ML060520022
| ML060520022 | |
| Person / Time | |
|---|---|
| Site: | Pilgrim |
| Issue date: | 02/15/2006 |
| From: | Balduzzi M Entergy Nuclear Operations |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| 2.06.014 | |
| Download: ML060520022 (3) | |
Text
SAFEGUARDS INFORMATION 7< 7
\\Entergy Nuclear Operations, Inc.
L nie-r0V Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360 Michael A. Balduzzi Site Vice President February 15, 2006 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk 11555 Rockville Pike Rockville, MD 20852-2738
SUBJECT:
Entergy Nuclear Operations, Inc.
Pilgrim Nuclear Power Station Docket No.: 50-293 License No.: DPR-35 Physical Security Plan, Revision 1 LETTER NUMBER: 2.06.014
Dear Sir or Madam:
By this letter Entergy is submitting, Revision 1 of the Pilgrim Nuclear Power Station (PNPS)
Physical Security Plant (PSP). This revision includes implementation of the guidance in Security Frequently Asked Questions 04-09 and 05-03. These changes do not decrease the effectiveness of the plan. A summary description of each change is enclosed (Attachment 1) in accordance with 10 CFR 50.54(p).
In accordance with 10 CFR 50.4(b)(4), the revised pages of the PSP are enclosed with this letter. In addition, a CD-ROM containing an electronic copy of the PSP with the changes incorporated is included with this letter.
The Attachments and Enclosure to this letter contain Safeguards Information as defined in 10 CFR 73.21 (e). Entergy therefore requests the Attachments and Enclosure be withheld from public disclosure.
There are no new commitments contained in this letter.
Please contact Mr. Bryan Ford, at (508) 830-8403, if you have any questions or require additional information.
Sincerely, Michael A. Balduzzi Site Vice President MJG/dm NOTE: THE ATTACHMENTS AND ENCLOSURE TO THIS LETTER EACH CONTAINS 'SAFEGUARDS INFORMATION" AND MUST BE PROTECTED ACCORDINGLY. UPON REMOVAL OF THE ATTACHMENTS AND ENCLOSURE, THIS LETTER IS -DECONTROLLED."
SAFEGUARDS INFORMATION
SAFEGUARDS INFORMATION Entergy Nuclear Operations, Inc.
Pilgrim Nuclear Power Station Letter Number: 2.06.014 Page 2 Attachment
- 1. Summary of Changes to PNPS Physical Security Plan
- 2. Revised Pages to PNPS Physical Security Plan Enclosure CD-ROM containing electronic copy of the PNPS Physical Security Plan Cc (w/o enclosure):
Mr. Samuel J. Collins Regional Administrator, Region I U. S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406-1415 Mr. J. E. Dyer Director, Office of Nuclear Reactor Regulation One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 NOTE: THE ATTACHMENTS AND ENCLOSURE TO THIS LETTER EACH CONTAINS 'SAFEGUARDS INFORMATION" AND MUST BE PROTECTED ACCORDINGLY. UPON REMOVAL OF THE ATTACHMENTS AND ENCLOSURE, THIS LETTER IS -DECONTROLLED."
SAFEGUARDS INFORMATION
SAFEGUARDS INFORMATION ATTACHMENT 1 to Letter Number 2.06.014 Summary of Changes to PNPS Physical Security Plan NOTE: THE ATTACHMENTS AND ENCLOSURE TO THIS LETTER EACH CONTAINS 'SAFEGUARDS INFORMATION" AND MUST BE PROTECTED ACCORDINGLY. UPON REMOVAL OF THE ATTACHMENTS AND ENCLOSURE, THIS LETTER IS -DECONTROLLED."
SAFEGUARDS INFORMATION