E-mail: (PA) Comments on Pilgrim AMP Document
ML062120412
Person / Time
Site: Pilgrim
Issue date: 07/07/2006
From: Joseph Zabel
Advanced Technologies & Labs International
To: Jennifer Davis
Office of Nuclear Reactor Regulation
References
%dam200612, TAC MC9669
Download: ML062120412 (3)


Text

[James Davis - RE: Comments on Pilarim AM document Page 11~

fJames Davis RE: Comments on ~iIarim AMP document

- Paae From: "Zabel, Joe" <JZabel@atlintl.com>

To: "James Davis" <JAD@nrc.gov>

Date: 07/07/2006 11:32:09 AM

Subject:

RE: Comments on Pilgrim AMP document Thanks, Jim!!!

Joe Zabel Senior Writer/Outreach Manager Advanced Technologies & Laboratories International, Inc.

20010 Century Boulevard, Suite 500 Germantown,'MD 20874 Tel: (301) 515-6783 Fax: (301) 972-6904


Original Message -----

From: James Davis [1]

Sent: Friday, July 07, 2006 11:03 AM To: Zabel, Joe Cc: Orr, Mark

Subject:

Re: Comments on Pilgrim AMP document

>> "Zabel, Joe" <JZabel@atlintl.com> 07/07/2006 10:48 AM >>>

Hi Jim:

In going over and incorporating your comments on the Pilgrim AMP document, I discovered that your comment change to page 65, lines 18-19, was missing a portion. The following is the excerpt from your comment that reflects the exclusion (...):

From an additional historical perspective, the SSW system at PNPS has experienced leaks on the buried inlet (screenhouse to auxiliary bays) piping as a result of internal corrosion. The original piping material was rubber-lined carbon steel wrapped with reinforced fiberglass wrapping and coal tar saturated felt and heavy Kraft paper. The leaks were determined to be the result of the degraded rubber lining being in contact with sea water. These pipes have since been replaced with the same external coating as the original pipe. The pipe replacement occurred in 1995 and 1997. In addition, the SSW buried discharge piping (also rubber-lined carbon steel with external pipe wrapping, same as inlet piping) from the auxiliary bays to the discharge canal also experienced severe internal corrosion due to failure of the rubber lining. Two 40-foot lengths of 22-inch diameter pipes (one on each loop) were replaced in 1999 as a result of the failed rubber lining and internal corrosion. These spools were replaced with carbon steel coated internally and externally with an epoxy coating. The piping that was removed was examined after its wrapping was removed and its external surface was found to be in good condition. Since that time, the entire length of both SSW buried

[James Davis - RE: Comments on Filarim AMP document Paoe 21i IJames Davis RE: Comments on Pilarim AMP document

- Paae 21 discharge loops have been lined internally with cured-in-place pipe linings-0B" Loop in 2001 and "A" Loop in 2003.

Please look this over and send me the missing words to complete your comment.

Thanks, Joe Joe Zabel Senior Writer/Outreach Manager Advanced Technologies & Laboratories International, Inc.

20010 Century Boulevard, Suite 500 Germantown, MD 20874 Tel: (301) 515-6783 Fax: (301) 972-6904

U&A-te-m D\GW 10000 1.T MP Pane 1 d Paae 1 ~

I c:\temD\GWIOOOO1 .TMP Mail Envelope Properties (44AE7E6F.6DA :4: 55002)

Subject:

RE: Comments on Pilgrim AMP document Creation Date 07/07/2006 11:09:30 AM From: "Zabel, Joe" <JZabel@atlintl.com>

Created By: JZabel@atlintl.com Recipients nrc.gov OWGWPO03.HQGWDO01 JAD (James Davis)

Post Office Route OWGWPOO3.HQGWDO01 nrc.gov Files Size Date & Time MESSAGE 2430 07/07/2006 11:09:30 AM Mime.822 3652 Options Expiration Date: None Priority: Standard ReplyRequested: No Return Notification: None Concealed

Subject:

No Security: Standard Junk Mail Handling Evaluation Results Message is eligible for Junk Mail handling This message was not classified as Junk Mail Junk Mail settings when this message was delivered Junk Mail handling disabled by User Junk Mail handling disabled by Administrator Junk List is not enabled Junk Mail using personal address books is not enabled Block List is not enabled