ML14203A427: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 9: Line 9:
| docket = 05000293
| docket = 05000293
| license number =  
| license number =  
| contact person = Armentrout D H
| contact person = Armentrout D
| package number = ML14203A422
| package number = ML14203A422
| document type = Spreadsheet File
| document type = Spreadsheet File
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:All Documents for Docket 05000293 in ADAMS Public Legacy from 01/01/2006 to 01/01/2007 Document TitleAccession NumberDocument Date Pilgrim Nuclear Power Station Emergency Plan Changes to the Minimum Staffing Requirements for the Emergency Response Organization (ERO).ML0601004561/3/2006 Letter to NRC from Ford, Entergy, Emergency Plan Changes to the Minimum Staffing Requirements for the Emergency Response Organization with handwritten notes.ML0626803591/3/2006 G20060064/LTR-06-0041 - Sen T. Murray, Rep V. DeMacedo, and Rep T. O'Brien Ltr re: Relicensing of Pilgrim and Vermont YankeeML0602300461/12/2006 G20060054/LTR-06-0037 - Ltr. Alice Moore Re: Concerns Pilgrim and Vermont Yankee Relicensing.ML0601900391/13/2006 2006/01/13-Comment (4) submitted by Wedge Bramhall on Proposed Rule PR-73 regarding Design Basis Threat.ML0601801961/13/2006 G20060065/LTR-06-0042 - Ltr Mark D. Sylvia re: Concerns Pilgrim and Vermont Yankee Relicensing Applications.ML0602300481/18/2006 EA-05-221, Office of Investigations Report No. 1-2004-030.ML0601805481/19/2006 EA-05-220, Office of Investigations Report No. 1-2004-030.ML0601805091/19/2006 Letter to Debbie Grinnell Regarding Department of Labor (DOL) Occupational Safety & Health Administration (OSHA) Finding of Discrimination of a Contract Worker by Williams Power Corporation.ML0602404641/19/2006 2006/01/20-Comment (31) submitted by Pilgrim Security Watch, M. Lampert, et al. E. J. Epstein, N. Cohen, S. J.
{{#Wiki_filter:All Documents for Docket 05000293 in ADAMS Public Legacy from 01/01/2006 to 01/01/2007 Document Title                                                                                                Accession Number Document Date Pilgrim Nuclear Power Station Emergency Plan Changes to the Minimum Staffing Requirements for the Emergency Response Organization (ERO).                                                                         ML060100456          1/3/2006 Letter to NRC from Ford, Entergy, Emergency Plan Changes to the Minimum Staffing Requirements for the Emergency Response Organization with handwritten notes.                                                       ML062680359          1/3/2006 G20060064/LTR-06-0041 - Sen T. Murray, Rep V. DeMacedo, and Rep T. O'Brien Ltr re: Relicensing of Pilgrim and Vermont Yankee                                                                                                ML060230046          1/12/2006 G20060054/LTR-06-0037 - Ltr. Alice Moore Re: Concerns Pilgrim and Vermont Yankee Relicensing.                 ML060190039          1/13/2006 2006/01/13-Comment (4) submitted by Wedge Bramhall on Proposed Rule PR-73 regarding Design Basis Threat.       ML060180196          1/13/2006 G20060065/LTR-06-0042 - Ltr Mark D. Sylvia re: Concerns Pilgrim and Vermont Yankee Relicensing Applications. ML060230048          1/18/2006 EA-05-221, Office of Investigations Report No. 1-2004-030.                                                     ML060180548          1/19/2006 EA-05-220, Office of Investigations Report No. 1-2004-030.                                                     ML060180509          1/19/2006 Letter to Debbie Grinnell Regarding Department of Labor (DOL) Occupational Safety & Health Administration (OSHA) Finding of Discrimination of a Contract Worker by Williams Power Corporation.                           ML060240464          1/19/2006 2006/01/20-Comment (31) submitted by Pilgrim Security Watch, M. Lampert, et al. E. J. Epstein, N. Cohen, S. J.
Goodman, R. Becker, D. Katz and H. Moyer on Proposed Rule PR-73 regarding Design Basis ThreatML0602405871/20/2006 2006/01/25-Email: (PA) Re: Checking InML0621204911/25/2006 2006/01/25-Pilgrim Nuclear Power Station Applicant's Environmental Report Operating License Renewal Stage, Appendix E.ML0608306111/25/2006 Pilgrim Nuclear Power Station Updated Final Safety Analysis Report Supplement.ML0603000291/25/2006 2006/01/25-Transmittal of Pilgrim Nuclear Power Station License Renewal Application.ML0603000261/25/2006 2006/01/25-Pilgrim, License Renewal Application Boundary Drawings.ML0604702481/25/2006 2006/01/25-Pilgrim Nuclear Power Station License Renewal Application.ML0603000281/25/2006 2006/01/27-Email: (PA) Receipt of License Renewal Applications for VY and PilgrimML0621204981/27/2006 G20050841/LTR-05-0588-Mary Elizabeth Lampert Ltr. re. Pilgrim Nuclear Power Station E-mail Concerns Single Loop Operation Amendment.ML0602600211/27/2006 OFFICIAL EXHIBIT - PWA000006-00-BD01 - "Modeling of the Coastal Boundary Layer and Pollutant Transport in New England."ML1106009011/31/2006 Exhibit PWA 00006, "Modeling of the Coastal Boundary Layer and Pollutant Transport in New England."ML1100308991/31/2006 2006/01/31-Press Release-06-011: NRC Announces Availability of License Renewal Applications for Vermont Yankee and Pilgrim.ML0603100431/31/2006 1
Goodman, R. Becker, D. Katz and H. Moyer on Proposed Rule PR-73 regarding Design Basis Threat                  ML060240587          1/20/2006 2006/01/25-Email: (PA) Re: Checking In                                                                        ML062120491          1/25/2006 2006/01/25-Pilgrim Nuclear Power Station Applicant's Environmental Report Operating License Renewal Stage, Appendix E.                                                                                                   ML060830611          1/25/2006 Pilgrim Nuclear Power Station Updated Final Safety Analysis Report Supplement.                                 ML060300029          1/25/2006 2006/01/25-Transmittal of Pilgrim Nuclear Power Station License Renewal Application.                           ML060300026          1/25/2006 2006/01/25-Pilgrim, License Renewal Application Boundary Drawings.                                             ML060470248          1/25/2006 2006/01/25-Pilgrim Nuclear Power Station License Renewal Application.                                         ML060300028          1/25/2006 2006/01/27-Email: (PA) Receipt of License Renewal Applications for VY and Pilgrim                              ML062120498          1/27/2006 G20050841/LTR-05-0588-Mary Elizabeth Lampert Ltr. re. Pilgrim Nuclear Power Station E-mail Concerns Single Loop Operation Amendment.                                                                                     ML060260021          1/27/2006 OFFICIAL EXHIBIT - PWA000006-00-BD01 - "Modeling of the Coastal Boundary Layer and Pollutant Transport in New England."                                                                                                 ML110600901          1/31/2006 Exhibit PWA 00006, "Modeling of the Coastal Boundary Layer and Pollutant Transport in New England."           ML110030899          1/31/2006 2006/01/31-Press Release-06-011: NRC Announces Availability of License Renewal Applications for Vermont Yankee and Pilgrim.                                                                                           ML060310043          1/31/2006 1
All Documents for Docket 05000293 in ADAMS Public Legacy from 01/01/2006 to 01/01/2007 2006/01/31-Receipt and Availability of the License Renewal Application for the Pilgrim Nuclear Power Station.ML0603105931/31/2006 Pilgrim Nuclear Power Station - Seawater System Procedure 2.2.94.ML0613900832/1/2006 (3) ENN-NDE-10.03, Rev. 1; "VT-3 Examination," 02/02/2006.ML0706801572/2/2006 ENN-NDE-10.03, 02/02/06, VT-3 Examination.ML0707902082/2/2006 2006/02/03-Email: (PA) FWD: Government to Government Meeting for Vermont Yankee License RenewalML0621204992/3/2006 E-mail: (PA) FWD: Government to Government Meeting for Vermont Yankee License RenewalML0621205012/3/2006 E-mail: (PA) Re: FWD: Government to Government Meeting for Vermont Yankee License RenewalML0621205022/3/2006 IR 05000293-05-005; 10/01/2005 -12/31/2005; Pilgrim Nuclear Power Station; Flood Protection Measures; Maintenance Effectiveness.ML0603406302/3/2006 2006/02/03 - Maintenance of Reference Material at the Plymouth Public Library for the Pilgrim Nuclear Power Station License Renewal Application.ML0603705812/3/2006 E-mail: (PA) Re: FWD: Government to Government Meeting for Vermont Yankee License RenewalML0621205362/6/2006 E-mail: (PA) Re: FWD: Government to Government Meeting for Vermont Yankee License RenewalML0621205392/6/2006 PNPS Site Plan Monitoring Wells.ML0614203582/13/2006 (2) ENN-NDE-10.01, Rev. 2; "VT-1 Examination," 02/13/2006.ML0706801542/13/2006 03/08/2006 Notice of Forthcoming Public Information Session for the U.S. Nuclear Regulatory Commission (NRC)
Staff to Describe the License Renewal Process.ML0604405432/13/2006 2006/02/15-Email: (PA) License Renewal Tentative Govt to Govt Mtgs around VY.ML0621205432/15/2006 Pilgrim Nuclear Power Station Physical Security Plan, Revision 1.ML0605200222/15/2006 Pilgrim Nuclear Power Station Relief Request No. PPR-05 (TAC No. MC8288).ML0601201272/17/2006 2006/02/23-Groundwater Monitoring Well Repairs and Re-Survey Report, Pilgrim Power Station, Plymouth, Massachusetts.ML0614302042/23/2006 Pilgrim, Withdrawal of Inservice Inspection 10 CFR 50.55a (g)(4)(iv) Request No. PIL-05-R-03.ML0606205082/23/2006 G20060065/LTR-06-0042 - Mark Sylvia Ltr. re Concerns Pilgrim and Vermont Yankee relicensing applications.ML0602500682/25/2006 G20060054/LTR-06-0037 - Alice Moore Ltr. re. Concerns Pilgrim and Vermont Yankee Relicensing.ML0602400242/25/2006 Entergy Nuclear Northeast - Fitness-for-Duty Program Performance Report For the Period July 2005 - December 2005.ML0606200582/27/2006 G20060064/LTR-06-0041 - Sen. T. Murray Ltr. re. concerns relicensing of Pilgrim and Vermont Yankee.ML0602403092/27/2006 G20060064/LTR-06-0041 - Rep. V. DeMacedo and Rep. T. O'Brien Ltr. re. Concerns relicensing of Pilgrim and Vermont Yankee.ML0603402382/27/2006 2006/02/28-Email: (PA) Closeout: G20060065/LTR-06-0042 - Relicensing of Pilgrim and Vermont YankeeML0621205492/28/2006 2
All Documents for Docket 05000293 in ADAMS Public Legacy from 01/01/2006 to 01/01/2007 Press Release-I-06-011:  NRC To Hold March 8th Public Meeting In Plymouth, Mass., On License Renewal Application For Pilgrim Nuclear Plant.ML0606005283/1/2006 Annual Assessment Letter - Pilgrim Nuclear Power Station (Report 05000293/2006001).ML0606203713/2/2006 E-mail from Johnson to Shea, Pilgram ERO Staffing Change Request.ML0626803633/6/2006 03/07/2006 - RIC 2006 Presentation - T1E - John F. McCann - License Renewal.ML0615901583/7/2006 2006/03/07- - RIC 2006 Presentation -  T1F - Garry G. Young - License Renewal.ML0615902323/7/2006 03/07/2006 - RIC 2006 Presentation - T2E - Vincent Coulehan - Use of Operating Experience (Regulator/Operator/Licensee).ML0617802713/7/2006 CR-PNP-----------, CR Just Entered, Operability of Refuel Bellows Seal Rupture Drain Leakage Alarm Switch.ML0707801973/8/2006 E-mail form Johnson to Shea, Phone Call with Pilgrim on ERO Staffing Submittal.ML0626803653/10/2006 03/11/2006 Annual Town Meeting Summary.ML0610304043/11/2006 D. Johnson Calendar, 10:00 - 11:00 a.m. Scheduled Conference Call with Pilgrim.ML0632802503/14/2006 Issuance of Orders Requiring Compliance With Updated Adversary Characteristic.ML0605904643/20/2006 Pilgrim, Follow-Up Response to NRC Generic Letter 2003-01.ML0608904683/20/2006 Pilgrim Nuclear Power Station Relief Request No. PRR-11, (TAC No. MC8294)ML0603400283/21/2006 Determination of Acceptability and Sufficiency for Docketing, Proposed Review Schedule, and Opportunity for a Hearing regarding the Application from Entergy Nuclear Operations, Inc., for Renewal of the Operating License


for the Pilgrim Nuclear Power.ML0608007453/21/2006 2006/03/21-Email: (PA) VY Notice of Acceptablilty and Opportunity to Request a HearingML0621206253/21/2006 Pilgrim Revision to License Amendment Request Single Recirculation Loop Operation.ML0609004303/22/2006 Pilgrim Nuclear Power Station Relief Request No. PRR-9, (TAC No. MC8292).ML0602400553/22/2006 Press Release-06-040:  NRC Announces Opportunity to Request a Hearing on Application to Renew Operating License for Pilgrim Nuclear Power Station.ML0608104573/22/2006 Pilgrim, Indian Point, James A. Fitzpatrick, and Vermont Yankee Nuclear Power Station, Proof of Financial Protection (10 CFR 140.15) and Guarantee of Payment of Deferred Premiums (10 CFR 140.21).ML0609601373/28/2006 2006/03/29-Pilgrim: NRC Contact Report - Arrange Meeting with Town Officials During Site Audit (Intergovernmental).ML0634701763/29/2006 2006/03/29-E-MAIL: (PD) Pilgrim CZM Notice.ML0634503683/29/2006 FitzPatrick, Indian Point Units 1, 2, and 3, Pilgrim, and Vermont Yankee, Sources and Levels of Insurance Required by 10 CFR 50.54(w).ML0609504183/29/2006 2006/03/29-E-MAIL: (PD) CZM.ML0634703123/29/2006 2006/03/30-Email: (PA) PNPS Audit Plan.ML0624802913/30/2006 2006/03/30-E-MAIL: (Intergovernmental) Re: Pilgrim Audit.ML0634703093/30/2006 3
All Documents for Docket 05000293 in ADAMS Public Legacy from 01/01/2006 to 01/01/2007 2006/01/31-Receipt and Availability of the License Renewal Application for the Pilgrim Nuclear Power Station. ML060310593 1/31/2006 Pilgrim Nuclear Power Station - Seawater System Procedure 2.2.94.                                             ML061390083  2/1/2006 (3) ENN-NDE-10.03, Rev. 1; "VT-3 Examination," 02/02/2006.                                                   ML070680157  2/2/2006 ENN-NDE-10.03, 02/02/06, VT-3 Examination.                                                                   ML070790208 2/2/2006 2006/02/03-Email: (PA) FWD: Government to Government Meeting for Vermont Yankee License Renewal              ML062120499 2/3/2006 E-mail: (PA) FWD: Government to Government Meeting for Vermont Yankee License Renewal                        ML062120501 2/3/2006 E-mail: (PA) Re: FWD: Government to Government Meeting for Vermont Yankee License Renewal                     ML062120502  2/3/2006 IR 05000293-05-005; 10/01/2005 -12/31/2005; Pilgrim Nuclear Power Station; Flood Protection Measures; Maintenance Effectiveness.                                                                                   ML060340630  2/3/2006 2006/02/03 - Maintenance of Reference Material at the Plymouth Public Library for the Pilgrim Nuclear Power Station License Renewal Application.                                                                         ML060370581  2/3/2006 E-mail: (PA) Re: FWD: Government to Government Meeting for Vermont Yankee License Renewal                     ML062120536  2/6/2006 E-mail: (PA) Re: FWD: Government to Government Meeting for Vermont Yankee License Renewal                     ML062120539  2/6/2006 PNPS Site Plan Monitoring Wells.                                                                             ML061420358 2/13/2006 (2) ENN-NDE-10.01, Rev. 2; "VT-1 Examination," 02/13/2006.                                                   ML070680154 2/13/2006 03/08/2006 Notice of Forthcoming Public Information Session for the U.S. Nuclear Regulatory Commission (NRC)
All Documents for Docket 05000293 in ADAMS Public Legacy from 01/01/2006 to 01/01/2007 Letter dated. 3/31/06 to Multiple Addressees  who did not participate in the March 8, 2006 Generic Fundamentals Exam (GFE).ML0609305393/31/2006 2006/03/31-Email: (PA) Re: Request - License Renewal Work for CFEBML0621206293/31/2006 2006/04/03-Pilgrim: NRC Contact Report - Arrange meeting with Town personnel during May Site Audit (Intergovernmental).ML0634701804/3/2006 2006/04/03-Email: (PA) Re: Request - License Renewal Work for CFEBML0621206314/3/2006 Pilgrim, Response to Generic Letter 2006-02, Grid Reliability and the Impact on Plant Risk and the Operability of Offsite Power, dated February 1, 2006.ML0609504344/3/2006 2006/04/04-E-mail: (PA) Pilgrim Audit PlanML0624800854/4/2006 04/18/2006 Public Meeting Notice for the Annual Assessment Meeting with Entergy (Pilgrim Station) to Discuss CY2005 Performance.ML0609403704/4/2006 04/18/2006, NRC Slides for Annual Assessment Public Meeting with Entergy (Pilgrim Station) Reference CY2005 Performance.ML0609404084/4/2006 Pilgrim Nuclear Power Station - Relief Request No. PIL-05-R-002, (TAC MC8300).ML0606601324/5/2006 2006/04/05-Pilgrim: NRC Contact Report - Follow Up from 4/3/06 Telephone Call (Intergovernmental).ML0634701834/5/2006 2006/04/05-Pilgrim: NRC Contact Report - Arrange meeting with Town personnel during Site Audit in May
Staff to Describe the License Renewal Process.                                                               ML060440543 2/13/2006 2006/02/15-Email: (PA) License Renewal Tentative Govt to Govt Mtgs around VY.                                 ML062120543 2/15/2006 Pilgrim Nuclear Power Station Physical Security Plan, Revision 1.                                             ML060520022 2/15/2006 Pilgrim Nuclear Power Station Relief Request No. PPR-05 (TAC No. MC8288).                                     ML060120127 2/17/2006 2006/02/23-Groundwater Monitoring Well Repairs and Re-Survey Report, Pilgrim Power Station, Plymouth, Massachusetts.                                                                                               ML061430204 2/23/2006 Pilgrim, Withdrawal of Inservice Inspection 10 CFR 50.55a (g)(4)(iv) Request No. PIL-05-R-03.                 ML060620508 2/23/2006 G20060065/LTR-06-0042 - Mark Sylvia Ltr. re Concerns Pilgrim and Vermont Yankee relicensing applications. ML060250068 2/25/2006 G20060054/LTR-06-0037 - Alice Moore Ltr. re. Concerns Pilgrim and Vermont Yankee Relicensing.                 ML060240024 2/25/2006 Entergy Nuclear Northeast - Fitness-for-Duty Program Performance Report For the Period July 2005 - December 2005.                                                                                                         ML060620058 2/27/2006 G20060064/LTR-06-0041 - Sen. T. Murray Ltr. re. concerns relicensing of Pilgrim and Vermont Yankee.           ML060240309 2/27/2006 G20060064/LTR-06-0041 - Rep. V. DeMacedo and Rep. T. O'Brien Ltr. re. Concerns relicensing of Pilgrim and Vermont Yankee.                                                                                               ML060340238 2/27/2006 2006/02/28-Email: (PA) Closeout: G20060065/LTR-06-0042 - Relicensing of Pilgrim and Vermont Yankee            ML062120549 2/28/2006 2
[4/5/06]  (Intergovernmental).ML0634701894/5/2006 2006/04/06-E-MAIL: (Intergovernmental) Re: Pilgrim Audit [List for Plymouth meeting].ML0634703134/6/2006 2006/04/06-Email: (PA) Questions counts...ML0621206364/6/2006 2006/04/07-Email: (PA) AMP, AMR, and TLAA questions for PNPSML0621206424/7/2006 4/7/06 - Notice Of Intent To Prepare An Environmental Impact Statement And Conduct Scoping Process For License Renewal For The Pilgrim Nuclear Power Station (TAC NO. MC9676)ML0610002614/7/2006 2006/04/10-Email: (PA) 1999 LR Guidance on DamsML0621300954/10/2006 Pilgrim Nuclear Power Station - Technical Specification Pages re Revised Applicability For Containment Oxygen And Differential Pressure Limits (TAC MC7056).ML0611402654/10/2006 2006/04/10-E-MAIL: (PD) FW: Massachusetts Tribal Information.ML0634702174/10/2006 2006/04/10-Pilgrim: NRC Contact Report - Arrange Meeting with Planning Council Staff During Site Audit in May (Intergovernmental).ML0907704644/10/2006 Press Release-I-06-020:  NRC to Discuss 2005 Performance Assessment for Pilgrim Nuclear Power Plant.ML0610003744/10/2006 Pilgrim Nuclear Power Station - Issuance Of Amendment RE: Revised Applicability For Containment Oxygen And Differential Pressure Limits (TAC MC7056).ML0531404334/10/2006 2006/04/11-E-MAIL: (PD) CZM Consistency Determination.ML0634605414/11/2006 Pilgrim, Proposed License Amendment to Change Technical Specification 3.6.A.2, Pressure-Temperature Limit Curves.ML0610908324/12/2006 4
All Documents for Docket 05000293 in ADAMS Public Legacy from 01/01/2006 to 01/01/2007 Pilgrim, Issuance of Amendment Re: Single Recirculation Loop Operation (TAC No. MC4333).ML0601701194/12/2006 2006/04/12-E-MAIL: (Intergovernmental) May 3 meeting - Pilgrim NPS license renewal [List for Duxbury meeting].ML0634703264/12/2006 2006/04/12-E-MAIL: (Intergovernmental) May 4 meeting - Pilgrim NPS license renewal [List for Carver meeting].ML0634703294/12/2006 2006/04/12-E-MAIL: (Intergovernmental) May 4 meeting - Pilgrim NPS license renewal [List for Old Colony meeting].ML0634703194/12/2006 2006/04/12-E-MAIL: (Intergovernmental) May 3 meeting - Pilgrim NPS license renewal [List for Kingston Meeting].ML0634703244/12/2006 Pilgrim, Tech Spec Pages for Amendment 219 regarding Single Recirculation Loop Operation.ML0610701674/12/2006 Pilgrim, License Amendment 221 regarding Revised Rod Worth Minmizer ByPass Allowances.ML0607402144/13/2006 Pilgrim Nuclear Power Station-Issuance Of Amendment RE: Removal Of Main Steam Isolation Valve Twice Per Week Testing Surveillance Requirement (TAC MC7052).ML0606000404/13/2006 Pilgrim, Technical Specification Page, deletes the main steam isolation valve twice per week partial stroke testing surveillance specified in Technical Specification 4.7.A.2.b.1.c.ML0610702154/13/2006 Pilgrim Nuclear Power Station, Technical Specification Page re Revised Rod Worth Minimizer Bypass Allowances (TAC MC7055).ML0610702044/13/2006 2006/04/16-Pilgrim April 2008 Evidentiary Hearing - Intervenor Exhibit 16, Seismic: New England Not Immune to Strong Temblors and Specialists Say that a Major Event is Only a Matter of Time, Boston Globe, Bryan Bender, April 16, 2006.ML0810902914/16/2006 2006/04/18-E-MAIL: (PA) NRC Issues Notice of Intent to Prepares EIS Pilgrim LRA.ML0634701004/18/2006 2006/04/18-E-MAIL: (PD) Pilgrim Nuclear Generating Station License Renewal Application.ML0634605454/18/2006 PNPS Monthly Groundwater Discharge Data.ML0614201834/21/2006 2006/04/21 - Request for Comments Regarding the Pilgrim Nuclear Power Station License Renewal Application Review.ML0611606134/21/2006 4/21/06 - Request for Comments Regarding the Pilgrim Nuclear Power Station License Renewal Application Review.ML0611702224/21/2006 4/21/06 - Request for Comments Regarding the Pilgrim Nuclear Power Station License Renewal Application Review.ML0611701524/21/2006 2006/04/21- - Request for Comments Regarding the Pilgrim Nuclear Power Station License Renewal Application Review.ML0611700854/21/2006 2006/04/24-E-mail: (PA) PNPS AMP QuestionsML0621204154/24/2006 Pilgrim Nuclear Power Station - Request for Additional Information Regarding Unresolved Inspection Item 05000293-05-003-01 From the NRC Integrated Inspection Report 05000293-05-003 (TAC No. MD0178).ML0609703974/24/2006 5
All Documents for Docket 05000293 in ADAMS Public Legacy from 01/01/2006 to 01/01/2007 2006/04/25 - Request for a List of Protected Species and Essential Fish Habitat Within the area Under Evaluation for the Pilgrim Nuclear Power Station License renewal Application Review.ML0611602834/25/2006 2006/04/25 - Request for a List of Protected Species Within the Area Under Evaluation for the Pilgrim Nuclear Power Station License Renewal Application Review.ML0611603034/25/2006 2006/04/25-E-Mail: Re: Teleconference, Needed Information, and Updated Environmental Audit Schedule.ML0630703314/25/2006 License Renewal Audit and Review Plan for Plant Aging Management Review and Programs for the Pilgrim Nuclear Power Plant, Docket Number 50-293.ML0612206304/26/2006 2006/04/26-Pilgrim: NRC Contact Report - Follow up from Alicia Williamson's call to Mr. Halkiotis, in regard to meeting with Town personnel during Site Audit in May (Intergovernmental).ML0634701744/26/2006 2006/04/27-Email: (PA) PNPS LRA Appendix C - BWRVIP ActionsML0620905464/27/2006 Pilgrim Nuclear Power Station - Notification of Conduct of a Triennial Fire Protection Baseline Inspection.ML0611701104/27/2006 2006/04/28-E-MAIL: (Intergovernmental) May 3 meeting - Pilgrim NPS license renewal [List for Marshfield meeting].ML0634703334/28/2006 2006/04/28-Email: (PA) Pilgrim Questions to be Discussed at the AuditML0620904994/28/2006 2006/04/28-Pilgrim: NRC Contact Report - Arrange meeting with Town personnel during Site Audit in May (Intergovernmental).ML0634701704/28/2006 2006/04/28- 05/17/2006 Notice of Meeting to Discuss the Environmental Scoping Process for Pilgrim Nuclear Power Station, License Renewal Application (LRA)ML0611804244/28/2006 2006/04/30-Marine Ecology Studies Report #67, Appendix B, Geometric Mean Monthly Ichthyoplankton Densities Jan-Dec. 2005ML0620104824/30/2006 2006/05/01-(PD) Ecology Meeting Notes Pilgrim Nuclear Power Station Site Audit on May 1, 2006.ML0634700515/1/2006 05/02/2006 - Pilgrim Nuclear Power Station License Renewal Application Review.ML0612403355/2/2006 2006/05/02-(PD) Pilgrim Nuclear Power Station License Renewal Site Audit Off-Site Meetings May 2-4, 2006 Draft Meeting Notes.ML0634700725/2/2006 Pilgrim - Revision to the Request for Amendment to the Technical Specifications (TS) - Deletion of Requirement Related to NRC Approval of Engineering Evaluation for Elevated Relief Valve Discharge Pipe Temperature.ML0613200185/2/2006 Press Release-I-06-030:  NRC Seeks Public Input on Environmental Review Associated with License Renewal Proposed for Pilgrim Nuclear Power Plant.ML0612304115/3/2006 Indian Point Units 1, 2, and 3, Vermont Yankee, Pilgrim, James A. FitzPatrick; Entergy Operations, Inc., Service List Update.ML0612904245/3/2006 2006/05/03-E-MAIL: (Intergovernmental) Town of Kingston population figures.ML0634703355/3/2006 2006/05/03-E-MAIL: (Intergovernmental) FW: Planners Event on Current Trends in MetroBoston.ML0634703365/3/2006 6
All Documents for Docket 05000293 in ADAMS Public Legacy from 01/01/2006 to 01/01/2007 Email: (PA) Re: Re-assignment of Tables 3.3.2.14-XML0620904975/4/2006 2006/05/04-Email: (PA) Re: Re-assignment of Tables 3.3.2.14-XML0621206475/4/2006 2006/05/04-Email: (PA) PNPS Template for not consistent with Gall AMRsML0620904965/4/2006 2006/05/04-Email: (PA) AMP questionsML0620904885/4/2006 Photos taken on 05/04/2006 of view looking toward Pilgrim station from junction of Pricilla and White Horse beaches.ML0620104905/4/2006 Pilgrim Nuclear Power Station - Correction to Amendment No. 221 Re: Revised Rod Worth Minimizer Bypass Allowances (TAC No. MC7055)ML0611800835/5/2006 2006/05/05-E-MAIL: (Intergovernmental) Town of Carver, MA GIS layer list.ML0634701115/5/2006 Pilgrim Nuclear Power Station - Correction to Amendment No. 221 re: Revised Rod Worth Minimizer Bypass Allowances - Technical Specifications.ML0613000955/5/2006 2006/05/05-Email: (PA) Re: PNPS Template for not consistent with GALL AMRsML0620904935/5/2006 EMAIL: (PA) Re: Bolting Integrity ProgramML0620904905/5/2006 2006/05/05-Email: (PA) Re: Bolting Integrity ProgramML0620904985/5/2006 2006/05/05-EMAIL: (PA) AMR Template for Not Consistent with Gall SectionML0620903225/5/2006 2006/05/06-E-MAIL: (PD) FW: New dwelling units.ML0634702565/6/2006 Pilgrim, Main Stack Inspection Report - 05/08/2006.ML0704404815/8/2006 2006/05/08-Email: (PA) AMR's questionary for PilgrimML0620903245/8/2006 2006/05/09-E-MAIL: (Intergovernmental) Re: How many housing units built since 2000?.ML0634704015/9/2006 EMAIL: (PA-LR) PNPS Documents.ML0630505145/9/2006 2006/05/09-E-MAIL: (Intergovernmental) Re: New dwelling units.ML0634701915/9/2006 (NPA-PD) Letter to Mary Lampert from the Commonwealth of Massachusetts Executive Office of Heath and Human Services, Department of Public Health, Regarding Child Heath Statistics.ML0712901555/9/2006 2006/05/09-E-mail: (Intergovernmental) Re: Planners Event on Current Trends in MetroBoston.ML0634703385/9/2006 2006/05/09-EMAIL: (PA) AMR Review of Section 3.3ML0620903285/9/2006 2006/05/10-Email: (PA) Draft Questions for the Aging Management Program (AMP) Gall Consistency Audit - for Pilgrim.ML0624802725/10/2006 E-Mail: Guidance How to File Petition for Intervention with NRC - Pilgrim LRA.ML0630701875/10/2006 2006/05/10-Email: (PA) FWD: Pilgrim AMP Combined QuestionsML0624802835/10/2006 2006/05/10-E-Mail: Draft questions for the Aging Management Program (AMP) Gall consistency audit - for Pilgrim LRA.ML0630703935/10/2006 2006/05/11-E-Mail: Pilgrim Letter 2.06.040 - License Renewal Application, Amendment 1.ML0630704025/11/2006 Pilgrim - Annual Radiological Environmental Operating Report for January 1 through December 31, 2005.ML0613705745/11/2006 2006/05/11-EMAIL: (PA-INT-LR) Document Comparing PNPS Entrained Species to Other MA Stations.ML0630505185/11/2006 7
All Documents for Docket 05000293 in ADAMS Public Legacy from 01/01/2006 to 01/01/2007 Pilgrim Nuclear Power Station - Request For Additional Information Regarding Relief Request PRR-10, Fourth 10-Year Inservice Inspection Program Plan (TAC MC8293).ML0612101405/11/2006 E-Mail: Revised AMR Initial; from Johnny Eads 5/11/2006 4:01 pm.ML0630703845/11/2006 Pilgrim, Annual Radiological Effluent and Waste Disposal Report for January 1 Through December 31, 2005.ML0613806535/11/2006 2006/05/11-EMAIL: (PA) Table 3.3.1 AMR questionsML0620903335/11/2006 LER 06-01-000, Pilgrim re Manual Scram due to High Offgas Recombiner Temperature resulting from Inadequate Preventive Recombiner Preheater Pressure Control Valve Controller.ML0613706225/11/2006 2006/05/11-Pilgrim Nuclear Power Station, License Renewal Application, Amendment 1.ML0613805495/11/2006 2006/05/11- Pilgrim Nuclear Power Station License Renewal Application Review (SHPO No. RC36661)ML0613102345/11/2006 2006/05/12-Pilgrim April 2008 Evidentiary Hearing - Staff Exhibit 19, 05/12/2006 Letter from Clifford Anderson (NRC) to Entergy re Pilgrim Nuclear Power Station - NRC Integrated Inspection Report 05000293/2006002.ML0810905535/12/2006 IR 05000293-06-002 on 01/01/2006 - 03/31/2006 for Pilgrim Nuclear Power Station. Personnel Performance During Non-routine Plant Evolutions.ML0613205645/12/2006 2006/05/12-PNPS License Scoping Comment - Tom Belcher.ML0624104065/12/2006 E-Mail: Guidance how to file petition for intervention with NRC - Pilgrim LRA.ML0630704055/12/2006 Part 21 60-Day Interim Report Notification: BWR Core Shroud Tie Rod Upper Support Cracking.ML0613604655/12/2006 Transmittal Letter for License Renewal Audit and Review Plan for Plant Management Reviews and Programs for the Pilgrim Nuclear Power Plant Docket 50-293.ML0612207165/15/2006 Entergy Quality Assurance Program Manual, Revision 13.ML0613705935/15/2006 Entergy Operations, Inc., Request for Use of Delta Protection Mururoa V4F1 R Supplied Air Suits.ML0614401675/16/2006 Entergy Operations, Inc., Application to Use Weighting Factors for External Exposure.ML0614303595/16/2006 Pilgrim Nuclear Power Station - Request For Additional Information Regarding Relief Request PRR-15, Fourth 10-Year Inservice Inspection Program Plan (TAC No. MC8298).ML0610200415/16/2006 2006/05/17-Pilgrim Nuclear Power Station Environmental Scoping Meeting Handouts.ML0614201645/17/2006 : Evening Transcript, Public Scoping Meeting for Pilgrim, 05/17/2006.ML0617000505/17/2006 : Afternoon Transcript, Public Scoping Meeting for Pilgrim, 05/17/2006.ML0617000465/17/2006 CR-PNP-2006-01914 - Pilgrim.ML0704404795/18/2006 2006/05/18-E-mail: (Intergovernmental) Townscape Plan for Marshfield.ML0634704055/18/2006 Pilgrim, RAI, Regarding Technical Specification Changes to Revise Reactor Coolant Leakage Detection System Instrumentation (TAC No. MC7255).ML0612101725/18/2006 2006/05/18-(PD) PNPS LR EIS Ecology Meeting May 18, 2006.ML0634700675/18/2006 8
All Documents for Docket 05000293 in ADAMS Public Legacy from 01/01/2006 to 01/01/2007 2006/05/19-Project Manager Change for the License Renewal Environmental Review for Pilgrim Nuclear Power Station.ML0614100015/19/2006 2006/05/19-E-MAIL: (PD) Information re: Pilgrim LRA.ML0634605075/19/2006 2006/05/19-EMAIL: (PA-LR) Information re: Pilgrim LRA.ML0630602965/19/2006 Request for the Use of Delta Protection's Self Fed Single Use Mururoa BLU" Suit Systems.ML0614300155/19/2006 2006/05/22-Request for Additional Information (RAI) Regarding Severe Accident Mitigation Alternatives (SAMA) for Pilgrim Nuclear Power Station (TAC No. MC9676).ML0614400265/22/2006 2006/05/22-E-MAIL: (PD) Found Extra Color Copy.ML0634604965/22/2006 2006/05/22-EMAIL: (PA-LR) Pilgrim ETE Comments.ML0630505065/22/2006 2006/05/23-U.S. Dept. of the Interior Fish and Wildlife Service, Letter Dated May 23, 2006 - Regarding: Formal Consultation on Pilgrim License Renewal Not Required.ML0616500165/23/2006 2006/05/24-Ltr from Dr. Dean, ACHP to DLR to address license renewal application for Pilgrim.ML0617106015/24/2006 2006/05/25-Exhibit NRC000003, Pilgrim LR Proceeding - Request for a Hearing and Petition to Intervene.ML1100309755/25/2006 2006/05/30-Pilgrim - Pilgrim Watch Request for a Hearing and Petition to Intervene.ML0616301255/25/2006 , 2005 Annual Report, and, Securities and Exchange Commission Form 10-K Submittal for All Entergy Nuclear Operations, Inc. Plants.ML0615304195/25/2006 Declaration of Dr. Jan Beyea in Support of Massachusetts Attorney General's Contention and Petition for Backfit Order.ML1112203565/25/2006 OFFICIAL EXHIBIT - NRC000003-00-BD01 - Request for a Hearing and Petition to Intervene.ML1106009145/25/2006 2006/05/25-Pilgrim April 2008 Evidentiary Hearing - Staff Exhibit 18, Attachment 71111.07 (Issue Date 05/25/2006) "Heat Sink Performance"ML0810905375/25/2006 James A. Fitzpatrick, Indian Point, Pilgrim, & Vermont Yankee Nuclear Power Stations, 2005 Annual Report, and, Securities and Exchange Commission Form 10-K Submittal for all Entergy Nuclear Operations, Inc. Plants.ML0615304135/25/2006 2006/05/25-Declaration of Dr. Jan Beyea in Support of Massachusetts Attorney General's Contention and Petition for Backfit OrderML0616403295/25/2006 Commonwealth of Massachusetts v. USNRC; Nos. 07-1482 and 07-1483; Joint Appendix.ML0725001305/26/2006 Report To The Massachusetts Attorney General On The Potential Consequences Of A Spent- Fuel-Pool Fire At The Pilgrim Or Vermont Yankee Nuclear Plant.ML12094A1815/26/2006 Exhibit 1. Declaration of Dr. Gordon Thompson in Support of Massachusetts Attorney General's Contention and Petition for Backfit Order.ML1112203505/26/2006 Risks and Risk-Reducing Options Associated with Pool Storage of Spent Nuclear Fuel at the Pilgrim and Vermont Yankee Nuclear Power Plants.ML12094A1805/26/2006 9
All Documents for Docket 05000293 in ADAMS Public Legacy from 01/01/2006 to 01/01/2007 2006/05/26-Pilgrim- Massachusetts Attorney General's Request for a Hearing and Petition for Leave to Intervene with Respect to Entergy Nuclear Operations Inc.'s Application for Renewal of the Pilgrim Nuclear Power Plant


Operating LicenseML0616300885/26/2006 Pilgrim Watch Request for Hearing Regarding Insufficiency of Order Modifying Licenses with Regard to Spent Reliable Spent Fuel Pool Instrumentation.ML12094A1825/26/2006 2006/05/28-Email: (PA) Questions for NRC About the Reactor Head Closure Studs AMP (XI.M3) as described in the GALL ReportML0620903385/28/2006 2006/05/30-EMAIL: (PA-LR) PNPS License Renewal - Environmental.ML0630602995/30/2006 2006/05/30-E-MAIL: (PD) PNPS License Renewal - Environmental.ML0634702005/30/2006 Entergy Operations, Inc, North and South, Effective Dose Equivalent Weighting Factors for External Exposure.ML0614401105/30/2006 Entergy Operations, Inc, North and South, Delta Protection Mururoa V4F1 R Supplied Air Suits.ML0614401735/30/2006 2006/05/30-Letter from Diane Curran submitting the originals of several documents for which copies of faxed signature pages were filed on May 26, 2006 in connection with the Massachusetts Attorney General's hearing
All Documents for Docket 05000293 in ADAMS Public Legacy from 01/01/2006 to 01/01/2007 Press Release-I-06-011: NRC To Hold March 8th Public Meeting In Plymouth, Mass., On License Renewal Application For Pilgrim Nuclear Plant.                                                                            ML060600528  3/1/2006 Annual Assessment Letter - Pilgrim Nuclear Power Station (Report 05000293/2006001).                                ML060620371  3/2/2006 E-mail from Johnson to Shea, Pilgram ERO Staffing Change Request.                                                  ML062680363  3/6/2006 03/07/2006 - RIC 2006 Presentation - T1E - John F. McCann - License Renewal.                                      ML061590158  3/7/2006 2006/03/07- - RIC 2006 Presentation - T1F - Garry G. Young - License Renewal.                                      ML061590232  3/7/2006 03/07/2006 - RIC 2006 Presentation - T2E - Vincent Coulehan - Use of Operating Experience (Regulator/Operator/Licensee).                                                                                    ML061780271  3/7/2006 CR-PNP-----------, CR Just Entered, Operability of Refuel Bellows Seal Rupture Drain Leakage Alarm Switch.        ML070780197  3/8/2006 E-mail form Johnson to Shea, Phone Call with Pilgrim on ERO Staffing Submittal.                                    ML062680365 3/10/2006 03/11/2006 Annual Town Meeting Summary.                                                                            ML061030404 3/11/2006 D. Johnson Calendar, 10:00 - 11:00 a.m. Scheduled Conference Call with Pilgrim.                                    ML063280250 3/14/2006 Issuance of Orders Requiring Compliance With Updated Adversary Characteristic.                                    ML060590464 3/20/2006 Pilgrim, Follow-Up Response to NRC Generic Letter 2003-01.                                                        ML060890468 3/20/2006 Pilgrim Nuclear Power Station Relief Request No. PRR-11, (TAC No. MC8294)                                          ML060340028 3/21/2006 Determination of Acceptability and Sufficiency for Docketing, Proposed Review Schedule, and Opportunity for a Hearing regarding the Application from Entergy Nuclear Operations, Inc., for Renewal of the Operating License for the Pilgrim Nuclear Power.                                                                                     ML060800745 3/21/2006 2006/03/21-Email: (PA) VY Notice of Acceptablilty and Opportunity to Request a Hearing                            ML062120625 3/21/2006 Pilgrim Revision to License Amendment Request Single Recirculation Loop Operation.                                ML060900430 3/22/2006 Pilgrim Nuclear Power Station Relief Request No. PRR-9, (TAC No. MC8292).                                          ML060240055 3/22/2006 Press Release-06-040: NRC Announces Opportunity to Request a Hearing on Application to Renew Operating License for Pilgrim Nuclear Power Station.                                                                        ML060810457 3/22/2006 Pilgrim, Indian Point, James A. Fitzpatrick, and Vermont Yankee Nuclear Power Station, Proof of Financial Protection (10 CFR 140.15) and Guarantee of Payment of Deferred Premiums (10 CFR 140.21).                          ML060960137 3/28/2006 2006/03/29-Pilgrim: NRC Contact Report - Arrange Meeting with Town Officials During Site Audit (Intergovernmental).                                                                                               ML063470176 3/29/2006 2006/03/29-E-MAIL: (PD) Pilgrim CZM Notice.                                                                       ML063450368 3/29/2006 FitzPatrick, Indian Point Units 1, 2, and 3, Pilgrim, and Vermont Yankee, Sources and Levels of Insurance Required by 10 CFR 50.54(w).                                                                                                ML060950418 3/29/2006 2006/03/29-E-MAIL: (PD) CZM.                                                                                       ML063470312 3/29/2006 2006/03/30-Email: (PA) PNPS Audit Plan.                                                                           ML062480291 3/30/2006 2006/03/30-E-MAIL: (Intergovernmental) Re: Pilgrim Audit.                                                          ML063470309 3/30/2006 3


request and backfit petitionML0616400315/30/2006 2006/05/31-E-MAIL: (Intergovernmental) FW: No subject [from M. Sylvia to A. Parker].ML0634704085/31/2006 2006/06/01-E-MAIL: (Intergovernmental) Plymouth Population & Buildout Data [Forecasts].ML0634704126/1/2006 2006/06/02-E-MAIL: (Intergovernmental) FW: No Subject [6/2/06 from M. Sylvia to A. Parker].ML0634704186/2/2006 2006/06/02-EMAIL: (PA-LR) FW: Word Document of NRC LRA Programs Audit of Pilgrim.ML0630505046/2/2006 2006/06/02-EMAIL: (PA-LR) PNPS - Spotted Turtle.ML0630603226/2/2006 Response to NRC Request for Additional Information Regarding Unresolved Inspection Item 05000293/2005003-01 from NRC Integrated Inspection Report 05000293-05-003.ML0616403486/5/2006 2006/06/05-E-MAIL: (PD) Invasive Nuisances.ML0634701946/5/2006 2006/06/05-Pilgrim - Notice of Adoption of Contention by Pilgrim Watch.ML0617203846/5/2006 Pilgrim Response to NRC Generic Letter 2006-03, "Potentially Nonconforming Hemyc and MT Fire Barrier Configurations."ML0616401326/6/2006 Pilgrim, Request for Use of ASME Code Case N-623 and Withdrawal of Pilgrim Relief Request No. PRR-12.ML0617103556/6/2006 2006/06/06-Hearing Referral Memorandum from A. Vietti-Cook to P. Bollwerk, ASLBP.ML0616002216/6/2006 2006/06/07-Pilgrim, License Renewal Application, Amendment 2.ML0617104226/7/2006 2006/06/07-Establishment of Atomic Safety and Licensing BoardML0615905196/7/2006 2006/06/08-E-Mail: FWD: LRA Amendment 2 (Updated Drywell Shell Information).ML0630703306/8/2006 2006/06/08-Ltr from Mr. Colosi, NOAA to DLR addressing EFH.ML0617106006/8/2006 2006/06/09-EMAIL: (PA-LR) Another Round of AMR Questions and TLAA Questions.ML0630505126/9/2006 2006/06/09-E-Mail: The second set of AMR Questions.ML0630703276/9/2006 10 All Documents for Docket 05000293 in ADAMS Public Legacy from 01/01/2006 to 01/01/2007 2006/06/12-Comment (1) of Mary Lampert, re Scope of the Environmental Review for Pilgrim's License Renewal Application.ML0616701016/12/2006 2006/06/13-Pilgrim - Notice of Appearance of David R. Lewis and Paul A. Gaukler as Counsel on Behalf of Entergy Nuclear Generation Company and Entergy Nuclear Operations, Inc.ML0617201636/13/2006 2006/06/14-Comment (2) of Mary Lampert on Behalf of Pilgrim Watch regarding Scope of the Environmental Review for Pilgrim License Renewal Application - Direct Torus Vent System.ML0617101046/14/2006 Pilgrim - Response to NRC Request for Additional Information Regarding Technical Specification Changes to Revise Reactor Coolant Leakage Detection System Instrumentation.ML0617200846/14/2006 2006/06/14-LB Order (Regarding Schedule and Guidance for Proceedings)ML0616600476/14/2006 2006/06/15-Comment (3) of Diane Curran, and Matthew Brock, re EIS Scoping Process for Pilgrim Nuclear Plant License Renewal, Proceeding, 71 Fed. Reg. 19,554 (April 14, 2006).ML0617702776/15/2006 2006/06/15-Pilgrim - NRC Staff Answer to Notice of Adoption of Contentions by Pilgrim WatchML0616700396/15/2006 2006/06/15- Pilgrim - Notices of Appearance for Susan L. Uttal and Harry E. WedewerML0616700596/15/2006 2006/06/15-Comment (6) of R. J. Chin, H Chang, M. Lampert, M. Morrison, & B. Pye on Scope of Environmental Review for the Pilgrim Nuclear Power Station's License Renewal Application-Federal Register Notice, April 14, 2006.ML0617704076/15/2006 2006/06/16-Pilgrim - Unopposed Motion for Extension of Time to Reply to NRC Staff Response to Hearing Request.ML0618103956/16/2006 2006/06/16-Comment (7) of Elizabeth A. Higgins, re Scoping Comments in Response to Notice of Intent to Prepare Environmental Impact Statement for Pilgrim Nuclear Power Station in Plymouth, Massachusetts.ML0617700456/16/2006 2006/06/16-Comment (4) of Sheila S. Hollis, re Pilgrim Power Station Regarding Renewal of Facility Operating License DPR-35 for a 20 Year Period.ML0617700436/16/2006 2006/06/16-Pilgrim- Request of the Town of Plymouth to Participate as of Right Under 2.315(c).ML0617403466/16/2006 2006/06/16-Pilgrim - Unopposed Motion for Extension of Time to Reply to NRC Staff Response to Hearing Request, filed by D. Curran, Counsel for Massachusetts Attorney General.ML0617806346/16/2006 2006/06/16-Pilgrim - Letter from D. Curran to Judge Young providing recent decision by U.S. Court of Appeals for the Ninth Circuit.ML0617403496/16/2006 2006/06/26-Pilgrim - Email from S. Hollis to Judge Young re: Participation in Pilgrim Proceeding and Notice of Appearance.ML0617801256/16/2006 2006/06/19-Exhibit NRC000005, Pilgrim LR Proceeding - NRC Staff's Response to Request for Hearing and Petition to Intervene Filed by Pilgrim Watch.ML1100309776/19/2006 2006/06/19-Pilgrim - NRC Staff's Response to Request for Hearing and Petition to Intervene Filed by Pilgrim WatchML0617100866/19/2006 11 All Documents for Docket 05000293 in ADAMS Public Legacy from 01/01/2006 to 01/01/2007 OFFICIAL EXHIBIT - NRC000005-00-BD01 - NRC Staff's Response to Request for Hearing and Petition to Intervene Filed by Pilgrim Watch.ML1106009186/19/2006 FRN: General Notice, Letter A, Issuance of Order EA-06-137. Requiring Compliance with Key Radiological Protection Mitigation Strategies.ML0616000236/20/2006 2006/06/20- Pilgrim - Official Transcript of Pilgrim Nuclear Power Station Pre-Hearing Conference.ML0617403666/20/2006 FRN: General Notice, EA-06-137 Enclosure, Order Modifying Licenses (Effective Immediately) .ML0616000766/20/2006 FRN: General Notice, Order EA-06-137, Attachment 1-A List of Licensees.ML0616000876/20/2006 2006/06/20-Comment (5) of Frank Gorke and Stephanie Abrahams on Scope of Environmental Review for the Pilgrim Nuclear Power Station License Renewal Application - Federal Register Notice, April 14, 2006.ML0617703956/20/2006 2006/06/21-Email: (PA) Additional Missing AMPsML0625103596/21/2006 2006/06/21-LB Order and Notice (Regarding Oral Argument and Limited Appearance Statement Sessions)ML0617203976/21/2006 Pilgrim Nuclear Power Station, Response to NRC request for Additional Information Regarding Pilgrim Relief Request, PRR-10, Risk-informed ISI For Class 1, B-F and B-J Welds (TAC NO. MC8293).ML0618600866/21/2006 2006/06/22-Email: (PA) Additional missing AMPsML0625102956/22/2006 2006/06/22-Pilgrim - Entergy's Answer to Massachusetts Attorney General's Request for a Hearing, Petition for Leave to Intervene, and Petition for Backfit Order.ML0617901346/22/2006 2006/06/22-Pilgrim - NRC Staff Answer Opposing Massachusetts Attorney General's Request for Hearing and Petition for Leave to Intervene and Petition for Backfit OrderML0617304826/22/2006 2006/06/22-Email: (PA) Additional Missing AMPsML0625103616/22/2006 2006/06/23-Press Release-I-06-038:  Licensing Board to Hear Oral Arguments and Receive Public Comment in Pilgrim License Renewal Proceeding.ML0617400316/23/2006 2006/06/25-E-mail: (PA) Additional AMR Question - Section 3.1.1ML0621204106/25/2006 2006/06/26-Pilgrim - Email from R. Chin, Duxbury Nuclear Advisory Committee to Judge Young re: Limited Appearance StatementsML0617801596/26/2006 OFFICIAL EXHIBIT - NRC000004-00-BD01 - Entergy's Answer to the Request for Hearing and Petition to Intervene by Pilgrim Watch and Notice of Adoption of Contention.ML1106009166/26/2006 2006/06/26-Exhibit NRC000004, Pilgrim LR Proceeding - Entergy's Answer to the Request for Hearing and Petition to Intervene by Pilgrim Watch and Notice of Adoption of Contention.ML1100309746/26/2006 2006/06/26-E-MaiI: FWD: Comment (1) of Alex Marion on Behalf of Nuclear Energy Institute (NEI) on Proposed ISG LR-ISG-2006-01.ML0630703236/26/2006 2006/06/26-Email: (PA) Audit Report Attachment 5 - List of DocumentsML0621301456/26/2006 2006/06/26-EMAIL: (PA-LR) Pilgrim [regarding: Environmental Scoping].ML0630602676/26/2006 2006/06/26-EMAIL: (PA-LR) Draft Qs on Section 2.3 on Pilgrim LRA Staff Request a Phone Call on June 27, 2006.ML0630505096/26/2006 12 All Documents for Docket 05000293 in ADAMS Public Legacy from 01/01/2006 to 01/01/2007 2006/06/26-Pilgrim - Entergy's Answer to the Request for Hearing and Petition to Intervene by Pilgrim Watch and Notice of Adoption of Contention.ML0618402166/26/2006 E-mail: (PA) ScheduleML0621204086/26/2006 2006/06/27-E-mail: (PA) PNPS Response for AMR Items 460 and 512 - Potential Conflict in the ResponsesML0621204076/27/2006 2006/06/27-EMAIL: (PA-LR) Fwd: PNPS Response for AMR Items 460 and 512 - Potential Conflict in the Responses.ML0630503966/27/2006 2006/06/27-Email: (PA) PNPS Response for AMR Items 460 and 512 - Potential Conflict in the ResponsesML0620903886/27/2006 Pilgrim - Request for Approval of ASME Code, Section XI, Third Ten-Year Relief Request, PRR-42, Examinations of Component Welds with Less Than Essentially 100% Examination Coverage.ML0618701636/28/2006 2006/06/29-Email: (PA) Jim and PeterML0620903096/29/2006 2006/06/29-EMAIL: (PA-LR) Additional Questions From Bob JacksonML0630506036/29/2006 2006/06/29-Email: (PA) Re: QA for Aging Management of NSR ComponentsML0620903186/29/2006 Pilgrim Nuclear Power Station - Relief Request No. PRR-4, (TAC MC8287).ML0614500316/29/2006 2006/06/29-E-mail: (PA) - None -ML0621204066/29/2006 2006/06/29-Email: (PA) Additional Question from Bob JacksonML0621300576/29/2006 2006/06/29-Email: (PA) Re: QA for Aging Management of NSR ComponentsML0621300586/29/2006 2006/06/29-EMAIL: (PA-LR) Non-Safety Related SCs.ML0630506106/29/2006 IR 05000293-06-006; 04/10/2006 - 05/19/2006; Pilgrim Nuclear Power Station; Component Design Bases Inspection.ML0618002156/29/2006 2006/06/29-Email: (PA) Non-Safety Related SCsML0621300566/29/2006 Email: (PA) Re: QA for Aging Mangement of NSR ComponentsML0620905696/29/2006 Pilgrim Nuclear Power Station - Relief Request No. PIL-05-R-001, TAC No. MC8299).ML0614204706/29/2006 Pilgrim, Fourth Ten-Year In-Service Testing (IST) Program, IST Relief Request PR-03, Rev. 3.ML0618704926/29/2006 2006/06/29- Pilgrim - Massachusett's Attorney General's Reply to Entergy's and NRC Staff's Responses to Hearing Request and Petition to Intervene.ML0618702256/29/2006 2006/06/29-Email: (PA) PNPS ShellML0620903196/29/2006 2006/06/30-Email: (PA) Draft AMP Section of Audit ReportML0625103646/30/2006 2006/06/30- 07/19/2006 Notice of Forthcoming Exit Meeting with Entergy Nuclear Operations, Inc., on License Renewal Scoping and Screening Methodology and the Aging Management Program / Aging Management Review
All Documents for Docket 05000293 in ADAMS Public Legacy from 01/01/2006 to 01/01/2007 Letter dated. 3/31/06 to Multiple Addressees who did not participate in the March 8, 2006 Generic Fundamentals Exam (GFE).                                                                                         ML060930539 3/31/2006 2006/03/31-Email: (PA) Re: Request - License Renewal Work for CFEB                                                ML062120629 3/31/2006 2006/04/03-Pilgrim: NRC Contact Report - Arrange meeting with Town personnel during May Site Audit (Intergovernmental).                                                                                             ML063470180  4/3/2006 2006/04/03-Email: (PA) Re: Request - License Renewal Work for CFEB                                                ML062120631  4/3/2006 Pilgrim, Response to Generic Letter 2006-02, Grid Reliability and the Impact on Plant Risk and the Operability of Offsite Power, dated February 1, 2006.                                                                           ML060950434  4/3/2006 2006/04/04-E-mail: (PA) Pilgrim Audit Plan                                                                        ML062480085  4/4/2006 04/18/2006 Public Meeting Notice for the Annual Assessment Meeting with Entergy (Pilgrim Station) to Discuss CY2005 Performance.                                                                                               ML060940370 4/4/2006 04/18/2006, NRC Slides for Annual Assessment Public Meeting with Entergy (Pilgrim Station) Reference CY2005 Performance.                                                                                                     ML060940408  4/4/2006 Pilgrim Nuclear Power Station - Relief Request No. PIL-05-R-002, (TAC MC8300).                                   ML060660132  4/5/2006 2006/04/05-Pilgrim: NRC Contact Report - Follow Up from 4/3/06 Telephone Call (Intergovernmental).               ML063470183  4/5/2006 2006/04/05-Pilgrim: NRC Contact Report - Arrange meeting with Town personnel during Site Audit in May
[4/5/06] (Intergovernmental).                                                                                     ML063470189  4/5/2006 2006/04/06-E-MAIL: (Intergovernmental) Re: Pilgrim Audit [List for Plymouth meeting].                             ML063470313  4/6/2006 2006/04/06-Email: (PA) Questions counts...                                                                       ML062120636  4/6/2006 2006/04/07-Email: (PA) AMP, AMR, and TLAA questions for PNPS                                                     ML062120642  4/7/2006 4/7/06 - Notice Of Intent To Prepare An Environmental Impact Statement And Conduct Scoping Process For License Renewal For The Pilgrim Nuclear Power Station (TAC NO. MC9676)                                           ML061000261  4/7/2006 2006/04/10-Email: (PA) 1999 LR Guidance on Dams                                                                  ML062130095 4/10/2006 Pilgrim Nuclear Power Station - Technical Specification Pages re Revised Applicability For Containment Oxygen And Differential Pressure Limits (TAC MC7056).                                                                   ML061140265 4/10/2006 2006/04/10-E-MAIL: (PD) FW: Massachusetts Tribal Information.                                                    ML063470217 4/10/2006 2006/04/10-Pilgrim: NRC Contact Report - Arrange Meeting with Planning Council Staff During Site Audit in May (Intergovernmental).                                                                                             ML090770464 4/10/2006 Press Release-I-06-020: NRC to Discuss 2005 Performance Assessment for Pilgrim Nuclear Power Plant.              ML061000374 4/10/2006 Pilgrim Nuclear Power Station - Issuance Of Amendment RE: Revised Applicability For Containment Oxygen And Differential Pressure Limits (TAC MC7056).                                                                       ML053140433 4/10/2006 2006/04/11-E-MAIL: (PD) CZM Consistency Determination.                                                            ML063460541 4/11/2006 Pilgrim, Proposed License Amendment to Change Technical Specification 3.6.A.2, Pressure-Temperature Limit Curves.                                                                                                           ML061090832 4/12/2006 4


Audits for Pilgrim Nuclear Power Station.ML0618104246/30/2006 Pilgrim - Technical Specifications Amendment Request to Revise the Surveillance Requirements for the High Pressure Coolant Injection (HPCI) and Reactor Core Isolation Cooling (RCIC) Systems.ML0618704696/30/2006 Email: (PA) Response to ARM Questions 482 & 483ML0620905676/30/2006 2006/06/30-Email: (PA) Response to ARM Questions 482 and 483ML0620903806/30/2006 13 All Documents for Docket 05000293 in ADAMS Public Legacy from 01/01/2006 to 01/01/2007 2006/06/30-Email: (PA) FWD: Questions and Answers of Pilgrim LRA Aging Management Reviews.ML0624803796/30/2006 Pilgrim, Procedure No. 3.M.5-2, Revision 10, "Main Stack Inspection Guideline."ML0704404826/30/2006 2006/06/30-Email: (PA) Questions and Answers of Pilgrim LRA Aging Management Reviews.ML0624802976/30/2006 2006/06/30-Email: (PA:) FWD: Questions and Answers of Pilgrim LRA Aging Management ReviewsML0621300186/30/2006 2006/06/30-EMAIL: (PA-LR) Questions and Answers of Pilgrim LRA Aging Management Reviews.ML0630506136/30/2006 2006/06/30-Email: (PA) Draft AMP Section of Audit ReportML0621204236/30/2006 Email: (PA) Re: QA for Aging Management of NSR ComponentsML0620903077/3/2006 2006/07/03- Pilgrim - Pilgrim Watch Reply to Entergy Answer to Request for Hearing and Petition to Intervene by Pilgrim Watch.ML0621604497/3/2006 2006/07/03-Email: (PA) Re: QA for Aging Management of NSR ComponentsML0620905657/3/2006 2006/07/03- Pilgrim - Pilgrim Watch Reply to NRC's and Entergy's Answers to Notice of Adoption of Contention by Pilgrim Watch.ML0621604417/3/2006 2006/07/05-Pilgrim - License Renewal Application Amendment 3.ML0619401757/5/2006 Email: (PA) Re: Draft AMP section of Audit reportML0621300897/5/2006 Email: (PA) Re: Quality Assurance for Aging Management of NSR ComponentsML0620902947/5/2006 2006/07/05-Email: (PA) Re: Quality Assurance for aging management of NSR componentsML0621300647/5/2006 OFFICIAL EXHIBIT - ENT000007-00-BD01 - License Renewal Application Amendment 4: Response to Request for Additional Information Regarding Severe Accident Mitigation Alternatives for Pilgrim Nuclear Power Station.ML1106008737/5/2006 2006/07/05-Email: (PA) Re: Draft AMP Section of Audit ReportML0620903037/5/2006 2006/07/05-Email: (PA) FW: Handing of Generic IssuesML0621300917/5/2006 2006/07/05-Email: (PA) Re: Quality Assurance for aging management of NSR componentsML0621300547/5/2006 Exhibit ENT000007, Pilgrim LR Proceeding, License Renewal Application Amendment 4: Response to Request for Additional Information Regarding Severe Accident Mitigation Alternatives for Pilgrim Nuclear Power Station.ML1100309987/5/2006 2006/07/05-Email: (PA) Comments on the AMP writeupML0621300537/5/2006 Entergy Nuclear Operations Inc. License Renewal Application Amendment 3.ML0906303957/5/2006 2006/07/05-Email: (PA) FYI: Draft Audit Report Shell TLAA on Metal Fatigue - Audit Report Section 4.3ML0620902977/5/2006 2006/07/05-Pilgrim, License Renewal Application Amendment 4: Response to Request for Additional Information Regarding Severe Accident Mitigation Alternatives.ML0619304187/5/2006 2006/07/05-Email: (PA) Quality Assurance for Aging Management of NSR ComponentsML0620903047/5/2006 2006/07/05-Email: (PA) PNPS's TLAA Section 4.6ML0620903057/5/2006 2006/07/05-Email: (PA) Quality Asurance for Aging Management of NSR ComponentsML0620905617/5/2006 Email: (PA) Re: FW: Handling of Generic IssuesML0620903007/5/2006 14 All Documents for Docket 05000293 in ADAMS Public Legacy from 01/01/2006 to 01/01/2007 2006/07/05-Email: (PA) PNPS's TLAA Section 4.6ML0620905637/5/2006 2006/07/06-Email: (PA) FYI: Draft Audit Report Shell TLAA on Metal Fatigue - Audit Report Section 4.3ML0621300867/6/2006 2006/07/06- Pilgrim - Official Transcript of Oral Arguments on Contentions for the Pilgrim Nuclear Power Station License Renewal Proceeding.ML0619401797/6/2006 2006/07/06-Pilgrim - Official Transcript of Limited Appearance Comment Session in the Pilgrim Nuclear Power Station License Renewal Proceeding.ML0619302187/6/2006 Email: (PA) Re: Quality Assurance for aging management of NSR componentsML0621301407/6/2006 2006/07/06-EMAIL: (PA-LR) FW: PNPS ER EJ writeup.ML0630603097/6/2006 2006/07/06-Email: (PA) Additional AMR questionsML0621300617/6/2006 2006/07/06-Email: (PA) Re: Quality Assurance for Aging Management of NSR Components.ML0621204777/6/2006 Letter dated 7/7/06 to Multiple Addresses who did not participate in the June 7, 2006 Generic Fundamentals Examination (GFE)ML0623604837/7/2006 2006/07/07-Pilgrim - Limited Appearance Statement by Maurice C. Cion.ML0620700677/7/2006 2006/07/07- Pilgrim - Official Transcript of Oral Arguments on Contentions in the Pilgrim Nuclear Power Station License Renewal Proceeding.ML0619303907/7/2006 2006/07/07-Email: (PA) Comments on Pilgrim AMP documentML0621204807/7/2006 Email: (PA) Re: Comments on Pilgrim AMP DocumentML0621301427/7/2006 2006/07/07-Pilgrim - Limited Appearance Statement by W. BramhallML0620606077/7/2006 2006/07/07-E-mail: (PA) Re: Comments on Pilgrim AMP documentML0621204127/7/2006 2006/07/07-Email: (PA) Re: Comments on Pilgrim AMP DocumentML0620902937/7/2006 2006/07/10-E-Mail: FWD: Response to your question regarding Radwaste Piping.ML0630703197/10/2006 2006/07/10-Pilgrim - Email from Diane Curran to ASLBP and Parties.ML0620700557/10/2006 2006/07/11-EMAIL: (PA-LR) FW: Pilgrim Document 83.ML0630603027/11/2006 2006/07/11-CZM Federal Consistency Review of the Pilgrim Nuclear Power Station Operating License Renewal; Plymouth.ML0620903627/11/2006 2006/07/12- Pilgrim - Email from Susan Uttal to ASLBP and Parties.ML0620701317/12/2006 2006/07/12-E-mail: FWD: Pilgrim License Renewal Application Amendment 3 Cover Letter and Attachment A.ML0630705367/12/2006 2006/07/13-Summary of Public Scoping Meetings Conducted Related to the Review of the Pilgrim Nuclear Power Station, License Renewal Application.ML0617000557/13/2006 2006/07/13-Pilgrim - Letter to the Administrative Judges from Counsel for Entergy following up on one of the two matters raised at last week's prehearing conference.ML0620202357/13/2006 15 All Documents for Docket 05000293 in ADAMS Public Legacy from 01/01/2006 to 01/01/2007 Supplement to Request for the Use of Delta Protection's Self Fed Single Use "Mururoa BLU" Suit Systems; Arkansas Nuclear One, Indian Point, Grand Gulf, Waterford, FitzPatrick, River Bend Pilgrim, Vermont Yankee.ML0619800287/13/2006 2006/07/13-Press Release-I-06-040:  NRC To Meet With Entergy On July 19th To Discuss Pilgrim License Renewal Audit Findings.ML0619403687/13/2006 2006/07/13- Pilgrim - Limited Appearance Statement of John R. Glover.ML0620702247/13/2006 E-MAIL: NRC to Discuss Pilgrim Audit Findings.ML0630702497/13/2006 Supplement to Request for Use of Delta Protection Mururoa V4F1 R Supplied Air Suits; Arkansas Nuclear One, Indian Point, Grand Gulf, Waterford, FitzPatrick, River Bend, Pilgrim, Vermont Yankee.ML0619800307/13/2006 2006/07/14-Pilgrim - Email from Judge Young to the parties.ML0620606147/14/2006 2006/07/14-LB Order (Regarding Need for Further Briefing on Definition of New and Significant Information As Addressed in Participants' Petitions, Answers and Replies Relating to massachusetts Attorney General contentioin
All Documents for Docket 05000293 in ADAMS Public Legacy from 01/01/2006 to 01/01/2007 Pilgrim, Issuance of Amendment Re: Single Recirculation Loop Operation (TAC No. MC4333).                           ML060170119 4/12/2006 2006/04/12-E-MAIL: (Intergovernmental) May 3 meeting - Pilgrim NPS license renewal [List for Duxbury meeting].                                                                                                           ML063470326 4/12/2006 2006/04/12-E-MAIL: (Intergovernmental) May 4 meeting - Pilgrim NPS license renewal [List for Carver meeting].      ML063470329 4/12/2006 2006/04/12-E-MAIL: (Intergovernmental) May 4 meeting - Pilgrim NPS license renewal [List for Old Colony meeting].                                                                                                           ML063470319 4/12/2006 2006/04/12-E-MAIL: (Intergovernmental) May 3 meeting - Pilgrim NPS license renewal [List for Kingston Meeting].                                                                                                           ML063470324 4/12/2006 Pilgrim, Tech Spec Pages for Amendment 219 regarding Single Recirculation Loop Operation.                           ML061070167 4/12/2006 Pilgrim, License Amendment 221 regarding Revised Rod Worth Minmizer ByPass Allowances.                             ML060740214 4/13/2006 Pilgrim Nuclear Power Station-Issuance Of Amendment RE: Removal Of Main Steam Isolation Valve Twice Per Week Testing Surveillance Requirement (TAC MC7052).                                                                ML060600040 4/13/2006 Pilgrim, Technical Specification Page, deletes the main steam isolation valve twice per week partial stroke testing surveillance specified in Technical Specification 4.7.A.2.b.1.c.                                                   ML061070215 4/13/2006 Pilgrim Nuclear Power Station, Technical Specification Page re Revised Rod Worth Minimizer Bypass Allowances (TAC MC7055).                                                                                                      ML061070204 4/13/2006 2006/04/16-Pilgrim April 2008 Evidentiary Hearing - Intervenor Exhibit 16, Seismic: New England Not Immune to Strong Temblors and Specialists Say that a Major Event is Only a Matter of Time, Boston Globe, Bryan Bender, April 16, 2006.                                                                                                     ML081090291 4/16/2006 2006/04/18-E-MAIL: (PA) NRC Issues Notice of Intent to Prepares EIS Pilgrim LRA.                                    ML063470100 4/18/2006 2006/04/18-E-MAIL: (PD) Pilgrim Nuclear Generating Station License Renewal Application.                            ML063460545 4/18/2006 PNPS Monthly Groundwater Discharge Data.                                                                           ML061420183 4/21/2006 2006/04/21 - Request for Comments Regarding the Pilgrim Nuclear Power Station License Renewal Application Review.                                                                                                             ML061160613 4/21/2006 4/21/06 - Request for Comments Regarding the Pilgrim Nuclear Power Station License Renewal Application Review.                                                                                                             ML061170222 4/21/2006 4/21/06 - Request for Comments Regarding the Pilgrim Nuclear Power Station License Renewal Application Review.                                                                                                             ML061170152 4/21/2006 2006/04/21- - Request for Comments Regarding the Pilgrim Nuclear Power Station License Renewal Application Review.                                                                                                             ML061170085 4/21/2006 2006/04/24-E-mail: (PA) PNPS AMP Questions                                                                          ML062120415 4/24/2006 Pilgrim Nuclear Power Station - Request for Additional Information Regarding Unresolved Inspection Item 05000293-05-003-01 From the NRC Integrated Inspection Report 05000293-05-003 (TAC No. MD0178).                     ML060970397 4/24/2006 5


and Pilgrim Watch Contention 4:.ML0619504817/14/2006 Response to NRC Request for Additional Information and Revised Pilgrim Relief Request, PRR-15, Rev.1.ML0620102107/14/2006 2006/07/14-Pilgrim - Email to Judge Young from Molly BartlettML0620606167/14/2006 2006/07/17- Pilgrim - Limited Appearance Statement on Behalf of Clean Water Action (MASSPIRG) .ML0620700517/17/2006 2006/07/17-EMAIL: (PA-LR) Re: Pilgrim [from Lampert to A. Williamson 7/17/06].ML0630602597/17/2006 2006/07/17-Email: (PA-LR) Additional info for ER.ML0630602397/17/2006 2006/07/17-E-Mail: Core shroud tie rod upper support cracking- information request.ML0630702527/17/2006 2006/07/17-EMAIL: (PA-LR) Re: Pilgrim.ML0630602497/17/2006 2006/07/19-Pilgrim Nuclear Power Station - License Renewal Application Amendment 5.ML0620801427/19/2006 2006/07/19-Pilgrim - License Renewal Application Amendment 5.ML0620900757/19/2006 LER 06-002-00 for Pilgrim Nuclear Power Station re Small Quantities of Unaccountable Licensed Material.ML0620801437/19/2006 2006/07/20- Pilgrim - Entergy providing follow up information from the prehearing conference on Pilgrim's aging management review to ASLBP.ML0621200187/20/2006 2006/07/20- Pilgrim - Notice of Withdrawal and Certificate of Service for Harry E. Wedewer for Pilgrim Nuclear Power Station.ML0620105007/20/2006 2006/07/20-Letter on behalf of more than two dozen organizations and individuals listed on draft Director's Decision dated June 28, 2006, regarding groundwater contamination petition submitted January 25, 2006.ML0621904457/20/2006 2006/07/21- Pilgrim - Massachusetts Attorney General's Brief Regarding Relevance to this Proceeding of Regulatory Guide's Definition of "New and Significant Information."ML0620801717/21/2006 2006/07/21-Email: (PA) Fwd: Re: RAI for section 3.5ML0620903837/21/2006 16 All Documents for Docket 05000293 in ADAMS Public Legacy from 01/01/2006 to 01/01/2007 2006/07/21- Pilgrim - Entergy's Brief on New and Significant Information in Response to Licensing Board Order of July 14, 2006.ML0620805897/21/2006 2006/07/21-Pilgrim - NRC Staff's Response to July 14, 2006 Licensing Board OrderML0620207957/21/2006 2006/07/23-Pilgrim - Email to Judge Young from Molly BartlettML0620606177/23/2006 2006/07/24-Email: (PA) Re: Any Correspondences from PNPS on LRA Changes.ML0620903877/24/2006 2006/07/24-E-Mail: FW: Pilgrim LRA Amendment 5.ML0630703187/24/2006 2006/07/25- 05/01-05/2006 Meeting Summary of Environmental Site Audit Related to the Review of the License Renewal Application for Pilgrim.ML0620703057/25/2006 2006/07/25-Pilgrim, Request for Additional Information, Pilgrim Nuclear Power Station License Renewal Application (TAC MC9669).ML0620702407/25/2006 2006/07/25-Summary of Conferences Calls with Entergy Nuclear Operations, Inc., to Discuss the Severe Accident Mitigation Alternatives Requests for Additional Information for Pilgrim Nuclear Power Station (TAC NO. MC9676).ML0620702957/25/2006 2006/07/25-EMAIL: (PA) Re: FWD: FYI: Forwarding What We Want DCI/FEB to Work at for the Pilgrim Flaw Growth Analysis.ML0624803627/25/2006 2006/07/25-Email: (PA) Piligrim AMP/AMR Audit ReportML0625102967/25/2006 2006/07/26-E-Mail: Request for Additional information on LRA section 2.1 Scoping and Screening.ML0630702417/26/2006 2006/07/26- Pilgrim - Letter informing that Entergy has already fully addressed the points raised in the Massachusetts Attorney General's brief regarding new and significant information.ML0621304437/26/2006 2006/07/26- Pilgrim - Massachusetts Attorney General's Reply Brief Regarding Relevance to This Proceeding of Regulatory Guide's Definition of "New and Significant Information."ML0621304467/26/2006 2006/07/26-EMAIL: (PA) Revised AMR 3.4 InputML0624803887/26/2006 2006/07/26-Requests for Additional Information for the Review of the Pilgrim Nuclear Power Station License Renewal Application (TAC No. MC9669).ML0621204647/26/2006 IR 05000293-06-008; 06/12/2006-06/16/2006; Pilgrim Nuclear Power Station; Physical Protection.ML0620703967/26/2006 CR-PNP-2006-02799, Fair Amount of Water in Torus Room Floor.ML0707901747/26/2006 2006/07/27- Pilgrim - Official Transcript of Entergy Nuclear Generation Company Oral Arguments via Telephone Conference.ML0621300247/27/2006 2006/07/27-Email: (PA) PNPS Q&QML0625103067/27/2006 E-MAIL: Pilgrim Nuclear Power Station Hearing Files Information Request (7/1/06-7/31/06).ML0630702457/27/2006 2006/07/27-E-Mail: Fwd: FYI: Attaching File with my Assessment Tracking the Status of Our Metal Fatigue Questions - Jim.ML0630702467/27/2006 2006/07/27-Email: (NPA-PD-LR) Additional KI info [C. Jacobs] found.ML0630705957/27/2006 2006/07/27-Pilgrim - Judge Nicholas Trikouros disclosure statement.ML0621207307/27/2006 17 All Documents for Docket 05000293 in ADAMS Public Legacy from 01/01/2006 to 01/01/2007 Email: (PA) PNPS Q&AML0625103557/27/2006 2006/07/31-Requests for Additional Information for the Review of the Pilgrim Nuclear Power Station License Renewal Application.ML0621206627/31/2006 2006/07/31-Requests for Additional Information for the Review of the Pilgrim Nuclear Power Station License Renewal Application.ML0621207527/31/2006 2006/07/31-Requests for Additional Information for the Review of the Pilgrim Nuclear Power Station License Renewal Application.ML0621207437/31/2006 2006/07/31-Email: (PA) Updated Section 4.3, Metal Fatigue for PNPS LRAML0625103027/31/2006 Requests for Additional Information for the Review of the Pilgrim Nuclear Power Station License Renewal Application.ML0619400157/31/2006 Pilgrim Nuclear Power Station - Groundwater Protection - Data Collection Questionnaire.ML0622806027/31/2006 2006/07/31-E-Mail: Fwd: PNPS Q&A Data Base.ML0630702327/31/2006 2006/07/31-Email: (PA) Urgent - revised section 3.0.4 input for QA programML0625102997/31/2006 Groundwater Protection - Data Collection Questionnaire, Pilgrim.ML0625505187/31/2006 IR 05000293-06-003; 04/01-06/30/2006; Pilgrim Nuclear Power Station; Maintenance Risk Assessments and Emergent Work Control.ML0621306158/1/2006 2006/08/02-EMAIL: (PA) AMR Audit Report Section 3.3ML0624803918/2/2006 2006/08/02-Fax to Brian Ford/Fred Mogolesko from RAMS.ML0625103248/2/2006 2006/08/02-FAX: From: Ram Subbaratnam To: Brian Ford/ Fred Mogolesko 8/02/2006 RE: Supplement 3.ML0630703328/2/2006 2006/08/02-EMAIL: (PA) Email to James Davis from Duc Nguyen on 08/02/2006 at 3:50 4:43 pm (No Subject)ML0624803618/2/2006 2006/08/03-EMAIL: (PA) TLAA InputML0624803818/3/2006 2006/08/03-EMAIL: (PA) FYI: Forwarding Attachment 1 & Attachments 3-7 on Audit Report TLAA Sections.ML0624803838/3/2006 E-Mail: Fwd: Pilgrim ASLB Hearing.ML0630702368/3/2006 2006/08/03-EMAIL: (PA) Duc's Audit and Review Report InputML0624803858/3/2006 2006/08/03-EMAIL: (PA) TLAA Section 4.3 InputML0624803958/3/2006 E-Mail: Fwd: Pilgrim ASLB Hearing: from Ram Subbaratnam 8/3/06 10:55am.ML0630702348/3/2006 2006/08/04- Pilgrim - Massachusetts Attorney General's Motion for Disqualification of Judge Nicholas Trikouros.ML0622101008/4/2006 2006/08/04- Pilgrim - Motion on Behalf of Pilgrim Watch for Disqualification of Judge Nicholas Trikouros.ML0625001388/4/2006 Pilgrim - Issuance of License Amendment 222 RE:  Deletion of Requirement Related to NRC Approval of Engineering Evaluation for Elevated Relief Valve Discharge Pipe Temperature.ML0618400328/4/2006 Pilgrim - Tech Spec Pages for Amendment 222 RE: Deletion of Requirement Related to NRC Approval of Engineering Evaluation For Elevated Relief Valve Discharge Pipe Temperature.ML0622301678/4/2006 18 All Documents for Docket 05000293 in ADAMS Public Legacy from 01/01/2006 to 01/01/2007 2006/08/07-E-Mail Re: RAM: From Fred Mogolesko 8/7/06 12:01pm.ML0630702198/7/2006 2006/08/07-E-MAIL: Fwd: RAM: from Ram Sabbaratnam 8/7/06 9:13am.ML0630702398/7/2006 2006/08/07-E-Mail: FW: RAM.ML0630702208/7/2006 Pilgrim, Issuance of License Amendment 223 Regarding Administrative Changes and Relocation of Certain Technical Specification Responsibilities.ML0617200688/9/2006 Pilgrim, Tech Spec Pages for Amendment 223 Regarding Administrative Changes and Relocation of Certain Technical Specification Responsibilities.ML0622800138/9/2006 2006/08/09- Pilgrim - Notice of Appearance for Marian L. Zobler (Pilgrim Nuclear Power Plant) and Certificate of ServiceML0622102508/9/2006 2006/08/10-E-Mail: FW: Requested Information from Pilgrim License Renewal Program Document PRPD-06.ML0630702258/10/2006 E-Mail: FW: Requested Pilgrim ISl Information.ML0630702228/10/2006 2006/08/11-Email: (PA) RAI for the Three Flaw Issues for the Pilgrim LRAML0625103438/11/2006 2006/08/11-E-Mail: Draft RAIs on section 2.4 of Pilgrim LRA.ML0630702288/11/2006 2006/08/14-RAI For the Review of the Pilgrim Nuclear Power Station License Renewal Application (TAC MC9669).ML0622904748/14/2006 2006/08/14- Pilgrim- Entergy's Response to Motions for Disqualification of Judge Nicholas Trikouros.ML0623400988/14/2006 2006/08/14-Email: (PA) LRA B.1.1, Boraflex ProgramML0625103508/14/2006 2006/08/14-Email: (PA) RAIs 3.5.1-1 and 3.5.1-2ML0625103468/14/2006 2006/08/15-Summary of Public Audit Status Briefing with Entergy Nuclear Operations, Inc., on License Renewal Scoping and Screening Methodology and the Aging Management Program and the Aging Management Review
All Documents for Docket 05000293 in ADAMS Public Legacy from 01/01/2006 to 01/01/2007 2006/04/25 - Request for a List of Protected Species and Essential Fish Habitat Within the area Under Evaluation for the Pilgrim Nuclear Power Station License renewal Application Review.                                             ML061160283 4/25/2006 2006/04/25 - Request for a List of Protected Species Within the Area Under Evaluation for the Pilgrim Nuclear Power Station License Renewal Application Review.                                                                     ML061160303 4/25/2006 2006/04/25-E-Mail: Re: Teleconference, Needed Information, and Updated Environmental Audit Schedule.                 ML063070331 4/25/2006 License Renewal Audit and Review Plan for Plant Aging Management Review and Programs for the Pilgrim Nuclear Power Plant, Docket Number 50-293.                                                                           ML061220630 4/26/2006 2006/04/26-Pilgrim: NRC Contact Report - Follow up from Alicia Williamson's call to Mr. Halkiotis, in regard to meeting with Town personnel during Site Audit in May (Intergovernmental).                                             ML063470174 4/26/2006 2006/04/27-Email: (PA) PNPS LRA Appendix C - BWRVIP Actions                                                          ML062090546 4/27/2006 Pilgrim Nuclear Power Station - Notification of Conduct of a Triennial Fire Protection Baseline Inspection.           ML061170110 4/27/2006 2006/04/28-E-MAIL: (Intergovernmental) May 3 meeting - Pilgrim NPS license renewal [List for Marshfield meeting].                                                                                                             ML063470333 4/28/2006 2006/04/28-Email: (PA) Pilgrim Questions to be Discussed at the Audit                                                ML062090499 4/28/2006 2006/04/28-Pilgrim: NRC Contact Report - Arrange meeting with Town personnel during Site Audit in May (Intergovernmental).                                                                                                  ML063470170 4/28/2006 2006/04/28- 05/17/2006 Notice of Meeting to Discuss the Environmental Scoping Process for Pilgrim Nuclear Power Station, License Renewal Application (LRA)                                                                     ML061180424 4/28/2006 2006/04/30-Marine Ecology Studies Report #67, Appendix B, Geometric Mean Monthly Ichthyoplankton Densities Jan-Dec. 2005                                                                                              ML062010482 4/30/2006 2006/05/01-(PD) Ecology Meeting Notes Pilgrim Nuclear Power Station Site Audit on May 1, 2006.                       ML063470051  5/1/2006 05/02/2006 - Pilgrim Nuclear Power Station License Renewal Application Review.                                       ML061240335  5/2/2006 2006/05/02-(PD) Pilgrim Nuclear Power Station License Renewal Site Audit Off-Site Meetings May 2-4, 2006 Draft Meeting Notes.                                                                                                       ML063470072  5/2/2006 Pilgrim - Revision to the Request for Amendment to the Technical Specifications (TS) - Deletion of Requirement Related to NRC Approval of Engineering Evaluation for Elevated Relief Valve Discharge Pipe Temperature.               ML061320018 5/2/2006 Press Release-I-06-030: NRC Seeks Public Input on Environmental Review Associated with License Renewal Proposed for Pilgrim Nuclear Power Plant.                                                                             ML061230411  5/3/2006 Indian Point Units 1, 2, and 3, Vermont Yankee, Pilgrim, James A. FitzPatrick; Entergy Operations, Inc., Service List Update.                                                                                                               ML061290424  5/3/2006 2006/05/03-E-MAIL: (Intergovernmental) Town of Kingston population figures.                                           ML063470335 5/3/2006 2006/05/03-E-MAIL: (Intergovernmental) FW: Planners Event on Current Trends in MetroBoston.                           ML063470336  5/3/2006 6


Audits for the Pilgrim Nuclear Power Station.ML0622802188/15/2006 Updated Schedule of Submittal of License Renewal Applications for Entergy Plants.ML0623300088/16/2006 2006/08/16-EMAIL: (NPA-PD-LR) RAI on Chapter 4.0 TLAAs (from Ram Subbaratnam).ML0630404638/16/2006 2006/08/16-Pilgrim: NRC Contact Report - To Obtain an Update on the Status of Rainbow Smelt Stocks in the Vicinity of PNPS (Intergovernmental).ML0634701668/16/2006 2006/08/18-E-MAIL: (Intergovernmental) Rainbow Smelt Data [8/18 from S. Duda].ML0634704248/18/2006 2006/08/18-E-Mail: Formal RAIs for Pilgrim License Renewal Application on Section 3.5 & 3.6.ML0630702308/18/2006 Entergy Nuclear Operations, Inc., RAI Regarding Technical Specification Changes to Pressure and Temperature Curves (TAC No. MD1218).ML0622804348/18/2006 2006/08/21-E-Mail: Additional draft (draft RAIs) the audit team requests (August 21, 2006).ML0630701888/21/2006 2006/08/21-EMAIL: (NPA-PD-LR) RAIs from Audit by Danhoang & Erach.ML0629904428/21/2006 Update to Part 21 Interim Report Notification: Failure Analysis of Core Shroud Repair Tie Rod Upper Support Crack.ML0623700958/21/2006 19 All Documents for Docket 05000293 in ADAMS Public Legacy from 01/01/2006 to 01/01/2007 2006/08/21-EMAIL: (NPA-PD-LR) Requested RAI on Pilgrim LRA.ML0629902538/21/2006 2006/08/22-Requests for Additional Information for the Review of the Pilgrim Nuclear Power Station License Renewal Application (TAC MC9669).ML0623504408/22/2006 2006/08/22-Pilgrim - License Renewal Application Amendment 6.ML0624200608/22/2006 PD_Email from Fred Mogolesko, Entergy, dtd 8/22/06 re: Pilgrim AMP Review.ML0706602798/22/2006 2006/08/23-E-Mail: FW: Pilgrim License Renewal Application Amendment 6.ML0630702178/23/2006 2006/08/23-EMAIL: (NPA-PD-LR) Fwd: FW: Pilgrim License Renewal Application Amendment 6 (RAI Responses from Entergy on Pilgrim LRA).ML0630502968/23/2006 2006/08/23-E-Mail: Questions From Fred Mogolesko 8/23/2006 9:29am.ML0630701908/23/2006 2006/08/23-Summary of Follow Up Conference Call with Entergy Nuclear Operations, Inc., to Discuss the Severe Accident Mitigation Alternatives Requests for Additional Information for Pilgrim Nuclear Power Station (TAC No.  
All Documents for Docket 05000293 in ADAMS Public Legacy from 01/01/2006 to 01/01/2007 Email: (PA) Re: Re-assignment of Tables 3.3.2.14-X                                                          ML062090497  5/4/2006 2006/05/04-Email: (PA) Re: Re-assignment of Tables 3.3.2.14-X                                              ML062120647  5/4/2006 2006/05/04-Email: (PA) PNPS Template for not consistent with Gall AMRs                                      ML062090496  5/4/2006 2006/05/04-Email: (PA) AMP questions                                                                        ML062090488  5/4/2006 Photos taken on 05/04/2006 of view looking toward Pilgrim station from junction of Pricilla and White Horse beaches.                                                                                                    ML062010490  5/4/2006 Pilgrim Nuclear Power Station - Correction to Amendment No. 221 Re: Revised Rod Worth Minimizer Bypass Allowances (TAC No. MC7055)                                                                                 ML061180083  5/5/2006 2006/05/05-E-MAIL: (Intergovernmental) Town of Carver, MA GIS layer list.                                  ML063470111  5/5/2006 Pilgrim Nuclear Power Station - Correction to Amendment No. 221 re: Revised Rod Worth Minimizer Bypass Allowances - Technical Specifications.                                                                     ML061300095  5/5/2006 2006/05/05-Email: (PA) Re: PNPS Template for not consistent with GALL AMRs                                  ML062090493  5/5/2006 EMAIL: (PA) Re: Bolting Integrity Program                                                                  ML062090490  5/5/2006 2006/05/05-Email: (PA) Re: Bolting Integrity Program                                                        ML062090498  5/5/2006 2006/05/05-EMAIL: (PA) AMR Template for Not Consistent with Gall Section                                    ML062090322  5/5/2006 2006/05/06-E-MAIL: (PD) FW: New dwelling units.                                                             ML063470256  5/6/2006 Pilgrim, Main Stack Inspection Report - 05/08/2006.                                                         ML070440481  5/8/2006 2006/05/08-Email: (PA) AMR's questionary for Pilgrim                                                        ML062090324  5/8/2006 2006/05/09-E-MAIL: (Intergovernmental) Re: How many housing units built since 2000?.                        ML063470401  5/9/2006 EMAIL: (PA-LR) PNPS Documents.                                                                             ML063050514  5/9/2006 2006/05/09-E-MAIL: (Intergovernmental) Re: New dwelling units.                                              ML063470191  5/9/2006 (NPA-PD) Letter to Mary Lampert from the Commonwealth of Massachusetts Executive Office of Heath and Human Services, Department of Public Health, Regarding Child Heath Statistics.                             ML071290155  5/9/2006 2006/05/09-E-mail: (Intergovernmental) Re: Planners Event on Current Trends in MetroBoston.                 ML063470338  5/9/2006 2006/05/09-EMAIL: (PA) AMR Review of Section 3.3                                                            ML062090328  5/9/2006 2006/05/10-Email: (PA) Draft Questions for the Aging Management Program (AMP) Gall Consistency Audit - for Pilgrim.                                                                                                    ML062480272 5/10/2006 E-Mail: Guidance How to File Petition for Intervention with NRC - Pilgrim LRA.                             ML063070187 5/10/2006 2006/05/10-Email: (PA) FWD: Pilgrim AMP Combined Questions                                                  ML062480283 5/10/2006 2006/05/10-E-Mail: Draft questions for the Aging Management Program (AMP) Gall consistency audit - for Pilgrim LRA.                                                                                               ML063070393 5/10/2006 2006/05/11-E-Mail: Pilgrim Letter 2.06.040 - License Renewal Application, Amendment 1.                      ML063070402 5/11/2006 Pilgrim - Annual Radiological Environmental Operating Report for January 1 through December 31, 2005.       ML061370574 5/11/2006 2006/05/11-EMAIL: (PA-INT-LR) Document Comparing PNPS Entrained Species to Other MA Stations.               ML063050518 5/11/2006 7


MC9676).ML0623605148/23/2006 OFFICIAL EXHIBIT - PWA000004-00-BD01 - MACCS2 Support Forum, David I. Chanin; Development of MACCS2:
All Documents for Docket 05000293 in ADAMS Public Legacy from 01/01/2006 to 01/01/2007 Pilgrim Nuclear Power Station - Request For Additional Information Regarding Relief Request PRR-10, Fourth 10-Year Inservice Inspection Program Plan (TAC MC8293).                                                          ML061210140 5/11/2006 E-Mail: Revised AMR Initial; from Johnny Eads 5/11/2006 4:01 pm.                                               ML063070384 5/11/2006 Pilgrim, Annual Radiological Effluent and Waste Disposal Report for January 1 Through December 31, 2005.       ML061380653 5/11/2006 2006/05/11-EMAIL: (PA) Table 3.3.1 AMR questions                                                              ML062090333 5/11/2006 LER 06-01-000, Pilgrim re Manual Scram due to High Offgas Recombiner Temperature resulting from Inadequate Preventive Recombiner Preheater Pressure Control Valve Controller.                                             ML061370622 5/11/2006 2006/05/11-Pilgrim Nuclear Power Station, License Renewal Application, Amendment 1.                           ML061380549 5/11/2006 2006/05/11- Pilgrim Nuclear Power Station License Renewal Application Review (SHPO No. RC36661)               ML061310234 5/11/2006 2006/05/12-Pilgrim April 2008 Evidentiary Hearing - Staff Exhibit 19, 05/12/2006 Letter from Clifford Anderson (NRC) to Entergy re Pilgrim Nuclear Power Station - NRC Integrated Inspection Report 05000293/2006002.         ML081090553 5/12/2006 IR 05000293-06-002 on 01/01/2006 - 03/31/2006 for Pilgrim Nuclear Power Station. Personnel Performance During Non-routine Plant Evolutions.                                                                           ML061320564 5/12/2006 2006/05/12-PNPS License Scoping Comment - Tom Belcher.                                                        ML062410406 5/12/2006 E-Mail: Guidance how to file petition for intervention with NRC - Pilgrim LRA.                                ML063070405 5/12/2006 Part 21 60-Day Interim Report Notification: BWR Core Shroud Tie Rod Upper Support Cracking.                   ML061360465 5/12/2006 Transmittal Letter for License Renewal Audit and Review Plan for Plant Management Reviews and Programs for the Pilgrim Nuclear Power Plant Docket 50-293.                                                                 ML061220716 5/15/2006 Entergy Quality Assurance Program Manual, Revision 13.                                                        ML061370593 5/15/2006 Entergy Operations, Inc., Request for Use of Delta Protection Mururoa V4F1 R Supplied Air Suits.               ML061440167 5/16/2006 Entergy Operations, Inc., Application to Use Weighting Factors for External Exposure.                         ML061430359 5/16/2006 Pilgrim Nuclear Power Station - Request For Additional Information Regarding Relief Request PRR-15, Fourth 10-Year Inservice Inspection Program Plan (TAC No. MC8298).                                                       ML061020041 5/16/2006 2006/05/17-Pilgrim Nuclear Power Station Environmental Scoping Meeting Handouts.                              ML061420164 5/17/2006 : Evening Transcript, Public Scoping Meeting for Pilgrim, 05/17/2006.                               ML061700050 5/17/2006 : Afternoon Transcript, Public Scoping Meeting for Pilgrim, 05/17/2006.                             ML061700046 5/17/2006 CR-PNP-2006-01914 - Pilgrim.                                                                                   ML070440479 5/18/2006 2006/05/18-E-mail: (Intergovernmental) Townscape Plan for Marshfield.                                         ML063470405 5/18/2006 Pilgrim, RAI, Regarding Technical Specification Changes to Revise Reactor Coolant Leakage Detection System Instrumentation (TAC No. MC7255).                                                                             ML061210172 5/18/2006 2006/05/18-(PD) PNPS LR EIS Ecology Meeting May 18, 2006.                                                     ML063470067 5/18/2006 8
Lessons Learned, David I. Chanin.ML1106008868/23/2006 Exhibit PWA 00004, MACCS2 Support Forum, David I. Chanin; Development of MACCS2: Lessons Learned, David I.
Chanin.ML1100309068/23/2006 PD_Email from Fred Mogolesko, Entergy, dtd 8/24/06 re: Pilgrim AMP Review.ML0706700898/24/2006 2006/08/25-Email: (PA) Pilgrim Audit Report Peer Review AMP SectionsML0625103078/25/2006 Massachusetts Attorney General's Petition for Rulemaking to Amend 10 C.F.R. Part 51.ML1112203578/25/2006 2006/08/25-Petition for Rulemaking PRM 50-10 to Amend 10 C.F.R. Part 51, on behalf of the Massachusetts Attorney General, submitted by Diane Curran.ML0626404098/25/2006 2006/08/25-Summary of Conference Call with Entergy Nuclear Operations, Inc on August 1, 2006.ML0624103798/25/2006 2006/08/25-Email: (NPA-PD-LR) Final RAI on Section 2.4 - Scoping and Screening Structures for the Pilgrim LRA.ML0629803228/25/2006 Order Requiring Compliance with Key Radiological Protection Mitigation Strategies.ML0623003048/28/2006 2006/08/28-E-Mail: Draft Pilgrim RAIs on Section 4.2.1 - TLAAs on RV Internals, Neutron Fluence.ML0630703618/28/2006 2006/08/28-E-Mail: Meeting Summary for your information: from Ram Subbaratnam 8/28/06 9:18am.ML0630703758/28/2006 PD_Email from Fred Mogolesko, Entergy, dtd 8/28/06 re: Preparation for Region I Inspection at Pilgrim.ML0706600568/28/2006 PD_Email from Fred Mogolesko, Entergy, dtd 08/28/06 re: Preparation for Region I Inspection at Pilgrim.ML0706605488/28/2006 Pilgrim, Changes to the Pilgrim Fourth Ten-Year In Service Inspection Program Plan Related to the Snubber Inspection Program.ML0624904218/28/2006 2006/08/28-E-Mail: Preparation for Region 1 Inspection at Pilgrim: from: Fred Mogolesko 8/28/06 10:17 am.ML0630703678/28/2006 20 All Documents for Docket 05000293 in ADAMS Public Legacy from 01/01/2006 to 01/01/2007 FitzPatrick, Indian Point, Pilgrim, & Vermont Yankee Nuclear Power Stations - Fitness-for-Duty Program Performance Report For the Period January 2006 - June 2006.ML0624302988/29/2006 2006/08/30-Comment from David R. Lewis of Pillsbury, Winthrop, Shaw and Pittman on Massachusetts Attorney General's Petition for Rulemaking PRM-51-10 to Amend 10 CFR Part 51 (August 25, 2006).ML0626502218/30/2006 2006/08/30-LB Notice of Recusal of Judge Nicholas TrikourosML0624204878/30/2006 2006/08/30-LB Notice of ReconstitutionML0624204698/30/2006 2006/08/30-E-mail: (PA) SER Input.ML0908300738/30/2006 OFFICIAL EXHIBIT - ENT000008-00-BD01 - License Renewal Application Amendment 7.ML1106008748/30/2006 Pilgrim Nuclear Power Station, Technical Specification Amendment Request to Relocate Specifications not Meeting the Criteria of 10 CFR 50.36(c)(2)(ii), Revision 1, (TAC MC5421).ML0624904898/30/2006 2006/08/30-Vermont Yankee/Pilgrim - Entergy's Response to Massachusetts Attorney General's Petition for Rulemaking to Amend 10 C.F.R. Part 51 (Aug. 25, 2006).ML0624803668/30/2006 Exhibit ENT000008, Pilgrim LR Proceeding, License Renewal Application Amendment 7.ML1100309878/30/2006 2006/08/30-Pilgrim, Response to Requests for Additional Information re License Renewal Application Amendment 7.ML0625001178/30/2006 2006/08/31-E-MAIL: (Intergovernmental) Pilgrim NPS EIS - info request.ML0634704718/31/2006 Mid-cycle Performance  Review and Inspection Plan - Pilgrim Nuclear Power Station.ML0624304438/31/2006 2006/09/01-E-MAIL: (Intergovernmental) Re: Pilgrim NPS EIS - info request.ML0634704739/1/2006 2006/09/01-Pilgrim April 2008 Evidentiary Hearing - Intervenor Exhibit 7, Liquid Radioactive Release Lessons Learned Task Force Final Report, September 1, 2006; Executive Summary; Pages 19 and 26; Appendix B


Consolidated Recommendations List.ML0810905239/1/2006 2006/09/05-EMAIL: (NPA-PD-LR) Pilgrim LRA - RAI Responses from Entergy (NRC-03-03-038, Task Order 24).ML0631102099/5/2006 2006/09/07-Pilgrim, Request for Additional Information for the Review of the Pilgrim Nuclear Power Station License Renewal Application (TAC No. MC9669).ML0624905019/7/2006 2006/09/07-E-mail: Final RAI on Section 4.3.2.1 on Pilgrim LRA.ML0630605959/7/2006 2006/09/08-E-MAIL: (Intergovernmental) Re: Plymouth Population & Buildout Data.ML0634704799/8/2006 2006/09/08-Request for Additional Information for the Review of the Pilgrim Nuclear Power Station License Renewal Application (TAC MC9669) Section 3.2.ML0625004319/8/2006 2006/09/08-Requests for Additional Information for the Review of the Pilgrim Nuclear Power Station License Renewal Application (TAC MC9669).ML0625004019/8/2006 2006/09/08-EMAIL: (NPA-PD-LR) Fwd: Final RAI on Section 3.2.1 and 4.2.1 on the Pilgrim LRA.ML0629904469/8/2006 Pilgrim Nuclear Power Station - NRC Material Control and Accounting Program Inspection Report No.
All Documents for Docket 05000293 in ADAMS Public Legacy from 01/01/2006 to 01/01/2007 2006/05/19-Project Manager Change for the License Renewal Environmental Review for Pilgrim Nuclear Power Station.                                                                                                        ML061410001 5/19/2006 2006/05/19-E-MAIL: (PD) Information re: Pilgrim LRA.                                                            ML063460507 5/19/2006 2006/05/19-EMAIL: (PA-LR) Information re: Pilgrim LRA.                                                          ML063060296 5/19/2006 Request for the Use of Delta Protection's Self Fed Single Use Mururoa BLU" Suit Systems.                        ML061430015 5/19/2006 2006/05/22-Request for Additional Information (RAI) Regarding Severe Accident Mitigation Alternatives (SAMA) for Pilgrim Nuclear Power Station (TAC No. MC9676).                                                            ML061440026 5/22/2006 2006/05/22-E-MAIL: (PD) Found Extra Color Copy.                                                                ML063460496 5/22/2006 2006/05/22-EMAIL: (PA-LR) Pilgrim ETE Comments.                                                                ML063050506 5/22/2006 2006/05/23-U.S. Dept. of the Interior Fish and Wildlife Service, Letter Dated May 23, 2006 - Regarding: Formal Consultation on Pilgrim License Renewal Not Required.                                                          ML061650016 5/23/2006 2006/05/24-Ltr from Dr. Dean, ACHP to DLR to address license renewal application for Pilgrim.                  ML061710601 5/24/2006 2006/05/25-Exhibit NRC000003, Pilgrim LR Proceeding - Request for a Hearing and Petition to Intervene.          ML110030975 5/25/2006 2006/05/30-Pilgrim - Pilgrim Watch Request for a Hearing and Petition to Intervene.                            ML061630125 5/25/2006 , 2005 Annual Report, and, Securities and Exchange Commission Form 10-K Submittal for All Entergy Nuclear Operations, Inc. Plants.                                                                                ML061530419 5/25/2006 Declaration of Dr. Jan Beyea in Support of Massachusetts Attorney General's Contention and Petition for Backfit Order.                                                                                                          ML111220356 5/25/2006 OFFICIAL EXHIBIT - NRC000003-00-BD01 - Request for a Hearing and Petition to Intervene.                        ML110600914 5/25/2006 2006/05/25-Pilgrim April 2008 Evidentiary Hearing - Staff Exhibit 18, Attachment 71111.07 (Issue Date 05/25/2006) "Heat Sink Performance"                                                                            ML081090537 5/25/2006 James A. Fitzpatrick, Indian Point, Pilgrim, & Vermont Yankee Nuclear Power Stations, 2005 Annual Report, and, Securities and Exchange Commission Form 10-K Submittal for all Entergy Nuclear Operations, Inc. Plants.        ML061530413 5/25/2006 2006/05/25-Declaration of Dr. Jan Beyea in Support of Massachusetts Attorney General's Contention and Petition for Backfit Order                                                                                      ML061640329 5/25/2006 Commonwealth of Massachusetts v. USNRC; Nos. 07-1482 and 07-1483; Joint Appendix.                              ML072500130 5/26/2006 Report To The Massachusetts Attorney General On The Potential Consequences Of A Spent- Fuel-Pool Fire At The Pilgrim Or Vermont Yankee Nuclear Plant.                                                                        ML12094A181 5/26/2006 Exhibit 1. Declaration of Dr. Gordon Thompson in Support of Massachusetts Attorney General's Contention and Petition for Backfit Order.                                                                                    ML111220350 5/26/2006 Risks and Risk-Reducing Options Associated with Pool Storage of Spent Nuclear Fuel at the Pilgrim and Vermont Yankee Nuclear Power Plants.                                                                                    ML12094A180 5/26/2006 9
05000293/2006201 and Notice of Violation.ML0622601849/11/2006 21 All Documents for Docket 05000293 in ADAMS Public Legacy from 01/01/2006 to 01/01/2007 IR 05000293-06-009, on  07/24/2006 - 08/11/2006, Entergy Nuclear Operations, Inc., Pilgrim Nuclear Power Station; Triennial Fire Protection Team Inspection.ML0625603579/13/2006 2006/09/13-Pilgrim - License Renewal Application Amendment 8.ML0626500729/13/2006 2006/09/13-E-Mail: Entergy Memo of 9/13/2006 - Pilgrim.ML0630704209/13/2006 Pilgrim Nuclear Power Station - Issuance of Amendment RE:  Relocation of Technical Specifications (TAC No.
 
MC5421).ML0622803049/14/2006 Pilgrim, Core Operating Limits Report, Revision 25.ML0626904719/14/2006 Pilgrim, 10 CFR 50.46(a)(3)(ii) Annual Report.ML0626904689/14/2006 PD_Email from Glenn Meyer dtd 9/14/06 re: Planning for Initial Contacts.ML0706605269/14/2006 Pilgrim Nuclear Power Station - Technical Specification Pages re Relocation of Technical Specifications Structural Integrity Requirements to Final Safety Analysis Report.ML0626202409/14/2006 Pre-Inspection Cover Sheet and Inspection Plan.ML0626101439/14/2006 Audit Trip Report Regarding Entergy Nuclear Operations Inc. License Renewal Application for Pilgrim Nuclear Power Station, dated January 25, 2006.ML0625801629/15/2006 10/02/2006 Commission Meetings - FRN.ML0626102709/18/2006 CR-PNP-2006-03467, Evidence of Past (Non-Active) Leakage Found on Torus Room Bay 1 Wall.ML0707901569/19/2006 22}}
All Documents for Docket 05000293 in ADAMS Public Legacy from 01/01/2006 to 01/01/2007 2006/05/26-Pilgrim- Massachusetts Attorney General's Request for a Hearing and Petition for Leave to Intervene with Respect to Entergy Nuclear Operations Inc.'s Application for Renewal of the Pilgrim Nuclear Power Plant Operating License                                                                                              ML061630088 5/26/2006 Pilgrim Watch Request for Hearing Regarding Insufficiency of Order Modifying Licenses with Regard to Spent Reliable Spent Fuel Pool Instrumentation.                                                                      ML12094A182 5/26/2006 2006/05/28-Email: (PA) Questions for NRC About the Reactor Head Closure Studs AMP (XI.M3) as described in the GALL Report                                                                                                ML062090338 5/28/2006 2006/05/30-EMAIL: (PA-LR) PNPS License Renewal - Environmental.                                                ML063060299 5/30/2006 2006/05/30-E-MAIL: (PD) PNPS License Renewal - Environmental.                                                  ML063470200 5/30/2006 Entergy Operations, Inc, North and South, Effective Dose Equivalent Weighting Factors for External Exposure. ML061440110 5/30/2006 Entergy Operations, Inc, North and South, Delta Protection Mururoa V4F1 R Supplied Air Suits.                  ML061440173 5/30/2006 2006/05/30-Letter from Diane Curran submitting the originals of several documents for which copies of faxed signature pages were filed on May 26, 2006 in connection with the Massachusetts Attorney General's hearing request and backfit petition                                                                                  ML061640031 5/30/2006 2006/05/31-E-MAIL: (Intergovernmental) FW: No subject [from M. Sylvia to A. Parker].                          ML063470408 5/31/2006 2006/06/01-E-MAIL: (Intergovernmental) Plymouth Population & Buildout Data [Forecasts].                        ML063470412  6/1/2006 2006/06/02-E-MAIL: (Intergovernmental) FW: No Subject [6/2/06 from M. Sylvia to A. Parker].                    ML063470418  6/2/2006 2006/06/02-EMAIL: (PA-LR) FW: Word Document of NRC LRA Programs Audit of Pilgrim.                              ML063050504  6/2/2006 2006/06/02-EMAIL: (PA-LR) PNPS - Spotted Turtle.                                                              ML063060322  6/2/2006 Response to NRC Request for Additional Information Regarding Unresolved Inspection Item 05000293/2005003-01 from NRC Integrated Inspection Report 05000293-05-003.                                                      ML061640348  6/5/2006 2006/06/05-E-MAIL: (PD) Invasive Nuisances.                                                                    ML063470194  6/5/2006 2006/06/05-Pilgrim - Notice of Adoption of Contention by Pilgrim Watch.                                        ML061720384  6/5/2006 Pilgrim Response to NRC Generic Letter 2006-03, "Potentially Nonconforming Hemyc and MT Fire Barrier Configurations."                                                                                              ML061640132  6/6/2006 Pilgrim, Request for Use of ASME Code Case N-623 and Withdrawal of Pilgrim Relief Request No. PRR-12.          ML061710355  6/6/2006 2006/06/06-Hearing Referral Memorandum from A. Vietti-Cook to P. Bollwerk, ASLBP.                              ML061600221  6/6/2006 2006/06/07-Pilgrim, License Renewal Application, Amendment 2.                                                  ML061710422  6/7/2006 2006/06/07-Establishment of Atomic Safety and Licensing Board                                                  ML061590519  6/7/2006 2006/06/08-E-Mail: FWD: LRA Amendment 2 (Updated Drywell Shell Information).                                  ML063070330  6/8/2006 2006/06/08-Ltr from Mr. Colosi, NOAA to DLR addressing EFH.                                                    ML061710600  6/8/2006 2006/06/09-EMAIL: (PA-LR) Another Round of AMR Questions and TLAA Questions.                                  ML063050512  6/9/2006 2006/06/09-E-Mail: The second set of AMR Questions.                                                            ML063070327  6/9/2006 10
 
All Documents for Docket 05000293 in ADAMS Public Legacy from 01/01/2006 to 01/01/2007 2006/06/12-Comment (1) of Mary Lampert, re Scope of the Environmental Review for Pilgrim's License Renewal Application.                                                                                                    ML061670101 6/12/2006 2006/06/13-Pilgrim - Notice of Appearance of David R. Lewis and Paul A. Gaukler as Counsel on Behalf of Entergy Nuclear Generation Company and Entergy Nuclear Operations, Inc.                                                  ML061720163 6/13/2006 2006/06/14-Comment (2) of Mary Lampert on Behalf of Pilgrim Watch regarding Scope of the Environmental Review for Pilgrim License Renewal Application - Direct Torus Vent System.                                      ML061710104 6/14/2006 Pilgrim - Response to NRC Request for Additional Information Regarding Technical Specification Changes to Revise Reactor Coolant Leakage Detection System Instrumentation.                                                ML061720084 6/14/2006 2006/06/14-LB Order (Regarding Schedule and Guidance for Proceedings)                                            ML061660047 6/14/2006 2006/06/15-Comment (3) of Diane Curran, and Matthew Brock, re EIS Scoping Process for Pilgrim Nuclear Plant License Renewal, Proceeding, 71 Fed. Reg. 19,554 (April 14, 2006).                                              ML061770277 6/15/2006 2006/06/15-Pilgrim - NRC Staff Answer to Notice of Adoption of Contentions by Pilgrim Watch                      ML061670039 6/15/2006 2006/06/15- Pilgrim - Notices of Appearance for Susan L. Uttal and Harry E. Wedewer                              ML061670059 6/15/2006 2006/06/15-Comment (6) of R. J. Chin, H Chang, M. Lampert, M. Morrison, & B. Pye on Scope of Environmental Review for the Pilgrim Nuclear Power Station's License Renewal Application-Federal Register Notice, April 14, 2006.                                                                                                            ML061770407 6/15/2006 2006/06/16-Pilgrim - Unopposed Motion for Extension of Time to Reply to NRC Staff Response to Hearing Request.                                                                                                        ML061810395 6/16/2006 2006/06/16-Comment (7) of Elizabeth A. Higgins, re Scoping Comments in Response to Notice of Intent to Prepare Environmental Impact Statement for Pilgrim Nuclear Power Station in Plymouth, Massachusetts.            ML061770045 6/16/2006 2006/06/16-Comment (4) of Sheila S. Hollis, re Pilgrim Power Station Regarding Renewal of Facility Operating License DPR-35 for a 20 Year Period.                                                                            ML061770043 6/16/2006 2006/06/16-Pilgrim- Request of the Town of Plymouth to Participate as of Right Under 2.315(c).                  ML061740346 6/16/2006 2006/06/16-Pilgrim - Unopposed Motion for Extension of Time to Reply to NRC Staff Response to Hearing Request, filed by D. Curran, Counsel for Massachusetts Attorney General.                                        ML061780634 6/16/2006 2006/06/16-Pilgrim - Letter from D. Curran to Judge Young providing recent decision by U.S. Court of Appeals for the Ninth Circuit.                                                                                              ML061740349 6/16/2006 2006/06/26-Pilgrim - Email from S. Hollis to Judge Young re: Participation in Pilgrim Proceeding and Notice of Appearance.                                                                                                      ML061780125 6/16/2006 2006/06/19-Exhibit NRC000005, Pilgrim LR Proceeding - NRC Staff's Response to Request for Hearing and Petition to Intervene Filed by Pilgrim Watch.                                                                            ML110030977 6/19/2006 2006/06/19-Pilgrim - NRC Staff's Response to Request for Hearing and Petition to Intervene Filed by Pilgrim Watch                                                                                                            ML061710086 6/19/2006 11
 
All Documents for Docket 05000293 in ADAMS Public Legacy from 01/01/2006 to 01/01/2007 OFFICIAL EXHIBIT - NRC000005-00-BD01 - NRC Staff's Response to Request for Hearing and Petition to Intervene Filed by Pilgrim Watch.                                                                                        ML110600918 6/19/2006 FRN: General Notice, Letter A, Issuance of Order EA-06-137. Requiring Compliance with Key Radiological Protection Mitigation Strategies.                                                                              ML061600023 6/20/2006 2006/06/20- Pilgrim - Official Transcript of Pilgrim Nuclear Power Station Pre-Hearing Conference.            ML061740366 6/20/2006 FRN: General Notice, EA-06-137 Enclosure, Order Modifying Licenses (Effective Immediately) .                  ML061600076 6/20/2006 FRN: General Notice, Order EA-06-137, Attachment 1-A List of Licensees.                                        ML061600087 6/20/2006 2006/06/20-Comment (5) of Frank Gorke and Stephanie Abrahams on Scope of Environmental Review for the Pilgrim Nuclear Power Station License Renewal Application - Federal Register Notice, April 14, 2006.          ML061770395 6/20/2006 2006/06/21-Email: (PA) Additional Missing AMPs                                                                ML062510359 6/21/2006 2006/06/21-LB Order and Notice (Regarding Oral Argument and Limited Appearance Statement Sessions)            ML061720397 6/21/2006 Pilgrim Nuclear Power Station, Response to NRC request for Additional Information Regarding Pilgrim Relief Request, PRR-10, Risk-informed ISI For Class 1, B-F and B-J Welds (TAC NO. MC8293).                            ML061860086 6/21/2006 2006/06/22-Email: (PA) Additional missing AMPs                                                                ML062510295 6/22/2006 2006/06/22-Pilgrim - Entergy's Answer to Massachusetts Attorney General's Request for a Hearing, Petition for Leave to Intervene, and Petition for Backfit Order.                                                            ML061790134 6/22/2006 2006/06/22-Pilgrim - NRC Staff Answer Opposing Massachusetts Attorney General's Request for Hearing and Petition for Leave to Intervene and Petition for Backfit Order                                                ML061730482 6/22/2006 2006/06/22-Email: (PA) Additional Missing AMPs                                                                ML062510361 6/22/2006 2006/06/23-Press Release-I-06-038: Licensing Board to Hear Oral Arguments and Receive Public Comment in Pilgrim License Renewal Proceeding.                                                                            ML061740031 6/23/2006 2006/06/25-E-mail: (PA) Additional AMR Question - Section 3.1.1                                                ML062120410 6/25/2006 2006/06/26-Pilgrim - Email from R. Chin, Duxbury Nuclear Advisory Committee to Judge Young re: Limited Appearance Statements                                                                                          ML061780159 6/26/2006 OFFICIAL EXHIBIT - NRC000004-00-BD01 - Entergy's Answer to the Request for Hearing and Petition to Intervene by Pilgrim Watch and Notice of Adoption of Contention.                                                        ML110600916 6/26/2006 2006/06/26-Exhibit NRC000004, Pilgrim LR Proceeding - Entergy's Answer to the Request for Hearing and Petition to Intervene by Pilgrim Watch and Notice of Adoption of Contention.                                            ML110030974 6/26/2006 2006/06/26-E-MaiI: FWD: Comment (1) of Alex Marion on Behalf of Nuclear Energy Institute (NEI) on Proposed ISG LR-ISG-2006-01.                                                                                            ML063070323 6/26/2006 2006/06/26-Email: (PA) Audit Report Attachment 5 - List of Documents                                          ML062130145 6/26/2006 2006/06/26-EMAIL: (PA-LR) Pilgrim [regarding: Environmental Scoping].                                          ML063060267 6/26/2006 2006/06/26-EMAIL: (PA-LR) Draft Qs on Section 2.3 on Pilgrim LRA Staff Request a Phone Call on June 27, 2006. ML063050509 6/26/2006 12
 
All Documents for Docket 05000293 in ADAMS Public Legacy from 01/01/2006 to 01/01/2007 2006/06/26-Pilgrim - Entergy's Answer to the Request for Hearing and Petition to Intervene by Pilgrim Watch and Notice of Adoption of Contention.                                                                              ML061840216 6/26/2006 E-mail: (PA) Schedule                                                                                          ML062120408 6/26/2006 2006/06/27-E-mail: (PA) PNPS Response for AMR Items 460 and 512 - Potential Conflict in the Responses          ML062120407 6/27/2006 2006/06/27-EMAIL: (PA-LR) Fwd: PNPS Response for AMR Items 460 and 512 - Potential Conflict in the Responses.                                                                                                      ML063050396 6/27/2006 2006/06/27-Email: (PA) PNPS Response for AMR Items 460 and 512 - Potential Conflict in the Responses            ML062090388 6/27/2006 Pilgrim - Request for Approval of ASME Code, Section XI, Third Ten-Year Relief Request, PRR-42, Examinations of Component Welds with Less Than Essentially 100% Examination Coverage.                                          ML061870163 6/28/2006 2006/06/29-Email: (PA) Jim and Peter                                                                            ML062090309 6/29/2006 2006/06/29-EMAIL: (PA-LR) Additional Questions From Bob Jackson                                                ML063050603 6/29/2006 2006/06/29-Email: (PA) Re: QA for Aging Management of NSR Components                                            ML062090318 6/29/2006 Pilgrim Nuclear Power Station - Relief Request No. PRR-4, (TAC MC8287).                                        ML061450031 6/29/2006 2006/06/29-E-mail: (PA) - None -                                                                                ML062120406 6/29/2006 2006/06/29-Email: (PA) Additional Question from Bob Jackson                                                    ML062130057 6/29/2006 2006/06/29-Email: (PA) Re: QA for Aging Management of NSR Components                                            ML062130058 6/29/2006 2006/06/29-EMAIL: (PA-LR) Non-Safety Related SCs.                                                              ML063050610 6/29/2006 IR 05000293-06-006; 04/10/2006 - 05/19/2006; Pilgrim Nuclear Power Station; Component Design Bases Inspection.                                                                                                    ML061800215 6/29/2006 2006/06/29-Email: (PA) Non-Safety Related SCs                                                                  ML062130056 6/29/2006 Email: (PA) Re: QA for Aging Mangement of NSR Components                                                        ML062090569 6/29/2006 Pilgrim Nuclear Power Station - Relief Request No. PIL-05-R-001, TAC No. MC8299).                              ML061420470 6/29/2006 Pilgrim, Fourth Ten-Year In-Service Testing (IST) Program, IST Relief Request PR-03, Rev. 3.                    ML061870492 6/29/2006 2006/06/29- Pilgrim - Massachusett's Attorney General's Reply to Entergy's and NRC Staff's Responses to Hearing Request and Petition to Intervene.                                                                              ML061870225 6/29/2006 2006/06/29-Email: (PA) PNPS Shell                                                                              ML062090319 6/29/2006 2006/06/30-Email: (PA) Draft AMP Section of Audit Report                                                        ML062510364 6/30/2006 2006/06/30- 07/19/2006 Notice of Forthcoming Exit Meeting with Entergy Nuclear Operations, Inc., on License Renewal Scoping and Screening Methodology and the Aging Management Program / Aging Management Review Audits for Pilgrim Nuclear Power Station.                                                                      ML061810424 6/30/2006 Pilgrim - Technical Specifications Amendment Request to Revise the Surveillance Requirements for the High Pressure Coolant Injection (HPCI) and Reactor Core Isolation Cooling (RCIC) Systems.                            ML061870469 6/30/2006 Email: (PA) Response to ARM Questions 482 & 483                                                                ML062090567 6/30/2006 2006/06/30-Email: (PA) Response to ARM Questions 482 and 483                                                    ML062090380 6/30/2006 13
 
All Documents for Docket 05000293 in ADAMS Public Legacy from 01/01/2006 to 01/01/2007 2006/06/30-Email: (PA) FWD: Questions and Answers of Pilgrim LRA Aging Management Reviews.                      ML062480379 6/30/2006 Pilgrim, Procedure No. 3.M.5-2, Revision 10, "Main Stack Inspection Guideline."                                ML070440482 6/30/2006 2006/06/30-Email: (PA) Questions and Answers of Pilgrim LRA Aging Management Reviews.                          ML062480297 6/30/2006 2006/06/30-Email: (PA:) FWD: Questions and Answers of Pilgrim LRA Aging Management Reviews                      ML062130018 6/30/2006 2006/06/30-EMAIL: (PA-LR) Questions and Answers of Pilgrim LRA Aging Management Reviews.                        ML063050613 6/30/2006 2006/06/30-Email: (PA) Draft AMP Section of Audit Report                                                        ML062120423 6/30/2006 Email: (PA) Re: QA for Aging Management of NSR Components                                                      ML062090307  7/3/2006 2006/07/03- Pilgrim - Pilgrim Watch Reply to Entergy Answer to Request for Hearing and Petition to Intervene by Pilgrim Watch.                                                                                                  ML062160449  7/3/2006 2006/07/03-Email: (PA) Re: QA for Aging Management of NSR Components                                            ML062090565  7/3/2006 2006/07/03- Pilgrim - Pilgrim Watch Reply to NRC's and Entergy's Answers to Notice of Adoption of Contention by Pilgrim Watch.                                                                                              ML062160441  7/3/2006 2006/07/05-Pilgrim - License Renewal Application Amendment 3.                                                  ML061940175  7/5/2006 Email: (PA) Re: Draft AMP section of Audit report                                                              ML062130089  7/5/2006 Email: (PA) Re: Quality Assurance for Aging Management of NSR Components                                        ML062090294  7/5/2006 2006/07/05-Email: (PA) Re: Quality Assurance for aging management of NSR components                            ML062130064  7/5/2006 OFFICIAL EXHIBIT - ENT000007-00-BD01 - License Renewal Application Amendment 4: Response to Request for Additional Information Regarding Severe Accident Mitigation Alternatives for Pilgrim Nuclear Power Station. ML110600873  7/5/2006 2006/07/05-Email: (PA) Re: Draft AMP Section of Audit Report                                                    ML062090303  7/5/2006 2006/07/05-Email: (PA) FW: Handing of Generic Issues                                                            ML062130091  7/5/2006 2006/07/05-Email: (PA) Re: Quality Assurance for aging management of NSR components                            ML062130054  7/5/2006 Exhibit ENT000007, Pilgrim LR Proceeding, License Renewal Application Amendment 4: Response to Request for Additional Information Regarding Severe Accident Mitigation Alternatives for Pilgrim Nuclear Power Station. ML110030998  7/5/2006 2006/07/05-Email: (PA) Comments on the AMP writeup                                                              ML062130053  7/5/2006 Entergy Nuclear Operations Inc. License Renewal Application Amendment 3.                                        ML090630395  7/5/2006 2006/07/05-Email: (PA) FYI: Draft Audit Report Shell TLAA on Metal Fatigue - Audit Report Section 4.3          ML062090297  7/5/2006 2006/07/05-Pilgrim, License Renewal Application Amendment 4: Response to Request for Additional Information Regarding Severe Accident Mitigation Alternatives.                                                              ML061930418  7/5/2006 2006/07/05-Email: (PA) Quality Assurance for Aging Management of NSR Components                                ML062090304  7/5/2006 2006/07/05-Email: (PA) PNPS's TLAA Section 4.6                                                                  ML062090305  7/5/2006 2006/07/05-Email: (PA) Quality Asurance for Aging Management of NSR Components                                  ML062090561  7/5/2006 Email: (PA) Re: FW: Handling of Generic Issues                                                                  ML062090300  7/5/2006 14
 
All Documents for Docket 05000293 in ADAMS Public Legacy from 01/01/2006 to 01/01/2007 2006/07/05-Email: (PA) PNPS's TLAA Section 4.6                                                                  ML062090563  7/5/2006 2006/07/06-Email: (PA) FYI: Draft Audit Report Shell TLAA on Metal Fatigue - Audit Report Section 4.3            ML062130086  7/6/2006 2006/07/06- Pilgrim - Official Transcript of Oral Arguments on Contentions for the Pilgrim Nuclear Power Station License Renewal Proceeding.                                                                                      ML061940179  7/6/2006 2006/07/06-Pilgrim - Official Transcript of Limited Appearance Comment Session in the Pilgrim Nuclear Power Station License Renewal Proceeding.                                                                              ML061930218  7/6/2006 Email: (PA) Re: Quality Assurance for aging management of NSR components                                        ML062130140  7/6/2006 2006/07/06-EMAIL: (PA-LR) FW: PNPS ER EJ writeup.                                                                ML063060309  7/6/2006 2006/07/06-Email: (PA) Additional AMR questions                                                                  ML062130061  7/6/2006 2006/07/06-Email: (PA) Re: Quality Assurance for Aging Management of NSR Components.                            ML062120477  7/6/2006 Letter dated 7/7/06 to Multiple Addresses who did not participate in the June 7, 2006 Generic Fundamentals Examination (GFE)                                                                                                ML062360483  7/7/2006 2006/07/07-Pilgrim - Limited Appearance Statement by Maurice C. Cion.                                            ML062070067  7/7/2006 2006/07/07- Pilgrim - Official Transcript of Oral Arguments on Contentions in the Pilgrim Nuclear Power Station License Renewal Proceeding.                                                                                      ML061930390  7/7/2006 2006/07/07-Email: (PA) Comments on Pilgrim AMP document                                                          ML062120480  7/7/2006 Email: (PA) Re: Comments on Pilgrim AMP Document                                                                ML062130142  7/7/2006 2006/07/07-Pilgrim - Limited Appearance Statement by W. Bramhall                                                ML062060607  7/7/2006 2006/07/07-E-mail: (PA) Re: Comments on Pilgrim AMP document                                                    ML062120412  7/7/2006 2006/07/07-Email: (PA) Re: Comments on Pilgrim AMP Document                                                      ML062090293  7/7/2006 2006/07/10-E-Mail: FWD: Response to your question regarding Radwaste Piping.                                    ML063070319 7/10/2006 2006/07/10-Pilgrim - Email from Diane Curran to ASLBP and Parties.                                              ML062070055 7/10/2006 2006/07/11-EMAIL: (PA-LR) FW: Pilgrim Document 83.                                                              ML063060302 7/11/2006 2006/07/11-CZM Federal Consistency Review of the Pilgrim Nuclear Power Station Operating License Renewal; Plymouth.                                                                                                        ML062090362 7/11/2006 2006/07/12- Pilgrim - Email from Susan Uttal to ASLBP and Parties.                                              ML062070131 7/12/2006 2006/07/12-E-mail: FWD: Pilgrim License Renewal Application Amendment 3 Cover Letter and Attachment A.          ML063070536 7/12/2006 2006/07/13-Summary of Public Scoping Meetings Conducted Related to the Review of the Pilgrim Nuclear Power Station, License Renewal Application.                                                                            ML061700055 7/13/2006 2006/07/13-Pilgrim - Letter to the Administrative Judges from Counsel for Entergy following up on one of the two matters raised at last week's prehearing conference.                                                        ML062020235 7/13/2006 15
 
All Documents for Docket 05000293 in ADAMS Public Legacy from 01/01/2006 to 01/01/2007 Supplement to Request for the Use of Delta Protection's Self Fed Single Use "Mururoa BLU" Suit Systems; Arkansas Nuclear One, Indian Point, Grand Gulf, Waterford, FitzPatrick, River Bend Pilgrim, Vermont Yankee.      ML061980028 7/13/2006 2006/07/13-Press Release-I-06-040: NRC To Meet With Entergy On July 19th To Discuss Pilgrim License Renewal Audit Findings.                                                                                                  ML061940368 7/13/2006 2006/07/13- Pilgrim - Limited Appearance Statement of John R. Glover.                                            ML062070224 7/13/2006 E-MAIL: NRC to Discuss Pilgrim Audit Findings.                                                                  ML063070249 7/13/2006 Supplement to Request for Use of Delta Protection Mururoa V4F1 R Supplied Air Suits; Arkansas Nuclear One, Indian Point, Grand Gulf, Waterford, FitzPatrick, River Bend, Pilgrim, Vermont Yankee.                          ML061980030 7/13/2006 2006/07/14-Pilgrim - Email from Judge Young to the parties.                                                      ML062060614 7/14/2006 2006/07/14-LB Order (Regarding Need for Further Briefing on Definition of New and Significant Information As Addressed in Participants' Petitions, Answers and Replies Relating to massachusetts Attorney General contentioin and Pilgrim Watch Contention 4:.                                                                                ML061950481 7/14/2006 Response to NRC Request for Additional Information and Revised Pilgrim Relief Request, PRR-15, Rev.1.            ML062010210 7/14/2006 2006/07/14-Pilgrim - Email to Judge Young from Molly Bartlett                                                    ML062060616 7/14/2006 2006/07/17- Pilgrim - Limited Appearance Statement on Behalf of Clean Water Action (MASSPIRG) .                  ML062070051 7/17/2006 2006/07/17-EMAIL: (PA-LR) Re: Pilgrim [from Lampert to A. Williamson 7/17/06].                                  ML063060259 7/17/2006 2006/07/17-Email: (PA-LR) Additional info for ER.                                                                ML063060239 7/17/2006 2006/07/17-E-Mail: Core shroud tie rod upper support cracking- information request.                              ML063070252 7/17/2006 2006/07/17-EMAIL: (PA-LR) Re: Pilgrim.                                                                          ML063060249 7/17/2006 2006/07/19-Pilgrim Nuclear Power Station - License Renewal Application Amendment 5.                              ML062080142 7/19/2006 2006/07/19-Pilgrim - License Renewal Application Amendment 5.                                                    ML062090075 7/19/2006 LER 06-002-00 for Pilgrim Nuclear Power Station re Small Quantities of Unaccountable Licensed Material.          ML062080143 7/19/2006 2006/07/20- Pilgrim - Entergy providing follow up information from the prehearing conference on Pilgrim's aging management review to ASLBP.                                                                                      ML062120018 7/20/2006 2006/07/20- Pilgrim - Notice of Withdrawal and Certificate of Service for Harry E. Wedewer for Pilgrim Nuclear Power Station.                                                                                                  ML062010500 7/20/2006 2006/07/20-Letter on behalf of more than two dozen organizations and individuals listed on draft Director's Decision dated June 28, 2006, regarding groundwater contamination petition submitted January 25, 2006.          ML062190445 7/20/2006 2006/07/21- Pilgrim - Massachusetts Attorney General's Brief Regarding Relevance to this Proceeding of Regulatory Guide's Definition of "New and Significant Information."                                              ML062080171 7/21/2006 2006/07/21-Email: (PA) Fwd: Re: RAI for section 3.5                                                              ML062090383 7/21/2006 16
 
All Documents for Docket 05000293 in ADAMS Public Legacy from 01/01/2006 to 01/01/2007 2006/07/21- Pilgrim - Entergy's Brief on New and Significant Information in Response to Licensing Board Order of July 14, 2006.                                                                                                  ML062080589 7/21/2006 2006/07/21-Pilgrim - NRC Staff's Response to July 14, 2006 Licensing Board Order                                ML062020795 7/21/2006 2006/07/23-Pilgrim - Email to Judge Young from Molly Bartlett                                                    ML062060617 7/23/2006 2006/07/24-Email: (PA) Re: Any Correspondences from PNPS on LRA Changes.                                        ML062090387 7/24/2006 2006/07/24-E-Mail: FW: Pilgrim LRA Amendment 5.                                                                  ML063070318 7/24/2006 2006/07/25- 05/01-05/2006 Meeting Summary of Environmental Site Audit Related to the Review of the License Renewal Application for Pilgrim.                                                                                ML062070305 7/25/2006 2006/07/25-Pilgrim, Request for Additional Information, Pilgrim Nuclear Power Station License Renewal Application (TAC MC9669).                                                                                        ML062070240 7/25/2006 2006/07/25-Summary of Conferences Calls with Entergy Nuclear Operations, Inc., to Discuss the Severe Accident Mitigation Alternatives Requests for Additional Information for Pilgrim Nuclear Power Station (TAC NO. MC9676). ML062070295 7/25/2006 2006/07/25-EMAIL: (PA) Re: FWD: FYI: Forwarding What We Want DCI/FEB to Work at for the Pilgrim Flaw Growth Analysis.                                                                                                ML062480362 7/25/2006 2006/07/25-Email: (PA) Piligrim AMP/AMR Audit Report                                                            ML062510296 7/25/2006 2006/07/26-E-Mail: Request for Additional information on LRA section 2.1 Scoping and Screening.                  ML063070241 7/26/2006 2006/07/26- Pilgrim - Letter informing that Entergy has already fully addressed the points raised in the Massachusetts Attorney General's brief regarding new and significant information.                                ML062130443 7/26/2006 2006/07/26- Pilgrim - Massachusetts Attorney General's Reply Brief Regarding Relevance to This Proceeding of Regulatory Guide's Definition of "New and Significant Information."                                              ML062130446 7/26/2006 2006/07/26-EMAIL: (PA) Revised AMR 3.4 Input                                                                    ML062480388 7/26/2006 2006/07/26-Requests for Additional Information for the Review of the Pilgrim Nuclear Power Station License Renewal Application (TAC No. MC9669).                                                                            ML062120464 7/26/2006 IR 05000293-06-008; 06/12/2006-06/16/2006; Pilgrim Nuclear Power Station; Physical Protection.                  ML062070396 7/26/2006 CR-PNP-2006-02799, Fair Amount of Water in Torus Room Floor.                                                    ML070790174 7/26/2006 2006/07/27- Pilgrim - Official Transcript of Entergy Nuclear Generation Company Oral Arguments via Telephone Conference.                                                                                                      ML062130024 7/27/2006 2006/07/27-Email: (PA) PNPS Q&Q                                                                                  ML062510306 7/27/2006 E-MAIL: Pilgrim Nuclear Power Station Hearing Files Information Request (7/1/06-7/31/06).                        ML063070245 7/27/2006 2006/07/27-E-Mail: Fwd: FYI: Attaching File with my Assessment Tracking the Status of Our Metal Fatigue Questions - Jim.                                                                                                ML063070246 7/27/2006 2006/07/27-Email: (NPA-PD-LR) Additional KI info [C. Jacobs] found.                                              ML063070595 7/27/2006 2006/07/27-Pilgrim - Judge Nicholas Trikouros disclosure statement.                                              ML062120730 7/27/2006 17
 
All Documents for Docket 05000293 in ADAMS Public Legacy from 01/01/2006 to 01/01/2007 Email: (PA) PNPS Q&A                                                                                            ML062510355 7/27/2006 2006/07/31-Requests for Additional Information for the Review of the Pilgrim Nuclear Power Station License Renewal Application.                                                                                            ML062120662 7/31/2006 2006/07/31-Requests for Additional Information for the Review of the Pilgrim Nuclear Power Station License Renewal Application.                                                                                            ML062120752 7/31/2006 2006/07/31-Requests for Additional Information for the Review of the Pilgrim Nuclear Power Station License Renewal Application.                                                                                            ML062120743 7/31/2006 2006/07/31-Email: (PA) Updated Section 4.3, Metal Fatigue for PNPS LRA                                          ML062510302 7/31/2006 Requests for Additional Information for the Review of the Pilgrim Nuclear Power Station License Renewal Application.                                                                                                    ML061940015 7/31/2006 Pilgrim Nuclear Power Station - Groundwater Protection - Data Collection Questionnaire.                        ML062280602 7/31/2006 2006/07/31-E-Mail: Fwd: PNPS Q&A Data Base.                                                                    ML063070232 7/31/2006 2006/07/31-Email: (PA) Urgent - revised section 3.0.4 input for QA program                                      ML062510299 7/31/2006 Groundwater Protection - Data Collection Questionnaire, Pilgrim.                                                ML062550518 7/31/2006 IR 05000293-06-003; 04/01-06/30/2006; Pilgrim Nuclear Power Station; Maintenance Risk Assessments and Emergent Work Control.                                                                                          ML062130615  8/1/2006 2006/08/02-EMAIL: (PA) AMR Audit Report Section 3.3                                                            ML062480391  8/2/2006 2006/08/02-Fax to Brian Ford/Fred Mogolesko from RAMS.                                                          ML062510324  8/2/2006 2006/08/02-FAX: From: Ram Subbaratnam To: Brian Ford/ Fred Mogolesko 8/02/2006 RE: Supplement 3.                ML063070332  8/2/2006 2006/08/02-EMAIL: (PA) Email to James Davis from Duc Nguyen on 08/02/2006 at 3:50 4:43 pm (No Subject)          ML062480361  8/2/2006 2006/08/03-EMAIL: (PA) TLAA Input                                                                              ML062480381  8/3/2006 2006/08/03-EMAIL: (PA) FYI: Forwarding Attachment 1 & Attachments 3-7 on Audit Report TLAA Sections.            ML062480383  8/3/2006 E-Mail: Fwd: Pilgrim ASLB Hearing.                                                                              ML063070236  8/3/2006 2006/08/03-EMAIL: (PA) Duc's Audit and Review Report Input                                                      ML062480385  8/3/2006 2006/08/03-EMAIL: (PA) TLAA Section 4.3 Input                                                                  ML062480395  8/3/2006 E-Mail: Fwd: Pilgrim ASLB Hearing: from Ram Subbaratnam 8/3/06 10:55am.                                        ML063070234  8/3/2006 2006/08/04- Pilgrim - Massachusetts Attorney General's Motion for Disqualification of Judge Nicholas Trikouros. ML062210100  8/4/2006 2006/08/04- Pilgrim - Motion on Behalf of Pilgrim Watch for Disqualification of Judge Nicholas Trikouros.      ML062500138  8/4/2006 Pilgrim - Issuance of License Amendment 222 RE: Deletion of Requirement Related to NRC Approval of Engineering Evaluation for Elevated Relief Valve Discharge Pipe Temperature.                                    ML061840032  8/4/2006 Pilgrim - Tech Spec Pages for Amendment 222 RE: Deletion of Requirement Related to NRC Approval of Engineering Evaluation For Elevated Relief Valve Discharge Pipe Temperature.                                    ML062230167  8/4/2006 18
 
All Documents for Docket 05000293 in ADAMS Public Legacy from 01/01/2006 to 01/01/2007 2006/08/07-E-Mail Re: RAM: From Fred Mogolesko 8/7/06 12:01pm.                                                  ML063070219  8/7/2006 2006/08/07-E-MAIL: Fwd: RAM: from Ram Sabbaratnam 8/7/06 9:13am.                                                ML063070239  8/7/2006 2006/08/07-E-Mail: FW: RAM.                                                                                      ML063070220  8/7/2006 Pilgrim, Issuance of License Amendment 223 Regarding Administrative Changes and Relocation of Certain Technical Specification Responsibilities.                                                                        ML061720068  8/9/2006 Pilgrim, Tech Spec Pages for Amendment 223 Regarding Administrative Changes and Relocation of Certain Technical Specification Responsibilities.                                                                        ML062280013  8/9/2006 2006/08/09- Pilgrim - Notice of Appearance for Marian L. Zobler (Pilgrim Nuclear Power Plant) and Certificate of Service                                                                                                          ML062210250  8/9/2006 2006/08/10-E-Mail: FW: Requested Information from Pilgrim License Renewal Program Document PRPD-06.              ML063070225 8/10/2006 E-Mail: FW: Requested Pilgrim ISl Information.                                                                  ML063070222 8/10/2006 2006/08/11-Email: (PA) RAI for the Three Flaw Issues for the Pilgrim LRA                                        ML062510343 8/11/2006 2006/08/11-E-Mail: Draft RAIs on section 2.4 of Pilgrim LRA.                                                    ML063070228 8/11/2006 2006/08/14-RAI For the Review of the Pilgrim Nuclear Power Station License Renewal Application (TAC MC9669).                                                                                                        ML062290474 8/14/2006 2006/08/14- Pilgrim- Entergy's Response to Motions for Disqualification of Judge Nicholas Trikouros.            ML062340098 8/14/2006 2006/08/14-Email: (PA) LRA B.1.1, Boraflex Program                                                              ML062510350 8/14/2006 2006/08/14-Email: (PA) RAIs 3.5.1-1 and 3.5.1-2                                                                  ML062510346 8/14/2006 2006/08/15-Summary of Public Audit Status Briefing with Entergy Nuclear Operations, Inc., on License Renewal Scoping and Screening Methodology and the Aging Management Program and the Aging Management Review Audits for the Pilgrim Nuclear Power Station.                                                                    ML062280218 8/15/2006 Updated Schedule of Submittal of License Renewal Applications for Entergy Plants.                                ML062330008 8/16/2006 2006/08/16-EMAIL: (NPA-PD-LR) RAI on Chapter 4.0 TLAAs (from Ram Subbaratnam).                                  ML063040463 8/16/2006 2006/08/16-Pilgrim: NRC Contact Report - To Obtain an Update on the Status of Rainbow Smelt Stocks in the Vicinity of PNPS (Intergovernmental).                                                                            ML063470166 8/16/2006 2006/08/18-E-MAIL: (Intergovernmental) Rainbow Smelt Data [8/18 from S. Duda].                                  ML063470424 8/18/2006 2006/08/18-E-Mail: Formal RAIs for Pilgrim License Renewal Application on Section 3.5 & 3.6.                    ML063070230 8/18/2006 Entergy Nuclear Operations, Inc., RAI Regarding Technical Specification Changes to Pressure and Temperature Curves (TAC No. MD1218).                                                                                        ML062280434 8/18/2006 2006/08/21-E-Mail: Additional draft (draft RAIs) the audit team requests (August 21, 2006).                      ML063070188 8/21/2006 2006/08/21-EMAIL: (NPA-PD-LR) RAIs from Audit by Danhoang & Erach.                                              ML062990442 8/21/2006 Update to Part 21 Interim Report Notification: Failure Analysis of Core Shroud Repair Tie Rod Upper Support Crack.                                                                                                          ML062370095 8/21/2006 19
 
All Documents for Docket 05000293 in ADAMS Public Legacy from 01/01/2006 to 01/01/2007 2006/08/21-EMAIL: (NPA-PD-LR) Requested RAI on Pilgrim LRA.                                                    ML062990253 8/21/2006 2006/08/22-Requests for Additional Information for the Review of the Pilgrim Nuclear Power Station License Renewal Application (TAC MC9669).                                                                              ML062350440 8/22/2006 2006/08/22-Pilgrim - License Renewal Application Amendment 6.                                                  ML062420060 8/22/2006 PD_Email from Fred Mogolesko, Entergy, dtd 8/22/06 re: Pilgrim AMP Review.                                      ML070660279 8/22/2006 2006/08/23-E-Mail: FW: Pilgrim License Renewal Application Amendment 6.                                        ML063070217 8/23/2006 2006/08/23-EMAIL: (NPA-PD-LR) Fwd: FW: Pilgrim License Renewal Application Amendment 6 (RAI Responses from Entergy on Pilgrim LRA).                                                                                  ML063050296 8/23/2006 2006/08/23-E-Mail: Questions From Fred Mogolesko 8/23/2006 9:29am.                                              ML063070190 8/23/2006 2006/08/23-Summary of Follow Up Conference Call with Entergy Nuclear Operations, Inc., to Discuss the Severe Accident Mitigation Alternatives Requests for Additional Information for Pilgrim Nuclear Power Station (TAC No.
MC9676).                                                                                                        ML062360514 8/23/2006 OFFICIAL EXHIBIT - PWA000004-00-BD01 - MACCS2 Support Forum, David I. Chanin; Development of MACCS2:
Lessons Learned, David I. Chanin.                                                                              ML110600886 8/23/2006 Exhibit PWA 00004, MACCS2 Support Forum, David I. Chanin; Development of MACCS2: Lessons Learned, David I.
Chanin.                                                                                                        ML110030906 8/23/2006 PD_Email from Fred Mogolesko, Entergy, dtd 8/24/06 re: Pilgrim AMP Review.                                      ML070670089 8/24/2006 2006/08/25-Email: (PA) Pilgrim Audit Report Peer Review AMP Sections                                            ML062510307 8/25/2006 Massachusetts Attorney General's Petition for Rulemaking to Amend 10 C.F.R. Part 51.                            ML111220357 8/25/2006 2006/08/25-Petition for Rulemaking PRM 50-10 to Amend 10 C.F.R. Part 51, on behalf of the Massachusetts Attorney General, submitted by Diane Curran.                                                                    ML062640409 8/25/2006 2006/08/25-Summary of Conference Call with Entergy Nuclear Operations, Inc on August 1, 2006.                  ML062410379 8/25/2006 2006/08/25-Email: (NPA-PD-LR) Final RAI on Section 2.4 - Scoping and Screening Structures for the Pilgrim LRA. ML062980322 8/25/2006 Order Requiring Compliance with Key Radiological Protection Mitigation Strategies.                              ML062300304 8/28/2006 2006/08/28-E-Mail: Draft Pilgrim RAIs on Section 4.2.1 - TLAAs on RV Internals, Neutron Fluence.                ML063070361 8/28/2006 2006/08/28-E-Mail: Meeting Summary for your information: from Ram Subbaratnam 8/28/06 9:18am.                  ML063070375 8/28/2006 PD_Email from Fred Mogolesko, Entergy, dtd 8/28/06 re: Preparation for Region I Inspection at Pilgrim.          ML070660056 8/28/2006 PD_Email from Fred Mogolesko, Entergy, dtd 08/28/06 re: Preparation for Region I Inspection at Pilgrim.        ML070660548 8/28/2006 Pilgrim, Changes to the Pilgrim Fourth Ten-Year In Service Inspection Program Plan Related to the Snubber Inspection Program.                                                                                            ML062490421 8/28/2006 2006/08/28-E-Mail: Preparation for Region 1 Inspection at Pilgrim: from: Fred Mogolesko 8/28/06 10:17 am.      ML063070367 8/28/2006 20
 
All Documents for Docket 05000293 in ADAMS Public Legacy from 01/01/2006 to 01/01/2007 FitzPatrick, Indian Point, Pilgrim, & Vermont Yankee Nuclear Power Stations - Fitness-for-Duty Program Performance Report For the Period January 2006 - June 2006.                                                  ML062430298 8/29/2006 2006/08/30-Comment from David R. Lewis of Pillsbury, Winthrop, Shaw and Pittman on Massachusetts Attorney General's Petition for Rulemaking PRM-51-10 to Amend 10 CFR Part 51 (August 25, 2006).                      ML062650221 8/30/2006 2006/08/30-LB Notice of Recusal of Judge Nicholas Trikouros                                                  ML062420487 8/30/2006 2006/08/30-LB Notice of Reconstitution                                                                      ML062420469 8/30/2006 2006/08/30-E-mail: (PA) SER Input.                                                                          ML090830073 8/30/2006 OFFICIAL EXHIBIT - ENT000008-00-BD01 - License Renewal Application Amendment 7.                              ML110600874 8/30/2006 Pilgrim Nuclear Power Station, Technical Specification Amendment Request to Relocate Specifications not Meeting the Criteria of 10 CFR 50.36(c)(2)(ii), Revision 1, (TAC MC5421).                                    ML062490489 8/30/2006 2006/08/30-Vermont Yankee/Pilgrim - Entergy's Response to Massachusetts Attorney General's Petition for Rulemaking to Amend 10 C.F.R. Part 51 (Aug. 25, 2006).                                                      ML062480366 8/30/2006 Exhibit ENT000008, Pilgrim LR Proceeding, License Renewal Application Amendment 7.                          ML110030987 8/30/2006 2006/08/30-Pilgrim, Response to Requests for Additional Information re License Renewal Application Amendment 7.                                                                                                ML062500117 8/30/2006 2006/08/31-E-MAIL: (Intergovernmental) Pilgrim NPS EIS - info request.                                      ML063470471 8/31/2006 Mid-cycle Performance Review and Inspection Plan - Pilgrim Nuclear Power Station.                            ML062430443 8/31/2006 2006/09/01-E-MAIL: (Intergovernmental) Re: Pilgrim NPS EIS - info request.                                  ML063470473  9/1/2006 2006/09/01-Pilgrim April 2008 Evidentiary Hearing - Intervenor Exhibit 7, Liquid Radioactive Release Lessons Learned Task Force Final Report, September 1, 2006; Executive Summary; Pages 19 and 26; Appendix B Consolidated Recommendations List.                                                                          ML081090523  9/1/2006 2006/09/05-EMAIL: (NPA-PD-LR) Pilgrim LRA - RAI Responses from Entergy (NRC-03-03-038, Task Order 24).      ML063110209  9/5/2006 2006/09/07-Pilgrim, Request for Additional Information for the Review of the Pilgrim Nuclear Power Station License Renewal Application (TAC No. MC9669).                                                               ML062490501  9/7/2006 2006/09/07-E-mail: Final RAI on Section 4.3.2.1 on Pilgrim LRA.                                             ML063060595  9/7/2006 2006/09/08-E-MAIL: (Intergovernmental) Re: Plymouth Population & Buildout Data.                              ML063470479  9/8/2006 2006/09/08-Request for Additional Information for the Review of the Pilgrim Nuclear Power Station License Renewal Application (TAC MC9669) Section 3.2.                                                               ML062500431  9/8/2006 2006/09/08-Requests for Additional Information for the Review of the Pilgrim Nuclear Power Station License Renewal Application (TAC MC9669).                                                                           ML062500401  9/8/2006 2006/09/08-EMAIL: (NPA-PD-LR) Fwd: Final RAI on Section 3.2.1 and 4.2.1 on the Pilgrim LRA.                 ML062990446  9/8/2006 Pilgrim Nuclear Power Station - NRC Material Control and Accounting Program Inspection Report No.
05000293/2006201 and Notice of Violation.                                                                    ML062260184 9/11/2006 21
 
All Documents for Docket 05000293 in ADAMS Public Legacy from 01/01/2006 to 01/01/2007 IR 05000293-06-009, on 07/24/2006 - 08/11/2006, Entergy Nuclear Operations, Inc., Pilgrim Nuclear Power Station; Triennial Fire Protection Team Inspection.                                                               ML062560357 9/13/2006 2006/09/13-Pilgrim - License Renewal Application Amendment 8.                                                      ML062650072 9/13/2006 2006/09/13-E-Mail: Entergy Memo of 9/13/2006 - Pilgrim.                                                           ML063070420 9/13/2006 Pilgrim Nuclear Power Station - Issuance of Amendment RE: Relocation of Technical Specifications (TAC No.
MC5421).                                                                                                           ML062280304 9/14/2006 Pilgrim, Core Operating Limits Report, Revision 25.                                                                ML062690471 9/14/2006 Pilgrim, 10 CFR 50.46(a)(3)(ii) Annual Report.                                                                    ML062690468 9/14/2006 PD_Email from Glenn Meyer dtd 9/14/06 re: Planning for Initial Contacts.                                          ML070660526 9/14/2006 Pilgrim Nuclear Power Station - Technical Specification Pages re Relocation of Technical Specifications Structural Integrity Requirements to Final Safety Analysis Report.                                                           ML062620240 9/14/2006 Pre-Inspection Cover Sheet and Inspection Plan.                                                                   ML062610143 9/14/2006 Audit Trip Report Regarding Entergy Nuclear Operations Inc. License Renewal Application for Pilgrim Nuclear Power Station, dated January 25, 2006.                                                                            ML062580162 9/15/2006 10/02/2006 Commission Meetings - FRN.                                                                             ML062610270 9/18/2006 CR-PNP-2006-03467, Evidence of Past (Non-Active) Leakage Found on Torus Room Bay 1 Wall.                           ML070790156 9/19/2006 22}}

Latest revision as of 02:17, 4 November 2019

Karen Vale 50-293 ADAMS Docs 2006
ML14203A427
Person / Time
Site: Pilgrim
Issue date: 05/29/2014
From:
NRC/OIS/PMPD/IPB
To:
Armentrout D
Shared Package
ML14203A422 List:
References
Download: ML14203A427 (22)


Text

All Documents for Docket 05000293 in ADAMS Public Legacy from 01/01/2006 to 01/01/2007 Document Title Accession Number Document Date Pilgrim Nuclear Power Station Emergency Plan Changes to the Minimum Staffing Requirements for the Emergency Response Organization (ERO). ML060100456 1/3/2006 Letter to NRC from Ford, Entergy, Emergency Plan Changes to the Minimum Staffing Requirements for the Emergency Response Organization with handwritten notes. ML062680359 1/3/2006 G20060064/LTR-06-0041 - Sen T. Murray, Rep V. DeMacedo, and Rep T. O'Brien Ltr re: Relicensing of Pilgrim and Vermont Yankee ML060230046 1/12/2006 G20060054/LTR-06-0037 - Ltr. Alice Moore Re: Concerns Pilgrim and Vermont Yankee Relicensing. ML060190039 1/13/2006 2006/01/13-Comment (4) submitted by Wedge Bramhall on Proposed Rule PR-73 regarding Design Basis Threat. ML060180196 1/13/2006 G20060065/LTR-06-0042 - Ltr Mark D. Sylvia re: Concerns Pilgrim and Vermont Yankee Relicensing Applications. ML060230048 1/18/2006 EA-05-221, Office of Investigations Report No. 1-2004-030. ML060180548 1/19/2006 EA-05-220, Office of Investigations Report No. 1-2004-030. ML060180509 1/19/2006 Letter to Debbie Grinnell Regarding Department of Labor (DOL) Occupational Safety & Health Administration (OSHA) Finding of Discrimination of a Contract Worker by Williams Power Corporation. ML060240464 1/19/2006 2006/01/20-Comment (31) submitted by Pilgrim Security Watch, M. Lampert, et al. E. J. Epstein, N. Cohen, S. J.

Goodman, R. Becker, D. Katz and H. Moyer on Proposed Rule PR-73 regarding Design Basis Threat ML060240587 1/20/2006 2006/01/25-Email: (PA) Re: Checking In ML062120491 1/25/2006 2006/01/25-Pilgrim Nuclear Power Station Applicant's Environmental Report Operating License Renewal Stage, Appendix E. ML060830611 1/25/2006 Pilgrim Nuclear Power Station Updated Final Safety Analysis Report Supplement. ML060300029 1/25/2006 2006/01/25-Transmittal of Pilgrim Nuclear Power Station License Renewal Application. ML060300026 1/25/2006 2006/01/25-Pilgrim, License Renewal Application Boundary Drawings. ML060470248 1/25/2006 2006/01/25-Pilgrim Nuclear Power Station License Renewal Application. ML060300028 1/25/2006 2006/01/27-Email: (PA) Receipt of License Renewal Applications for VY and Pilgrim ML062120498 1/27/2006 G20050841/LTR-05-0588-Mary Elizabeth Lampert Ltr. re. Pilgrim Nuclear Power Station E-mail Concerns Single Loop Operation Amendment. ML060260021 1/27/2006 OFFICIAL EXHIBIT - PWA000006-00-BD01 - "Modeling of the Coastal Boundary Layer and Pollutant Transport in New England." ML110600901 1/31/2006 Exhibit PWA 00006, "Modeling of the Coastal Boundary Layer and Pollutant Transport in New England." ML110030899 1/31/2006 2006/01/31-Press Release-06-011: NRC Announces Availability of License Renewal Applications for Vermont Yankee and Pilgrim. ML060310043 1/31/2006 1

All Documents for Docket 05000293 in ADAMS Public Legacy from 01/01/2006 to 01/01/2007 2006/01/31-Receipt and Availability of the License Renewal Application for the Pilgrim Nuclear Power Station. ML060310593 1/31/2006 Pilgrim Nuclear Power Station - Seawater System Procedure 2.2.94. ML061390083 2/1/2006 (3) ENN-NDE-10.03, Rev. 1; "VT-3 Examination," 02/02/2006. ML070680157 2/2/2006 ENN-NDE-10.03, 02/02/06, VT-3 Examination. ML070790208 2/2/2006 2006/02/03-Email: (PA) FWD: Government to Government Meeting for Vermont Yankee License Renewal ML062120499 2/3/2006 E-mail: (PA) FWD: Government to Government Meeting for Vermont Yankee License Renewal ML062120501 2/3/2006 E-mail: (PA) Re: FWD: Government to Government Meeting for Vermont Yankee License Renewal ML062120502 2/3/2006 IR 05000293-05-005; 10/01/2005 -12/31/2005; Pilgrim Nuclear Power Station; Flood Protection Measures; Maintenance Effectiveness. ML060340630 2/3/2006 2006/02/03 - Maintenance of Reference Material at the Plymouth Public Library for the Pilgrim Nuclear Power Station License Renewal Application. ML060370581 2/3/2006 E-mail: (PA) Re: FWD: Government to Government Meeting for Vermont Yankee License Renewal ML062120536 2/6/2006 E-mail: (PA) Re: FWD: Government to Government Meeting for Vermont Yankee License Renewal ML062120539 2/6/2006 PNPS Site Plan Monitoring Wells. ML061420358 2/13/2006 (2) ENN-NDE-10.01, Rev. 2; "VT-1 Examination," 02/13/2006. ML070680154 2/13/2006 03/08/2006 Notice of Forthcoming Public Information Session for the U.S. Nuclear Regulatory Commission (NRC)

Staff to Describe the License Renewal Process. ML060440543 2/13/2006 2006/02/15-Email: (PA) License Renewal Tentative Govt to Govt Mtgs around VY. ML062120543 2/15/2006 Pilgrim Nuclear Power Station Physical Security Plan, Revision 1. ML060520022 2/15/2006 Pilgrim Nuclear Power Station Relief Request No. PPR-05 (TAC No. MC8288). ML060120127 2/17/2006 2006/02/23-Groundwater Monitoring Well Repairs and Re-Survey Report, Pilgrim Power Station, Plymouth, Massachusetts. ML061430204 2/23/2006 Pilgrim, Withdrawal of Inservice Inspection 10 CFR 50.55a (g)(4)(iv) Request No. PIL-05-R-03. ML060620508 2/23/2006 G20060065/LTR-06-0042 - Mark Sylvia Ltr. re Concerns Pilgrim and Vermont Yankee relicensing applications. ML060250068 2/25/2006 G20060054/LTR-06-0037 - Alice Moore Ltr. re. Concerns Pilgrim and Vermont Yankee Relicensing. ML060240024 2/25/2006 Entergy Nuclear Northeast - Fitness-for-Duty Program Performance Report For the Period July 2005 - December 2005. ML060620058 2/27/2006 G20060064/LTR-06-0041 - Sen. T. Murray Ltr. re. concerns relicensing of Pilgrim and Vermont Yankee. ML060240309 2/27/2006 G20060064/LTR-06-0041 - Rep. V. DeMacedo and Rep. T. O'Brien Ltr. re. Concerns relicensing of Pilgrim and Vermont Yankee. ML060340238 2/27/2006 2006/02/28-Email: (PA) Closeout: G20060065/LTR-06-0042 - Relicensing of Pilgrim and Vermont Yankee ML062120549 2/28/2006 2

All Documents for Docket 05000293 in ADAMS Public Legacy from 01/01/2006 to 01/01/2007 Press Release-I-06-011: NRC To Hold March 8th Public Meeting In Plymouth, Mass., On License Renewal Application For Pilgrim Nuclear Plant. ML060600528 3/1/2006 Annual Assessment Letter - Pilgrim Nuclear Power Station (Report 05000293/2006001). ML060620371 3/2/2006 E-mail from Johnson to Shea, Pilgram ERO Staffing Change Request. ML062680363 3/6/2006 03/07/2006 - RIC 2006 Presentation - T1E - John F. McCann - License Renewal. ML061590158 3/7/2006 2006/03/07- - RIC 2006 Presentation - T1F - Garry G. Young - License Renewal. ML061590232 3/7/2006 03/07/2006 - RIC 2006 Presentation - T2E - Vincent Coulehan - Use of Operating Experience (Regulator/Operator/Licensee). ML061780271 3/7/2006 CR-PNP-----------, CR Just Entered, Operability of Refuel Bellows Seal Rupture Drain Leakage Alarm Switch. ML070780197 3/8/2006 E-mail form Johnson to Shea, Phone Call with Pilgrim on ERO Staffing Submittal. ML062680365 3/10/2006 03/11/2006 Annual Town Meeting Summary. ML061030404 3/11/2006 D. Johnson Calendar, 10:00 - 11:00 a.m. Scheduled Conference Call with Pilgrim. ML063280250 3/14/2006 Issuance of Orders Requiring Compliance With Updated Adversary Characteristic. ML060590464 3/20/2006 Pilgrim, Follow-Up Response to NRC Generic Letter 2003-01. ML060890468 3/20/2006 Pilgrim Nuclear Power Station Relief Request No. PRR-11, (TAC No. MC8294) ML060340028 3/21/2006 Determination of Acceptability and Sufficiency for Docketing, Proposed Review Schedule, and Opportunity for a Hearing regarding the Application from Entergy Nuclear Operations, Inc., for Renewal of the Operating License for the Pilgrim Nuclear Power. ML060800745 3/21/2006 2006/03/21-Email: (PA) VY Notice of Acceptablilty and Opportunity to Request a Hearing ML062120625 3/21/2006 Pilgrim Revision to License Amendment Request Single Recirculation Loop Operation. ML060900430 3/22/2006 Pilgrim Nuclear Power Station Relief Request No. PRR-9, (TAC No. MC8292). ML060240055 3/22/2006 Press Release-06-040: NRC Announces Opportunity to Request a Hearing on Application to Renew Operating License for Pilgrim Nuclear Power Station. ML060810457 3/22/2006 Pilgrim, Indian Point, James A. Fitzpatrick, and Vermont Yankee Nuclear Power Station, Proof of Financial Protection (10 CFR 140.15) and Guarantee of Payment of Deferred Premiums (10 CFR 140.21). ML060960137 3/28/2006 2006/03/29-Pilgrim: NRC Contact Report - Arrange Meeting with Town Officials During Site Audit (Intergovernmental). ML063470176 3/29/2006 2006/03/29-E-MAIL: (PD) Pilgrim CZM Notice. ML063450368 3/29/2006 FitzPatrick, Indian Point Units 1, 2, and 3, Pilgrim, and Vermont Yankee, Sources and Levels of Insurance Required by 10 CFR 50.54(w). ML060950418 3/29/2006 2006/03/29-E-MAIL: (PD) CZM. ML063470312 3/29/2006 2006/03/30-Email: (PA) PNPS Audit Plan. ML062480291 3/30/2006 2006/03/30-E-MAIL: (Intergovernmental) Re: Pilgrim Audit. ML063470309 3/30/2006 3

All Documents for Docket 05000293 in ADAMS Public Legacy from 01/01/2006 to 01/01/2007 Letter dated. 3/31/06 to Multiple Addressees who did not participate in the March 8, 2006 Generic Fundamentals Exam (GFE). ML060930539 3/31/2006 2006/03/31-Email: (PA) Re: Request - License Renewal Work for CFEB ML062120629 3/31/2006 2006/04/03-Pilgrim: NRC Contact Report - Arrange meeting with Town personnel during May Site Audit (Intergovernmental). ML063470180 4/3/2006 2006/04/03-Email: (PA) Re: Request - License Renewal Work for CFEB ML062120631 4/3/2006 Pilgrim, Response to Generic Letter 2006-02, Grid Reliability and the Impact on Plant Risk and the Operability of Offsite Power, dated February 1, 2006. ML060950434 4/3/2006 2006/04/04-E-mail: (PA) Pilgrim Audit Plan ML062480085 4/4/2006 04/18/2006 Public Meeting Notice for the Annual Assessment Meeting with Entergy (Pilgrim Station) to Discuss CY2005 Performance. ML060940370 4/4/2006 04/18/2006, NRC Slides for Annual Assessment Public Meeting with Entergy (Pilgrim Station) Reference CY2005 Performance. ML060940408 4/4/2006 Pilgrim Nuclear Power Station - Relief Request No. PIL-05-R-002, (TAC MC8300). ML060660132 4/5/2006 2006/04/05-Pilgrim: NRC Contact Report - Follow Up from 4/3/06 Telephone Call (Intergovernmental). ML063470183 4/5/2006 2006/04/05-Pilgrim: NRC Contact Report - Arrange meeting with Town personnel during Site Audit in May

[4/5/06] (Intergovernmental). ML063470189 4/5/2006 2006/04/06-E-MAIL: (Intergovernmental) Re: Pilgrim Audit [List for Plymouth meeting]. ML063470313 4/6/2006 2006/04/06-Email: (PA) Questions counts... ML062120636 4/6/2006 2006/04/07-Email: (PA) AMP, AMR, and TLAA questions for PNPS ML062120642 4/7/2006 4/7/06 - Notice Of Intent To Prepare An Environmental Impact Statement And Conduct Scoping Process For License Renewal For The Pilgrim Nuclear Power Station (TAC NO. MC9676) ML061000261 4/7/2006 2006/04/10-Email: (PA) 1999 LR Guidance on Dams ML062130095 4/10/2006 Pilgrim Nuclear Power Station - Technical Specification Pages re Revised Applicability For Containment Oxygen And Differential Pressure Limits (TAC MC7056). ML061140265 4/10/2006 2006/04/10-E-MAIL: (PD) FW: Massachusetts Tribal Information. ML063470217 4/10/2006 2006/04/10-Pilgrim: NRC Contact Report - Arrange Meeting with Planning Council Staff During Site Audit in May (Intergovernmental). ML090770464 4/10/2006 Press Release-I-06-020: NRC to Discuss 2005 Performance Assessment for Pilgrim Nuclear Power Plant. ML061000374 4/10/2006 Pilgrim Nuclear Power Station - Issuance Of Amendment RE: Revised Applicability For Containment Oxygen And Differential Pressure Limits (TAC MC7056). ML053140433 4/10/2006 2006/04/11-E-MAIL: (PD) CZM Consistency Determination. ML063460541 4/11/2006 Pilgrim, Proposed License Amendment to Change Technical Specification 3.6.A.2, Pressure-Temperature Limit Curves. ML061090832 4/12/2006 4

All Documents for Docket 05000293 in ADAMS Public Legacy from 01/01/2006 to 01/01/2007 Pilgrim, Issuance of Amendment Re: Single Recirculation Loop Operation (TAC No. MC4333). ML060170119 4/12/2006 2006/04/12-E-MAIL: (Intergovernmental) May 3 meeting - Pilgrim NPS license renewal [List for Duxbury meeting]. ML063470326 4/12/2006 2006/04/12-E-MAIL: (Intergovernmental) May 4 meeting - Pilgrim NPS license renewal [List for Carver meeting]. ML063470329 4/12/2006 2006/04/12-E-MAIL: (Intergovernmental) May 4 meeting - Pilgrim NPS license renewal [List for Old Colony meeting]. ML063470319 4/12/2006 2006/04/12-E-MAIL: (Intergovernmental) May 3 meeting - Pilgrim NPS license renewal [List for Kingston Meeting]. ML063470324 4/12/2006 Pilgrim, Tech Spec Pages for Amendment 219 regarding Single Recirculation Loop Operation. ML061070167 4/12/2006 Pilgrim, License Amendment 221 regarding Revised Rod Worth Minmizer ByPass Allowances. ML060740214 4/13/2006 Pilgrim Nuclear Power Station-Issuance Of Amendment RE: Removal Of Main Steam Isolation Valve Twice Per Week Testing Surveillance Requirement (TAC MC7052). ML060600040 4/13/2006 Pilgrim, Technical Specification Page, deletes the main steam isolation valve twice per week partial stroke testing surveillance specified in Technical Specification 4.7.A.2.b.1.c. ML061070215 4/13/2006 Pilgrim Nuclear Power Station, Technical Specification Page re Revised Rod Worth Minimizer Bypass Allowances (TAC MC7055). ML061070204 4/13/2006 2006/04/16-Pilgrim April 2008 Evidentiary Hearing - Intervenor Exhibit 16, Seismic: New England Not Immune to Strong Temblors and Specialists Say that a Major Event is Only a Matter of Time, Boston Globe, Bryan Bender, April 16, 2006. ML081090291 4/16/2006 2006/04/18-E-MAIL: (PA) NRC Issues Notice of Intent to Prepares EIS Pilgrim LRA. ML063470100 4/18/2006 2006/04/18-E-MAIL: (PD) Pilgrim Nuclear Generating Station License Renewal Application. ML063460545 4/18/2006 PNPS Monthly Groundwater Discharge Data. ML061420183 4/21/2006 2006/04/21 - Request for Comments Regarding the Pilgrim Nuclear Power Station License Renewal Application Review. ML061160613 4/21/2006 4/21/06 - Request for Comments Regarding the Pilgrim Nuclear Power Station License Renewal Application Review. ML061170222 4/21/2006 4/21/06 - Request for Comments Regarding the Pilgrim Nuclear Power Station License Renewal Application Review. ML061170152 4/21/2006 2006/04/21- - Request for Comments Regarding the Pilgrim Nuclear Power Station License Renewal Application Review. ML061170085 4/21/2006 2006/04/24-E-mail: (PA) PNPS AMP Questions ML062120415 4/24/2006 Pilgrim Nuclear Power Station - Request for Additional Information Regarding Unresolved Inspection Item 05000293-05-003-01 From the NRC Integrated Inspection Report 05000293-05-003 (TAC No. MD0178). ML060970397 4/24/2006 5

All Documents for Docket 05000293 in ADAMS Public Legacy from 01/01/2006 to 01/01/2007 2006/04/25 - Request for a List of Protected Species and Essential Fish Habitat Within the area Under Evaluation for the Pilgrim Nuclear Power Station License renewal Application Review. ML061160283 4/25/2006 2006/04/25 - Request for a List of Protected Species Within the Area Under Evaluation for the Pilgrim Nuclear Power Station License Renewal Application Review. ML061160303 4/25/2006 2006/04/25-E-Mail: Re: Teleconference, Needed Information, and Updated Environmental Audit Schedule. ML063070331 4/25/2006 License Renewal Audit and Review Plan for Plant Aging Management Review and Programs for the Pilgrim Nuclear Power Plant, Docket Number 50-293. ML061220630 4/26/2006 2006/04/26-Pilgrim: NRC Contact Report - Follow up from Alicia Williamson's call to Mr. Halkiotis, in regard to meeting with Town personnel during Site Audit in May (Intergovernmental). ML063470174 4/26/2006 2006/04/27-Email: (PA) PNPS LRA Appendix C - BWRVIP Actions ML062090546 4/27/2006 Pilgrim Nuclear Power Station - Notification of Conduct of a Triennial Fire Protection Baseline Inspection. ML061170110 4/27/2006 2006/04/28-E-MAIL: (Intergovernmental) May 3 meeting - Pilgrim NPS license renewal [List for Marshfield meeting]. ML063470333 4/28/2006 2006/04/28-Email: (PA) Pilgrim Questions to be Discussed at the Audit ML062090499 4/28/2006 2006/04/28-Pilgrim: NRC Contact Report - Arrange meeting with Town personnel during Site Audit in May (Intergovernmental). ML063470170 4/28/2006 2006/04/28- 05/17/2006 Notice of Meeting to Discuss the Environmental Scoping Process for Pilgrim Nuclear Power Station, License Renewal Application (LRA) ML061180424 4/28/2006 2006/04/30-Marine Ecology Studies Report #67, Appendix B, Geometric Mean Monthly Ichthyoplankton Densities Jan-Dec. 2005 ML062010482 4/30/2006 2006/05/01-(PD) Ecology Meeting Notes Pilgrim Nuclear Power Station Site Audit on May 1, 2006. ML063470051 5/1/2006 05/02/2006 - Pilgrim Nuclear Power Station License Renewal Application Review. ML061240335 5/2/2006 2006/05/02-(PD) Pilgrim Nuclear Power Station License Renewal Site Audit Off-Site Meetings May 2-4, 2006 Draft Meeting Notes. ML063470072 5/2/2006 Pilgrim - Revision to the Request for Amendment to the Technical Specifications (TS) - Deletion of Requirement Related to NRC Approval of Engineering Evaluation for Elevated Relief Valve Discharge Pipe Temperature. ML061320018 5/2/2006 Press Release-I-06-030: NRC Seeks Public Input on Environmental Review Associated with License Renewal Proposed for Pilgrim Nuclear Power Plant. ML061230411 5/3/2006 Indian Point Units 1, 2, and 3, Vermont Yankee, Pilgrim, James A. FitzPatrick; Entergy Operations, Inc., Service List Update. ML061290424 5/3/2006 2006/05/03-E-MAIL: (Intergovernmental) Town of Kingston population figures. ML063470335 5/3/2006 2006/05/03-E-MAIL: (Intergovernmental) FW: Planners Event on Current Trends in MetroBoston. ML063470336 5/3/2006 6

All Documents for Docket 05000293 in ADAMS Public Legacy from 01/01/2006 to 01/01/2007 Email: (PA) Re: Re-assignment of Tables 3.3.2.14-X ML062090497 5/4/2006 2006/05/04-Email: (PA) Re: Re-assignment of Tables 3.3.2.14-X ML062120647 5/4/2006 2006/05/04-Email: (PA) PNPS Template for not consistent with Gall AMRs ML062090496 5/4/2006 2006/05/04-Email: (PA) AMP questions ML062090488 5/4/2006 Photos taken on 05/04/2006 of view looking toward Pilgrim station from junction of Pricilla and White Horse beaches. ML062010490 5/4/2006 Pilgrim Nuclear Power Station - Correction to Amendment No. 221 Re: Revised Rod Worth Minimizer Bypass Allowances (TAC No. MC7055) ML061180083 5/5/2006 2006/05/05-E-MAIL: (Intergovernmental) Town of Carver, MA GIS layer list. ML063470111 5/5/2006 Pilgrim Nuclear Power Station - Correction to Amendment No. 221 re: Revised Rod Worth Minimizer Bypass Allowances - Technical Specifications. ML061300095 5/5/2006 2006/05/05-Email: (PA) Re: PNPS Template for not consistent with GALL AMRs ML062090493 5/5/2006 EMAIL: (PA) Re: Bolting Integrity Program ML062090490 5/5/2006 2006/05/05-Email: (PA) Re: Bolting Integrity Program ML062090498 5/5/2006 2006/05/05-EMAIL: (PA) AMR Template for Not Consistent with Gall Section ML062090322 5/5/2006 2006/05/06-E-MAIL: (PD) FW: New dwelling units. ML063470256 5/6/2006 Pilgrim, Main Stack Inspection Report - 05/08/2006. ML070440481 5/8/2006 2006/05/08-Email: (PA) AMR's questionary for Pilgrim ML062090324 5/8/2006 2006/05/09-E-MAIL: (Intergovernmental) Re: How many housing units built since 2000?. ML063470401 5/9/2006 EMAIL: (PA-LR) PNPS Documents. ML063050514 5/9/2006 2006/05/09-E-MAIL: (Intergovernmental) Re: New dwelling units. ML063470191 5/9/2006 (NPA-PD) Letter to Mary Lampert from the Commonwealth of Massachusetts Executive Office of Heath and Human Services, Department of Public Health, Regarding Child Heath Statistics. ML071290155 5/9/2006 2006/05/09-E-mail: (Intergovernmental) Re: Planners Event on Current Trends in MetroBoston. ML063470338 5/9/2006 2006/05/09-EMAIL: (PA) AMR Review of Section 3.3 ML062090328 5/9/2006 2006/05/10-Email: (PA) Draft Questions for the Aging Management Program (AMP) Gall Consistency Audit - for Pilgrim. ML062480272 5/10/2006 E-Mail: Guidance How to File Petition for Intervention with NRC - Pilgrim LRA. ML063070187 5/10/2006 2006/05/10-Email: (PA) FWD: Pilgrim AMP Combined Questions ML062480283 5/10/2006 2006/05/10-E-Mail: Draft questions for the Aging Management Program (AMP) Gall consistency audit - for Pilgrim LRA. ML063070393 5/10/2006 2006/05/11-E-Mail: Pilgrim Letter 2.06.040 - License Renewal Application, Amendment 1. ML063070402 5/11/2006 Pilgrim - Annual Radiological Environmental Operating Report for January 1 through December 31, 2005. ML061370574 5/11/2006 2006/05/11-EMAIL: (PA-INT-LR) Document Comparing PNPS Entrained Species to Other MA Stations. ML063050518 5/11/2006 7

All Documents for Docket 05000293 in ADAMS Public Legacy from 01/01/2006 to 01/01/2007 Pilgrim Nuclear Power Station - Request For Additional Information Regarding Relief Request PRR-10, Fourth 10-Year Inservice Inspection Program Plan (TAC MC8293). ML061210140 5/11/2006 E-Mail: Revised AMR Initial; from Johnny Eads 5/11/2006 4:01 pm. ML063070384 5/11/2006 Pilgrim, Annual Radiological Effluent and Waste Disposal Report for January 1 Through December 31, 2005. ML061380653 5/11/2006 2006/05/11-EMAIL: (PA) Table 3.3.1 AMR questions ML062090333 5/11/2006 LER 06-01-000, Pilgrim re Manual Scram due to High Offgas Recombiner Temperature resulting from Inadequate Preventive Recombiner Preheater Pressure Control Valve Controller. ML061370622 5/11/2006 2006/05/11-Pilgrim Nuclear Power Station, License Renewal Application, Amendment 1. ML061380549 5/11/2006 2006/05/11- Pilgrim Nuclear Power Station License Renewal Application Review (SHPO No. RC36661) ML061310234 5/11/2006 2006/05/12-Pilgrim April 2008 Evidentiary Hearing - Staff Exhibit 19, 05/12/2006 Letter from Clifford Anderson (NRC) to Entergy re Pilgrim Nuclear Power Station - NRC Integrated Inspection Report 05000293/2006002. ML081090553 5/12/2006 IR 05000293-06-002 on 01/01/2006 - 03/31/2006 for Pilgrim Nuclear Power Station. Personnel Performance During Non-routine Plant Evolutions. ML061320564 5/12/2006 2006/05/12-PNPS License Scoping Comment - Tom Belcher. ML062410406 5/12/2006 E-Mail: Guidance how to file petition for intervention with NRC - Pilgrim LRA. ML063070405 5/12/2006 Part 21 60-Day Interim Report Notification: BWR Core Shroud Tie Rod Upper Support Cracking. ML061360465 5/12/2006 Transmittal Letter for License Renewal Audit and Review Plan for Plant Management Reviews and Programs for the Pilgrim Nuclear Power Plant Docket 50-293. ML061220716 5/15/2006 Entergy Quality Assurance Program Manual, Revision 13. ML061370593 5/15/2006 Entergy Operations, Inc., Request for Use of Delta Protection Mururoa V4F1 R Supplied Air Suits. ML061440167 5/16/2006 Entergy Operations, Inc., Application to Use Weighting Factors for External Exposure. ML061430359 5/16/2006 Pilgrim Nuclear Power Station - Request For Additional Information Regarding Relief Request PRR-15, Fourth 10-Year Inservice Inspection Program Plan (TAC No. MC8298). ML061020041 5/16/2006 2006/05/17-Pilgrim Nuclear Power Station Environmental Scoping Meeting Handouts. ML061420164 5/17/2006 : Evening Transcript, Public Scoping Meeting for Pilgrim, 05/17/2006. ML061700050 5/17/2006 : Afternoon Transcript, Public Scoping Meeting for Pilgrim, 05/17/2006. ML061700046 5/17/2006 CR-PNP-2006-01914 - Pilgrim. ML070440479 5/18/2006 2006/05/18-E-mail: (Intergovernmental) Townscape Plan for Marshfield. ML063470405 5/18/2006 Pilgrim, RAI, Regarding Technical Specification Changes to Revise Reactor Coolant Leakage Detection System Instrumentation (TAC No. MC7255). ML061210172 5/18/2006 2006/05/18-(PD) PNPS LR EIS Ecology Meeting May 18, 2006. ML063470067 5/18/2006 8

All Documents for Docket 05000293 in ADAMS Public Legacy from 01/01/2006 to 01/01/2007 2006/05/19-Project Manager Change for the License Renewal Environmental Review for Pilgrim Nuclear Power Station. ML061410001 5/19/2006 2006/05/19-E-MAIL: (PD) Information re: Pilgrim LRA. ML063460507 5/19/2006 2006/05/19-EMAIL: (PA-LR) Information re: Pilgrim LRA. ML063060296 5/19/2006 Request for the Use of Delta Protection's Self Fed Single Use Mururoa BLU" Suit Systems. ML061430015 5/19/2006 2006/05/22-Request for Additional Information (RAI) Regarding Severe Accident Mitigation Alternatives (SAMA) for Pilgrim Nuclear Power Station (TAC No. MC9676). ML061440026 5/22/2006 2006/05/22-E-MAIL: (PD) Found Extra Color Copy. ML063460496 5/22/2006 2006/05/22-EMAIL: (PA-LR) Pilgrim ETE Comments. ML063050506 5/22/2006 2006/05/23-U.S. Dept. of the Interior Fish and Wildlife Service, Letter Dated May 23, 2006 - Regarding: Formal Consultation on Pilgrim License Renewal Not Required. ML061650016 5/23/2006 2006/05/24-Ltr from Dr. Dean, ACHP to DLR to address license renewal application for Pilgrim. ML061710601 5/24/2006 2006/05/25-Exhibit NRC000003, Pilgrim LR Proceeding - Request for a Hearing and Petition to Intervene. ML110030975 5/25/2006 2006/05/30-Pilgrim - Pilgrim Watch Request for a Hearing and Petition to Intervene. ML061630125 5/25/2006 , 2005 Annual Report, and, Securities and Exchange Commission Form 10-K Submittal for All Entergy Nuclear Operations, Inc. Plants. ML061530419 5/25/2006 Declaration of Dr. Jan Beyea in Support of Massachusetts Attorney General's Contention and Petition for Backfit Order. ML111220356 5/25/2006 OFFICIAL EXHIBIT - NRC000003-00-BD01 - Request for a Hearing and Petition to Intervene. ML110600914 5/25/2006 2006/05/25-Pilgrim April 2008 Evidentiary Hearing - Staff Exhibit 18, Attachment 71111.07 (Issue Date 05/25/2006) "Heat Sink Performance" ML081090537 5/25/2006 James A. Fitzpatrick, Indian Point, Pilgrim, & Vermont Yankee Nuclear Power Stations, 2005 Annual Report, and, Securities and Exchange Commission Form 10-K Submittal for all Entergy Nuclear Operations, Inc. Plants. ML061530413 5/25/2006 2006/05/25-Declaration of Dr. Jan Beyea in Support of Massachusetts Attorney General's Contention and Petition for Backfit Order ML061640329 5/25/2006 Commonwealth of Massachusetts v. USNRC; Nos. 07-1482 and 07-1483; Joint Appendix. ML072500130 5/26/2006 Report To The Massachusetts Attorney General On The Potential Consequences Of A Spent- Fuel-Pool Fire At The Pilgrim Or Vermont Yankee Nuclear Plant. ML12094A181 5/26/2006 Exhibit 1. Declaration of Dr. Gordon Thompson in Support of Massachusetts Attorney General's Contention and Petition for Backfit Order. ML111220350 5/26/2006 Risks and Risk-Reducing Options Associated with Pool Storage of Spent Nuclear Fuel at the Pilgrim and Vermont Yankee Nuclear Power Plants. ML12094A180 5/26/2006 9

All Documents for Docket 05000293 in ADAMS Public Legacy from 01/01/2006 to 01/01/2007 2006/05/26-Pilgrim- Massachusetts Attorney General's Request for a Hearing and Petition for Leave to Intervene with Respect to Entergy Nuclear Operations Inc.'s Application for Renewal of the Pilgrim Nuclear Power Plant Operating License ML061630088 5/26/2006 Pilgrim Watch Request for Hearing Regarding Insufficiency of Order Modifying Licenses with Regard to Spent Reliable Spent Fuel Pool Instrumentation. ML12094A182 5/26/2006 2006/05/28-Email: (PA) Questions for NRC About the Reactor Head Closure Studs AMP (XI.M3) as described in the GALL Report ML062090338 5/28/2006 2006/05/30-EMAIL: (PA-LR) PNPS License Renewal - Environmental. ML063060299 5/30/2006 2006/05/30-E-MAIL: (PD) PNPS License Renewal - Environmental. ML063470200 5/30/2006 Entergy Operations, Inc, North and South, Effective Dose Equivalent Weighting Factors for External Exposure. ML061440110 5/30/2006 Entergy Operations, Inc, North and South, Delta Protection Mururoa V4F1 R Supplied Air Suits. ML061440173 5/30/2006 2006/05/30-Letter from Diane Curran submitting the originals of several documents for which copies of faxed signature pages were filed on May 26, 2006 in connection with the Massachusetts Attorney General's hearing request and backfit petition ML061640031 5/30/2006 2006/05/31-E-MAIL: (Intergovernmental) FW: No subject [from M. Sylvia to A. Parker]. ML063470408 5/31/2006 2006/06/01-E-MAIL: (Intergovernmental) Plymouth Population & Buildout Data [Forecasts]. ML063470412 6/1/2006 2006/06/02-E-MAIL: (Intergovernmental) FW: No Subject [6/2/06 from M. Sylvia to A. Parker]. ML063470418 6/2/2006 2006/06/02-EMAIL: (PA-LR) FW: Word Document of NRC LRA Programs Audit of Pilgrim. ML063050504 6/2/2006 2006/06/02-EMAIL: (PA-LR) PNPS - Spotted Turtle. ML063060322 6/2/2006 Response to NRC Request for Additional Information Regarding Unresolved Inspection Item 05000293/2005003-01 from NRC Integrated Inspection Report 05000293-05-003. ML061640348 6/5/2006 2006/06/05-E-MAIL: (PD) Invasive Nuisances. ML063470194 6/5/2006 2006/06/05-Pilgrim - Notice of Adoption of Contention by Pilgrim Watch. ML061720384 6/5/2006 Pilgrim Response to NRC Generic Letter 2006-03, "Potentially Nonconforming Hemyc and MT Fire Barrier Configurations." ML061640132 6/6/2006 Pilgrim, Request for Use of ASME Code Case N-623 and Withdrawal of Pilgrim Relief Request No. PRR-12. ML061710355 6/6/2006 2006/06/06-Hearing Referral Memorandum from A. Vietti-Cook to P. Bollwerk, ASLBP. ML061600221 6/6/2006 2006/06/07-Pilgrim, License Renewal Application, Amendment 2. ML061710422 6/7/2006 2006/06/07-Establishment of Atomic Safety and Licensing Board ML061590519 6/7/2006 2006/06/08-E-Mail: FWD: LRA Amendment 2 (Updated Drywell Shell Information). ML063070330 6/8/2006 2006/06/08-Ltr from Mr. Colosi, NOAA to DLR addressing EFH. ML061710600 6/8/2006 2006/06/09-EMAIL: (PA-LR) Another Round of AMR Questions and TLAA Questions. ML063050512 6/9/2006 2006/06/09-E-Mail: The second set of AMR Questions. ML063070327 6/9/2006 10

All Documents for Docket 05000293 in ADAMS Public Legacy from 01/01/2006 to 01/01/2007 2006/06/12-Comment (1) of Mary Lampert, re Scope of the Environmental Review for Pilgrim's License Renewal Application. ML061670101 6/12/2006 2006/06/13-Pilgrim - Notice of Appearance of David R. Lewis and Paul A. Gaukler as Counsel on Behalf of Entergy Nuclear Generation Company and Entergy Nuclear Operations, Inc. ML061720163 6/13/2006 2006/06/14-Comment (2) of Mary Lampert on Behalf of Pilgrim Watch regarding Scope of the Environmental Review for Pilgrim License Renewal Application - Direct Torus Vent System. ML061710104 6/14/2006 Pilgrim - Response to NRC Request for Additional Information Regarding Technical Specification Changes to Revise Reactor Coolant Leakage Detection System Instrumentation. ML061720084 6/14/2006 2006/06/14-LB Order (Regarding Schedule and Guidance for Proceedings) ML061660047 6/14/2006 2006/06/15-Comment (3) of Diane Curran, and Matthew Brock, re EIS Scoping Process for Pilgrim Nuclear Plant License Renewal, Proceeding, 71 Fed. Reg. 19,554 (April 14, 2006). ML061770277 6/15/2006 2006/06/15-Pilgrim - NRC Staff Answer to Notice of Adoption of Contentions by Pilgrim Watch ML061670039 6/15/2006 2006/06/15- Pilgrim - Notices of Appearance for Susan L. Uttal and Harry E. Wedewer ML061670059 6/15/2006 2006/06/15-Comment (6) of R. J. Chin, H Chang, M. Lampert, M. Morrison, & B. Pye on Scope of Environmental Review for the Pilgrim Nuclear Power Station's License Renewal Application-Federal Register Notice, April 14, 2006. ML061770407 6/15/2006 2006/06/16-Pilgrim - Unopposed Motion for Extension of Time to Reply to NRC Staff Response to Hearing Request. ML061810395 6/16/2006 2006/06/16-Comment (7) of Elizabeth A. Higgins, re Scoping Comments in Response to Notice of Intent to Prepare Environmental Impact Statement for Pilgrim Nuclear Power Station in Plymouth, Massachusetts. ML061770045 6/16/2006 2006/06/16-Comment (4) of Sheila S. Hollis, re Pilgrim Power Station Regarding Renewal of Facility Operating License DPR-35 for a 20 Year Period. ML061770043 6/16/2006 2006/06/16-Pilgrim- Request of the Town of Plymouth to Participate as of Right Under 2.315(c). ML061740346 6/16/2006 2006/06/16-Pilgrim - Unopposed Motion for Extension of Time to Reply to NRC Staff Response to Hearing Request, filed by D. Curran, Counsel for Massachusetts Attorney General. ML061780634 6/16/2006 2006/06/16-Pilgrim - Letter from D. Curran to Judge Young providing recent decision by U.S. Court of Appeals for the Ninth Circuit. ML061740349 6/16/2006 2006/06/26-Pilgrim - Email from S. Hollis to Judge Young re: Participation in Pilgrim Proceeding and Notice of Appearance. ML061780125 6/16/2006 2006/06/19-Exhibit NRC000005, Pilgrim LR Proceeding - NRC Staff's Response to Request for Hearing and Petition to Intervene Filed by Pilgrim Watch. ML110030977 6/19/2006 2006/06/19-Pilgrim - NRC Staff's Response to Request for Hearing and Petition to Intervene Filed by Pilgrim Watch ML061710086 6/19/2006 11

All Documents for Docket 05000293 in ADAMS Public Legacy from 01/01/2006 to 01/01/2007 OFFICIAL EXHIBIT - NRC000005-00-BD01 - NRC Staff's Response to Request for Hearing and Petition to Intervene Filed by Pilgrim Watch. ML110600918 6/19/2006 FRN: General Notice, Letter A, Issuance of Order EA-06-137. Requiring Compliance with Key Radiological Protection Mitigation Strategies. ML061600023 6/20/2006 2006/06/20- Pilgrim - Official Transcript of Pilgrim Nuclear Power Station Pre-Hearing Conference. ML061740366 6/20/2006 FRN: General Notice, EA-06-137 Enclosure, Order Modifying Licenses (Effective Immediately) . ML061600076 6/20/2006 FRN: General Notice, Order EA-06-137, Attachment 1-A List of Licensees. ML061600087 6/20/2006 2006/06/20-Comment (5) of Frank Gorke and Stephanie Abrahams on Scope of Environmental Review for the Pilgrim Nuclear Power Station License Renewal Application - Federal Register Notice, April 14, 2006. ML061770395 6/20/2006 2006/06/21-Email: (PA) Additional Missing AMPs ML062510359 6/21/2006 2006/06/21-LB Order and Notice (Regarding Oral Argument and Limited Appearance Statement Sessions) ML061720397 6/21/2006 Pilgrim Nuclear Power Station, Response to NRC request for Additional Information Regarding Pilgrim Relief Request, PRR-10, Risk-informed ISI For Class 1, B-F and B-J Welds (TAC NO. MC8293). ML061860086 6/21/2006 2006/06/22-Email: (PA) Additional missing AMPs ML062510295 6/22/2006 2006/06/22-Pilgrim - Entergy's Answer to Massachusetts Attorney General's Request for a Hearing, Petition for Leave to Intervene, and Petition for Backfit Order. ML061790134 6/22/2006 2006/06/22-Pilgrim - NRC Staff Answer Opposing Massachusetts Attorney General's Request for Hearing and Petition for Leave to Intervene and Petition for Backfit Order ML061730482 6/22/2006 2006/06/22-Email: (PA) Additional Missing AMPs ML062510361 6/22/2006 2006/06/23-Press Release-I-06-038: Licensing Board to Hear Oral Arguments and Receive Public Comment in Pilgrim License Renewal Proceeding. ML061740031 6/23/2006 2006/06/25-E-mail: (PA) Additional AMR Question - Section 3.1.1 ML062120410 6/25/2006 2006/06/26-Pilgrim - Email from R. Chin, Duxbury Nuclear Advisory Committee to Judge Young re: Limited Appearance Statements ML061780159 6/26/2006 OFFICIAL EXHIBIT - NRC000004-00-BD01 - Entergy's Answer to the Request for Hearing and Petition to Intervene by Pilgrim Watch and Notice of Adoption of Contention. ML110600916 6/26/2006 2006/06/26-Exhibit NRC000004, Pilgrim LR Proceeding - Entergy's Answer to the Request for Hearing and Petition to Intervene by Pilgrim Watch and Notice of Adoption of Contention. ML110030974 6/26/2006 2006/06/26-E-MaiI: FWD: Comment (1) of Alex Marion on Behalf of Nuclear Energy Institute (NEI) on Proposed ISG LR-ISG-2006-01. ML063070323 6/26/2006 2006/06/26-Email: (PA) Audit Report Attachment 5 - List of Documents ML062130145 6/26/2006 2006/06/26-EMAIL: (PA-LR) Pilgrim [regarding: Environmental Scoping]. ML063060267 6/26/2006 2006/06/26-EMAIL: (PA-LR) Draft Qs on Section 2.3 on Pilgrim LRA Staff Request a Phone Call on June 27, 2006. ML063050509 6/26/2006 12

All Documents for Docket 05000293 in ADAMS Public Legacy from 01/01/2006 to 01/01/2007 2006/06/26-Pilgrim - Entergy's Answer to the Request for Hearing and Petition to Intervene by Pilgrim Watch and Notice of Adoption of Contention. ML061840216 6/26/2006 E-mail: (PA) Schedule ML062120408 6/26/2006 2006/06/27-E-mail: (PA) PNPS Response for AMR Items 460 and 512 - Potential Conflict in the Responses ML062120407 6/27/2006 2006/06/27-EMAIL: (PA-LR) Fwd: PNPS Response for AMR Items 460 and 512 - Potential Conflict in the Responses. ML063050396 6/27/2006 2006/06/27-Email: (PA) PNPS Response for AMR Items 460 and 512 - Potential Conflict in the Responses ML062090388 6/27/2006 Pilgrim - Request for Approval of ASME Code,Section XI, Third Ten-Year Relief Request, PRR-42, Examinations of Component Welds with Less Than Essentially 100% Examination Coverage. ML061870163 6/28/2006 2006/06/29-Email: (PA) Jim and Peter ML062090309 6/29/2006 2006/06/29-EMAIL: (PA-LR) Additional Questions From Bob Jackson ML063050603 6/29/2006 2006/06/29-Email: (PA) Re: QA for Aging Management of NSR Components ML062090318 6/29/2006 Pilgrim Nuclear Power Station - Relief Request No. PRR-4, (TAC MC8287). ML061450031 6/29/2006 2006/06/29-E-mail: (PA) - None - ML062120406 6/29/2006 2006/06/29-Email: (PA) Additional Question from Bob Jackson ML062130057 6/29/2006 2006/06/29-Email: (PA) Re: QA for Aging Management of NSR Components ML062130058 6/29/2006 2006/06/29-EMAIL: (PA-LR) Non-Safety Related SCs. ML063050610 6/29/2006 IR 05000293-06-006; 04/10/2006 - 05/19/2006; Pilgrim Nuclear Power Station; Component Design Bases Inspection. ML061800215 6/29/2006 2006/06/29-Email: (PA) Non-Safety Related SCs ML062130056 6/29/2006 Email: (PA) Re: QA for Aging Mangement of NSR Components ML062090569 6/29/2006 Pilgrim Nuclear Power Station - Relief Request No. PIL-05-R-001, TAC No. MC8299). ML061420470 6/29/2006 Pilgrim, Fourth Ten-Year In-Service Testing (IST) Program, IST Relief Request PR-03, Rev. 3. ML061870492 6/29/2006 2006/06/29- Pilgrim - Massachusett's Attorney General's Reply to Entergy's and NRC Staff's Responses to Hearing Request and Petition to Intervene. ML061870225 6/29/2006 2006/06/29-Email: (PA) PNPS Shell ML062090319 6/29/2006 2006/06/30-Email: (PA) Draft AMP Section of Audit Report ML062510364 6/30/2006 2006/06/30- 07/19/2006 Notice of Forthcoming Exit Meeting with Entergy Nuclear Operations, Inc., on License Renewal Scoping and Screening Methodology and the Aging Management Program / Aging Management Review Audits for Pilgrim Nuclear Power Station. ML061810424 6/30/2006 Pilgrim - Technical Specifications Amendment Request to Revise the Surveillance Requirements for the High Pressure Coolant Injection (HPCI) and Reactor Core Isolation Cooling (RCIC) Systems. ML061870469 6/30/2006 Email: (PA) Response to ARM Questions 482 & 483 ML062090567 6/30/2006 2006/06/30-Email: (PA) Response to ARM Questions 482 and 483 ML062090380 6/30/2006 13

All Documents for Docket 05000293 in ADAMS Public Legacy from 01/01/2006 to 01/01/2007 2006/06/30-Email: (PA) FWD: Questions and Answers of Pilgrim LRA Aging Management Reviews. ML062480379 6/30/2006 Pilgrim, Procedure No. 3.M.5-2, Revision 10, "Main Stack Inspection Guideline." ML070440482 6/30/2006 2006/06/30-Email: (PA) Questions and Answers of Pilgrim LRA Aging Management Reviews. ML062480297 6/30/2006 2006/06/30-Email: (PA:) FWD: Questions and Answers of Pilgrim LRA Aging Management Reviews ML062130018 6/30/2006 2006/06/30-EMAIL: (PA-LR) Questions and Answers of Pilgrim LRA Aging Management Reviews. ML063050613 6/30/2006 2006/06/30-Email: (PA) Draft AMP Section of Audit Report ML062120423 6/30/2006 Email: (PA) Re: QA for Aging Management of NSR Components ML062090307 7/3/2006 2006/07/03- Pilgrim - Pilgrim Watch Reply to Entergy Answer to Request for Hearing and Petition to Intervene by Pilgrim Watch. ML062160449 7/3/2006 2006/07/03-Email: (PA) Re: QA for Aging Management of NSR Components ML062090565 7/3/2006 2006/07/03- Pilgrim - Pilgrim Watch Reply to NRC's and Entergy's Answers to Notice of Adoption of Contention by Pilgrim Watch. ML062160441 7/3/2006 2006/07/05-Pilgrim - License Renewal Application Amendment 3. ML061940175 7/5/2006 Email: (PA) Re: Draft AMP section of Audit report ML062130089 7/5/2006 Email: (PA) Re: Quality Assurance for Aging Management of NSR Components ML062090294 7/5/2006 2006/07/05-Email: (PA) Re: Quality Assurance for aging management of NSR components ML062130064 7/5/2006 OFFICIAL EXHIBIT - ENT000007-00-BD01 - License Renewal Application Amendment 4: Response to Request for Additional Information Regarding Severe Accident Mitigation Alternatives for Pilgrim Nuclear Power Station. ML110600873 7/5/2006 2006/07/05-Email: (PA) Re: Draft AMP Section of Audit Report ML062090303 7/5/2006 2006/07/05-Email: (PA) FW: Handing of Generic Issues ML062130091 7/5/2006 2006/07/05-Email: (PA) Re: Quality Assurance for aging management of NSR components ML062130054 7/5/2006 Exhibit ENT000007, Pilgrim LR Proceeding, License Renewal Application Amendment 4: Response to Request for Additional Information Regarding Severe Accident Mitigation Alternatives for Pilgrim Nuclear Power Station. ML110030998 7/5/2006 2006/07/05-Email: (PA) Comments on the AMP writeup ML062130053 7/5/2006 Entergy Nuclear Operations Inc. License Renewal Application Amendment 3. ML090630395 7/5/2006 2006/07/05-Email: (PA) FYI: Draft Audit Report Shell TLAA on Metal Fatigue - Audit Report Section 4.3 ML062090297 7/5/2006 2006/07/05-Pilgrim, License Renewal Application Amendment 4: Response to Request for Additional Information Regarding Severe Accident Mitigation Alternatives. ML061930418 7/5/2006 2006/07/05-Email: (PA) Quality Assurance for Aging Management of NSR Components ML062090304 7/5/2006 2006/07/05-Email: (PA) PNPS's TLAA Section 4.6 ML062090305 7/5/2006 2006/07/05-Email: (PA) Quality Asurance for Aging Management of NSR Components ML062090561 7/5/2006 Email: (PA) Re: FW: Handling of Generic Issues ML062090300 7/5/2006 14

All Documents for Docket 05000293 in ADAMS Public Legacy from 01/01/2006 to 01/01/2007 2006/07/05-Email: (PA) PNPS's TLAA Section 4.6 ML062090563 7/5/2006 2006/07/06-Email: (PA) FYI: Draft Audit Report Shell TLAA on Metal Fatigue - Audit Report Section 4.3 ML062130086 7/6/2006 2006/07/06- Pilgrim - Official Transcript of Oral Arguments on Contentions for the Pilgrim Nuclear Power Station License Renewal Proceeding. ML061940179 7/6/2006 2006/07/06-Pilgrim - Official Transcript of Limited Appearance Comment Session in the Pilgrim Nuclear Power Station License Renewal Proceeding. ML061930218 7/6/2006 Email: (PA) Re: Quality Assurance for aging management of NSR components ML062130140 7/6/2006 2006/07/06-EMAIL: (PA-LR) FW: PNPS ER EJ writeup. ML063060309 7/6/2006 2006/07/06-Email: (PA) Additional AMR questions ML062130061 7/6/2006 2006/07/06-Email: (PA) Re: Quality Assurance for Aging Management of NSR Components. ML062120477 7/6/2006 Letter dated 7/7/06 to Multiple Addresses who did not participate in the June 7, 2006 Generic Fundamentals Examination (GFE) ML062360483 7/7/2006 2006/07/07-Pilgrim - Limited Appearance Statement by Maurice C. Cion. ML062070067 7/7/2006 2006/07/07- Pilgrim - Official Transcript of Oral Arguments on Contentions in the Pilgrim Nuclear Power Station License Renewal Proceeding. ML061930390 7/7/2006 2006/07/07-Email: (PA) Comments on Pilgrim AMP document ML062120480 7/7/2006 Email: (PA) Re: Comments on Pilgrim AMP Document ML062130142 7/7/2006 2006/07/07-Pilgrim - Limited Appearance Statement by W. Bramhall ML062060607 7/7/2006 2006/07/07-E-mail: (PA) Re: Comments on Pilgrim AMP document ML062120412 7/7/2006 2006/07/07-Email: (PA) Re: Comments on Pilgrim AMP Document ML062090293 7/7/2006 2006/07/10-E-Mail: FWD: Response to your question regarding Radwaste Piping. ML063070319 7/10/2006 2006/07/10-Pilgrim - Email from Diane Curran to ASLBP and Parties. ML062070055 7/10/2006 2006/07/11-EMAIL: (PA-LR) FW: Pilgrim Document 83. ML063060302 7/11/2006 2006/07/11-CZM Federal Consistency Review of the Pilgrim Nuclear Power Station Operating License Renewal; Plymouth. ML062090362 7/11/2006 2006/07/12- Pilgrim - Email from Susan Uttal to ASLBP and Parties. ML062070131 7/12/2006 2006/07/12-E-mail: FWD: Pilgrim License Renewal Application Amendment 3 Cover Letter and Attachment A. ML063070536 7/12/2006 2006/07/13-Summary of Public Scoping Meetings Conducted Related to the Review of the Pilgrim Nuclear Power Station, License Renewal Application. ML061700055 7/13/2006 2006/07/13-Pilgrim - Letter to the Administrative Judges from Counsel for Entergy following up on one of the two matters raised at last week's prehearing conference. ML062020235 7/13/2006 15

All Documents for Docket 05000293 in ADAMS Public Legacy from 01/01/2006 to 01/01/2007 Supplement to Request for the Use of Delta Protection's Self Fed Single Use "Mururoa BLU" Suit Systems; Arkansas Nuclear One, Indian Point, Grand Gulf, Waterford, FitzPatrick, River Bend Pilgrim, Vermont Yankee. ML061980028 7/13/2006 2006/07/13-Press Release-I-06-040: NRC To Meet With Entergy On July 19th To Discuss Pilgrim License Renewal Audit Findings. ML061940368 7/13/2006 2006/07/13- Pilgrim - Limited Appearance Statement of John R. Glover. ML062070224 7/13/2006 E-MAIL: NRC to Discuss Pilgrim Audit Findings. ML063070249 7/13/2006 Supplement to Request for Use of Delta Protection Mururoa V4F1 R Supplied Air Suits; Arkansas Nuclear One, Indian Point, Grand Gulf, Waterford, FitzPatrick, River Bend, Pilgrim, Vermont Yankee. ML061980030 7/13/2006 2006/07/14-Pilgrim - Email from Judge Young to the parties. ML062060614 7/14/2006 2006/07/14-LB Order (Regarding Need for Further Briefing on Definition of New and Significant Information As Addressed in Participants' Petitions, Answers and Replies Relating to massachusetts Attorney General contentioin and Pilgrim Watch Contention 4:. ML061950481 7/14/2006 Response to NRC Request for Additional Information and Revised Pilgrim Relief Request, PRR-15, Rev.1. ML062010210 7/14/2006 2006/07/14-Pilgrim - Email to Judge Young from Molly Bartlett ML062060616 7/14/2006 2006/07/17- Pilgrim - Limited Appearance Statement on Behalf of Clean Water Action (MASSPIRG) . ML062070051 7/17/2006 2006/07/17-EMAIL: (PA-LR) Re: Pilgrim [from Lampert to A. Williamson 7/17/06]. ML063060259 7/17/2006 2006/07/17-Email: (PA-LR) Additional info for ER. ML063060239 7/17/2006 2006/07/17-E-Mail: Core shroud tie rod upper support cracking- information request. ML063070252 7/17/2006 2006/07/17-EMAIL: (PA-LR) Re: Pilgrim. ML063060249 7/17/2006 2006/07/19-Pilgrim Nuclear Power Station - License Renewal Application Amendment 5. ML062080142 7/19/2006 2006/07/19-Pilgrim - License Renewal Application Amendment 5. ML062090075 7/19/2006 LER 06-002-00 for Pilgrim Nuclear Power Station re Small Quantities of Unaccountable Licensed Material. ML062080143 7/19/2006 2006/07/20- Pilgrim - Entergy providing follow up information from the prehearing conference on Pilgrim's aging management review to ASLBP. ML062120018 7/20/2006 2006/07/20- Pilgrim - Notice of Withdrawal and Certificate of Service for Harry E. Wedewer for Pilgrim Nuclear Power Station. ML062010500 7/20/2006 2006/07/20-Letter on behalf of more than two dozen organizations and individuals listed on draft Director's Decision dated June 28, 2006, regarding groundwater contamination petition submitted January 25, 2006. ML062190445 7/20/2006 2006/07/21- Pilgrim - Massachusetts Attorney General's Brief Regarding Relevance to this Proceeding of Regulatory Guide's Definition of "New and Significant Information." ML062080171 7/21/2006 2006/07/21-Email: (PA) Fwd: Re: RAI for section 3.5 ML062090383 7/21/2006 16

All Documents for Docket 05000293 in ADAMS Public Legacy from 01/01/2006 to 01/01/2007 2006/07/21- Pilgrim - Entergy's Brief on New and Significant Information in Response to Licensing Board Order of July 14, 2006. ML062080589 7/21/2006 2006/07/21-Pilgrim - NRC Staff's Response to July 14, 2006 Licensing Board Order ML062020795 7/21/2006 2006/07/23-Pilgrim - Email to Judge Young from Molly Bartlett ML062060617 7/23/2006 2006/07/24-Email: (PA) Re: Any Correspondences from PNPS on LRA Changes. ML062090387 7/24/2006 2006/07/24-E-Mail: FW: Pilgrim LRA Amendment 5. ML063070318 7/24/2006 2006/07/25- 05/01-05/2006 Meeting Summary of Environmental Site Audit Related to the Review of the License Renewal Application for Pilgrim. ML062070305 7/25/2006 2006/07/25-Pilgrim, Request for Additional Information, Pilgrim Nuclear Power Station License Renewal Application (TAC MC9669). ML062070240 7/25/2006 2006/07/25-Summary of Conferences Calls with Entergy Nuclear Operations, Inc., to Discuss the Severe Accident Mitigation Alternatives Requests for Additional Information for Pilgrim Nuclear Power Station (TAC NO. MC9676). ML062070295 7/25/2006 2006/07/25-EMAIL: (PA) Re: FWD: FYI: Forwarding What We Want DCI/FEB to Work at for the Pilgrim Flaw Growth Analysis. ML062480362 7/25/2006 2006/07/25-Email: (PA) Piligrim AMP/AMR Audit Report ML062510296 7/25/2006 2006/07/26-E-Mail: Request for Additional information on LRA section 2.1 Scoping and Screening. ML063070241 7/26/2006 2006/07/26- Pilgrim - Letter informing that Entergy has already fully addressed the points raised in the Massachusetts Attorney General's brief regarding new and significant information. ML062130443 7/26/2006 2006/07/26- Pilgrim - Massachusetts Attorney General's Reply Brief Regarding Relevance to This Proceeding of Regulatory Guide's Definition of "New and Significant Information." ML062130446 7/26/2006 2006/07/26-EMAIL: (PA) Revised AMR 3.4 Input ML062480388 7/26/2006 2006/07/26-Requests for Additional Information for the Review of the Pilgrim Nuclear Power Station License Renewal Application (TAC No. MC9669). ML062120464 7/26/2006 IR 05000293-06-008; 06/12/2006-06/16/2006; Pilgrim Nuclear Power Station; Physical Protection. ML062070396 7/26/2006 CR-PNP-2006-02799, Fair Amount of Water in Torus Room Floor. ML070790174 7/26/2006 2006/07/27- Pilgrim - Official Transcript of Entergy Nuclear Generation Company Oral Arguments via Telephone Conference. ML062130024 7/27/2006 2006/07/27-Email: (PA) PNPS Q&Q ML062510306 7/27/2006 E-MAIL: Pilgrim Nuclear Power Station Hearing Files Information Request (7/1/06-7/31/06). ML063070245 7/27/2006 2006/07/27-E-Mail: Fwd: FYI: Attaching File with my Assessment Tracking the Status of Our Metal Fatigue Questions - Jim. ML063070246 7/27/2006 2006/07/27-Email: (NPA-PD-LR) Additional KI info [C. Jacobs] found. ML063070595 7/27/2006 2006/07/27-Pilgrim - Judge Nicholas Trikouros disclosure statement. ML062120730 7/27/2006 17

All Documents for Docket 05000293 in ADAMS Public Legacy from 01/01/2006 to 01/01/2007 Email: (PA) PNPS Q&A ML062510355 7/27/2006 2006/07/31-Requests for Additional Information for the Review of the Pilgrim Nuclear Power Station License Renewal Application. ML062120662 7/31/2006 2006/07/31-Requests for Additional Information for the Review of the Pilgrim Nuclear Power Station License Renewal Application. ML062120752 7/31/2006 2006/07/31-Requests for Additional Information for the Review of the Pilgrim Nuclear Power Station License Renewal Application. ML062120743 7/31/2006 2006/07/31-Email: (PA) Updated Section 4.3, Metal Fatigue for PNPS LRA ML062510302 7/31/2006 Requests for Additional Information for the Review of the Pilgrim Nuclear Power Station License Renewal Application. ML061940015 7/31/2006 Pilgrim Nuclear Power Station - Groundwater Protection - Data Collection Questionnaire. ML062280602 7/31/2006 2006/07/31-E-Mail: Fwd: PNPS Q&A Data Base. ML063070232 7/31/2006 2006/07/31-Email: (PA) Urgent - revised section 3.0.4 input for QA program ML062510299 7/31/2006 Groundwater Protection - Data Collection Questionnaire, Pilgrim. ML062550518 7/31/2006 IR 05000293-06-003; 04/01-06/30/2006; Pilgrim Nuclear Power Station; Maintenance Risk Assessments and Emergent Work Control. ML062130615 8/1/2006 2006/08/02-EMAIL: (PA) AMR Audit Report Section 3.3 ML062480391 8/2/2006 2006/08/02-Fax to Brian Ford/Fred Mogolesko from RAMS. ML062510324 8/2/2006 2006/08/02-FAX: From: Ram Subbaratnam To: Brian Ford/ Fred Mogolesko 8/02/2006 RE: Supplement 3. ML063070332 8/2/2006 2006/08/02-EMAIL: (PA) Email to James Davis from Duc Nguyen on 08/02/2006 at 3:50 4:43 pm (No Subject) ML062480361 8/2/2006 2006/08/03-EMAIL: (PA) TLAA Input ML062480381 8/3/2006 2006/08/03-EMAIL: (PA) FYI: Forwarding Attachment 1 & Attachments 3-7 on Audit Report TLAA Sections. ML062480383 8/3/2006 E-Mail: Fwd: Pilgrim ASLB Hearing. ML063070236 8/3/2006 2006/08/03-EMAIL: (PA) Duc's Audit and Review Report Input ML062480385 8/3/2006 2006/08/03-EMAIL: (PA) TLAA Section 4.3 Input ML062480395 8/3/2006 E-Mail: Fwd: Pilgrim ASLB Hearing: from Ram Subbaratnam 8/3/06 10:55am. ML063070234 8/3/2006 2006/08/04- Pilgrim - Massachusetts Attorney General's Motion for Disqualification of Judge Nicholas Trikouros. ML062210100 8/4/2006 2006/08/04- Pilgrim - Motion on Behalf of Pilgrim Watch for Disqualification of Judge Nicholas Trikouros. ML062500138 8/4/2006 Pilgrim - Issuance of License Amendment 222 RE: Deletion of Requirement Related to NRC Approval of Engineering Evaluation for Elevated Relief Valve Discharge Pipe Temperature. ML061840032 8/4/2006 Pilgrim - Tech Spec Pages for Amendment 222 RE: Deletion of Requirement Related to NRC Approval of Engineering Evaluation For Elevated Relief Valve Discharge Pipe Temperature. ML062230167 8/4/2006 18

All Documents for Docket 05000293 in ADAMS Public Legacy from 01/01/2006 to 01/01/2007 2006/08/07-E-Mail Re: RAM: From Fred Mogolesko 8/7/06 12:01pm. ML063070219 8/7/2006 2006/08/07-E-MAIL: Fwd: RAM: from Ram Sabbaratnam 8/7/06 9:13am. ML063070239 8/7/2006 2006/08/07-E-Mail: FW: RAM. ML063070220 8/7/2006 Pilgrim, Issuance of License Amendment 223 Regarding Administrative Changes and Relocation of Certain Technical Specification Responsibilities. ML061720068 8/9/2006 Pilgrim, Tech Spec Pages for Amendment 223 Regarding Administrative Changes and Relocation of Certain Technical Specification Responsibilities. ML062280013 8/9/2006 2006/08/09- Pilgrim - Notice of Appearance for Marian L. Zobler (Pilgrim Nuclear Power Plant) and Certificate of Service ML062210250 8/9/2006 2006/08/10-E-Mail: FW: Requested Information from Pilgrim License Renewal Program Document PRPD-06. ML063070225 8/10/2006 E-Mail: FW: Requested Pilgrim ISl Information. ML063070222 8/10/2006 2006/08/11-Email: (PA) RAI for the Three Flaw Issues for the Pilgrim LRA ML062510343 8/11/2006 2006/08/11-E-Mail: Draft RAIs on section 2.4 of Pilgrim LRA. ML063070228 8/11/2006 2006/08/14-RAI For the Review of the Pilgrim Nuclear Power Station License Renewal Application (TAC MC9669). ML062290474 8/14/2006 2006/08/14- Pilgrim- Entergy's Response to Motions for Disqualification of Judge Nicholas Trikouros. ML062340098 8/14/2006 2006/08/14-Email: (PA) LRA B.1.1, Boraflex Program ML062510350 8/14/2006 2006/08/14-Email: (PA) RAIs 3.5.1-1 and 3.5.1-2 ML062510346 8/14/2006 2006/08/15-Summary of Public Audit Status Briefing with Entergy Nuclear Operations, Inc., on License Renewal Scoping and Screening Methodology and the Aging Management Program and the Aging Management Review Audits for the Pilgrim Nuclear Power Station. ML062280218 8/15/2006 Updated Schedule of Submittal of License Renewal Applications for Entergy Plants. ML062330008 8/16/2006 2006/08/16-EMAIL: (NPA-PD-LR) RAI on Chapter 4.0 TLAAs (from Ram Subbaratnam). ML063040463 8/16/2006 2006/08/16-Pilgrim: NRC Contact Report - To Obtain an Update on the Status of Rainbow Smelt Stocks in the Vicinity of PNPS (Intergovernmental). ML063470166 8/16/2006 2006/08/18-E-MAIL: (Intergovernmental) Rainbow Smelt Data [8/18 from S. Duda]. ML063470424 8/18/2006 2006/08/18-E-Mail: Formal RAIs for Pilgrim License Renewal Application on Section 3.5 & 3.6. ML063070230 8/18/2006 Entergy Nuclear Operations, Inc., RAI Regarding Technical Specification Changes to Pressure and Temperature Curves (TAC No. MD1218). ML062280434 8/18/2006 2006/08/21-E-Mail: Additional draft (draft RAIs) the audit team requests (August 21, 2006). ML063070188 8/21/2006 2006/08/21-EMAIL: (NPA-PD-LR) RAIs from Audit by Danhoang & Erach. ML062990442 8/21/2006 Update to Part 21 Interim Report Notification: Failure Analysis of Core Shroud Repair Tie Rod Upper Support Crack. ML062370095 8/21/2006 19

All Documents for Docket 05000293 in ADAMS Public Legacy from 01/01/2006 to 01/01/2007 2006/08/21-EMAIL: (NPA-PD-LR) Requested RAI on Pilgrim LRA. ML062990253 8/21/2006 2006/08/22-Requests for Additional Information for the Review of the Pilgrim Nuclear Power Station License Renewal Application (TAC MC9669). ML062350440 8/22/2006 2006/08/22-Pilgrim - License Renewal Application Amendment 6. ML062420060 8/22/2006 PD_Email from Fred Mogolesko, Entergy, dtd 8/22/06 re: Pilgrim AMP Review. ML070660279 8/22/2006 2006/08/23-E-Mail: FW: Pilgrim License Renewal Application Amendment 6. ML063070217 8/23/2006 2006/08/23-EMAIL: (NPA-PD-LR) Fwd: FW: Pilgrim License Renewal Application Amendment 6 (RAI Responses from Entergy on Pilgrim LRA). ML063050296 8/23/2006 2006/08/23-E-Mail: Questions From Fred Mogolesko 8/23/2006 9:29am. ML063070190 8/23/2006 2006/08/23-Summary of Follow Up Conference Call with Entergy Nuclear Operations, Inc., to Discuss the Severe Accident Mitigation Alternatives Requests for Additional Information for Pilgrim Nuclear Power Station (TAC No.

MC9676). ML062360514 8/23/2006 OFFICIAL EXHIBIT - PWA000004-00-BD01 - MACCS2 Support Forum, David I. Chanin; Development of MACCS2:

Lessons Learned, David I. Chanin. ML110600886 8/23/2006 Exhibit PWA 00004, MACCS2 Support Forum, David I. Chanin; Development of MACCS2: Lessons Learned, David I.

Chanin. ML110030906 8/23/2006 PD_Email from Fred Mogolesko, Entergy, dtd 8/24/06 re: Pilgrim AMP Review. ML070670089 8/24/2006 2006/08/25-Email: (PA) Pilgrim Audit Report Peer Review AMP Sections ML062510307 8/25/2006 Massachusetts Attorney General's Petition for Rulemaking to Amend 10 C.F.R. Part 51. ML111220357 8/25/2006 2006/08/25-Petition for Rulemaking PRM 50-10 to Amend 10 C.F.R. Part 51, on behalf of the Massachusetts Attorney General, submitted by Diane Curran. ML062640409 8/25/2006 2006/08/25-Summary of Conference Call with Entergy Nuclear Operations, Inc on August 1, 2006. ML062410379 8/25/2006 2006/08/25-Email: (NPA-PD-LR) Final RAI on Section 2.4 - Scoping and Screening Structures for the Pilgrim LRA. ML062980322 8/25/2006 Order Requiring Compliance with Key Radiological Protection Mitigation Strategies. ML062300304 8/28/2006 2006/08/28-E-Mail: Draft Pilgrim RAIs on Section 4.2.1 - TLAAs on RV Internals, Neutron Fluence. ML063070361 8/28/2006 2006/08/28-E-Mail: Meeting Summary for your information: from Ram Subbaratnam 8/28/06 9:18am. ML063070375 8/28/2006 PD_Email from Fred Mogolesko, Entergy, dtd 8/28/06 re: Preparation for Region I Inspection at Pilgrim. ML070660056 8/28/2006 PD_Email from Fred Mogolesko, Entergy, dtd 08/28/06 re: Preparation for Region I Inspection at Pilgrim. ML070660548 8/28/2006 Pilgrim, Changes to the Pilgrim Fourth Ten-Year In Service Inspection Program Plan Related to the Snubber Inspection Program. ML062490421 8/28/2006 2006/08/28-E-Mail: Preparation for Region 1 Inspection at Pilgrim: from: Fred Mogolesko 8/28/06 10:17 am. ML063070367 8/28/2006 20

All Documents for Docket 05000293 in ADAMS Public Legacy from 01/01/2006 to 01/01/2007 FitzPatrick, Indian Point, Pilgrim, & Vermont Yankee Nuclear Power Stations - Fitness-for-Duty Program Performance Report For the Period January 2006 - June 2006. ML062430298 8/29/2006 2006/08/30-Comment from David R. Lewis of Pillsbury, Winthrop, Shaw and Pittman on Massachusetts Attorney General's Petition for Rulemaking PRM-51-10 to Amend 10 CFR Part 51 (August 25, 2006). ML062650221 8/30/2006 2006/08/30-LB Notice of Recusal of Judge Nicholas Trikouros ML062420487 8/30/2006 2006/08/30-LB Notice of Reconstitution ML062420469 8/30/2006 2006/08/30-E-mail: (PA) SER Input. ML090830073 8/30/2006 OFFICIAL EXHIBIT - ENT000008-00-BD01 - License Renewal Application Amendment 7. ML110600874 8/30/2006 Pilgrim Nuclear Power Station, Technical Specification Amendment Request to Relocate Specifications not Meeting the Criteria of 10 CFR 50.36(c)(2)(ii), Revision 1, (TAC MC5421). ML062490489 8/30/2006 2006/08/30-Vermont Yankee/Pilgrim - Entergy's Response to Massachusetts Attorney General's Petition for Rulemaking to Amend 10 C.F.R. Part 51 (Aug. 25, 2006). ML062480366 8/30/2006 Exhibit ENT000008, Pilgrim LR Proceeding, License Renewal Application Amendment 7. ML110030987 8/30/2006 2006/08/30-Pilgrim, Response to Requests for Additional Information re License Renewal Application Amendment 7. ML062500117 8/30/2006 2006/08/31-E-MAIL: (Intergovernmental) Pilgrim NPS EIS - info request. ML063470471 8/31/2006 Mid-cycle Performance Review and Inspection Plan - Pilgrim Nuclear Power Station. ML062430443 8/31/2006 2006/09/01-E-MAIL: (Intergovernmental) Re: Pilgrim NPS EIS - info request. ML063470473 9/1/2006 2006/09/01-Pilgrim April 2008 Evidentiary Hearing - Intervenor Exhibit 7, Liquid Radioactive Release Lessons Learned Task Force Final Report, September 1, 2006; Executive Summary; Pages 19 and 26; Appendix B Consolidated Recommendations List. ML081090523 9/1/2006 2006/09/05-EMAIL: (NPA-PD-LR) Pilgrim LRA - RAI Responses from Entergy (NRC-03-03-038, Task Order 24). ML063110209 9/5/2006 2006/09/07-Pilgrim, Request for Additional Information for the Review of the Pilgrim Nuclear Power Station License Renewal Application (TAC No. MC9669). ML062490501 9/7/2006 2006/09/07-E-mail: Final RAI on Section 4.3.2.1 on Pilgrim LRA. ML063060595 9/7/2006 2006/09/08-E-MAIL: (Intergovernmental) Re: Plymouth Population & Buildout Data. ML063470479 9/8/2006 2006/09/08-Request for Additional Information for the Review of the Pilgrim Nuclear Power Station License Renewal Application (TAC MC9669) Section 3.2. ML062500431 9/8/2006 2006/09/08-Requests for Additional Information for the Review of the Pilgrim Nuclear Power Station License Renewal Application (TAC MC9669). ML062500401 9/8/2006 2006/09/08-EMAIL: (NPA-PD-LR) Fwd: Final RAI on Section 3.2.1 and 4.2.1 on the Pilgrim LRA. ML062990446 9/8/2006 Pilgrim Nuclear Power Station - NRC Material Control and Accounting Program Inspection Report No.

05000293/2006201 and Notice of Violation. ML062260184 9/11/2006 21

All Documents for Docket 05000293 in ADAMS Public Legacy from 01/01/2006 to 01/01/2007 IR 05000293-06-009, on 07/24/2006 - 08/11/2006, Entergy Nuclear Operations, Inc., Pilgrim Nuclear Power Station; Triennial Fire Protection Team Inspection. ML062560357 9/13/2006 2006/09/13-Pilgrim - License Renewal Application Amendment 8. ML062650072 9/13/2006 2006/09/13-E-Mail: Entergy Memo of 9/13/2006 - Pilgrim. ML063070420 9/13/2006 Pilgrim Nuclear Power Station - Issuance of Amendment RE: Relocation of Technical Specifications (TAC No.

MC5421). ML062280304 9/14/2006 Pilgrim, Core Operating Limits Report, Revision 25. ML062690471 9/14/2006 Pilgrim, 10 CFR 50.46(a)(3)(ii) Annual Report. ML062690468 9/14/2006 PD_Email from Glenn Meyer dtd 9/14/06 re: Planning for Initial Contacts. ML070660526 9/14/2006 Pilgrim Nuclear Power Station - Technical Specification Pages re Relocation of Technical Specifications Structural Integrity Requirements to Final Safety Analysis Report. ML062620240 9/14/2006 Pre-Inspection Cover Sheet and Inspection Plan. ML062610143 9/14/2006 Audit Trip Report Regarding Entergy Nuclear Operations Inc. License Renewal Application for Pilgrim Nuclear Power Station, dated January 25, 2006. ML062580162 9/15/2006 10/02/2006 Commission Meetings - FRN. ML062610270 9/18/2006 CR-PNP-2006-03467, Evidence of Past (Non-Active) Leakage Found on Torus Room Bay 1 Wall. ML070790156 9/19/2006 22