Other: ML060300028, ML061220630, ML061220716, ML061710422, ML061940175, ML062090293, ML062090294, ML062090300, ML062090304, ML062090305, ML062090307, ML062090309, ML062090318, ML062090319, ML062090322, ML062090324, ML062090328, ML062090333, ML062090338, ML062090380, ML062090387, ML062090388, ML062090488, ML062090490, ML062090493, ML062090496, ML062090497, ML062090498, ML062090499, ML062090546, ML062090561, ML062090563, ML062090565, ML062090567, ML062090569, ML062120406, ML062120407, ML062120408, ML062120410, ML062120412, ML062120415, ML062120477, ML062120480, ML062120491, ML062120498, ML062120543, ML062120549, ML062120625, ML062120629, ML062120631... further results
|
|
|
---|
Category:E-Mail
MONTHYEARML22335A2802022-11-0404 November 2022 11-4-2022 Email Transmitting Draft Questions Pertaining to Pilgrim ISFSI Exemption Request ML22270A0422022-09-26026 September 2022 Acknowledgement Email for Holtec'S Request for Reporting Exemption with Regards to the Pilgrim ISFSI Annual Radioactive Effluent Release Report (Docket No. 05000293) ML22154A1622022-05-26026 May 2022 Letter and Email from Save Our Bay/Diane Turco Regarding Irradiated Water Release from Pilgrim ML22007A2602021-12-0606 December 2021 E-mail from P. O'Brien, Holtec, to A. Snyder, NRC, on Pilgrim Effluent Discharge ML21287A6192021-10-14014 October 2021 E-mail from S. Phillips, MEMA, to A. Snyder, NRC, Pilgrim Nuclear Power Station, Commonwealth of Massachusetts Consultation Response to Amendment Review for Emergency Preparedness ML21266A2512021-09-23023 September 2021 Consultation with Commonwealth of Massachusetts Regarding Proposed Amendment Application for Emergency Plan and Emergency Action Levels ML21266A2772021-09-23023 September 2021 HDI Clarification of Exemption Requested from 10 CFR 20, Appendix G, Section Iii.E ML21267A0012021-09-23023 September 2021 E-mail from A. Snyder, NRC, to A. Sterdis, Holtec, - Pilgrim Nuclear Power Station - Request for Exemption from 10 CFR 20, Appendix G, Section Iii.E Acceptance Review ML21257A3832021-09-15015 September 2021 E-mail from A. Snyder, NRC, to A. Sterdis, Holtec, - Pilgrim Nuclear Power Station - Follow-on Request Re Request for Additional Information 2 Pilgrim - License Amendment Request Independent Spent Fuel Storage Installation Only Emergency Pl ML21211A5912021-07-22022 July 2021 Consultation Response from Commonwealth of Massachusetts Regarding Proposed Pilgrim ISFSI Only Technical Specifications ML21211A5162021-07-22022 July 2021 Consultation Response from Commonwealth of Massachusetts Regarding Proposed Pilgrim ISFSI Only Physical Security Plan ML21200A2352021-07-13013 July 2021 Consultation Request to Commonwealth of Massachusetts Regarding Proposed Pilgrim ISFSI Only Technical Specifications ML21200A1522021-07-13013 July 2021 Consultation Request to Commonwealth of Massachusetts Regarding Proposed Pilgrim Isfi Only Physical Security Plan ML21176A1842021-06-25025 June 2021 Email from HDI Regarding Pilgrim Nuclear Power Station Training ML21180A0582021-06-17017 June 2021 Email from Region I Regarding Pilgrim Nuclear Power Station Inspection - EA-13-132 ML21097A0402021-04-0606 April 2021 E-Mail Consult with Commonwealth of Mass Re - Amendment Application - Physical Security Plan for the Pilgrim Nuclear Power Station L-20-092, Email Pilgrim Nuclear Power Station-Exemption from Annual Force-On-Force Exercise Requirements of 10 CFR Part 73, Appendix B,2020-12-10010 December 2020 Email Pilgrim Nuclear Power Station-Exemption from Annual Force-On-Force Exercise Requirements of 10 CFR Part 73, Appendix B, L-20-096, Supplemental Information to Support Physical Security Plan Revision and License Amendment Request to Incorporate Alternate Measures - Holtec Email Dated December 10, 20102020-12-10010 December 2020 Supplemental Information to Support Physical Security Plan Revision and License Amendment Request to Incorporate Alternate Measures - Holtec Email Dated December 10, 2010 ML20328A2982020-11-16016 November 2020 Response from Commonwealth of Massachusetts on No Significant Hazard for Pilgrim ISFSI Amendment to Address ISFSI II Dated November 16, 2020 ML20297A2372020-10-22022 October 2020 Request for Additional Information - HDI Fleet Decommissioning Quality Assurance Program ML20266G4032020-09-22022 September 2020 Acceptance Review Email - Request for Approval of HDI Fleet Decommissioning Quality Assurance Program, Revision 0 ML20163A6802020-06-11011 June 2020 Confirmation of the Scope of the Requested Regulatory Relief for Pilgrim Security Qualifications ML20280A1912020-04-17017 April 2020 Request for Additional Information- Clarifying Information for Pilgrim ISFSI Physical Security Amendment Application ML20269A3542020-03-0505 March 2020 CFR 26.717 Reports 2019 Transmittal Email ML19336A0302019-11-27027 November 2019 OEDO-15-00479 - Re 2.206 Petition Regarding Pilgrim Nuclear Power Station'S Current Licensing Basis for Flooding ML19336A0332019-11-26026 November 2019 OEDO-15-00479 - E-mail to Petitioner - 2.206 Petition Regarding Pilgrim Nuclear Power Station'S Current Licensing Basis for Flooding (CAC No. MF6460; EPID L-2015-CRS-0002)- Issuance of Final Director'S Decision ML19331A1952019-11-21021 November 2019 NRR E-mail Capture - (External_Sender) Pilgrim Nuclear Power Station - Commonwealth Consultation Response - Amendment Regarding Site Emergency Plan and Emergency Action Level Scheme ML19331A1732019-11-12012 November 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station -Consult with Commonwealth - Amendment Regarding Cyber Security Plan ML19331A1642019-11-0505 November 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station -Consult with Commonwealth - Amendment Regarding Site Emergency Plan and Emergency Action Level Scheme ML19331A1792019-11-0505 November 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - EA and Fonsi for Pilgrim Emergency Planning Exemption CY-19-007, LTR-19-0441 Henrietta Cosentino, E-mail SECY-19-0078 Request by Entergy Nuclear Operations Inc. for Exemptions from Certain Emergency Planning Requirements for the Pilgrim Nuclear Power Station2019-11-0404 November 2019 LTR-19-0441 Henrietta Cosentino, E-mail SECY-19-0078 Request by Entergy Nuclear Operations Inc. for Exemptions from Certain Emergency Planning Requirements for the Pilgrim Nuclear Power Station ML19275H1962019-09-24024 September 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - Consult with Commonwealth - Amendment Regarding Permanently Defueled Technical Specifications (PDTS) ML19239A0372019-08-26026 August 2019 E-mail from Entergy Dated August 26, 2019, Notification of Pilgrim License Transfer ML19239A0262019-08-23023 August 2019 LTR-19-0330 Janet Azarovitz, E-mail a Plea for More Time and Reasonable Discussion Including the Citizens of the Commonwealth in the Sale of the Pilgrim Nuclear Power Station ML19234A2072019-08-20020 August 2019 LTR-19-0328 Lawrence Delafield, President, Six Ponds Improv Assoc., Plymouth, Ma, Ltr Requests NRC to Postpone Consideration of Transferring the Licenses for the Pilgrim Nuclear Power Until the NRC Has Answered Concerns by Pilgrim Watch, Se ML19232A4032019-08-20020 August 2019 LTR-19-0322 Diane Turco, Director, Cape Downwinders, Massachusetts, Letter/E-mail Requests Suspension of the Pilgrim License Transfer from Entergy to Holtec Until the Adjudicatory Hearing Is Held and Raised Contentions Are Resolved ML19308A9942019-08-19019 August 2019 Entergy Nuclear Operations, Inc. Confirmatory Order Rescission Supplemental Information ML19226A3912019-08-14014 August 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - EA and Fonsi for Pilgrim Decommissioning Trust Fund Exemption (Holtec) ML19226A3962019-08-14014 August 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station -Consult with Commonwealth - Conforming Amendment in Support of Pilgrim License Transfer Application ML19226A1212019-08-13013 August 2019 OEDO-15-00479-2.206 Petition Regarding Pilgrim Nuclear Power Station'S Current Licensing Basis for Flooding - Status (CAC No. MF6460; EPID L-2015-CRS-0002) ML19227A1032019-08-0707 August 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - Draft Wording for Potential Condition of License Transfer Order ML19207B3662019-07-26026 July 2019 NRR E-mail Capture - Pilgrim - RAI Direct and Indirect Transfer of Lic.; Conforming Lic. Amend.; Req. for Exemption 10 CFR 50.82(A)(8)(I)(A) for Holtec Decom. International, Llc ML19176A3452019-06-25025 June 2019 2.206 Petition Regarding Pilgrim Nuclear Power Station'S Current Licensing Basis for Flooding - Information (OEDO-15-00479) (CAC No. MF6460; EPID L-2015-CRS-0002) ML19154A0652019-06-0303 June 2019 NRR E-mail Capture - Pilgrim - Permanent Cessation of Power Operations ML19154A5242019-06-0303 June 2019 NRR E-mail Capture - RAI - Pilgrim Post-Decommissioning Technical Specifications (PDTS) License Amendment Request (LAR) ML19161A2122019-05-20020 May 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - Acceptance of License Amendment Request to Remove Cyber Security Plan Requirements ML19123A0332019-05-0101 May 2019 NRR E-mail Capture - Logbook Entry: 05/01/2019 Endangered Species Report Regarding a Confirmed Sighting of North Atlantic Right Whale(S) (Balaena Glacialis) ML19122A4912019-04-29029 April 2019 NRR E-mail Capture - Logbook Entry: 04/29/2019 Regarding the Confirmed Sighting of Ten North Atlantic Right Whales (Balaena Glacialis) ML19108A2372019-04-18018 April 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - Acceptance of Requested Licensing Action, Proposed Exemptions from 10 CFR 50.54(w)(1) - On-Site Property Damage Insurance ML19108A2362019-04-18018 April 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - Acceptance of Requested Licensing Action, Proposed Exemptions from 10 CFR 140.11(a)(4) - Primary and Secondary Liability Insurance 2022-09-26
[Table view] |
Text
James Davis - Re: QA for aging management of NSR components Page 1:1 From: <erachp@comcast.net>
To: "James Davis" <JAD @nrc.gov>
Date: Mon, Jul 3, 2006 4:09 PM
Subject:
Re: QA for aging management of NSR components Jim, I reviewed the Browns Ferry SER. Within the AMR sections 3.1 - 3.6, the SER states, 3.1.2.2.15 Quality Assurance for Aging Management of Non-Safety-Related Components The applicant referenced LRA Section B.1.3. The staff's evaluation of LRA Section B.1.3 is provided in SER Section 3.0.4.
Section 3.0.4 is in the AMP section where a more detailed staff evaluation is provided.
I suggest we do not repeat this in all AMR sections of our audit report. Perhaps we write this just once, maybe in the AMP section as new section 3.0.4. or write it once in the AMR sections and refer to it in the rest of the AMR sections. Our audit report will not be the same as the template or shell, if we add section 3.0.4 to the AMP report. However, it will be in the right spot when and if we have to write the NRC.
Let's discuss this on Wednesday and we can let the audit team know.
Erach
- ------------- Original message --------------
From: "James Davis" <JAD@nrc.gov>
> Erach,
> I looked to see what the QA branch put in the Browns Ferry SER and here is what
> I found.
> "3.0.4 Quality Assurance Program Attributes. Integral to Aging Management
> Programs
> Pursuant to 10 CFR 54.21 (a)(3), a license renewal applicant is required to
> demonstrate that the
> effects of aging on SCs subject to an AMR will be adequately managed so that
> their intended
> functions will be maintained consistent with the CLB for the period of extended
> operation.
> SRP-LR, Branch Technical Position RLSB-1, "Aging Management Review - Generic,"
> describes
> ten attributes of an acceptable AMP. Three of these ten attributes are
> associated with the
> quality assurance activities of corrective action, confirmation processes, and
> administrative
> controls. Table A.1-1, "Elements of an Aging Management Program for License
> Renewal," of
> Branch Technical Position RLSB-1 provides the following description of these
> quality attributes:
>
- Corrective actions, including root cause determination and prevention of
> recurrence,
> should be timely.
>
- The confirmation process should ensure that preventive actions are adequate
> and that
> appropriate corrective actions have been completed and are effective.
>
- Administrative controls should provide a formal review and approval process.
> SRP-LR, Branch Technical Position IQMB-1, "Quality Assurance For Aging
> Management
> Programs," noted that those aspects of the AMP that affect quality of SR SSCs
,J.mes Davis - Re: QA for aging management of NSR components Page 2,1
> are subject to
> the quality assurance (QA) requirements of 10 CFR Part 50, Appendix B.
> Additionally, for NSR
> SCs subject to an AMR, the existing 10 CFR Part 50, Appendix B, QA program may
> be used by
> the applicant to address the elements of corrective action, the confirmation
> process, and
> administrative controls. Branch Technical Position IQMB-1 provides the following
> guidance with
> regard to the QA attributes of AMPs:
>
> requirements, which are adequate to address all quality-related aspects of an
> AMP
> consistent with the CLB of the facility for the period of extended operation.
> For NSR SCs that are subject to an AMR for license renewal, an applicant has an
> option
> to expand the scope of its 10 CFR Part 50 Appendix B program to include these
> structures and components to address corrective actions, the confirmation
> process, and
> administrative controls for aging management during the period of extended
> operation.
> In this case, the applicant should document such a commitment in the FSAR
> supplement
> in accordance with 10 CFR 54.21(d)."
> I will send a question to the applicant and ask if they intend to expand the
> scope of their Appendix B program to include NDR SCs and if the commitment to do
> this will go in their FSAR supplement. As far as your write up goes, for
> Element 7 repeat what is said above. For Element 8 and 9 say see Element 7.
> Jim
> >>> 06/29/2006 9:31 AM >>>
> Jim/Peter,
> SRP section 3.3.2.2.15 states:
> 3.3.2.2.15 Quality Assurance for Aging Management of Nonsafety-Related
> Components
> Acceptance criteria are described in Branch Technical Position IQMB-1 (Appendix
> A.2, of this SRP-LR.)
> SRP section 3.3.3.2.15 states:
> "The applicant's aging management programs for license renewal should contain
> the elements of corrective actions, the confirmation process, and administrative
> controls. Safety-related components are covered by 10 CFR Part 50, Appendix B,
> which is adequate to address these program elements. However, Appendix B does
> not apply to nonsafety-related components that are subject to an AMR for license
> renewal. Nevertheless, the applicant has the option to expand the scope of its
> 10 CFR Part 50, Appendix B program to include these components and address the
> associated program elements. If the applicant chooses this option, the reviewer
> verifies that the applicant has documented such a commitment in the FSAR
> Supplement. If the applicant chooses alternative means, the branch responsible
James Davis - Re: OA for aging management of NSR components Page 3 ýj Jae .ais.R:Q .fraigmaa. e.of.RcmonnsPg 3I
> for quality assurance should be requested to review the applicant's proposal on
> a case-by-case basis."
> The same statement appears in each SRP section 3.1, 3.2, 3.3, 3.4, 3.5, 3.6.
> How do we handle this? There should be one set of standard words that is
> applied in each of the AMR sections.
> The following is what is stated in the Oyster Creek Audit Report shell that we
> are following:
> 3.3.2.2.15 Quality Assurance for Aging Management of Nonsafey-Related Components
" OCGS LRA Section 3.3.2.2.15 is reviewed by NRR DE staff and will be addressed
> separately in Section 3 of the SER related to the OCGS LRA.
> The applicant states in LRA Appendix B.O.3:
" PNPS quality assurance (QA) procedures, review and approval processes, and
" administrative controls are implemented in accordance with the requirements of
" 10 CFR Part 50, Appendix B. The Entergy Quality Assurance Program applies to
" PNPS safety-related structures and components. Corrective actions and
" administrative (document) control for both safety-related and nonsafety-related
" structures and components are accomplished per the existing PNPS corrective
" action program and document control program.
" Please advise.
" Erach CC: Wayne Pavinich <wapavinich@comcast.net>, Bob Jackson <JacksonWR@msn.com>,
"Duc Nguyen" <DTN1 @nrc.gov>, "Dan Hoang" <DVH@nrc.gov>, "James Medoff" <JXM@nrc.gov>,
"Peter Wen" <PXW @nrc.gov>
Page 1]
c:\temp\GWIQOOO1 .TMP cAtemp\GW)00001.TMP Page 1 !1 Mail Envelope Properties (44A9796E.7CC: 5 :34764)
Subject:
Re: QA for aging management of NSR components Creation Date Mon, Jul 3, 2006 4:08 PM From: <erachp @comcast.net>
Created By: erachp @comcast.net Recipients nrc.gov OWGWPO03.HQGWDO01 JAD (James Davis) nrc.gov TWGWPO01.HQGWDO01 DTN1 CC (Duc Nguyen)
JXM CC (James Medoff) nrc.gov OWGWPOO2.HQGWDOO1 DVH CC (Dan Hoang) nrc.gov TWGWPO04.HQGWDO01 PXW CC (Peter Wen) msn.com JacksonWR CC (Bob Jackson) comcast.net wapavinich CC (Wayne Pavinich)
Post Office Route OWGWPO03.HQGWDO01 nrc.gov TWGWPO01 .HQGWDO01 nrc.gov OWGWPOO2.HQGWDOOI nrc.gov TWGWPO04.HQGWDOO1 nrc.gov msn.com comcast.net Files Size Date & Time MESSAGE 6405 Monday, July 3, 2006 4:08 PM TEXT.htm 7518 Mime.822 15713
c:\temp\GW)00001.TMP Page ag
- ,I
. GWOO TM [
Options Expiration Date: None Priority: Standard ReplyRequested: No Return Notification: None Concealed
Subject:
No Security: Standard Junk Mail Handling Evaluation Results Message is eligible for Junk Mail handling This message was not classified as Junk Mail Junk Mail settings when this message was delivered Junk Mail handling disabled by User Junk Mail handling disabled by Administrator Junk List is not enabled Junk Mail using personal address books is not enabled Block List is not enabled