|
---|
Category:E-Mail
MONTHYEARML22335A2802022-11-0404 November 2022 11-4-2022 Email Transmitting Draft Questions Pertaining to Pilgrim ISFSI Exemption Request ML22270A0422022-09-26026 September 2022 Acknowledgement Email for Holtec'S Request for Reporting Exemption with Regards to the Pilgrim ISFSI Annual Radioactive Effluent Release Report (Docket No. 05000293) ML22154A1622022-05-26026 May 2022 Letter and Email from Save Our Bay/Diane Turco Regarding Irradiated Water Release from Pilgrim ML22007A2602021-12-0606 December 2021 E-mail from P. O'Brien, Holtec, to A. Snyder, NRC, on Pilgrim Effluent Discharge ML21287A6192021-10-14014 October 2021 E-mail from S. Phillips, MEMA, to A. Snyder, NRC, Pilgrim Nuclear Power Station, Commonwealth of Massachusetts Consultation Response to Amendment Review for Emergency Preparedness ML21266A2512021-09-23023 September 2021 Consultation with Commonwealth of Massachusetts Regarding Proposed Amendment Application for Emergency Plan and Emergency Action Levels ML21266A2772021-09-23023 September 2021 HDI Clarification of Exemption Requested from 10 CFR 20, Appendix G, Section Iii.E ML21267A0012021-09-23023 September 2021 E-mail from A. Snyder, NRC, to A. Sterdis, Holtec, - Pilgrim Nuclear Power Station - Request for Exemption from 10 CFR 20, Appendix G, Section Iii.E Acceptance Review ML21257A3832021-09-15015 September 2021 E-mail from A. Snyder, NRC, to A. Sterdis, Holtec, - Pilgrim Nuclear Power Station - Follow-on Request Re Request for Additional Information 2 Pilgrim - License Amendment Request Independent Spent Fuel Storage Installation Only Emergency Pl ML21211A5912021-07-22022 July 2021 Consultation Response from Commonwealth of Massachusetts Regarding Proposed Pilgrim ISFSI Only Technical Specifications ML21211A5162021-07-22022 July 2021 Consultation Response from Commonwealth of Massachusetts Regarding Proposed Pilgrim ISFSI Only Physical Security Plan ML21200A2352021-07-13013 July 2021 Consultation Request to Commonwealth of Massachusetts Regarding Proposed Pilgrim ISFSI Only Technical Specifications ML21200A1522021-07-13013 July 2021 Consultation Request to Commonwealth of Massachusetts Regarding Proposed Pilgrim Isfi Only Physical Security Plan ML21176A1842021-06-25025 June 2021 Email from HDI Regarding Pilgrim Nuclear Power Station Training ML21180A0582021-06-17017 June 2021 Email from Region I Regarding Pilgrim Nuclear Power Station Inspection - EA-13-132 ML21097A0402021-04-0606 April 2021 E-Mail Consult with Commonwealth of Mass Re - Amendment Application - Physical Security Plan for the Pilgrim Nuclear Power Station L-20-092, Email Pilgrim Nuclear Power Station-Exemption from Annual Force-On-Force Exercise Requirements of 10 CFR Part 73, Appendix B,2020-12-10010 December 2020 Email Pilgrim Nuclear Power Station-Exemption from Annual Force-On-Force Exercise Requirements of 10 CFR Part 73, Appendix B, L-20-096, Supplemental Information to Support Physical Security Plan Revision and License Amendment Request to Incorporate Alternate Measures - Holtec Email Dated December 10, 20102020-12-10010 December 2020 Supplemental Information to Support Physical Security Plan Revision and License Amendment Request to Incorporate Alternate Measures - Holtec Email Dated December 10, 2010 ML20328A2982020-11-16016 November 2020 Response from Commonwealth of Massachusetts on No Significant Hazard for Pilgrim ISFSI Amendment to Address ISFSI II Dated November 16, 2020 ML20297A2372020-10-22022 October 2020 Request for Additional Information - HDI Fleet Decommissioning Quality Assurance Program ML20266G4032020-09-22022 September 2020 Acceptance Review Email - Request for Approval of HDI Fleet Decommissioning Quality Assurance Program, Revision 0 ML20163A6802020-06-11011 June 2020 Confirmation of the Scope of the Requested Regulatory Relief for Pilgrim Security Qualifications ML20280A1912020-04-17017 April 2020 Request for Additional Information- Clarifying Information for Pilgrim ISFSI Physical Security Amendment Application ML20269A3542020-03-0505 March 2020 CFR 26.717 Reports 2019 Transmittal Email ML19336A0302019-11-27027 November 2019 OEDO-15-00479 - Re 2.206 Petition Regarding Pilgrim Nuclear Power Station'S Current Licensing Basis for Flooding ML19336A0332019-11-26026 November 2019 OEDO-15-00479 - E-mail to Petitioner - 2.206 Petition Regarding Pilgrim Nuclear Power Station'S Current Licensing Basis for Flooding (CAC No. MF6460; EPID L-2015-CRS-0002)- Issuance of Final Director'S Decision ML19331A1952019-11-21021 November 2019 NRR E-mail Capture - (External_Sender) Pilgrim Nuclear Power Station - Commonwealth Consultation Response - Amendment Regarding Site Emergency Plan and Emergency Action Level Scheme ML19331A1732019-11-12012 November 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station -Consult with Commonwealth - Amendment Regarding Cyber Security Plan ML19331A1642019-11-0505 November 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station -Consult with Commonwealth - Amendment Regarding Site Emergency Plan and Emergency Action Level Scheme ML19331A1792019-11-0505 November 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - EA and Fonsi for Pilgrim Emergency Planning Exemption CY-19-007, LTR-19-0441 Henrietta Cosentino, E-mail SECY-19-0078 Request by Entergy Nuclear Operations Inc. for Exemptions from Certain Emergency Planning Requirements for the Pilgrim Nuclear Power Station2019-11-0404 November 2019 LTR-19-0441 Henrietta Cosentino, E-mail SECY-19-0078 Request by Entergy Nuclear Operations Inc. for Exemptions from Certain Emergency Planning Requirements for the Pilgrim Nuclear Power Station ML19275H1962019-09-24024 September 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - Consult with Commonwealth - Amendment Regarding Permanently Defueled Technical Specifications (PDTS) ML19239A0372019-08-26026 August 2019 E-mail from Entergy Dated August 26, 2019, Notification of Pilgrim License Transfer ML19239A0262019-08-23023 August 2019 LTR-19-0330 Janet Azarovitz, E-mail a Plea for More Time and Reasonable Discussion Including the Citizens of the Commonwealth in the Sale of the Pilgrim Nuclear Power Station ML19234A2072019-08-20020 August 2019 LTR-19-0328 Lawrence Delafield, President, Six Ponds Improv Assoc., Plymouth, Ma, Ltr Requests NRC to Postpone Consideration of Transferring the Licenses for the Pilgrim Nuclear Power Until the NRC Has Answered Concerns by Pilgrim Watch, Se ML19232A4032019-08-20020 August 2019 LTR-19-0322 Diane Turco, Director, Cape Downwinders, Massachusetts, Letter/E-mail Requests Suspension of the Pilgrim License Transfer from Entergy to Holtec Until the Adjudicatory Hearing Is Held and Raised Contentions Are Resolved ML19308A9942019-08-19019 August 2019 Entergy Nuclear Operations, Inc. Confirmatory Order Rescission Supplemental Information ML19226A3912019-08-14014 August 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - EA and Fonsi for Pilgrim Decommissioning Trust Fund Exemption (Holtec) ML19226A3962019-08-14014 August 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station -Consult with Commonwealth - Conforming Amendment in Support of Pilgrim License Transfer Application ML19226A1212019-08-13013 August 2019 OEDO-15-00479-2.206 Petition Regarding Pilgrim Nuclear Power Station'S Current Licensing Basis for Flooding - Status (CAC No. MF6460; EPID L-2015-CRS-0002) ML19227A1032019-08-0707 August 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - Draft Wording for Potential Condition of License Transfer Order ML19207B3662019-07-26026 July 2019 NRR E-mail Capture - Pilgrim - RAI Direct and Indirect Transfer of Lic.; Conforming Lic. Amend.; Req. for Exemption 10 CFR 50.82(A)(8)(I)(A) for Holtec Decom. International, Llc ML19176A3452019-06-25025 June 2019 2.206 Petition Regarding Pilgrim Nuclear Power Station'S Current Licensing Basis for Flooding - Information (OEDO-15-00479) (CAC No. MF6460; EPID L-2015-CRS-0002) ML19154A0652019-06-0303 June 2019 NRR E-mail Capture - Pilgrim - Permanent Cessation of Power Operations ML19154A5242019-06-0303 June 2019 NRR E-mail Capture - RAI - Pilgrim Post-Decommissioning Technical Specifications (PDTS) License Amendment Request (LAR) ML19161A2122019-05-20020 May 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - Acceptance of License Amendment Request to Remove Cyber Security Plan Requirements ML19123A0332019-05-0101 May 2019 NRR E-mail Capture - Logbook Entry: 05/01/2019 Endangered Species Report Regarding a Confirmed Sighting of North Atlantic Right Whale(S) (Balaena Glacialis) ML19122A4912019-04-29029 April 2019 NRR E-mail Capture - Logbook Entry: 04/29/2019 Regarding the Confirmed Sighting of Ten North Atlantic Right Whales (Balaena Glacialis) ML19108A2372019-04-18018 April 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - Acceptance of Requested Licensing Action, Proposed Exemptions from 10 CFR 50.54(w)(1) - On-Site Property Damage Insurance ML19108A2362019-04-18018 April 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - Acceptance of Requested Licensing Action, Proposed Exemptions from 10 CFR 140.11(a)(4) - Primary and Secondary Liability Insurance 2022-09-26
[Table view] Category:Meeting Notice
MONTHYEARML19070A0962019-03-11011 March 2019 Notice of Category 3 Public Meeting - Annual Assessment Meeting for Pilgrim Nuclear Power Station ML18361A5452018-12-27027 December 2018 Notice of Public Webinar Meeting for Pilgrim Nuclear Power Station to Discuss the Decommissioning Process for Nuclear Power Reactors ML18073A1402018-03-14014 March 2018 Notice of Category 1 Public Meeting - Annual Assessment Meeting for Pilgrim Nuclear Power Station ML17179A0822017-06-28028 June 2017 Open Regulatory Conference July 13, 2017 ML17069A0942017-03-10010 March 2017 3/21/2017 - Notice of Category 1 Public Meeting - Annual Assessment and 95003 Inspection Exit Meeting for Pilgrim Nuclear Power Station ML17020A0032017-01-19019 January 2017 1/31/2017 - Notice of Category 3 Public Meeting - Preliminary Findings and Status of 95003 Inspection at Pilgrim Nuclear Power Station ML16090A2332016-03-30030 March 2016 4/13/2016 - Notice of Category 1 Public Meeting - Annual Assessment of Safety Performance at the Pilgrim Nuclear Power Station for 2015 IR 05000293/20150072015-06-22022 June 2015 Notice of Category 1 Public Meeting - Regulatory Conference to Discuss Preliminary White Finding and Associated Apparent Violation for Pilgrim Nuclear Power Station (IR 05000293/2015007) ML15062A0872015-03-0404 March 2015 3/18/2015 - Notice of Category 1 Public Meeting - Pilgrim 2014 Annual Assessment Meeting ML14098A3162014-04-0808 April 2014 5/1/2014 - Notice of Category 1 Public Meeting to Discuss Entergy Performance at Pilgrim Nuclear Power Station During Cy 2013 ML13336A8092013-12-0202 December 2013 Webinar to Discuss Independent Spent Fuel Storage Installation (ISFSI) Basics and Planned Use at the Pilgrim Nuclear Power Station ML13108A3282013-04-22022 April 2013 Notice of Forthcoming Meeting with Petitioners Requesting Action Against Entergy Nuclear Operations, Inc., Regarding Operations at FitzPatrick, Pilgrim, and Vermont Yankee Nuclear Power Stations (TAC Nos. MF1092, MF1093, and MF1094) ML13086A5902013-03-27027 March 2013 Revised: April 2, 2013 Notice of Public Meeting with Entergy Nuclear Operations, Inc. to Discuss Pilgrim'S Performance During FY12 ML13079A0202013-03-18018 March 2013 G20130209/LTR-13-0224 - Ltr. Representatives Edward J. Markey, John F. Tierney and Bill Keating Request for the Nuclear Regulatory Commission to Alter Plans to Hold Open House Style Meetings to Review the 2012 Performance of Pilgrim and Sea ML13072A6782013-03-13013 March 2013 Notice of Public Meeting, April 2, 2013 ML12074A0832012-03-14014 March 2012 Notice of Meeting with Public to Discuss the Nrc'S Assessment of Safety Performance at Pilgrim Nuclear Power Station for 2011 ML11250A1712011-09-14014 September 2011 Notice of Forthcoming Meeting with Petitioner Requesting Action Under 10 CFR 2.206 Regarding Immediate Suspension of the Operating Licenses of General Electric (GE) Mark 1 Boiling Water Reactors (Bwrs) ML1115704052011-06-0606 June 2011 Notice of Meeting with Entergy Operations, Inc., to Discuss Implementation of Quality Oversight and Verification Programs at Entergy Sites Including Actions Being Taken to Enhance Effectiveness ML1115403882011-06-0202 June 2011 08/02-03/2011 Meeting Announcement - 2011 U.S. Nuclear Regulatory Commission (NRC) Initial Examination Writers Workshop ML11126A0962011-05-12012 May 2011 Notice of Meeting with Petitioner Requesting Action Under 10CFR2.206 Regarding Immediate Suspension of Operating Licenses of General Electric Mark 1 Boiling Water Reactors ML1113102952011-05-11011 May 2011 Notice of Meeting with the Public to the Nrc'S Assessment of Safety Performance at Pilgrim Nuclear Power Station for 2010 ML1107504052011-03-21021 March 2011 Notice of Meeting with Entergy Operations, Inc., to Discuss Fleetwide Submittal for Proposed Technical Specification and Quality Assurance Program Manual Changes Related to Unit Staff Qualification Requirements ML1008201642010-03-23023 March 2010 Entergy Nuclear Operations (Entergy) Notice of Meeting with NRC ML1006805402010-03-0909 March 2010 Notice of Meeting with Pilgrim Nuclear Power Station to Discuss Safety Performance for Calendar Year 2009 and Nrc'S Role in Ensuring Safe Plant Operations ML0906807852009-03-0909 March 2009 Notice of Meeting to Discuss Nrc'S Assessment of the Safety Performance of Pilgrim Nuclear Power Plant for Calendar Year 2008 and the Role of the Agency in Ensuring Safe Plant Operations ML0807100682008-03-10010 March 2008 Notice of Meeting with Entergy Nuclear Operations to Discuss Nrc'S Assessment of the Safety Performance of the Pilgrim Nuclear Power Station for Calendar Year 2007 ML0709204592007-03-30030 March 2007 Meeting with Entergy Nuclear Operations, Inc., to Discuss Nrc'S Assessment of the Safety Performance of the Pilgrim Nuclear Power Station for Calendar Year 2006 ML0701706102007-01-17017 January 2007 Notice of Meeting Between NRC Staff & Entergy Management to Inform Entergy Management of Results of NRC Team Inspection Covering Scoping & Aging Management Portions of Pilgrim Nuclear Power Station Application for a Renewed License ML0700501532007-01-0808 January 2007 01/24/2007 Notice of Forthcoming Meeting to Discuss the Draft Supplemental Environmental Impact Statement for the License Renewal of Pilgrim Nuclear Power Station ML0618104242006-06-30030 June 2006 2006/06/30- 07/19/2006 Notice of Forthcoming Exit Meeting with Entergy Nuclear Operations, Inc., on License Renewal Scoping and Screening Methodology and the Aging Management Program / Aging Management Review Audits for Pilgrim Nuclear Powe ML0634703382006-05-0909 May 2006 E-mail: (Intergovernmental) Planners Event on Current Trends in Metroboston ML0611804242006-04-28028 April 2006 2006/04/28- 05/17/2006 Notice of Meeting to Discuss the Environmental Scoping Process for Pilgrim Nuclear Power Station, License Renewal Application (LRA) ML0609403702006-04-0404 April 2006 Public Meeting Notice for the Annual Assessment Meeting with Entergy (Pilgrim Station) to Discuss CY2005 Performance ML0604405432006-02-13013 February 2006 03/08/2006 Notice of Forthcoming Public Information Session for the U.S. Nuclear Regulatory Commission (NRC) Staff to Describe the License Renewal Process ML0508401332005-03-29029 March 2005 Notice for Closed Pilgrim Predecisional Enforcement Conference Regarding Apparent Violations Involving Failures of Control Room Staff to Follow Pilgrim Procedures ML0507500032005-03-16016 March 2005 Revised - Pilgrim Annual Assessment Meeting Notice W/Nrc Slides ML0506203432005-03-0404 March 2005 3/24/05 Pilgrim Annual Assessment Meeting Notice ML0432304512004-11-19019 November 2004 Meeting with Entergy Nuclear Re Pilgrim I Nuclear Generating Station Regarding Relief Request Related to High Pressure Coolant Injection Pump Vibrations ML0406406452004-03-0404 March 2004 Notice of Meeting with Entergy Nuclear Operations, Inc. Nrc'S Assessment of the Safety Performance of the Pilgrim Nuclear Power Station for Calendar Year 2003 ML0307000432003-03-10010 March 2003 Notice of Meeting with Entergy Nuclear Generation Co Re Nrc'S Annual Assessment of the Safety Performance at the Pilgrim Nuclear Power Station ML0219106652002-07-12012 July 2002 Meeting with Entergy Nuclear Operations, Inc. (ENO) on Safety Relief Valve Seismic Analysis Methodology for Pilgrim Nuclear Power Station ML0207301872002-03-14014 March 2002 Meeting with Entergy Nuclear Generation Company (Pilgrim) Re Results of Nrc'S Assessment of the Safety Performance at the Pilgrim Nuclear Power Station for the Period April 1, 2001 Through December 31, 2001 2019-03-11
[Table view] |
Text
Message Page 1 of 9 Provenzano, Susan From: Provenzano, Susan Sent: Tuesday, May 09, 2006 10:22 AM To: 'Thomas Bott'
Subject:
RE: Planners Event on Current Trends in MetroBoston Thank you very much for the web address for the 2006 projections. Andrew and I are "back home", so we can't attend the meeting. I appreciate your thinking about us.
Susan Provenzano From: Thomas Bott [1]
Sent: Wednesday, May 03, 2006 2:45 PM To: Provenzano, Susan; Parker, Andrew
Subject:
FW: Planners Event on Current Trends in MetroBoston In the event you are still in the neighborhood.
Trend analysis for Kingston area http://www.mapc.org/2006-proiections.html Thomas Bott, AICP Town Planner Kingston, MASS 781-585-0549 781 585-0543 fax Original
Message-From: Clark, Bill [2]
Sent: Wednesday, May 03, 2006 1:36 PM
Subject:
FW: Planners Event on Current Trends in MetroBoston SSC and TRIC members, Can you distribute this to planners in your communities that have not already seen the briefing (or if they have, encourage them to send their peers/junior staff?). This event is geared towards practicing planners.
Thank You, Bill Clark Please Join MA Chapter of APA, MA Association of Planning Directors, and MA Association of Consulting Plannersfor a Planners' Conversation on:
The Future of Metro Boston: Current Trends Extended to 2030 Wednesday, May 10, 5:30 - 7:00 PM 10/25/2006
Message Page 2 of 9 Wentworth Institute of Technology Beatty Hall (Building 8): Faculty/Staff Dining Room 550 Huntington Avenue, Boston*
MAPC just released its demographic and economic development projections for the year 2030 and wish to hold a discussion with practicing planners in the region. During this conversation:
You will hear about how the region is expected to develop over the next 25 years if current trends continue, and get information on trends and data you can use in your daily work.
For example, in 2030 metro Boston will:
o have four major job centers.
o need over 300,000 new housing units, yet maturing suburbs along Route 128 will have the hardest time creating new housing.
o lose 15 acres of open space a day.
o have a water deficit of 12 million gallons per day.
- MAPC will share the reactions to these trends that we have heard from diverse groups -
from mayors and state legislators, to human service providers and immigrant groups, to environmental attorneys.
" We will solicit your expertise on which trends you would like to see change in the region.
Refreshments are sponsored by Wentworth Technology and the MA Association of Consulting Planners.
To RSVP, send an e-mail to Rachel Mercier at rmeercier@_mapc.org.
The study area extends beyond MAPC's boundaries to coincide with transportation planning boundaries. Communities in the study area include:
Abington Acton Amesbury Andover Arlington Ashland Attleboro Avon Ayer Bedford Bellingham 10/25/2006
Message Page 3 of 9 Belmont Berlin Beverly Billerica Blackstone Bolton Boston Boxborough Boxford Braintree Bridgewater Brockton Brookline Burlington Cambridge Canton Carlisle Carver Chelmsford Chelsea Clinton Cohasset Concord Danvers Dedham 10/25/2006
. Message Page 4 of 9 Dover Dracut Dunstable Duxbury East Bridgewater Easton Essex Everett Foxborough Framingham Franklin Georgetown Gloucester Groton Groveland Halifax Hamilton Hanover Hanson Harvard Haverhill Hingham Holbrook Holliston Hopedale 10/25/2006
. Message Page 5 of 9 Hopkinton Hudson Hull Ipswich Kingston Lakeville Lancaster Lawrence Lexington Lincoln Littleton Lowell Lynn Lynnfield Malden Manchester-by-the-Sea Mansfield Marblehead Marlborough Marshfield Maynard Medfield Medford Medway Melrose 10/25/2006
Message Page 6 of 9 Mendon Merrimac Methuen Middleborough Middleton Milford Millis Millville Milton Nahant Natick Needham Newbury Newburyport Newton Norfolk North Andover North Attleborough North Reading Northborough Northbridge Norton Norwell Norwood Peabody 10/25/2006
. Message Page 7 of 9 Pembroke Pepperell Plainville Plymouth Plympton Quincy Randolph Raynham Reading Revere Rockland Rockport Rowley Salem Salisbury Saugus Scituate Sharon Sherborn Shirley Somerville Southborough Stoneham Stoughton Stow 10/25/2006
. Message Page 8 of 9 Sudbury Swampscott Taunton Tewksbury Topsfield Tyngsborough Upton Uxbridge Wakefield Walpole Waltham Watertown Wayland Wellesley Wenham West Bridgewater West Newbury Westborough Westford Weston Westwood Weymouth Whitman Wilmington Winchester 10/25/2006
'Message Page 9 of 9 Winthrop Wobum Wrentham 10/25/2006