1 clarification The staff noted the following regarding information provided in the two cross-matrix tables and additional clarification items identified in Table RAI 2-1-3. Table RAI 2-1-3 was provided in response to RAI 2-1.
- 1. Drawings NUH-05-1022-FO1 through NUH-05-1025-FO1 listed in the first note at the end of LRA Table 2-6 have not been provided to the NRC. Please provide the drawings.
- 2. Drawing NUH-05-1053-FC1 Item 2 "Lead Shielding" for the basket assembly is not included in Table 2-6. This SSC seems to be identical to Drawing NUH-05-4004 Item 3 or Drawing NUH-05-1051-FC1 Item 3 "Lead Shielding" for shell assembly in Table RAI 2-1-1. Please clarify.
- 3. Table RAI 2-1-1 lists drawing NUH-05-1031-FF1 Item 4 "Outer Support Plate" which appears to be incorrect. This SSC should be Drawing NUH-05-1031-FF1 Item 3 "Support Plate". Please clarify.
The information requested in RAI 2-1 is needed to determine compliance with 10 CFR 72.24(c) and 72.42(a).
RAI 2-2 clarification Please clarify the following items identified in Table RAI 2-2-2, which was provided in response to RAI 2-2:
Item #34: The descriptions in LRA Sections B.3.1, B.4.1, B.5.1, B.6.1 and B.3.2, B.4.2, B.5.2, and B.6.2 should be consistent. B.4.1 states: The HSM subcomponents subject to aging management review are constructed of the following materials: B.4.2 states: The HSM subcomponents that are subject to aging management are exposed to the following environments:
Since the aging management review is contained in Section 3 of the LRA and Appendix B is the aging management program description, it appears that aging management review in B.4.1 should be aging management as stated in B.4.2. Please clarify.
Item #35: Please clarify if there is a typo in the change to LRA Sections B.4.4. The NRC staff believes it should read "of the aging effects and/or mechanism listed in Section B.4.3".
2 Item #38: Please clarify if there is a typo in the change to LRA Sections B.4.5(3). The NRC staff believes it should read "While no aging mechanisms were identified that would cause other conditions.
Item #43: Please clarify if there is a missing word in the change to LRA Sections B.6.5(3). The NRC believes the following sentence should include the word steel. "(4) loss of material due to general, pitting, and crevice corrosion for carbon steel reinforcing bars.
The information requested in RAI 2-2 is needed to determine compliance with 10 CFR 72.24(c) and 72.42(a).
RAI 2-8 Clarification RAI 2-8 requested, in part, that the licensee provide a justification as to why the guide tubes did not provide a criticality safety function during the extended period of operation. The response to the RAI stated that the guide tubes solely support the structural safety function as shown in LRA Table 2-9, and that this conclusion is solely consistent with the intended safety functions of the components list in Table 4-25 of NUREG-2214, Managing Aging Processes in Storage Report, Draft for Comment (Agencywide Documents Access and Management System (ADAMS)
Accession No. ML17289A237).
The NRC bases an ISFSI license renewal on the continuation of the approved design bases through the period of extended operation. After reviewing Section 3.3.4 of the Rancho Seco Final Safety Analysis Report, NRC staff determined that the guide tubes are explicitly modeled in the Rancho Seco criticality safety evaluations. In describing the criticality models, Section 3.3.4.3.1 specifically identifies that a minimum thickness was employed to model the guide tubes. In addition, Section 3.3.4.3.1 also identifies that KENO input files for the criticality calculations can be found in Appendix 6.6.2 of the MP187 Part 71 safety analysis report. NRC staff reviewed these KENO input files and found the guide tubes explicitly identified.
Consequently, the staff found that the explanation provided in the previous paragraph did not adequately justify the licensees scoping determination because the guide tubes serve a criticality function by displacing water which decreases the neutron multiplication factor (keff).
The NRC requests the licensee supplement their response to RAI 2-8 by providing further justification as to why the guide tubes do not perform a criticality safety function during the extended period of operation. Alternatively, the licensee could modify the scoping of the guide tubes to include a criticality function in addition to the structural function for which the guide tubes are currently shown to scope into the renewal review.
The information requested in RAI 2-8 is needed to determine compliance with 10 CFR 72.42(a).
RAI 3-2 Clarification RAI 3-2 Part (ii) requested that the licensee clarify why radiation-induced SCC is determined to be an aging effect requiring management. In the RAI response, the gamma dose rate at the beginning of storage to the end of the period of extended operation was calculated using a conversion factor based on the density of concrete, as per Calculation 502917-0500 (part of the information submitted per the NRCs request for supplemental information (ADAMS Accession No. ML18179A255) in June 2018.
3 The NRC requests the licensee supplement their response to RAI 3-2 by providing an explanation of why a concrete conversion factor was used to calculate dose rate on the canister surface.
The information requested in RAI B-2 is needed to determine compliance with 10 CFR 72.42(a).
RAI 3-5 Clarification Please clarify if microbiological chemical attack should be deleted from the list under Loss of Material in LRA Section 3.6.5. This response is related to the Response to RAI B-1.
The information requested in RAI 3-5 is needed to determine compliance with 10 CFR 72.42(a).
RAI B-2(1) Clarification RAI B-2 (part 1) asked the licensee to address certain inconsistencies detailed in the HSM Aging Management Program (AMP). In the response, SMUD concluded...that the 10-year inspection frequency referred to in American Concrete Institute (ACI) 349.3R for inaccessible areas and controlled interior environments is appropriate for the inspection frequency of the exterior of the HSM and basemat based on the lack of an aggressive environment and the physical conditions of the HSM and basemat structures.
The NRC notes that the 10 year inspection frequency in ACI 349.3R is for interior environments.
Since the HSMs are stored in an exterior environment, the NRC is requesting that SMUD supplement their response to RAI B-2(1) by providing justification as to why a 10-year inspection interval is appropriate for the HSM AMP.
The information requested in RAI B-2 is needed to determine compliance with 10 CFR 72.24(e) and 72.42(a).
RAI B-4 Clarification Please clarify if LRA Sections 2.3.1, 2.4.3, 3.7.1, 3.7.5.2 need to be revised. The response to the RAI stated that these sections have been revised; however, they have not. This response is related to the Response to RAI B-5(3).
Please clarify whether Section C.2.4.4 for inspection of offsite shipment should be changed to for inspection or offsite shipment.
The information requested in B-4 is needed to determine compliance with 10 CFR 72.42(a).