May 18, 2006 Mr. Michael R. Kansler President Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION REGARDING TECHNICAL SPECIFICATION CHANGES TO REVISE REACTOR COOLANT LEAKAGE DETECTION SYSTEM INSTRUMENTATION (TAC NO. MC7255)
Dear Mr. Kansler:
By letter dated June 2, 2005, Entergy Nuclear Operations, Inc. submitted an amendment request to revise the Pilgrim Nuclear Power Station reactor coolant leakage detection system instrumentation requirements.
The Nuclear Regulatory Commission staff has been reviewing the submittal and has determined that additional information is needed to complete its review. The specific questions are found in the enclosed request for additional information (RAI). A response to these RAIs is requested to be provided within 30 days.
Sincerely,
/RA/
James J. Shea, Project Manager Plant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-293
Enclosure:
As stated cc w/encl: See next page
May 18, 2006 Mr. Michael R. Kansler President Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION REGARDING TECHNICAL SPECIFICATION CHANGES TO REVISE REACTOR COOLANT LEAKAGE DETECTION SYSTEM INSTRUMENTATION (TAC NO. MC7255)
Dear Mr. Kansler:
By letter dated June 2, 2005, Entergy Nuclear Operations, Inc. submitted an amendment request to revise the Pilgrim Nuclear Power Station reactor coolant leakage detection system instrumentation requirements.
The Nuclear Regulatory Commission staff has been reviewing the submittal and has determined that additional information is needed to complete its review. The specific questions are found in the enclosed request for additional information (RAI). A response to these RAIs is requested to be provided within 30 days.
Sincerely,
/RA/
James J. Shea, Project Manager Plant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-293
Enclosure:
As stated cc w/encl: See next page DISTRIBUTION:
PUBLIC RidsNrrDORLLpl1-1 RidsOgcRP ALewin LPLI-1 R/F RidsNrrLASLittle RidsAcrsAcnwMailCenter RHernandez RidsNrrPMJShea RidsNrrDORLDpr RidsRgn1MailCenter Accession Number: ML061210172 OFFICE LPL1-1/PM LPL1-1/LA SBPB/BC ITSB/BC LPL1-1/BC NAME JShea SLittle DSolorio TKobetz RLaufer DATE 5/15/06 5/14/06 5/16/06 5/15/06 5/18/06 Official Record Copy
REQUEST FOR ADDITIONAL INFORMATION REGARDING TECHNICAL SPECIFICATION CHANGES TO REVISE REACTOR COOLANT LEAKAGE DETECTION INSTRUMENTATION ENTERGY NUCLEAR OPERATIONS, INC.
PILGRIM NUCLEAR POWER STATION DOCKET NO. 50-293 By letter dated June 2, 2005, Entergy Nuclear Operations, Inc. submitted an amendment request to revise the Pilgrim Nuclear Power Station (Pilgrim) reactor coolant leakage detection system instrumentation requirements.
The Nuclear Regulatory Commission staff has been reviewing the submittal and has determined that additional information is needed to complete its review.
Pilgrim Leakage Detection Instrumentation Requirements & Actions 1.
The proposed Pilgrim Technical Specification (TS) changes to the reactor coolant system (RCS) leakage detection instrumentation would remove the operability requirements of the drywell equipment drain sump from TS 3.6.C.2.a.1 and TS 3.6.C.2.b.1. Please explain how the total leakage limits as specified in TS 3.6.C.1.a.3 would be verified during plant operation.
2.
The proposed revised Pilgrim TSs allow for an outage time of 30 days for the drywell floor drain sump. Please explain how TS 4.6.C.1 would verify the requirements of TS 3.6.C.1.a while the drywell floor drain sump is inoperable.
RCS Proposed Leakage Actions The NRC Standard Technical Specifications (STS) Surveillance Requirement (SR) 3.4.4.1 states the following, "Verify RCS unidentified and total LEAKAGE and unidentified LEAKAGE increase are within limits [every 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />s]." The proposed Pilgrim SR 4.6.C.1 consists of the following statement, "Demonstrate drywell leakage is within the limits specified in 3.6.C.1 at least once every 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />." It is not clear to the staff that the proposed Pilgrim SR is consistent with the STS.
- 1.
Provide clarification on how the proposed Pilgrim SR 4.6.C.1 is equivalent to STS SR 3.4.4.1.
- 2.
With the dry well sump monitoring system inoperable, how can you demonstrate that total leakage and the unidentified leakage increase are within the TS specified limits?
Enclosure
Pilgrim Nuclear Power Station cc:
Regional Administrator, Region I U. S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406-1415 Senior Resident Inspector U. S. Nuclear Regulatory Commission Pilgrim Nuclear Power Station Post Office Box 867 Plymouth, MA 02360 Chairman, Board of Selectmen 11 Lincoln Street Plymouth, MA 02360 Chairman Nuclear Matters Committee Town Hall 11 Lincoln Street Plymouth, MA 02360 Chairman, Duxbury Board of Selectmen Town Hall 878 Tremont Street Duxbury, MA 02332 Office of the Commissioner Massachusetts Department of Environmental Protection One Winter Street Boston, MA 02108 Office of the Attorney General One Ashburton Place 20th Floor Boston, MA 02108 Director, Radiation Control Program Commonwealth of Massachusetts Executive Offices of Health and Human Services 174 Portland Street Boston, MA 02114 Secretary of Public Safety Executive Office of Public Safety One Ashburton Place Boston, MA 02108 Director, Massachusetts Emergency Management Agency Attn: James Muckerheide 400 Worcester Road Framingham, MA 01702-5399 Mr. William D. Meinert Nuclear Engineer Massachusetts Municipal Wholesale Electric Company P.O. Box 426 Ludlow, MA 01056-0426 Mr. Kevin H. Bronson General Manager, Plant Operations Entergy Nuclear Operations, Inc.
Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360-5508 Mr. Michael A. Balduzzi Site Vice President Entergy Nuclear Operations, Inc.
Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360-5508 Mr. Stephen J. Bethay Director, Nuclear Safety Assurance Entergy Nuclear Operations, Inc.
Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360-5508 Mr. Bryan S. Ford Manager, Licensing Entergy Nuclear Operations, Inc.
Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360-5508
Pilgrim Nuclear Power Station cc:
Mr. Gary J. Taylor Chief Executive Officer Entergy Operations 1340 Echelon Parkway Jackson, MS 39213 Mr. John T. Herron Sr. VP and Chief Operating Officer Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601 Mr. Oscar Limpias Vice President, Engineering Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601 Mr. Christopher Schwarz Vice President, Operations Support Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601 Mr. John F. McCann Director, Nuclear Safety Assurance Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601 Ms. Charlene D. Faison Manager, Licensing Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601 Mr. Michael J. Colomb Director of Oversight Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601 Assistant General Counsel Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601 Ms. Stacey Lousteau Treasury Department Entergy Services, Inc.
639 Loyola Avenue New Orleans, LA 70113 Mr. James Sniezek 5486 Nithsdale Drive Salisbury, MD 21801-2490 Mr. Michael D. Lyster 5931 Barclay Lane Naples, FL 34110-7306 Mr. Garrett D. Edwards 814 Waverly Road Kennett Square, PA 19348