Letter Sequence Other |
---|
|
Results
Other: ML060300028, ML061220630, ML061220716, ML061710422, ML061940175, ML062090293, ML062090294, ML062090300, ML062090304, ML062090305, ML062090307, ML062090309, ML062090318, ML062090319, ML062090322, ML062090324, ML062090328, ML062090333, ML062090338, ML062090380, ML062090387, ML062090388, ML062090488, ML062090490, ML062090493, ML062090496, ML062090497, ML062090498, ML062090499, ML062090546, ML062090561, ML062090563, ML062090565, ML062090567, ML062090569, ML062120406, ML062120407, ML062120408, ML062120410, ML062120412, ML062120415, ML062120477, ML062120480, ML062120491, ML062120498, ML062120543, ML062120549, ML062120625, ML062120629, ML062120631... further results
|
|
|
---|
Category:E-Mail
MONTHYEARML22335A2802022-11-0404 November 2022 11-4-2022 Email Transmitting Draft Questions Pertaining to Pilgrim ISFSI Exemption Request ML22270A0422022-09-26026 September 2022 Acknowledgement Email for Holtecs Request for Reporting Exemption with Regards to the Pilgrim ISFSI Annual Radioactive Effluent Release Report (Docket No. 05000293) ML22154A1622022-05-26026 May 2022 Letter and Email from Save Our Bay/Diane Turco Regarding Irradiated Water Release from Pilgrim ML22007A2602021-12-0606 December 2021 E-mail from P. Obrien, Holtec, to A. Snyder, NRC, on Pilgrim Effluent Discharge ML21287A6192021-10-14014 October 2021 E-mail from S. Phillips, MEMA, to A. Snyder, NRC, Pilgrim Nuclear Power Station, Commonwealth of Massachusetts Consultation Response to Amendment Review for Emergency Preparedness ML21266A2512021-09-23023 September 2021 Consultation with Commonwealth of Massachusetts Regarding Proposed Amendment Application for Emergency Plan and Emergency Action Levels ML21266A2772021-09-23023 September 2021 HDI Clarification of Exemption Requested from 10 CFR 20, Appendix G, Section Iii.E ML21267A0012021-09-23023 September 2021 E-mail from A. Snyder, NRC, to A. Sterdis, Holtec, - Pilgrim Nuclear Power Station - Request for Exemption from 10 CFR 20, Appendix G, Section Iii.E Acceptance Review ML21257A3832021-09-15015 September 2021 E-mail from A. Snyder, NRC, to A. Sterdis, Holtec, - Pilgrim Nuclear Power Station - Follow-on Request Re Request for Additional Information 2 Pilgrim - License Amendment Request Independent Spent Fuel Storage Installation Only Emergency Pl ML21211A5912021-07-22022 July 2021 Consultation Response from Commonwealth of Massachusetts Regarding Proposed Pilgrim ISFSI Only Technical Specifications ML21211A5162021-07-22022 July 2021 Consultation Response from Commonwealth of Massachusetts Regarding Proposed Pilgrim ISFSI Only Physical Security Plan ML21200A2352021-07-13013 July 2021 Consultation Request to Commonwealth of Massachusetts Regarding Proposed Pilgrim ISFSI Only Technical Specifications ML21200A1522021-07-13013 July 2021 Consultation Request to Commonwealth of Massachusetts Regarding Proposed Pilgrim Isfi Only Physical Security Plan ML21176A1842021-06-25025 June 2021 Email from HDI Regarding Pilgrim Nuclear Power Station Training ML21180A0582021-06-17017 June 2021 Email from Region I Regarding Pilgrim Nuclear Power Station Inspection - EA-13-132 ML21097A0402021-04-0606 April 2021 E-Mail Consult with Commonwealth of Mass Re - Amendment Application - Physical Security Plan for the Pilgrim Nuclear Power Station L-20-092, Email Pilgrim Nuclear Power Station-Exemption from Annual Force-On-Force Exercise Requirements of 10 CFR Part 73, Appendix B,2020-12-10010 December 2020 Email Pilgrim Nuclear Power Station-Exemption from Annual Force-On-Force Exercise Requirements of 10 CFR Part 73, Appendix B, L-20-096, Supplemental Information to Support Physical Security Plan Revision and License Amendment Request to Incorporate Alternate Measures - Holtec Email Dated December 10, 20102020-12-10010 December 2020 Supplemental Information to Support Physical Security Plan Revision and License Amendment Request to Incorporate Alternate Measures - Holtec Email Dated December 10, 2010 ML20328A2982020-11-16016 November 2020 Response from Commonwealth of Massachusetts on No Significant Hazard for Pilgrim ISFSI Amendment to Address ISFSI II Dated November 16, 2020 ML20297A2372020-10-22022 October 2020 Request for Additional Information - HDI Fleet Decommissioning Quality Assurance Program ML20266G4032020-09-22022 September 2020 Acceptance Review Email - Request for Approval of HDI Fleet Decommissioning Quality Assurance Program, Revision 0 ML20163A6802020-06-11011 June 2020 Confirmation of the Scope of the Requested Regulatory Relief for Pilgrim Security Qualifications ML20280A1912020-04-17017 April 2020 Request for Additional Information- Clarifying Information for Pilgrim ISFSI Physical Security Amendment Application ML20269A3542020-03-0505 March 2020 CFR 26.717 Reports 2019 Transmittal Email ML19336A0302019-11-27027 November 2019 OEDO-15-00479 - Re 2.206 Petition Regarding Pilgrim Nuclear Power Station'S Current Licensing Basis for Flooding ML19336A0332019-11-26026 November 2019 OEDO-15-00479 - E-mail to Petitioner - 2.206 Petition Regarding Pilgrim Nuclear Power Station'S Current Licensing Basis for Flooding (CAC No. MF6460; EPID L-2015-CRS-0002)- Issuance of Final Director'S Decision ML19331A1952019-11-21021 November 2019 NRR E-mail Capture - (External_Sender) Pilgrim Nuclear Power Station - Commonwealth Consultation Response - Amendment Regarding Site Emergency Plan and Emergency Action Level Scheme ML19331A1732019-11-12012 November 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station -Consult with Commonwealth - Amendment Regarding Cyber Security Plan ML19331A1642019-11-0505 November 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station -Consult with Commonwealth - Amendment Regarding Site Emergency Plan and Emergency Action Level Scheme ML19331A1792019-11-0505 November 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - EA and Fonsi for Pilgrim Emergency Planning Exemption CY-19-007, LTR-19-0441 Henrietta Cosentino, E-mail SECY-19-0078 Request by Entergy Nuclear Operations Inc. for Exemptions from Certain Emergency Planning Requirements for the Pilgrim Nuclear Power Station2019-11-0404 November 2019 LTR-19-0441 Henrietta Cosentino, E-mail SECY-19-0078 Request by Entergy Nuclear Operations Inc. for Exemptions from Certain Emergency Planning Requirements for the Pilgrim Nuclear Power Station ML19275H1962019-09-24024 September 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - Consult with Commonwealth - Amendment Regarding Permanently Defueled Technical Specifications (PDTS) ML19239A0372019-08-26026 August 2019 E-mail from Entergy Dated August 26, 2019, Notification of Pilgrim License Transfer ML19239A0262019-08-23023 August 2019 LTR-19-0330 Janet Azarovitz, E-mail a Plea for More Time and Reasonable Discussion Including the Citizens of the Commonwealth in the Sale of the Pilgrim Nuclear Power Station ML19234A2072019-08-20020 August 2019 LTR-19-0328 Lawrence Delafield, President, Six Ponds Improv Assoc., Plymouth, Ma, Ltr Requests NRC to Postpone Consideration of Transferring the Licenses for the Pilgrim Nuclear Power Until the NRC Has Answered Concerns by Pilgrim Watch, Se ML19232A4032019-08-20020 August 2019 LTR-19-0322 Diane Turco, Director, Cape Downwinders, Massachusetts, Letter/E-mail Requests Suspension of the Pilgrim License Transfer from Entergy to Holtec Until the Adjudicatory Hearing Is Held and Raised Contentions Are Resolved ML19308A9942019-08-19019 August 2019 Entergy Nuclear Operations, Inc. Confirmatory Order Rescission Supplemental Information ML19226A3912019-08-14014 August 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - EA and Fonsi for Pilgrim Decommissioning Trust Fund Exemption (Holtec) ML19226A3962019-08-14014 August 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station -Consult with Commonwealth - Conforming Amendment in Support of Pilgrim License Transfer Application ML19226A1212019-08-13013 August 2019 OEDO-15-00479-2.206 Petition Regarding Pilgrim Nuclear Power Station'S Current Licensing Basis for Flooding - Status (CAC No. MF6460; EPID L-2015-CRS-0002) ML19227A1032019-08-0707 August 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - Draft Wording for Potential Condition of License Transfer Order ML19207B3662019-07-26026 July 2019 NRR E-mail Capture - Pilgrim - RAI Direct and Indirect Transfer of Lic.; Conforming Lic. Amend.; Req. for Exemption 10 CFR 50.82(A)(8)(I)(A) for Holtec Decom. International, Llc ML19176A3452019-06-25025 June 2019 2.206 Petition Regarding Pilgrim Nuclear Power Station'S Current Licensing Basis for Flooding - Information (OEDO-15-00479) (CAC No. MF6460; EPID L-2015-CRS-0002) ML19154A0652019-06-0303 June 2019 NRR E-mail Capture - Pilgrim - Permanent Cessation of Power Operations ML19154A5242019-06-0303 June 2019 NRR E-mail Capture - RAI - Pilgrim Post-Decommissioning Technical Specifications (PDTS) License Amendment Request (LAR) ML19161A2122019-05-20020 May 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - Acceptance of License Amendment Request to Remove Cyber Security Plan Requirements ML19123A0332019-05-0101 May 2019 NRR E-mail Capture - Logbook Entry: 05/01/2019 Endangered Species Report Regarding a Confirmed Sighting of North Atlantic Right Whale(S) (Balaena Glacialis) ML19122A4912019-04-29029 April 2019 NRR E-mail Capture - Logbook Entry: 04/29/2019 Regarding the Confirmed Sighting of Ten North Atlantic Right Whales (Balaena Glacialis) ML19108A2372019-04-18018 April 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - Acceptance of Requested Licensing Action, Proposed Exemptions from 10 CFR 50.54(w)(1) - On-Site Property Damage Insurance ML19108A2362019-04-18018 April 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - Acceptance of Requested Licensing Action, Proposed Exemptions from 10 CFR 140.11(a)(4) - Primary and Secondary Liability Insurance 2022-09-26
[Table view] |
Text
James Davis - Additional AMR Question Section 3.1.1 _Fe-Section 3.1.1 Page 11 James Davis Additional AMR Question From: "wilbur jackson" <JacksonWR@msn.com>
To: "James Davism <JAD@nrc.gov>
Date: 06/25/2006 9:04:33 AM
Subject:
Additional AMR Question -- Section 3.1.1 Jim --
Please see the attached, new question.
The question, as written, is lengthy because I am trying to get all the details that I would like to see included in the applicant's first response. The question is not hard; and I have an expectation of what the answer should be.
The short answer would be something like:
Jet pump sensing lines inside the RPV may be subject to the aging effect/mechanism of cracking due to cyclic loading (high cycle fatigue cause by flow-induced vibrations); however, that part of the jet pump sensing lines is not in scope for license renewal. Also, any failure of the in-core sensing lines would be noticed by change in instrument readings and tech specs will require shutdown per the applicable LCO.
Jet pump sensing lines outside the RPV are subject to the aging effect/mechanism of cracking due to thermal fatigue, SCC or IGSCC (but not high cycle fatigue -- since they are not in a flow stream). In these components, aging management of this aging effects due to these mechanisms is provided by TLAA -
metal fatigue (Line Item 3.1.1-3) or by Water Chemistry and One-Time Inspection (Line Item 3.1.1-48) --
which is consistent with the GALL's recommendations for other, similar components.
The AMPs that the applicant proposes are acceptable for this component. However, the applicant did not provide much detail of their critical thinking in the LRA; and I failed to notice any additional information from supporting documents that I reviewed while on site.
Please forward the question to the applicant and ask them to include a response in their e-mail scheduled for June 30.
Thanks, Bob Jackson 615-826-7542 CC: "Peter Wen" <PXW @nrc.gov>, "Erach Patel" <erachp @comcast.net>
I
[ c*\teMp\GWJ00001.TM Page I~c:\ternp\GW}OOO01 .TMP Page 11 1]
Mail Envelope Properties (449E89D9.47A: 11: 5242)
Subject:
Additional AMR Question -- Section 3.1.1 Creation Date 06/25/2006 9:03:57 AM From: "wilbur jackson" <JacksonWR@msn.com>
Created By: JacksonWR @msn.com Recipients nrc.gov OWGWPO03.HQGWDO01 JAD (James Davis) nrc.gov TWGWPO04.HQGWDO01 PXW CC (Peter Wen) comcast.net erachp CC (Erach Patel)
Post Office Route OWGWPO03.HQGWDO01 nrc.gov TWGWPOO4.HQGWDOO1 nrc.gov comcast.net Files Size Date & Time MESSAGE 1697 06/25/2006 9:03:57 AM TEXT.htm 2938 AMR Question Set #03 -- Jackson.wpd 7372 Mime.822 17351 Options Expiration Date: None Priority: Standard ReplyRequested: No Return Notification: None Concealed
Subject:
No Security: Standard Junk Mail Handling Evaluation Results Message is eligible for Junk Mail handling This message was not classified as Junk Mail
- ,\temp\Gw _}O9.PP-. . . .. . . .. P.g..
Junk Mail settings when this message was delivered Junk Mail handling disabled by User Junk Mail handling disabled by Administrator Junk List is not enabled Junk Mail using personal address books is not enabled Block List is not enabled
Questions Related to PNPS Aging Management Review Results for LRA Section 3.1.1 (Reactor Vessel, Internals and Reactor Coolant System)
Prepared by Bob Jackson Question Number:
Question NEW QUESTION: (Submitted after site audit) 3.1.1-33:
GALL Report, Volume 1, Table 1, Line ID 25, is applicable for the stainless steel jet pump sensing line and has the aging effect of cracking due to the aging mechanism of cyclic loading.
In the LRA, the discussion of Table 3.1.1, Line Item 3.1.1-25, the applicant states that "jet pump instrumentation lines inside the reactor vessel are not subject to aging management review"; and the applicant states that the lines outside the vessel "... are included as piping and fittings <4" nominal pipe size (NSP) and cracking of these lines is addressed by [LRA] Line Item 3.1.1-48." The discussion also points to LRA Section 3.1.2.2.8 item 1 for additional information.
LRA Section 3.1.2.2.8 states that the jet pump sensing lines inside the reactor vessel have, no license renewal intended function. Although this is a brief statement, it does provide an explanation for the line item discussion which says that the sensing lines inside the vessel are not subject to aging management review. However, the LRA does not provide any explanation of why or whether the AMPs in LRA Line Item 3.1.1-48 (water chemistry and one time inspection) are suitable to provide management of the aging effect of cracking due to cyclic loading for the jet pump sensing lines outside the reactor vessel, which are in scope for license renewal.
Question:
Please provide a discussion of why the AMPs water chemistry and one time inspection are adequate to manage aging of the in-scope jet pump sensing lines that are outside the vessel.
Include specific discussion of the aging effect of cracking due to the aging mechanism of cyclic loading on these lines. Please address whether the aging mechanism is applicable for the portion of the jet pump sensing lines outside the vessel. Considering that the aging effect due to this mechanism is cumulative over time, please explain how a one-time inspection, rather than a periodic inspection, provides adequate management of the aging effect. Please provide either a detailed discussion (or reference to publicly available technical literature) to support any statement that the aging effect of cracking due to cyclic loading is not applicable for the jet pump sensing lines that are outside the vessel.
Page 1 of 2
Questions Related to PNPS Aging Management Review Results for LRA Section 3.1.1 (Reactor Vessel, Internals and Reactor Coolant System)
Prepared by Bob Jackson Question Number:
Question Page 2 of 2