ML14203A429

From kanterella
Jump to navigation Jump to search
Karen Vale 50-293 ADAMS Docs 2007
ML14203A429
Person / Time
Site: Pilgrim
Issue date: 05/29/2014
From: Armentrout D
NRC/OIS/PMPD
To:
Armentrout D
Shared Package
ML14203A422 List:
References
Download: ML14203A429 (22)


Text

Document Title Accession Number 2008/01/03-Petition by Nuclear Information and Resource Service; Jersey SML080090190 E-MAIL: (PD) FW: Pilgrim in the News. ML070440359 Pilgrim - Technical Specification Revisions for Control Rod Operability ScramML070110501 Pilgrim Nuclear Power Station License Renewal Application Review (SHPO ML063480099 2007/01/05-Comment (10) submitted by Lea Wood on Massachusetts AttornML070080409 2007/01/05-Comment (9) submitted by Nina Keller on Massachusetts AttornML070080406 01/24/2007 Notice of Forthcoming Meeting to Discuss the Draft Supplement ML070050153 E-MAIL: (PA) Pilgrim LRA Amendment 11. ML070380551 E-MAIL: (PA) FW: Pilgrim LRA Amendment 11. ML070380577 Pilgrim, License Renewal Application Amendment 11. ML070250175 E-MAIL: (PA) Fluence Values. ML070380578 2007/01/11-Commission Memorandum and Order (CLI-07-02) ML070110598 SRM-M070111 - Affirmation: I. SECY-06-0227 Entergy Nuclear Vermont Ya ML070110513 M070111 - Affirmation Session: (a) SECY-06-0227 - Vermont Yankee; (b) S ML070110503 Press Release-I-07-002: NRC to Hold Public Meetings on Draft EnvironmenML070120427 NRC Receipt of Pilgrim Nuclear Power Station's Response to Generic Lette ML063620110 2001/01/13-Comment (10) submitted by Richard DiPrima on Shaw's PRM-5 ML070180520 2007/01/15-Comment (16) submitted by Richard DiPrima on MassachusettsML070180504 Proposed Change to Applicability of Pilgrim's Pressure - Temperature CurveML070230293 Pilgrim, License Renewal Application Amendment 12. ML070230286 2007/01/16- Pilgrim - Entergy's Second Supplemental Disclosure. ML070250365 E-MAIL: (PD) Fwd: Documents from Pilgrim. ML070370589 2007/01/16 - Updated Hearing File for Pilgrim Nuclear Power Station ML070170038 01/16/2007 Budget Presentation,"Town of Plymouth Fiscal Year 2008 BudgeML071570049 E-MAIL: (PD) Fwd: Entergy Info on Drywell Liner UT Measurements. ML070370587 E-MAIL: (PA) FW: Pilgrim License Renewal Application Amendment 12. ML070380549 01/30/2007 Notice of Meeting Between NRC Staff & Entergy Management toML070170610 E-MAIL: (PD) Pilgrim LRA Amendment 12. ML070380227 E-mail: (PD) Upcoming Pilgrim Environmental License Renewal Meeting. ML070440395 Comment (1) Of Joan Bartlett Re Pilgrim Power Plan In Plymouth, Requesti ML070430254 E-MAIL: (PD) Fwd: FW: Drawing. ML070380092 E-MAIL: (PA) FW: Drawing. ML070380545 12/18/2006 Summary of Conference Call With Entergy Nucelar Operations, ML063540010 01/19/07 - LTR-07-0073 - Letter to Annette L. Vietti-Cook, SECY from Scott ML080720117 E-mail: (PD) Drywall Air Gap Foam. ML070380088 M070122 - Affirmation Session: (a) SECY-06-0240 - Vermont Yankee and PML070220364 2007/01/22-Commission Memorandum and Order (CLI-07-03) ML070220402 SRM-M070122A-Affirmation: I. SECY-06-0240 Entergy Nuclear Vermont YaML070230087 Press Release-I-07-004: NRC to Discuss Preliminary Results of License ReML070230491 Letter from NOAA-National Marine Fisheries Service dated January 23, 200 ML070360071 Pilgrim Draft Environmental Impact Statement Public Meeting, January 24, 2ML070530185 Attachments to Pilgrim Draft Environmental Impact Statement Afternoon Me ML070600309 Pilgrim Draft Environmental Impact Statement Public Meeting, January 24, 2ML070530189 Meeting Agenda for Public Meeting to Discuss the Draft Supplemental Envir ML070330558 Pilgrim, RAI, Technical Specification Changes Single Control Rod Withdraw ML070030019 DSEIS Meeting Presentation, Preliminary Results of Environmental Review ML070330562 Pilgrim Nuclear Power Station, RAI, RE: Response To Generic Letter 2003-ML063610061 E-MAIL: (PA) Scan001 (30).pdf. ML070440356 E-MAIL: (PA) Meteorology/Modeling Considerations for Various NRC Regul ML070440358

E-MAIL: (PA) Backgrounder.pdf. ML070440355 Comment (2) of Rebecca Hall Opposing the Re-Licensing of Pilgrim NuclearML070430260 E-MAIL: (PA) FW: Pilgrim LRA Amendment 13. ML070380543 E-MAIL: (PA) PNPS Meeting 1.30.07?. ML070380579 Pilgrim - License Renewal Application Amendment 13. ML070370413 E-MAIL: (PD) DLR Briefs. ML070370295 2007/01/29-Comment (33) submitted by Mary Lampert on Shaw's PRM-51-1ML070300671 E-MAIL: (PD) Pilgrim LRA Amendment 13. ML070370298 E-MAIL: (PD) Re: Pilgrim SEIS. ML070440402 Pilgrim License Renewal Inspection Exit Meeting Slides. ML070440323 EMAIL: (PD) FSAR Excerpt. ML070370272 Pilgrim License Renewal Inspection Exit Meeting - Slides with Notes. ML070430476 E-mail: (PD) Pilgrim Follow Up Information. ML070440406 E-MAIL: (PD) Re: Inspection Exit Meeting - Plymouth - 01.30.07. ML070370290 E-MAIL: (PD) Re: Inspection Exit Meeting - Plymouth - 01.30.07 (from M. LaML070370286 2007/02/01- Pilgrim - Letter to Administrative Judges Notifying Them of No CML070320201 E-MAIL: (PA) Re: Inspection Exit Meeting - Plymouth - 01.30.07. ML070720361 2007/02/01-Massachusetts Attorney General's Motion for Leave to File Moti ML070370622 2007/02/01-Massachusetts Attorney General's Motion for Reconsideration aML070370620 EA-06-301, Pilgrim Nuclear Power Station - NRC Investigation Report No. 1 ML070390004 Audit and Review Report for Plant Aging Management Reviews and ProgramML063480333 Pilgrim Nuclear Power Station - NRC Integrated Inspection Report 0500029 ML070330607 E-MAIL: (PA) Re: NRC Exit Meeting - Reactor Safety. ML070720358 Pilgrim Nuclear Power Station-Revision To Emergency Plan To Change Em ML070320486 E-MAIL: (PA) Re: Safety Evaluation Review Team - Exit Meeting - PlymouthML070720357 Comment (3) of Mary Lampert on Draft Supplemental Environmental ReviewML070430263 Error in Pilgrim letter dated 01/04/07 (Pilgrim letter number 2.07.004). ML070380424 E-MAIL: (PD) Pilgrim Meeting Handouts. ML070680351 2007/02/07-Pilgrim and Vermont Yankee - NRC Staff Motion for Consolidati ML070390099 Pilgrim Nuclear Power Station-Proposed Amendment RE: HPCI & RCIC SuML063470397 Letter Dated February 8, 2007 From Massachusetts Historical Commission, ML070510463 Pilgrim Nuclear- Notice Consideration Of Issuance Of Amendment To Facil ML070310014 2007/02/09-Commission Extension Order ML070400655 Supplemental Information In Support of Proposed Change to Applicability of ML070520355 Comment (4) of Mary Lampert on Behalf of Pilgrim Watch regarding Draft N ML070470406 2007/02/15- Pilgrim - Updated Hearing File ML070540189 E-MAIL: (PD) Re: Pilgrim SEIS. ML070680341 Pre-Inspection Cover Sheet and Inspection Plan - Pilgrim Nuclear GeneratinML070670370 2007/02/16-Letter from Riverkeeper, Inc., Lisa Rainwater, et. al. on ProposeML070510413 2007/02/16-Entergy's Response to Massachusetts Attorney General's MotioML070530298 01/23/2007 Summary of Conference Call with Entergy Nuclear Operations, ML070300793 2007/02/16-NRC Staff Answer to Massachusetts Attorney General Motion foML070510132 Comment (5) of Heidi Mayo Opposing Draft Supplemental Environmental ReML070660107 Final QA/Related Forms (Folder 1). ML071340135 Pilgrim, Final - Section B Operating Exam (Folder 3). ML070820405 Pilgrim, Final - RO & SRO Written Examination with Answer Key (401-5 For ML070820363 Pilgrim, Final - Outlines (Folder 3). ML070820358 Operator Licensing Examination Approval (Pilgrim Nuclear Power Station). ML070520117 Pilgrim, Final - Section A Operating Exam (Folder 3). ML070820392 Morning Report 1-2007-0002 - Management Changes for Entergy Nuclear. ML070510543

Pilgrim, Final - Section C Operating Exam (Folder 3). ML070820446 02/21/2007, NMC Slides for Public Meeting, "Conduct of Operations Action ML070510674 2007/02/22-Comment (25) submitted by Sheila Lynch on Proposed Rules P ML070540303 02/22/2007 - Ltr to Lisa Rainwater From Annette Vietti-Cook, re: Reopening ML070510526 2007/02/22-Comment (24) submitted by Pilgrim Watch, Mary Lampert on Pr ML070540299 Pilgrim, Technical Specifications, Modify the TSs to Extend the Use of the CML070860339 E-MAIL: (PA) LRA amendment 14 (Entergy letter 2.07.023). ML070720348 Pilgrim, Response to NRC Request for Additional Information Regarding Te ML070650342 Pilgrim License Renewal Application Amendment 14. ML070650350 Comment (6) of Rebecca Chin Opposing Re-Licensing of Pilgrim Nuclear Pl ML070660114 Comment (7) of Lilias Cingolani Opposing Re-Licensing of Pilgrim Nuclear PML070660117 Comment (17) of Mary Osborn Opposing Relicensing of Pilgrim Nuclear PowML070660059 Comment (8) of Millie Morrison Opposing Relicensing of Pilgrim Nuclear PowML070660122 Comment (16) of Stephen J. Bethay, on Behalf of Entergy Nuclear Operatio ML070660079 Comment (12) of Paul E. McCormack Opposed to Permanent Storage of NuML070660285 Comment (14) of Diana L. Woebcke Opposing Application Renewal for PilgrML070660293 E-MAIL: (PA) 2/26 Conference Call Record. ML070720351 James A. FitzPatrick; Indian Point, Units 1, 2 & 3; Pilgrim and Vermont - FitnML070610094 Comment (13) of Brian Thurber, Frank Gorke and Alyssa Schuren OpposingML070660240 E-MAIL: (PA) Response from "Comment on NRC Documents" ML071030022 Comments (9) of Diane Curran and Matthew Brock on Behalf of Massachus ML070660133 Comment (15) of Robert S. Knorr on the Draft Supplemental Environmental ML070660326 Comment (10) of Robert W. Varney on Behalf of United States Environment ML070660135 Comment (11) of Pine duBois on Behalf of Jones River Watershed Associat ML070660273 01/24/2007 Summary of Meeting with Pilgrim on the Draft Supplemental EnvML070540205 Pilgrim Nuclear Power Station Hearing File Update. ML070930326 2007/03/01-Transmittal Ltr - Safety Evaluation Report With Open Items RelaML070510236 E-MAIL: (PD) Requested Document, Safety Evaluation Report With Open IteML070750127 2007/03/01- Pilgrim - Hearing File Update - Pilgrim Nuclear Power Station ML070610055 2007/02/28-Letter submitted by Wedge Bramhall on Proposed Rule PR 73, ML070610190 2007/03/01-Safety Evaluation Report With Open Items Related to the LicensML070600798 Annual Assessment Letter EOC 2006 - Pilgrim Station (IR 05000293-07-001ML070610612 2007/03/02-Comment (20) submitted by C-10 Research and Education FounML070650360 2007/03/02-Comment (22) submitted by Barbara Hildt on Massachusetts AttML070650365 2007/03/02-Comment (21) submitted by Janice Nickerson on Massachusett ML070650363 E-MAIL: (PA) Distribution of Final Document: Summary of Public Meetings DML071020479 E-MAIL: (PA) Pilgrim Nuclear Power Station DEIS Comments. ML071030021 2007/03/04-Comment (23) submitted by Kevin W. Craig on Massachusetts AML070650368 2007/03/05- Pilgrim - Email from Eric Epstein to David R. Lewis in re: seekinML070650581 2007/03/05-E-mail from David R. Lewis to Administrative Judge Young rega ML070650631 E-MAIL: (PD) Request hard copy-safety evaluation report From Mary LampeML071030191 2007/03/06- Pilgrim - Letter to Judge Cole from S. Uttal, OGC providing (CDML070730191 E-MAIL: (PD) Week of 2/26 - Conference Calls From Perry Buckberg To Do ML071030211 ACRS Review of the Pilgrim Nuclear Plant Station Renewal Application - SaML070640252 Velan, Inc., Piston Check Cv Information. ML071370309 2007/03/07-Comment (30) Submitted by Marilyn Harquail on MassachusettsML070660632 E-MAIL: (PD) Updated - Week of 2/26 conference call record From Perry BuML071030221 NRC Exam Results Letter w/o Enclosures dtd 03/08/07. ML071020003 E-MAIL: (PA) 1266 DC Mass AG comments on Draft EIS 2-28-07.pdf. ML071020508 E-MAIL: (PA) Re: 1266 DC Mass AG comments on Draft EIS 2-28-07.pdf. ML071020490

2007/03/09-Comment (31) submitted by Richard C. DiPrima on MassachuseML070710562 MR-1-2007-0005 - Announced Management Changes for Pilgrim Station 03 ML070680291 LTR-07-0346 - Nancy M. Oates re Annual Town Meeting on 03/10/2007on AML071370655 E-mail: (PA) Re: PNPS License Renewal - Cooling Tower Question. ML071020483 2007/03/13-Comment (35) submitted by Edward and Charlotte Russell SuppML070730345 Pilgrim - License Renewal Application Amendment 15. ML070790316 E-MAIL: (PD) Copy of LRA Amendment 15 letter - From Edward Sanchez toML071030042 GE-NE-0000-0061-6306-R4-NP, "Pilgrim Nuclear Power Station, Shroud ReML070930313 Request for Additional Information on Time-Limited Aging Analyses for The ML070810442 2007/03/15-Commission Memorandum and Order (CLI-07-13) ML070740693 Summary of the License Renewal Telephone Conference Call and Meeting ML070600567 SRM-M070315-Affirmation Session: I. SECY-07-0041 - Motion for ReconsidML070740655 2007/03/15- Pilgrim - Entergy's Third Supplemental Disclosure. ML070800217 M070315 - Affirmation: I. SECY-07-0041 Motion for Reconsideration of EnteML070740694 IR 05000293-06-007; Entergy Nuclear Operations; 09/18/2006 - 12/07/2006 ML070750055 03/16/07 -LTR-07-0073 - Letter to Scott H. Strauss, Esq. from Annette L. VieML080720114 Morning Report 1-2007-0008 - Pilgrim Manual Reactor Shutdown. ML070780524 2007/03/19-Comment (64) submitted by Paul A. Gaukler on behalf of EntergML070810384 E-mail: (PD) Meeting Summary - March 14 & 15 2007 - From Perry BuckberML071030048 2007/03/19-Comment (50) submitted by Sally Shaw on Massachusetts AttorML070790637 2007/03/19- Pilgrim - Updated Hearing File for Pilgrim Nuclear Power Statio ML070780108 2007/03/19-Comment (57) submitted by Judy and Howard Hall on Massach ML070790668 E-MAIL: (PD) Re: Pilgrim LR ACRS Subcommittee (SC) Meeting on 4/4/07 -ML071030058 2007/03/20-Comment (61) submitted by Wedge Bramhall on MassachusettsML070800125 E-MAIL: (PD) Fwd: Meeting Summary - March 14 & 15 2007 - From Perry B ML071030063 GE-NE-000-0064-9392-R2-NP, "Pilgrim Unit 1, IGSCC Assessment of Shro ML070870134 E-MAIL: (PA) EPA Suspends 316(b) Rule. ML071020505 Pilgrim - Request for Authorization Under the Provision of 10 CFR 50.55a(a)ML070870132 Pilgrim, Response to NRC Request for Additional Information Regarding Re ML070890406 3/22/2007 - Commonwealth of Massachusetts, Petitioner v. USNRC No. 07-ML071080421 E-MAIL: (PD) Dry Well - Event Number: 43245 - From Mary Lampert to PerrML071030069 Request For Additional Information For The Review of The Pilgrim Nuclear PML070780058 Pilgrim Nuclear Power Station, License Amendment, Issuance of Amendme ML070530384 Pilgrim - Issuance of License Amendment 226 RE: Adoption of Technical S ML070530646 Pilgrim, Technical Specifications, Issuance of License Amendment 226 RE: ML070860359 E-MAIL: (PD) Pilgrim Draft ACRS Presentation - from Bryan Ford to Perry B ML071030176 Pilgrim, License Renewal Comments on Draft Safety Evaluation Report, DatML071380190 E-MAIL: (PD) Re: Draft Program Detail Pilgrim ACRS Subcommitte presentaML071020296 E-MAIL: (PD) Re: Drywell. ML071020291 E-MAIL: (PD) Re: Revised DRAFT ACRS Fluence Slides2. ML071020345 Indian Point, Units 1, 2 and 3; Vermont Yankee; Pilgrim and James A. FitzP ML070950209 E-MAIL: (PD) Re: Revised DRAFT ACRS Fluence Slides. ML071020343 E-MAIL: (PD) Re: PDF copy of Entergy letter providing comments on draft SML071020316 E-MAIL: (PD) Re: Entergy-Preliminary Durability Performance Evaluation of ML071020319 E-MAIL: (PD) Re: People Attending ACRS Sub Committee Meeting. ML071020367 E-MAIL: (PD) Re: Final Presentation to Advisory Committee on Reactor Saf ML071020383 04/17/2007, Meeting with Entergy Nuclear Operations, Inc., to Discuss NRCML070920459 G20061071/LTR-06-0668 - Mary Lampert Ltr. re: Pilgrim Nuclear Power not ML070120424 2007/04/02- Pilgrim - Letter to Administrative Judges from D. Roth, OGC proML071010210 E-MAIL: (PD) Fw: Revised Drywell UT Table and Annulus Drain VT-2 Datas ML071200177

Pilgrim - Relief Request No. PPR-15, Rev. 01, Approval To Include Remaini ML070590479 E-MAIL: (PD) Annulus drain line buckets. ML071200197 2007/04/02- Pilgrim - Notice of Appearance for Andrea L. Curatola (Pilgrim NML070930119 2007/04/02- Pilgrim - Notice of Withdrawal for Molly L. Barkman ML070930427 E-MAIL: (PD) Conference Call Record 4/2/2007. ML071200188 Press Release-I-07-015: NRC To Discuss 2006 Assessment For Pilgrim NuML071000343 Pilgrim - Repair of the Core Shroud Stabilizer Assemblies - Torsion Arm Cla ML071080222 GE-NE-0000-0066-0380-R1-NP, "Pilgrim Nuclear Power Station, Torsion Ar ML071130384 Slides for 2006 Annual Assessment Meeting, "NRC Annual Performance As ML071010265 2007/04/12-LB Notification to Parties (Regarding Site Visit) ML071020203 E-MAIL: (PD) Re: Conference Call Record 4/2/2007. ML071200187 E-MAIL: (NPA-PD) Entergy EFH Comment References doc - Pilgrim. ML071280814 2007/04/16- Pilgrim - Entergy's Fourth Supplemental Disclosure. ML071170260 IR 05000293-07-301; February 23, 2007 - March 1, 2007; Pilgrim Nuclear P ML071070491 Pilgrim, License Renewal Application Annual Update. ML071160152 2007/04/18 - Pilgrim - Second Disclosure Statement by Pilgrim Watch. ML071170267 E-MAIL: (PD) Copy of PNPS LRA Annual Update Letter. ML071200179 2007/04/18- Pilgrim - Letter to Administrative Judges Updated Hearing File (ML071090040 E-mail: (NPA-PD) Entergy EFH Comment References2 - Pilgrim. ML071290120 4/20/2007 - Legal Motion for Filing for Commonwealth of Massachusetts v. NML071560312 E-MAIL: (NPA-PD) Entergy EFH Comment References - Pilgrim. ML071280811 Pilgrim, Response to NRC Request for Additional Information Related to Re ML071210250 Pilgrim Nuclear Power Station, Weld Filler and Welding Electrode Materials ML071210252 Pilgrim, Revision to Entergy Response to NRC Request for Additional InformML071210254 E-MAIL (NPA-PD) Paper Abstract. ML071290298 Pilgrim Nuclear Power Station, Technical Specifications, Limiting ConditionsML071430305 E-mail (NPA-PD) Additional Info/

References:

Sea Breeze Journal Article. ML071290387 E-MAIL: (PD) Buried Pipes and Tanks Inspection Program - Pilgrim. ML071240467 Pilgrim Nuclear Power Station, License Amendment, Issuance of Amendme ML070740419 Pilgrim - Tech Spec Pages for Amendment 228 Re: Single Control Rod Wit ML071560542 E-mail: (NPA-PD) Link to Rutgers Slides on WRF Calcs - Pilgrim. ML071280766 E-MAIL: (PD) Re: PNPS Request. ML071240473 Summary of Conference Calls on April 2, 2007, With Entergy Nuclear OperaML071030053 Pilgrim, Revised Request for Authorization under Provision of 10 CFR 50.55ML071280519 2007/05/01- Pilgrim - Letter to Administrative Judges re Pilgrim Nucelar PowML071210147 03/14-15/2007 Summary of Conference Calls With Entergy Nuclear OperatioML071030093 E-MAIL: (NPA-PD) LRA Letter Part 2. ML071640339 E-MAIL: (NPA-PD) Pilgrim Amendment. ML071640342 E-MAIL: (NPA-PD) Entergy LRA Letter Part 1 of 2. ML071640328 Pilgrim Nuclear Power Station - License Renewal Application Amendment 1 ML071280251 E-MAIL (NPA-PD) Re: MACCS2 Input files for Sensitive Cases. ML071570052 E-MAIL: (NPA-PD) Fwd: Pilgrim Waste Discussion. ML071560466 Pilgrim FSEIS Reference - Nonradioactive Waste Information. ML071230016 G20070320/LTR-07-0324 - Ltr. Lisa Rainwater, Re: Request for the NRC toML071290020 E-MAIL: (NPA-PD) Re: Fwd: Pilgrim Waste Discussion. ML071560469 E-MAIL: (NPA-PD) Entergy Efficiency Article. ML071560479 Pilgrim, Response to NRC Generic Letter 2007-01, "Inaccessible or Underg ML071300361 Pilgrim - Additional Information Concerning Revised Request for AuthorizatioML071310083 Branch Chief Assignment - James A. Fitzpatrick Nuclear Power Plant, IndianML071090630 Meeting Minutes of the ACRS Plant License Renewal Subcommittee, April 4ML081540187

E-MAIL: (NPA-PD) Re: MACCS2 Input Files for Sensitivity Cases. ML071570036 E-mail: (NPA-PD) FW: MACCS2 Input Files for Sensitivity Cases in ER. ML071570037 04/04/2007 Certified Minutes of the Subcommittee on Plant License RenewaML080080431 E-MAIL (NPA-PD) FW: MACCS2 Input Files for Sensitive Cases in ER. ML071570059 IR 05000293-07-002; on 01/01/2007 - 03/31/2007; Pilgrim Nuclear Power S ML071270525 E-MAIL: (NPA-PD) Re: Fw: Pilgrim Fluence RAIs. ML071640324 E-MAIL: (NPA-PD) Amendment 16 reply. ML071580958 2007/05/08- Pilgrim - Entergy's Fifth Supplemental Disclosure. ML071350505 Pilgrim, Core Operating Limits Report, Revision 26 (Cycle 17). ML071360197 Pilgrim Radioactive Effluent Release Report for January 1 through DecembeML071350484 E-MAIL (NPA-PD) FW: Letter to MA State Historic Preservation Officer. ML071570063 Pilgrim - Annual Radiological Environmental Operating Report for January 1 ML071350482 E-MAIL: (NPA-PD) RE: 5/10 Phone Conference. ML071580981 E-MAIL: (NPA-PD) LRA question. ML071580988 E-MAIL: (NPA-PD) 5/10 Phone Conference. ML071580985 5/14/2007 - Commonwealth of Massachusetts, Petitioner v. USNRC RegardML071440215 Pilgrim Nuclear Power Station - Issuance of Amendment RE: Adoption of T ML070871165 E-MAIL: (NPA-PD) RE: Revised Phone Conference Letter (5/10). ML071580965 E-MAIL: (NPA-PD) Revised Phone Conference Letter (5/10). ML071580962 2007/05/15- Pilgrim - Declaration of Thomas L. Sowdon in Support of EntergML071440332 2007/05/16 - Pilgrim - Declaration of Kevin R. O'Kula. ML071440354 Pilgrim, Third Ten-Year ISI Interval Relief Request, PRR-42, Examinations oML071430188 Pilgrim - Special Report - TS Table 3.2.F, Inoperable Main Stack High Rang ML071430192 LER 07-001-00 for Pilgrim Regarding Primary Containment Isolations FollowML071420092 2007/05/16- Pilgrim - Declaration of Fred J. Mogolesko in Support of Enterg ML071440333 2007/05/17- Pilgrim - Statement of Material Facts submitted by counsel for EML071440325 Pilgrim, License Renewal Application Amendment 17. ML071550310 E-MAIL: (NPA-PD) LRA Amendment 17. ML071640345 2007/05/17- Pilgrim - Entergy's Motion for Summary Disposition of Pilgrim WML071440321 Pilgrim Nuclear Power Station - Correction To Technical Specifications (TACML071340143 Pilgrim, Technical Specifications, Corrected Page II (Fixed Administrative ErML072610200 04/17/2007 Summary of Annual Assessment Meeting With Entergy Nuclear ML071370142 Feedback Form for Pilgrim Annual Assessment Meeting 2006-07. ML071370151 E-MAIL: (NPA-PD) Pilgrim Amendment 17 of 5/17/2007. ML071640347 2007/05/18 - Pilgrim - Letter To Administrative Judges (Pilgrim Nuclear Pow ML071510064 Pilgrim Nuclear Power Station - Response To Bulletin (BL) 2005-02 "EmergeML071300366 2007/05/22-Pilgrim - Request by Pilgrim Watch for Extension of Time to RepML071520175 Pilgrim PI&R Emails - Pre-Inspection Trip 05/29-31/2007. ML072210251 2007/05/22-Pilgrim - Notice of Appearance of Mary Elizabeth Lampert. ML071520168 Pilgrim - Supplemental Follow-Up Response to NRC Generic Letter 2003-01ML071510191 Pilgrim Nuclear Power Station - Withdrawal of a Relief Request (TAC No. M ML071410032 2007/05/22- Pilgrim - Notice of Withdrawal of Molly H. Bartlett. ML071520174 2007/05/24- Pilgrim - Entergy's Opposition to Pilgrim Watch Request to ExteML071500299 OFFICIAL EXHIBIT - PWA000002-00-BD01 - Dr. Jan Beyea Declaration Ex ML110600884 Exhibit PWA 00002, PWA - Dr. Jan Beyea Declaration Excerpts Pertaining t ML110030902 E-MAIL: (NPA-PD) Cost Benefit Equation Terms. ML071570118 E-MAIL: (NPA-PD) RE: Cost Benefit Equation Terms. ML071570124 E-MAIL: (NPA-PD) RE: Cost Benefit Equation Terms [Response from N. BixML071570122 2007/05/28- Pilgrim - Pilgrim Watch's Reply to Entergy's Opposition to Pilgri ML071570380 2007/05/30- Pilgrim - NRC Staff motion for extension of time to reply to EnteML071650255

2007/05/30-LB Order (Granting Request for Extension) ML071500416 OFFICIAL EXHIBIT - NRC000006-00-BD01 - WSMS-TR-07-0005, Revision ML110600920 2007/05/31-Pilgrim - Email from Susan Uttal to Administrative Judges and PML071510163 2007/05/31-Exhibit NRC000006, Pilgrim LR Proceeding - WSMS-TR-07-000ML110030979 E-MAIL: (NPA-PD) Amendment 16. ML071580976 2007/06/01- Pilgrim - Letters to Administrative Judges (Pilgrim Nuclear Pow ML071550020 Redacted Page (1) from: Follow Up to CR-PNP-2005-05471 - Outstanding QML071560232 2007/06/05- Pilgrim - Entergy's Sixth Supplemental Disclosure. ML071630395 OFFICIAL EXHIBIT - PWA000003-00-BD01 - Declaration of David I. ChaninML110600885 2007/06/05-LB Order (Granting Request for Extension) ML071560454 2007/06/05-Pilgrim April 2008 Evidentiary Hearing - Intervenor Exhibit 11, S ML081090527 2007/06/05-Pilgrim April 2008 Evidentiary Hearing - Intervenor Exhibit 9, re ML081090525 Exhibit PWA 00003, Declaration of David I. Chanin in Support of Pilgrim Wa ML110030904 NRC Receipt of Pilgrim Nuclear Power Station, Response To Generic LetterML071090262 Pilgrim - Spent Fuel Management Plan Submittal in Accordance with 10 CFRML071700121 2007/06/08- Pilgrim - Entergy's Motion for Summary Disposition of Pilgrim WML071640454 Summary of Conference Call on May 10, 2007, with Entergy Nuclear Opera ML071310069 Entergy Nuclear Operations, Inc. - Service List Update for FitzPatrick; IndianML071690431 Entergy Nuclear Operations, Inc., Annual report for Quality Assurance ProgrML071770254 2007/06/17 - Pilgrim - Third Disclosure Statement by Pilgrim Watch. ML071840035 2007/06/18- Pilgrim - Hearing File Index ML071700042 Exhibit PWA 00005, Declaration of Richard Rothstein In Support of Pilgrim WML110030944 OFFICIAL EXHIBIT - PWA000005-00-BD01 - Declaration of Richard Rothst ML110600887 2007/06/20-Exhibit NRC000007, Pilgrim LR Proceeding - Declaration of Bru ML110030978 OFFICIAL EXHIBIT - NRC000007-00-BD01 - Declaration of Bruce A. Egan, ML110600921 OFFICIAL EXHIBIT - PWA000001-00-BD01 - Declaration Of Bruce A. Egan ML110600883 Exhibit PWA 00001, Declaration Of Bruce A. Egan In Support Pilgrim WatchML110030900 Press Release-I-07-036 - NRC Names New Senior Resident Inspector at Pi ML071760529 Pilgrim Nuclear Power Station License Renewal Application Amendment 18 ML071730467 E-MAIL: (NPA-PD) LRA Amendment 18. ML071900121 Exhibit PWA 00007, Affidavit Of Joseph A. Jones and Dr. Nathan Bixler ConML110030905 2007/06/25- Pilgrim - Affidavit of Joseph A. Jones and Dr. Nathan Bixler ConML071800259 LER 07-003-00 for Pilgrim regarding Reactor Coolant Pressure Boundary LeML071840196 2007/06/25-Pilgrim - Resume for Nathan E. Bixler. ML071800287 OFFICIAL EXHIBIT - PWA000007-00-BD01 - Affidavit Of Joseph A. Jones aML110600888 2007/06/25- Pilgrim - Resume for Joseph A. Jones, PE ML071800273 2007/06/27- Pilgrim - Pilgrim Watch's Answer Opposing Entergy's Motion fo ML071840038 6/27/2007 - Motion for Extension of Time for the Commonwealth of MassachML071830522 Safety Evaluation Report Related to the License Renewal of Pilgrim NuclearML071410455 Transmittal Letter to M. Kansler Re: Safety Evaluation Report Related to theML071410036 2007/06/28 - Pilgrim - Affidavit of Dr. James A Davis Concerning Entergy's MML071800067 2007/06/28- Pilgrim - NRC Staff Response to Entergy's Motion for SummaryML071800059 2007/06/28- Pilgrim - Certificate of Service (Pilgrim Nuclear Power Station) ML071800078 2007/06/28-Pilgrim April 2008 Evidentiary Hearing - Intervenor Exhibit 21, A ML081090296 2007/06/29- Pilgrim - Certificate of Service (Pilgrim Nuclear Power Station) ML071800300 2007/06/29- Pilgrim - Pilgrim Watch's Answer Opposing Entergy's Motion fo ML071840568 2007/07/02- Pilgrim - NRC Staff Motion For Leave To File Response To Ent ML071840052 2007/07/02- Pilgrim - Letters to Administrative judges Entergy nuclear operaML071840981 Requalification Program Inspection - Pilgrim Nuclear Power Station. ML071860263 ACRS Review of the Pilgrim Nuclear Power Station License Renewal ApplicML071840034

2007/07/06- Pilgrim - Pilgrim Watch's Answer to NRC Staff Response to EntML072010095 2007/07/06- Pilgrim - Letter to Administative Judges providing a copy of the ML071900100 2007/07/09- Pilgrim - Pilgrim Watch's Answer to NRC Staff Response to EntML072010092 2007/07/09- Pilgrim - Entergy's Motion to Strike Portions of Pilgrim Watch's AML071980073 LER-07-002-00 for Pilgrim Nuclear Power Station re: Emergency Diesel GenML071980400 Pilgrim - Response to NRC Request for Additional Information Related to In-ML072010018 IR 05000293-07-402, on 06/04/2007 - 06/07/2007, Pilgrim Nuclear Power S ML071970168 2007/07/17- Pilgrim - Pilgrim Watch's Answer Opposing Entergy's Motion to ML072050145 2007/07/18- Pilgrim - Pilgrim Hearing File Supplement 8 ML072000155 2007/07/19- Pilgrim - NRC Staff Response in Support of Entergy's Motion toML072010128 Pilgrim Nuclear Power Station - Audit of the Licensee's Management of Reg ML071910070 Pilgrim Nuclear Power Station - Response to Generic Letter 2006-02, "Grid ML071910447 Pilgrim - Withdrawal of Relief Request PR-03 (MD2487). ML072040360 2007/07/26- Pilgrim - Pilgrim Watch's Answer Opposing NRC Staff's SupporML072130225 Pilgrim Nuclear Power Station - Withdrawal of a Relief Request (TAC No. M ML071990351 Requests for Additional Information for the Review of the Pilgrim Nuclear PoML072000407 Ltr to M. Balduzzi, re: Notice of Availability of the Final Plant-Specific SuppleML072040480 Ltr to EPA, re: Final Supplement 29 to the Generic Environmental impact St ML072050047 2007/07/27- Pilgrim - NRC Staff Motion Requesting that Pilgrim Watch's AnsML072080303 E-MAIL: (PA) PNPS Final SEIS. ML072270378 2007/07/27- Pilgrim - Email from S. Uttal, OGC to Admin. Judges and PartieML072120147 Press Release-07-092 - NRC Finds No Significant Environmental Impacts fr ML072080285 2007/07/30 - Pilgrim Watch's Answer Opposing NRC Staff's Motion RequestML072190191 E-MAIL: (NPA-PD) Pilgrim LRA Amendment 19. ML072150600 E-MAIL: (NPA-PD) Pilgrim LRA Amendment 19 - 7/30/2007. ML072150602 Pilgrim, Indian Point, James A. FitzPatrick, Vermont Yankee, Palisades, andML072220219 Pilgrim Nuclear Power Station, License Renewal Application Amendment 19ML072190611 2007/07/31- Pilgrim - Notice of Name Change (Andrea L. Silvia) ML072120034 NUREG-1437, Supp 29, Vol 2, "Generic Environmental Impact Statement foML071990027 Pilgrim - Refueling Outage 16, Inservice Inspection (ISI) Summary Report. ML072180237 2007/07/31-Exhibit NRC000002, Pilgrim LR Proceeding - NUREG-1437, Su ML110030964 OFFICIAL EXHIBIT - NRC000002-00-BD01 - NUREG-1437, Supplemental 2ML110600912 IR 05000293-07-006, on 06/11/2007 - 06/21/2007; Pilgrim Nuclear Power S ML072140281 IR 05000293-07-003; 04/01/2007-06/30/2007; Pilgrim Nuclear Power StationML072140621 2007/08/03- Pilgrim - Notice of Withdrawal (Marian L. Zobler) Pilgrim NucleaML072180071 E-mail from G. Newman of USNRC to J. Kulp of USNRC, Regarding Pilgrim ML072851129 IR 05000293-07-403; on 07/10/2007, Pilgrim Nuclear Power Station; Inspec ML072260043 LER 07-004-00 for Pilgrim Re: Target Rock Relief Valves' Test Pressure ExcML072330094 E-mail from G. Newman of USNRC to B. Sienel of USNRC, Regarding Strik ML072851136 2007/08/17- Pilgrim - Letter from Andrea L. Silvia to Administrative Judges eML072290541 2007/08/22 Pilgrim Renewal Hearing - RE: Conference number for NRC/EntML072530032 Pilgrim Nuclear Power Station - Conforming License Amendment to Incorpo ML072340008 Pilgrim Nuclear Power Station - Revised License Pages of Facility OperatingML072340009 2007/08/23 Pilgrim Renewal Hearing - RE: Entergy Letter transmitting respoML072530029 2007/08/23 Pilgrim Renewal Hearing - Entergy Letter transmitting response ML072530030 2007/08/24 Pilgrim Renewal Hearing - Meeting (Conference Call) Summary ML072530028 E-mail from G. Cowan of USNRC to G. Newman of USNRC, Regarding R7NML072880632 2007/08/27 Pilgrim Renewal Hearing - Copy of Pilgrim ACRS slides ML072530025 2007/08/27 Pilgrim Renewal Hearing - FW: Fluence Plan ML072530023 2007/08/27 Pilgrim Renewal Hearing - FW: AT&T reservationless teleconfer ML072530027

James A. Fitzpatrick; Indian Point, Units 1, 2 & 3; Pilgrim, and Vermont YankML072420245 2007/08/28 Pilgrim Renewal Hearing - Pilgrim LRA Amendment 20 ML072530021 Pilgrim Nuclear Power Station License Renewal Application Amendment 20 ML072470403 2007/08/30 Pilgrim Renewal Hearing - August 30 2007 phone conference ML072530018 2007/08/30 Pilgrim Renewal Hearing - 8?23 and 8/27 Conference Call RecoML072530019 2007/08/30 Pilgrim Renewal Hearing - Clarification of Entergy Pilgrim letter dML072530020 Letter from R.W. Varney, EPA, to NRC, Comments on Generic EnvironmentML12170A860 General Electric Company's Request for Withholding Information from PublicML072410419 2007/08/31 - Pilgrim - License Renewal Hearing File Update 10. ML072470709 Mid-Cycle Performance Review and Inspection Plan - Pilgrim Nuclear Powe ML072430944 Summary of Telephone Conference Call Held on August 23, 2007, BetweenML072390007 General Electric Company's Request for Withholding Information from PublicML072410446 2007/08/31 Pilgrim Renewal Hearing - Pilgrim Nuclear Power Station FEIS CML072680019 2007/09/01-Pilgrim April 2008 Evidentiary Hearing - Applicant Exhibit 7, NURML081090474 2007/09/05 Pilgrim Renewal Hearing - Pilgrim P-T Curve Extension ML072670307 2007/09/06-Pilgrim April 2008 Evidentiary Hearing - Intervenor Exhibit 22, OML081090297 Pilgrim Nuclear Power Station License Renewal ACRS Full Committee BriefML072640022 RI-2006-A-0128: NRC Office of Investigations Case No. 1-2007-011. ML072560120 08/30/2007 Summary of Telephone Conference Call Between the U.S. NRCML072430264 LER 07-005-00 for Pilgrim Nuclear Power Station re Reactor Scram ResultinML072610600 2007/09/10-Comment (9) of Mary Lampet on Behalf of Pilgrim Watch, et. al. ML072540573 2007/09/12 Pilgrim Renewal Hearing - Pilgrim Letter 2.07.078- Fluence benML072670304 Pilgrim, License Renewal Application Commitment 47 Response. ML072700723 Pilgrim - Response to NRC Request for Additional Information Related to ThML072620080 09/14/2007/ P. Paquin Ltr re: Amendment to Certificate of Compliance No. 9ML072630114 2007/09/14 - Pilgrim - Hearing File Update No. 11. ML072600037 09/14/2007 P. Paquin Ltr re: Amendment to Certificate of Compliance No. 6 ML072630319 2007/09/18- Motion to Intervene of Local 369, Utility Workers Union of AmerML072620540 Pilgrim, Technical Specifications, Adoption of Technical Specification Task FML072610197 2007/09/20-Entergy Nuclear Operations Inc. Answer Opposing Intervention ML072690159 MPR Associates, Inc. - Report of Defect in Accordance with 10 CFR 21. ML072750470 2007/09/23-Comment (12) of Mary Lampert on Behalf of Pilgrim Watch, et. aML072670245 2007/09/24-Comment (13) of Lisa Rainwater on Behalf of Riverkeeper on EpML072670574 Pilgrim, Indian Point Units 1, 2, & 3, FitzPatrick, Vermont Yankee, PalisadesML072770008 2007/09/27- Reply of Local 369, Utility Workers Union of America, AFL-CIO ML090350763 Ltr. to M. Balduzzi Re: Supplemental Safety Evaluation Report Related to th ML072140328 Pilgrim Nuclear Power Station - Relief For The Reactor Core Shroud StabilizML072420161 2007/09/28 - Pilgrim - Letter from Andrea L. Silvia to Administrative Judges ML072740116 Supplement 1, Safety Evaluation Report Related to the License Renewal of ML072210487 2007/09/30-Pilgrim April 2008 Evidentiary Hearing - Staff Exhibit 12, NUREGML081090441 2007/10/01-Letter from J. Samuel Walker to Scott H. Strauss and Rebecca JML072750053 2007/10/01 Pilgrim Renewal Hearing - ML072530637 ML072970197 2007/10/03 - Pilgrim License Renewal SSER, Supplement 1 Letter to Board ML072780389 2007/10/03-Pilgrim April 2008 Evidentiary Hearing - Staff Exhibit 26, NRC InML081090559 Pilgrim - Notification for Information Only - Deviation from BWRVIP-76 InspeML072890357 Entergy Nuclear Operations, Inc. - Request for Withholding Information fromML072750032 Electronic Distribtion Initiative Letter, Licensee List, Electronic Distribution InML072820307 2007/10/11-Pilgrim - Hearing File Supplement 13. ML072850027 Comment (28) of Susan Shapiro on Behalf of Friends United for SustainableML072960457 2007/10/15 - Pilgrim - Notice of Appearance - Sexton. ML072890037

2007/10/16 Pilgrim Renewal Hearing - Replacement page 3/4.2-17 ML073100225 2007/10/17 - Pilgrim - Pilgrim Watch's Motion Requesting That the Order Es ML072970088 2007/10/17 LB Memorandum and Order (Ruling on Entergy's Motion for SumML072900448 2007/10/17 Pilgrim Renewal Hearing - Pilgrim License Conditions ML073100229 2007/10/17 Pilgrim Renewal Hearing - Resolution of discrepancy between NML073100226 2007/10/17 LB Order (Extending Deadline for Filing Witness Lists RegardingML072900460 Pilgrim - Response to Request for Information: Operator Licensing Examina ML072990069 Entergy Application for Order Approving Indirect Transfer of Control of LicenML072890337 2007/10/25 - Pilgrim - Supplement 14 to Hearing File. ML072980822 Examples of Max Thermal Power License Conditions. ML073240024 2007/10/29 - Pilgrim - NRC Staff Response Opposing Pilgrim Watch's Motio ML073020617 2007/10/29- Pilgrim - Entergy's Motion for Reconsideration of LPB-07-12. ML073100763 2007/10/29- Pilgrim - Entergy's Answer Opposing Pilgrim Watch's Motion to ML073100765 E-Mail: (PA) 2007/10/29 Pilgrim Nuclear Plant. ML073170154 2007/10/30-LB Memorandum and Order (Ruling on Motion to Dismiss PetitioML073030322 2007/10/31-Pilgrim April 2008 Evidentiary Hearing - Staff Exhibit 16, PNPS- ML081090535 E-Mail: (PA) 2007/10/31 Pilgrim Nuclear Plant License Renewal. ML073240321 Entergy Operations, Inc. - Supplemental Information in Support of ApplicatioML073100216 IR 05000293-07-004, on 07/01/2007 - 09/30/2007, Pilgrim Nuclear Power SML073050199 2007/10/31-Pilgrim April 2008 Evidentiary Hearing - Applicant Exhibit 12, AMML081090619 2007/11/01-Pilgrim April 2008 Evidentiary Hearing - Intervenor Exhibit 25, MML081120228 Pilgrim Nuclear Power Station, License Amendment, Issuance Of AmendmeML072750394 Pilgrim Nuclear Power Station, Technical Specifications, Issuance Of AmendML073100478 2007/11/06- Pilgrim - Pilgrim Watch's Reply to Entergy's Motion for Reconsi ML073190638 11/07/2007 Meeting Handout Re: Fitzpatrick GNF2 Introduction at Entergy. ML073190220 2007/11/08 - Pilgrim - NRC Staff Response to Entergy's Motion for ReconsidML073130118 Pilgrim Nuclear Power Station - Distribution of Revision 2 of the NRC's Sign ML072900461 2007/11/08 - Pilgrim - Hearing File Update Supplement 15. ML073130042 Commonwealth of Massachusetts v. United States and U.S. Nuclear RegulaML073250351 Notification of Potential Part 21 Report re: Conval Valves Weld Qualification ML073200086 2007/11/13- Pilgrim - Pilgrim Watch Brief on Appeal of LBP-07-13 Memoran ML073240995 2007/11/14-LB Memorandum and Order (Ruling on Pilgrim Watch's Motion tML073180433 2007/11/14 LB Memorandum and Order (Ruling on Entergy's Motion for RecML073180451 ROP Public Meeting Summary Enclosures 5-10, Duane Arnold Appeal. ML080080534 2007/11/19-Pilgrim April 2008 Evidentiary Hearing - Intervenor Exhibit 14, B ML081090289 2007/11/19-Pilgrim April 2008 Evidentiary Hearing - Applicant Exhibit 5, NucML081090480 Pilgrim - Correction to 10 CFR 50.46(a)(3)(ii) Annual Report Previously TranML073381102 2007/11/21-Pilgrim - Hearing File Update Supplement 16. ML073270243 2007/11/21 - Pilgrim - Entergy's Answer Opposing Pilgrim Watch's Appeal o ML073320809 2007/11/21-Pilgrim - NRC Staff Answer to Pilgrim Watch's Petition for InterloML073270380 2007/11/26 - Pilgrim - E-mail from Susan Uttal to Service List regarding Pub ML073330921 Pilgrim Nuclear Power Station, Request for License Amendment - Control R ML073460062 2007/11/29 - Pilgrim - Letter to Judge Cole from Susan Uttal, Forwarding NoML073330893 2007/11/29- Pilgrim - Pilgrim Watch Witness List - Docket No. 50-293 ML073400434 Pilgrim Nuclear Power Station, Procedure 6.1-215, Rev. 9, Off-Site ActivitiesML080650013 Exhibit PWA 00012, Dr. Edwin Lyman, A Critique Of The Radiological Cons ML110030945 2007/11/30 - Entergy's Seventh Supplemental Disclosure. ML073400437 OFFICIAL EXHIBIT - PWA000012-00-BD01 - Dr. Edwin Lyman, A Critique OML110600893 NUREG-1891, "Safety Evaluation Report Related to the License Renewal ofML073241016 2007/11/30 - Pilgrim - NRC Staff Final Witness List for Contention 1. ML073370286

Pilgrim, Indian Point, Units 1, 2 & 3, James A. FitzPatrick, Vermont Yankee, ML073440039 Document Date 1/3/2007 1/4/2007 1/4/2007 1/5/2007 1/5/2007 1/5/2007 1/8/2007 1/10/2007 1/10/2007 1/10/2007 1/10/2007 1/11/2007 1/11/2007 1/11/2007 1/12/2007 1/12/2007 1/13/2007 1/15/2007 1/15/2007 1/16/2007 1/16/2007 1/16/2007 1/16/2007 1/16/2007 1/17/2007 1/17/2007 1/17/2007 1/17/2007 1/18/2007 1/18/2007 1/18/2007 1/18/2007 1/18/2007 1/19/2007 1/22/2007 1/22/2007 1/22/2007 1/22/2007 1/23/2007 1/23/2007 1/24/2007 1/24/2007 1/24/2007 1/24/2007 1/24/2007 1/24/2007 1/26/2007 1/26/2007 1/26/2007

1/26/2007 1/28/2007 1/29/2007 1/29/2007 1/29/2007 1/29/2007 1/29/2007 1/30/2007 1/30/2007 1/30/2007 1/30/2007 1/30/2007 1/31/2007 1/31/2007 1/31/2007 2/1/2007 2/1/2007 2/1/2007 2/1/2007 2/2/2007 2/2/2007 2/2/2007 2/5/2007 2/5/2007 2/5/2007 2/5/2007 2/7/2007 2/7/2007 2/7/2007 2/8/2007 2/8/2007 2/8/2007 2/9/2007 2/12/2007 2/14/2007 2/15/2007 2/15/2007 2/15/2007 2/16/2007 2/16/2007 2/16/2007 2/16/2007 2/18/2007 2/20/2007 2/20/2007 2/20/2007 2/20/2007 2/20/2007 2/20/2007 2/20/2007

2/20/2007 2/21/2007 2/22/2007 2/22/2007 2/22/2007 2/22/2007 2/23/2007 2/23/2007 2/23/2007 2/23/2007 2/25/2007 2/27/2007 2/27/2007 2/27/2007 2/28/2007 2/28/2007 2/28/2007 2/28/2007 2/28/2007 2/28/2007 2/28/2007 2/28/2007 2/28/2007 2/28/2007 3/1/2007 3/1/2007 3/1/2007 3/1/2007 3/1/2007 3/1/2007 3/1/2007 3/2/2007 3/2/2007 3/2/2007 3/2/2007 3/2/2007 3/2/2007 3/4/2007 3/5/2007 3/5/2007 3/5/2007 3/6/2007 3/6/2007 3/6/2007 3/7/2007 3/7/2007 3/7/2007 3/8/2007 3/8/2007 3/8/2007

3/9/2007 3/9/2007 3/10/2007 3/12/2007 3/13/2007 3/13/2007 3/13/2007 3/14/2007 3/15/2007 3/15/2007 3/15/2007 3/15/2007 3/15/2007 3/15/2007 3/15/2007 3/16/2007 3/17/2007 3/19/2007 3/19/2007 3/19/2007 3/19/2007 3/19/2007 3/20/2007 3/20/2007 3/21/2007 3/21/2007 3/21/2007 3/22/2007 3/22/2007 3/22/2007 3/22/2007 3/26/2007 3/26/2007 3/26/2007 3/26/2007 3/27/2007 3/28/2007 3/28/2007 3/28/2007 3/28/2007 3/29/2007 3/29/2007 3/29/2007 3/29/2007 3/30/2007 3/30/2007 3/30/2007 3/30/2007 4/2/2007 4/2/2007

4/2/2007 4/2/2007 4/2/2007 4/2/2007 4/3/2007 4/10/2007 4/10/2007 4/10/2007 4/11/2007 4/12/2007 4/12/2007 4/13/2007 4/16/2007 4/17/2007 4/18/2007 4/18/2007 4/18/2007 4/18/2007 4/19/2007 4/20/2007 4/20/2007 4/20/2007 4/21/2007 4/24/2007 4/24/2007 4/25/2007 4/25/2007 4/25/2007 4/25/2007 4/25/2007 4/26/2007 4/26/2007 4/27/2007 4/29/2007 5/1/2007 5/1/2007 5/1/2007 5/1/2007 5/1/2007 5/1/2007 5/2/2007 5/2/2007 5/2/2007 5/2/2007 5/3/2007 5/3/2007 5/3/2007 5/3/2007 5/3/2007 5/4/2007

5/4/2007 5/4/2007 5/4/2007 5/4/2007 5/7/2007 5/7/2007 5/8/2007 5/8/2007 5/9/2007 5/9/2007 5/9/2007 5/9/2007 5/10/2007 5/10/2007 5/10/2007 5/14/2007 5/14/2007 5/14/2007 5/14/2007 5/15/2007 5/16/2007 5/16/2007 5/16/2007 5/16/2007 5/16/2007 5/17/2007 5/17/2007 5/17/2007 5/17/2007 5/17/2007 5/17/2007 5/18/2007 5/18/2007 5/18/2007 5/18/2007 5/18/2007 5/22/2007 5/22/2007 5/22/2007 5/22/2007 5/22/2007 5/22/2007 5/24/2007 5/24/2007 5/24/2007 5/24/2007 5/24/2007 5/24/2007 5/28/2007 5/30/2007

5/30/2007 5/31/2007 5/31/2007 5/31/2007 5/31/2007 6/1/2007 6/4/2007 6/5/2007 6/5/2007 6/5/2007 6/5/2007 6/5/2007 6/5/2007 6/7/2007 6/7/2007 6/8/2007 6/8/2007 6/15/2007 6/15/2007 6/17/2007 6/18/2007 6/19/2007 6/19/2007 6/20/2007 6/20/2007 6/20/2007 6/20/2007 6/21/2007 6/21/2007 6/21/2007 6/25/2007 6/25/2007 6/25/2007 6/25/2007 6/25/2007 6/25/2007 6/27/2007 6/27/2007 6/28/2007 6/28/2007 6/28/2007 6/28/2007 6/28/2007 6/28/2007 6/29/2007 6/29/2007 7/2/2007 7/2/2007 7/5/2007 7/6/2007

7/6/2007 7/6/2007 7/9/2007 7/9/2007 7/10/2007 7/12/2007 7/16/2007 7/17/2007 7/18/2007 7/19/2007 7/20/2007 7/20/2007 7/23/2007 7/26/2007 7/26/2007 7/26/2007 7/26/2007 7/26/2007 7/27/2007 7/27/2007 7/27/2007 7/28/2007 7/30/2007 7/30/2007 7/30/2007 7/30/2007 7/30/2007 7/31/2007 7/31/2007 7/31/2007 7/31/2007 7/31/2007 8/1/2007 8/2/2007 8/3/2007 8/10/2007 8/10/2007 8/13/2007 8/14/2007 8/17/2007 8/22/2007 8/23/2007 8/23/2007 8/23/2007 8/23/2007 8/24/2007 8/24/2007 8/27/2007 8/27/2007 8/27/2007

8/28/2007 8/28/2007 8/28/2007 8/30/2007 8/30/2007 8/30/2007 8/30/2007 8/31/2007 8/31/2007 8/31/2007 8/31/2007 8/31/2007 8/31/2007 9/1/2007 9/5/2007 9/6/2007 9/6/2007 9/7/2007 9/7/2007 9/10/2007 9/10/2007 9/12/2007 9/12/2007 9/13/2007 9/14/2007 9/14/2007 9/14/2007 9/18/2007 9/18/2007 9/20/2007 9/21/2007 9/23/2007 9/24/2007 9/26/2007 9/27/2007 9/27/2007 9/27/2007 9/28/2007 9/28/2007 9/30/2007 10/1/2007 10/1/2007 10/3/2007 10/3/2007 10/10/2007 10/11/2007 10/11/2007 10/11/2007 10/12/2007 10/15/2007

10/16/2007 10/17/2007 10/17/2007 10/17/2007 10/17/2007 10/17/2007 10/18/2007 10/18/2007 10/25/2007 10/25/2007 10/29/2007 10/29/2007 10/29/2007 10/29/2007 10/30/2007 10/31/2007 10/31/2007 10/31/2007 10/31/2007 10/31/2007 11/1/2007 11/5/2007 11/5/2007 11/6/2007 11/7/2007 11/8/2007 11/8/2007 11/8/2007 11/8/2007 11/9/2007 11/13/2007 11/14/2007 11/14/2007 11/14/2007 11/19/2007 11/19/2007 11/20/2007 11/21/2007 11/21/2007 11/21/2007 11/26/2007 11/29/2007 11/29/2007 11/29/2007 11/30/2007 11/30/2007 11/30/2007 11/30/2007 11/30/2007 11/30/2007

12/5/2007