Letter Sequence RAI |
---|
|
Results
Other: ML060300028, ML061220630, ML061220716, ML061710422, ML061940175, ML062090293, ML062090294, ML062090300, ML062090304, ML062090305, ML062090307, ML062090309, ML062090318, ML062090319, ML062090322, ML062090324, ML062090328, ML062090333, ML062090338, ML062090380, ML062090387, ML062090388, ML062090488, ML062090490, ML062090493, ML062090496, ML062090497, ML062090498, ML062090499, ML062090546, ML062090561, ML062090563, ML062090565, ML062090567, ML062090569, ML062120406, ML062120407, ML062120408, ML062120410, ML062120412, ML062120415, ML062120477, ML062120480, ML062120491, ML062120498, ML062120543, ML062120549, ML062120625, ML062120629, ML062120631... further results
|
|
|
---|
Category:Letter
MONTHYEARML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status IR 05000293/20240022024-08-21021 August 2024 NRC Inspection Report No. 05000293/2024002 PNP 2024-030, Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 02024-08-0202 August 2024 Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 0 ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities ML24129A1042024-05-26026 May 2024 Preapplication Readiness Assessment Plan for the Holtec Decommissioning International License Termination Plan ML24136A2382024-05-14014 May 2024 Annual Radiological Environmental Operating Report for 2023 ML24135A3212024-05-14014 May 2024 Annual Radioactive Effluent Release Report, January 1 Through December 31, 2023 IR 05000293/20240012024-05-0707 May 2024 NRC Inspection Report No. 05000293/2024001 L-24-009, HDI Annual Occupational Radiation Exposure Data Reports - 20232024-04-29029 April 2024 HDI Annual Occupational Radiation Exposure Data Reports - 2023 L-24-010, Request for Preapplication Readiness Assessment of the Draft License Termination Plan2024-04-22022 April 2024 Request for Preapplication Readiness Assessment of the Draft License Termination Plan L-24-007, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations – Holtec Decommissioning International, LLC (HDI)2024-03-29029 March 2024 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations – Holtec Decommissioning International, LLC (HDI) IR 05000293/20230032024-02-29029 February 2024 NRC Inspection Report Nos. 05000293/2023003 and 05000293/2023004 L-24-002, Late LLRW Shipment Investigation Report Pursuant to 10 CFR 20, Appendix G2024-02-0202 February 2024 Late LLRW Shipment Investigation Report Pursuant to 10 CFR 20, Appendix G ML23342A1182024-01-0909 January 2024 Independent Spent Fuel Storage Installation Security Inspection Plan L-23-019, Proof of Financial Protection 10 CFR 140.152023-12-18018 December 2023 Proof of Financial Protection 10 CFR 140.15 ML23334A1822023-11-30030 November 2023 Biennial Report for the Defueled Safety Analysis Report Update, Technical Specification Bases Changes, 10 CFR 50.59 Evaluation Summary, and Regulatory Commitment Change Summary – November 2021 Through October 2023 L-23-012, Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point2023-11-13013 November 2023 Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point ML23306A0992023-11-0202 November 2023 And Indian Point Energy Center, Notification of Changes in Schedule in Accordance with 10 CFR 50.82(a)(7) ML23300A0022023-10-27027 October 2023 10 CFR 72.48 Biennial Change Summary Report IR 05000293/20234012023-08-31031 August 2023 NRC Inspection Report No. 05000293/2023401 & 2023001 (Cover Letter Only) IR 05000293/20230022023-08-0404 August 2023 NRC Inspection Report No. 05000293/2023002 L-23-008, Correction to Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations – Holtec Decommissioning International, LLC (HDI)2023-05-23023 May 2023 Correction to Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations – Holtec Decommissioning International, LLC (HDI) ML23135A2152023-05-15015 May 2023 Annual Radioactive Effluent Release Report, January 1 Through December 31, 2022 ML23136A7792023-05-15015 May 2023 Annual Radiological Environmental Operating Report, January 1 Through December 31, 2022 L-23-004, HDI Annual Occupational Radiation Exposure Data Reports - 20222023-04-24024 April 2023 HDI Annual Occupational Radiation Exposure Data Reports - 2022 L-23-003, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-31031 March 2023 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations ML23088A0382023-03-29029 March 2023 Stations 1, 2, & 3, Palisades Nuclear Plant, and Big Rock Point - Nuclear Onsite Property Damage Insurance ML23069A2782023-03-13013 March 2023 Request for Scoping Comments Concerning the Environmental Review of Monticello Nuclear Generating Plant, Unit 1 Subsequent License Renewal Application ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities IR 05000293/20220042023-02-15015 February 2023 NRC Inspection Report No. 05000293/2022004 ML22356A0712023-01-31031 January 2023 Issuance of Exemption for Pilgrim Nuclear Power Station ISFSI Regarding Annual Radioactive Effluent Release Report - Cover Letter ML22347A2782022-12-21021 December 2022 Independent Spent Fuel Storage Installation Security Inspection Plan Dated December 21, 2022 L-22-042, Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.152022-12-14014 December 2022 Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.15 L-22-041, Supplemental Information to Enhance Exemption Request Detail for Pilgrim ISFSI Annual Radioactive Effluent Release Report Due Date Extension2022-12-0909 December 2022 Supplemental Information to Enhance Exemption Request Detail for Pilgrim ISFSI Annual Radioactive Effluent Release Report Due Date Extension IR 05000293/20220032022-11-18018 November 2022 NRC Inspection Report No. 05000293/2022003 ML22276A1762022-10-24024 October 2022 Decommissioning International Proposed Revisions to the Quality Assurance Program Approval Forms for Radioactive Material Packages ML22266A1922022-09-23023 September 2022 And Pilgrim Nuclear Power Station - Request to Withdraw Prior Submissions from NRC Consideration ML22269A4202022-09-22022 September 2022 Citizen Lawsuit ML22272A0352022-09-22022 September 2022 S. Lynch-Benttinen Letter Regarding U.S. Citizen Intent to Sue U.S. Fish and Wildlife and NOAA Fisheries Representing the Endangered Species (Na Right Whale) Which Will Be Adversely Affected by Holtec International Potential Actions ML22241A1122022-08-29029 August 2022 Request for Exemption from 10 CFR 72.212(a)(2), (b)(2), (b)(3), (b)(4), (B)(5)(i), (b)(11), and 72.214 for Pilgrim ISFSI Annual Radioactive Effluent Release Report IR 05000293/20220022022-08-12012 August 2022 NRC Inspection Report No. 05000293/2022002 ML22215A1772022-08-0303 August 2022 Decommissioning International (HDI) Proposed Revisions to the Quality Assurance Program Approval Forms for Radioactive Material Packages ML22206A1512022-08-0101 August 2022 NRC Office of Investigations Case Nos. 1-2022-002 & 1-2022-006 ML22221A2592022-08-0101 August 2022 LTR-22-0217-1-NMSS - Town of Duxbury Letter Opposing the Irradiated Water Release from Pilgrim (Docket No. 05000293) ML22193A1662022-07-28028 July 2022 LTR-22-0154-1 - Heather Govern, VP, Clean Air and Water Program, Et Al., Letter Regarding Radioactive Wastewater Disposal from the Pilgrim Nuclear Power Station (Docket No. 05000293) ML22175A1732022-07-28028 July 2022 LTR-22-0153-1 - Response Letter to D. Turco, Cape Downwinders, from A. Roberts, NRC, Regarding Holtec-Pilgrim Plans to Dump One Million Gallons of Radioactive Waste Into Cape Cod Bay ML22154A4882022-06-0101 June 2022 Letter from Conservation Law Foundation Regarding Irradiated Water Release from Pilgrim ML22154A1622022-05-26026 May 2022 Letter and Email from Save Our Bay/Diane Turco Regarding Irradiated Water Release from Pilgrim ML22136A2572022-05-16016 May 2022 Submittal of Annual Radioactive Effluent Release Report for January 1 Through December 31, 2021 ML22136A2602022-05-16016 May 2022 Submittal of Annual Radiological Environmental Operating Report for January 1 Through December 31, 2021 2024-09-18
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML21223A2422021-08-16016 August 2021 Enclosure - Pilgrim Nuclear Power Station - Request for Additional Information Regarding Pilgrim - License Amendment Request Independent Spent Fuel Storage Installation Only Emergency Plan ML21161A1072021-07-0909 July 2021 Request for Additional Information Regarding Pilgrim License Amendment Request ISFSI Only Emergency Plan ML21013A5232021-01-15015 January 2021 Request for Additional Information Regarding the Request to Change the Physical Security Plan - Alternative Measures ML20297A2382020-10-22022 October 2020 Fleet DQAP RAIs - Enclosure ML20297A2372020-10-22022 October 2020 Request for Additional Information - HDI Fleet Decommissioning Quality Assurance Program ML20142A2422020-05-26026 May 2020 Acceptance of Requested Licensing Action Physical Security Plan Revision and License Amendment Request to Incorporate Additional Independent Spent Fuel Storage Installation with Requests for Additional Information ML20280A1912020-04-17017 April 2020 Request for Additional Information- Clarifying Information for Pilgrim ISFSI Physical Security Amendment Application ML19207B3662019-07-26026 July 2019 NRR E-mail Capture - Pilgrim - RAI Direct and Indirect Transfer of Lic.; Conforming Lic. Amend.; Req. for Exemption 10 CFR 50.82(A)(8)(I)(A) for Holtec Decom. International, Llc ML19154A5242019-06-0303 June 2019 NRR E-mail Capture - RAI - Pilgrim Post-Decommissioning Technical Specifications (PDTS) License Amendment Request (LAR) ML19086A3492019-03-21021 March 2019 NRR E-mail Capture - Pilgrim Power Station - Request for Additional Information Application for Order Consenting to Direct and Indirect Transfers of Control of Licenses and Approving Conforming License Amendment (EPID: L-2018-LL0-0003) ML19036A6512019-02-0404 February 2019 NRR E-mail Capture - RAI - Pilgrim EP Exemption ML18320A1292018-11-16016 November 2018 NRR E-mail Capture - Request for Additional Information (RAI) - Pilgrim Post-Decommissioning Technical Specifications (PDTS) License Amendment Request (LAR) ML18323A1192018-11-15015 November 2018 CAL 5 Document Request #2 ML18317A2202018-11-11011 November 2018 NRR E-mail Capture - (External_Sender) Questions and Comments Regarding Pilgrim EP Exemption RAI, October 16, 2018 ML18317A2192018-11-0808 November 2018 NRR E-mail Capture - (External_Sender) RAI EP 11.06.18-Question ML18310A0212018-11-0606 November 2018 NRR E-mail Capture - RAI - Pilgrim EP Exemption ML18289A4072018-10-16016 October 2018 NRR E-mail Capture - RAIs - Pilgrim EP Exemption ML18285A8182018-10-12012 October 2018 NRR E-mail Capture - for Your Action: RAIs - Pilgrim - LAR - EP and EAL Scheme to Address Permanently Defueled Condition ML18124A1392018-05-0404 May 2018 NRR E-mail Capture - RAI - Pilgrim ERO Staffing License Amendment Request ML18094B0922018-04-0505 April 2018 Enclosurequest for Additional Information (Letter to B. S. Ford RAI Regarding Entergy Operations, Inc.'S Decommissioning Funding Plan Update for ISFSI Docket Nos.: 72-43, 72-51, 72-1044, 72-07, 72-12, and 72-59) ML18005A5422018-01-0505 January 2018 NRR E-mail Capture - Second Round of RAI for DAEC Fifth Inservice Inspection Interval Program Plan, Relief Request RR-03 - EPID: L-2017-LLR-0110 ML16347A0042016-12-0909 December 2016 NRR E-mail Capture - Pilgrim: Request for Additional Information for Relief Requests on Volumetric Exam Requirements, PNPS-ISI-001, 002 and 003 ML16013A0642016-01-13013 January 2016 NRR E-mail Capture - Request for Additional Information Entergy CNRO-2015-00023 - Revision to Entergy Quality Assurance Program Manual (Fleet Submittal CAC Nos. MF7086-MF7097) ML15341A1662015-12-0707 December 2015 NRR E-mail Capture - Entergy Fleet RR-EN-15-1, Request for Additional Information (CACs MF6341-MF6349) ML15211A6612015-07-30030 July 2015 Licensed Operator Positive Fitness-For-Duty-Test ML15051A0322015-02-25025 February 2015 Request for Additional Information Regarding the Safety Limit Minimum Critical Power Ratio License Amendment Request ML14342A0942014-12-17017 December 2014 Request for Additional Information Regarding Relief Request PRR-24, Nozzle-to-Vessel Welds and Nozzle Inner Radii Examinations ML14042A0432014-02-18018 February 2014 Request for Additional Information Regarding Safety Limits to Resolve Pressure Regulator Fail-Open Transient License Amendment Request ML13333A9102013-12-0505 December 2013 Interim Staff Evaluation and Request for Additional Information Regarding the Overall Integrated Plan for Implementation of Order EA-12-051, Issuance of Order to Modify Licenses with Regard to Reliable Spent Fuel Pool ins ML13323B4702013-11-25025 November 2013 Request for Additional Information Regarding Relief Request PRR-22 ML13304B4182013-11-0101 November 2013 Request for Additional Information Associated with Near-Term Task Force Recommendation 2.3, Seismic Walkdowns ML13179A4622013-07-0505 July 2013 Entergy Nuclear Operations, Inc., Decommissioning Funding Status Report Request for Additional Information Regarding the Decommissioning Funding Status Report ML13182A4252013-07-0101 July 2013 Request for Additional Information E-mail from R.Guzman to W.Lobo PR-03 and PR-05 Fifth Ten-Year Inservice Testing (IST) Program ML13165A2762013-06-20020 June 2013 Request for Additional Information Regarding Overall Integrated Plan for Reliable Spent Fuel Pool Instrumentation (NRC Order EA-12-051) ML12278A3862012-10-0404 October 2012 ANO 1 & 2, Big Rock, FitzPatrick, GGNS, Indian Point 1, 2, and 3, Palisades, Pilgrim, RBS, Vermont Yankee, and Waterford, Request for Additional Information, Round 2, Amendment Request to Revise QA Program Manual and Staff Qualification TSs ML1209604492012-04-0505 April 2012 ANO 1 & 2, Big Rock, FitzPatrick, GGNS, Indian Point 1, 2 & 3, Palisades, Pilgrim, RBS, Vermont Yankee, and Waterford - Request for Additional Information, Revise Quality Assurance Program Manual and Staff Qualification Technical Specificat ML1208601472012-03-26026 March 2012 Request for Additional Information - Pilgrim Nuclear Power Station Revision to Condensate Storage Tank Low Level Trip Setpoint ML12056A0512012-03-12012 March 2012 Enclosure 5 - Recommendation 9.3: Emergency Preparedness ML12056A0502012-03-12012 March 2012 Enclosure 4 - Recommendation 2.3: Flooding ML12056A0482012-03-12012 March 2012 Enclosure 2 - Recommendation 2.1: Flooding ML12056A0492012-03-12012 March 2012 Enclosure 3 - Recommendation 2.3: Seismic ML12056A0472012-03-12012 March 2012 Enclosure 1 - Recommendation 2.1: Seismic ML1132502282011-11-22022 November 2011 Request for Additional Information, Relief Request No. PRR-21 ML1132202342011-11-21021 November 2011 Request for Additional Information 60-Day Response to Bulletin 2011-01, Mitigating Strategies, ML1114402342011-05-25025 May 2011 Request for Additional Information to Support the Review of 2011 Decommissioning Funding Status Report ML1108202082011-04-11011 April 2011 Summary of Telephone Conference Call Held on March 23, 2011, Between the USNRC and Entergy Nuclear Operations, Inc., Concerning the Pilgrim Nuclear Power Station License Renewal Application ML1106101872011-03-0303 March 2011 Request for Additional Information to Support the Review of Pilgrim Nuclear Power Station Cyber Security Plan (Id: 2.10.034) ML1105403302011-02-15015 February 2011 Response to Request for Additional Information (Rai), Dated January 5, 2011 on the Cyber Security Plan ML1100900272011-01-10010 January 2011 Request for Additional Information Revision to TS for Setpoint and Setpoint Tolerance Increase for Safety Relief Valves and Spring Safety Valves, and Related Changes (ME3543) ML1034105062011-01-0707 January 2011 December 1, 2010, Summary of Telephone Conference Call Held Between the U.S. Nuclear Regulatory Commission and Entergy Nuclear Operations, Inc., Concerning the Pilgrim Nuclear Power Station License Renewal Application 2021-08-16
[Table view] |
Text
July 31, 2006Mr. Michael KanslerPresident Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601-1839
SUBJECT:
REQUESTS FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THEPILGRIM NUCLEAR POWER STATION LICENSE RENEWAL APPLICATION(TAC MC9669)
Dear Mr. Kansler:
By letter dated January 25, 2006, Entergy Nuclear Operations, Inc. submitted an applicationpursuant to 10 CFR Part 54, to renew the operating license for Pilgrim Nuclear Power Stationfor review by the U.S. Nuclear Regulatory Commission (NRC). The NRC staff is reviewing theinformation contained in the license renewal application and has identified, in the enclosure,areas where additional information is needed to complete the review. These relate to Section 2.5 Scoping and Screening results: Electrical and Instrumentation and Control Systems.These questions were discussed with a member of your staff, Bryan Ford, and a mutuallyagreeable date for this response is within 30 days from the date of this letter. If you have any questions, please contact me at 301-415-1478 or e-mail RXS2@nrc.gov
. Sincerely, /RA/Ram Subbaratnam, Project ManagerLicense Renewal Branch A Division of License Renewal Office of Nuclear Reactor RegulationDocket No. 50-293
Enclosure:
Requests for Additional Informationcc w/encl: See next page
ML061940015E:\Filenet\ML061940015.wpdOFFICEPM:RLRA:DLRLA::DLRBC:RLRA:DLRNAMERSubbaratnamIKingLLund DATE7/ 25 /067/ 25 /067/ 27 /06 Letter to Michael Kansler from Ram Subbaratnam dated July 31, 2006
SUBJECT:
REQUESTS FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THEPILGRIM NUCLEAR POWER STATION LICENSE RENEWAL APPLICATION(TAC MC9669)HARD COPYDLR R/FE-MAIL:JFairRWeisman AMurphy RPettis GGalletti DShum GBagchi SSmith (srs3)
SDuraiswamy YL (Renee) Li RidsNrrDlr RidsNrrDlrRlra RidsNrrDlrRlrb RidsNrrDe RidsNrrDci RidsNrreEemb RidsNrrDeEeeb RidsNrrDeEqva RidsNrrDss RidsNrrDnrl RidsOgcMailCenter RidsNrrAdes DLR Staff----------JShea DNguyen APaul GWilson CAnderson, Region 1 WRaymond, Region 1 NSheehan, Region 1 Pilgrim Nuclear Power Station cc:
Regional Administrator, Region IU. S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406-1415Senior Resident InspectorU. S. Nuclear Regulatory Commission Pilgrim Nuclear Power Station Post Office Box 867 Plymouth, MA 02360Chairman, Board of Selectmen11 Lincoln Street Plymouth, MA 02360ChairmanNuclear Matters Committee Town Hall 11 Lincoln Street Plymouth, MA 02360Chairman, Duxbury Board of SelectmenTown Hall 878 Tremont Street Duxbury, MA 02332Office of the CommissionerMassachusetts Department of Environmental Protection One Winter Street Boston, MA 02108Office of the Attorney GeneralOne Ashburton Place 20th Floor Boston, MA 02108Director, Radiation Control ProgramCommonwealth of Massachusetts Executive Offices of Health and Human Services 174 Portland Street Boston, MA 02114Secretary of Public SafetyExecutive Office of Public Safety One Ashburton Place Boston, MA 02108 Director, Massachusetts Emergency Management Agency Attn: James Muckerheide 400 Worcester Road Framingham, MA 01702-5399Mr. William D. MeinertNuclear Engineer Massachusetts Municipal Wholesale Electric Company
P.O. Box 426 Ludlow, MA 01056-0426Mr. Michael A. BalduzziSite Vice President Entergy Nuclear Operations, Inc.
Pilgrim Nuclear Power Station 600 Rocky Hill RoadPlymouth, MA 02360-5508Mr. Stephen J. BethayDirector, Nuclear Safety Assurance Entergy Nuclear Operations, Inc.
Pilgrim Nuclear Power Station 600 Rocky Hill RoadPlymouth, MA 02360-5508Mr. Bryan S. FordManager, Licensing Entergy Nuclear Operations, Inc.
Pilgrim Nuclear Power Station 600 Rocky Hill RoadPlymouth, MA 02360-5508Mr. Gary J. Taylor Chief Executive Officer Entergy Operations 1340 Echelon Parkway Jackson, MS 39213 Pilgrim Nuclear Power Station cc:
Mr. John T. HerronSr. VP and Chief Operating Officer Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601Mr. Oscar LimpiasVice President, Engineering Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601Mr. Christopher SchwarzVice President, Operations Support Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601 Mr. John F. McCannDirector, Nuclear Safety Assurance Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601Ms. Charlene D. FaisonManager, Licensing Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601Mr. Michael D. Lyster5931 Barclay Lane Naples, FL 34110-7306Mr. Michael J. ColombDirector of Oversight Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601Ms. Stacey LousteauTreasury Department Entergy Services, Inc.
639 Loyola Avenue New Orleans, LA 70113Mr. James Sniezek5486 Nithsdale Drive Salisbury, MD 21801Mr. Travis C. McCulloughAssistant General Counsel Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601Mr. James RossNuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708Plymouth Public LibraryAttn: Dinah O'Brien 132 South Street Plymouth, MA 02360Duxbury Free Library ATTN: Ms. Elaine Winquist 77 Alden Street Duxbury, MA 02332 Kingston Public Library ATTN: Reference Librarian 6 Green Street Kingston, MA 02364Ms. Mary LampertDuxbury Nuclear Advisory, Chair Pilgrim watch, Director 148 Washington Street Duxbury 02332 EnclosureREQUESTS FOR ADDITIONAL INFORMATIONPILGRIM NUCLEAR POWER STATIONLICENSE RENEWAL APPLICATION SECTION 2.51.License renewal application (LRA) Section 2.5 states that the basic philosophy used inthe electrical and instrumentation and control (I&C) components in the integrated plantassessment (IPA) was that components are included in the review unless they are specifically screened out. When used with the plant spaces approach, this method eliminates the need for unique identification of every component and its specific location. Also, it states that during the IPA, commodity groups and specific plant systems were eliminated from further review as the intended functions of commoditygroups were examined. (1) Identify all the components that were screened out andprovide a basis used for doing so. (2) Were all plant spaces evaluated under this methodology? If any spaces were excluded from evaluation, identify those spaces thatwere excluded and provide the reason why each space was excluded. (3) Identify commodity groups and specific plant systems that were eliminated from further reviewand provide a basis used for doing so.2.LRA Section 2.5 states that fuse holders with metallic clamps are either part of acomplex active assembly or part of circuits that perform no license renewal intended function. Where as in Table 2.5-1, fuse holder insulation material is identified as electrical and I&C components subject to aging management review (AMR). Confirm that Pilgrim Nuclear Power Station does not use fuse holders (with metallic clamps orbolted connection type) that are not part of a larger assembly, but support safety-related and non safety-related functions in which the failure of a fuse precludes a safety function from being accomplished [10 CFR Part 54.4(a)(1) and (a)(2)] and revise Table 2.5-1 accordingly. 3.LRA Section 2.5 states that electrical cables and connections subject to 10 CFR 50.49environmental qualification (EQ) requirements are not subject to AMR since the components are replaced based on qualified life. Confirm that all electrical cables and connections subject to 10 CFR 50.49 EQ requirements are replaced based on qualified life (current licensing basis is 40 years).