Entergy Nuclear Operations, Inc., RAI Regarding Technical Specification Changes to Pressure and Temperature Curves
ML062280434
Person / Time
Site: Pilgrim
Issue date: 08/18/2006
From: James Shea
NRC/NRR/ADRO/DORL/LPLA
To: Kansler M
Entergy Nuclear Operations
SHea J, NRR/DORL, 415-1388
References
TAC MD1218
Download: ML062280434 (6)


Text

August 18, 2006 Mr. Michael R. Kansler President Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION REGARDING TECHNICAL SPECIFICATION CHANGES TO PRESSURE AND TEMPERATURE CURVES (TAC NO. MD1218)

Dear Mr. Kansler:

By letter dated April 12, 2006, Entergy Nuclear Operations, Inc. submitted an amendment request to revise the Pilgrim Nuclear Power Station (Pilgrim) Technical Specification pressure and temperature curves.

The Nuclear Regulatory Commission staff has been reviewing the submittal and has determined that additional information is needed to complete its review. The specific questions are found in the enclosed request for additional information (RAI). A response to these RAIs is requested to be provided within 60 days.

Sincerely,

/RA/

James J. Shea, Project Manager Plant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-293

Enclosure:

As stated cc w/encl: See next page

August 18, 2006 Mr. Michael R. Kansler President Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION REGARDING TECHNICAL SPECIFICATION CHANGES TO PRESSURE AND TEMPERATURE CURVES (TAC NO. MD1218)

Dear Mr. Kansler:

By letter dated April 12, 2006, Entergy Nuclear Operations, Inc. submitted an amendment request to revise the Pilgrim Nuclear Power Station (Pilgrim) Technical Specification pressure and temperature curves.

The Nuclear Regulatory Commission staff has been reviewing the submittal and has determined that additional information is needed to complete its review. The specific questions are found in the enclosed request for additional information (RAI). A response to these RAIs is requested to be provided within 60 days.

Sincerely,

/RA/

James J. Shea, Project Manager Plant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-293

Enclosure:

As stated cc w/encl: See next page DISTRIBUTION:

PUBLIC RidsNrrDORLLpl1-1 RidsOgcRP LLois LPLI-1 R/F RidsNrrLASLittle RidsAcrsAcnwMailCenter RidsNrrPMJShea RidsNrrDORLDpr RidsRgn1MailCenter Accession Number: ML062280434 OFFICE LPL1-1/PM LPL1-1/LA SBWB/BC LPL1-1/BC NAME JShea SLittle GCranston RLaufer DATE 8/17/06 8/18/06 8/18/06 8/18/06 Official Record Copy

REQUEST FOR ADDITIONAL INFORMATION REGARDING TECHNICAL SPECIFICATION CHANGES TO REVISE PILGRIM PRESSURE AND TEMPERATURE CURVES ENTERGY NUCLEAR OPERATIONS, INC.

PILGRIM NUCLEAR POWER STATION DOCKET NO. 50-293 By letter dated April 12, 2006, Entergy Nuclear Operations, Inc. (Entergy) submitted an amendment request to revise the Pilgrim Nuclear Power Station (Pilgrim) Technical Specification (TS) pressure and temperature (P-T) curves.

The Nuclear Regulatory Commission staff has been reviewing the submittal and has determined that additional information is needed to complete its review.

In your submittal, you requested TS 3.6.A.2 changes regarding revisions to the P-T limit curves.

The revised P-T limits are based on recalculated vessel fluence values using the RAMA code.

The technical analysis in Section 4 of the submittal gives peak fluence values for 54 effective full-power years (EFPYs) at the 1-338A/C weld and the lower intermediate shell location.

However, the submittal includes curves for 24, 34, 44, and 54 EFPYs of operation for which fluence values are not presented. In addition, the RAMA approval includes limitations regarding the benchmarking of the code. Accordingly, please respond to the following request for additional information:

1.

Provide fluence values for the exposure for which you calculate limit P-T curves.

2.

Identify the limiting material for each of the exposures if required.

3.

Address the RAMA limitations for the Pilgrim application.

Enclosure

Pilgrim Nuclear Power Station cc:

Regional Administrator, Region I U. S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406-1415 Senior Resident Inspector U. S. Nuclear Regulatory Commission Pilgrim Nuclear Power Station Post Office Box 867 Plymouth, MA 02360 Chairman, Board of Selectmen 11 Lincoln Street Plymouth, MA 02360 Chairman Nuclear Matters Committee Town Hall 11 Lincoln Street Plymouth, MA 02360 Chairman, Duxbury Board of Selectmen Town Hall 878 Tremont Street Duxbury, MA 02332 Office of the Commissioner Massachusetts Department of Environmental Protection One Winter Street Boston, MA 02108 Office of the Attorney General One Ashburton Place 20th Floor Boston, MA 02108 MA Department of Public Health Radiation Control Program Schrafft Center, Suite 1M2A 529 Main Street Charlestown, MA 02129 Secretary of Public Safety Executive Office of Public Safety One Ashburton Place Boston, MA 02108 Director, Massachusetts Emergency Management Agency Attn: James Muckerheide 400 Worcester Road Framingham, MA 01702-5399 Mr. William D. Meinert Nuclear Engineer Massachusetts Municipal Wholesale Electric Company P.O. Box 426 Ludlow, MA 01056-0426 Mr. Kevin H. Bronson General Manager, Plant Operations Entergy Nuclear Operations, Inc.

Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360-5508 Mr. Michael A. Balduzzi Site Vice President Entergy Nuclear Operations, Inc.

Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360-5508 Mr. Stephen J. Bethay Director, Nuclear Safety Assurance Entergy Nuclear Operations, Inc.

Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360-5508 Mr. Bryan S. Ford Manager, Licensing Entergy Nuclear Operations, Inc.

Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360-5508

Pilgrim Nuclear Power Station cc:

Mr. Gary J. Taylor Chief Executive Officer Entergy Operations 1340 Echelon Parkway Jackson, MS 39213 Mr. John T. Herron Sr. VP and Chief Operating Officer Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601 Mr. Oscar Limpias Vice President, Engineering Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601 Mr. Christopher Schwarz Vice President, Operations Support Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601 Mr. Michael Kansler President Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601 Mr. John F. McCann Director, Nuclear Safety Assurance Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601 Ms. Charlene D. Faison Manager, Licensing Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601 Mr. Michael J. Colomb Director of Oversight Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601 Assistant General Counsel Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601 Ms. Stacey Lousteau Treasury Department Entergy Services, Inc.

639 Loyola Avenue New Orleans, LA 70113 Mr. James Sniezek 5486 Nithsdale Drive Salisbury, MD 21801-2490 Mr. Michael D. Lyster 5931 Barclay Lane Naples, FL 34110-7306 Mr. Garrett D. Edwards 814 Waverly Road Kennett Square, PA 19348