ML070660056
| ML070660056 | |
| Person / Time | |
|---|---|
| Site: | Pilgrim |
| Issue date: | 08/28/2006 |
| From: | Mogolesko F Entergy Corp |
| To: | Meyer G Engineering Region 1 Branch 1 |
| Mogolesko, F | |
| References | |
| GL-88-001, Suppl 1, GL-89-010 | |
| Download: ML070660056 (3) | |
Text
From:
"Mogolesko, Fred" <fmogole@entergy.com>
To:
"Glenn Meyer" <GWM@nrc.gov>
Date:
08/28/2006 6:22:03 AM
Subject:
Preparation for Region I Inspection at Pilgrim We have some additional thoughts based on our discussion of last Thursday.
- 1. Fuse Holders - no AMP since no fuse holders with metallic clamps perform LR intended functions.
- 2. Compressed Air - we don't use the GALL AMP, but we have a plant-specific instrument air quality program.
- 3. RWCU - Supplement 1 to GL 88-01 states that IGSCC inspection of RWCU piping outside of the containment isolation valves is recommended only until actions associated with GL 89-10 on motor operated valves are completed.
Since PNPS has satisfactorily completed all actions requested in NRC GL 89-10, the Water Chemistry Control - BWR Program is used in lieu of the BWR Reactor Water Cleanup System Program to manage this potential aging effect.
- 4. Protective Coatings - no AMP. We don't credit coatings to prevent loss of material and no AMP will prevent LOCA forces from stripping off protective coatings.
I hope this information is useful.
Lastly, per our discussion, Pilgrim will arrange for an ENTRANCE MEETING at 2 PM on September 18, 2006. I further understand that you will likely arrive before your team and Pilgrim will be ready to support you at your arrival. Your team and our team will meet daily to review status and specific needs to assure completeness of the Pilgrim support and responsiveness. The first inspection week ending DEBRIEF will be on Friday, September 22, 2006 at 9 AM. Will you require an entrance on October 2, 2006 (week two of the inspection)? I assume that the week two debrief will be at 9 AM on October 6, 2006.
Fred
CC:
"Ellis, Douglas" <dellis1@entergy.com>, "Chan, Laris" <lchan@entergy.com>,
"COX, ALAN B" <ACOX@entergy.com>, "Lach, David J" <DLach@entergy.com>, "Mogolesko, Fred" <fmogole@entergy.com>, "Ford, Bryan" <BFord@entergy.com>
Mail Envelope Properties (44F2C3AD.46F : 15 : 50287)
Subject:
Preparation for Region I Inspection at Pilgrim Creation Date 08/28/2006 6:21:18 AM From:
"Mogolesko, Fred" <fmogole@entergy.com>
Created By:
fmogole@entergy.com Recipients nrc.gov kp1_po.KP_DO GWM (Glenn Meyer) entergy.com BFord CC (Bryan Ford)
DLach CC (David J Lach)
ACOX CC (ALAN B COX) lchan CC (Laris Chan) dellis1 CC (Douglas Ellis)
Post Office Route kp1_po.KP_DO nrc.gov entergy.com Files Size Date & Time MESSAGE 1591 08/28/2006 6:21:18 AM TEXT.htm 5999 Mime.822 10604 Options Expiration Date:
None Priority:
Standard ReplyRequested:
No Return Notification:
None Concealed
Subject:
No Security:
Standard Junk Mail Handling Evaluation Results Message is eligible for Junk Mail handling This message was not classified as Junk Mail Junk Mail settings when this message was delivered Junk Mail handling disabled by User Junk List is not enabled Junk Mail using personal address books is not enabled Block List is not enabled