ML062280218

From kanterella
Jump to navigation Jump to search

2006/08/15-Summary of Public Audit Status Briefing with Entergy Nuclear Operations, Inc., on License Renewal Scoping and Screening Methodology and the Aging Management Program and the Aging Management Review Audits for the Pilgrim Nuclear P
ML062280218
Person / Time
Site: Pilgrim
Issue date: 08/15/2006
From: Subbaratnam R
NRC/NRR/ADRO/DLR/RLRA
To:
Subbaratnam R NRR/DRIP/RLEP, 415-1478
References
%dam200612, TAC MC9669
Download: ML062280218 (7)


Text

August 15, 2006LICENSEE:Entergy Nuclear Operations, Inc.FACILITY:Pilgrim Nuclear Power Station

SUBJECT:

SUMMARY

OF PUBLIC AUDIT STATUS BRIEFING WITH ENTERGYNUCLEAR OPERATIONS, INC., ON LICENSE RENEWAL SCOPING AND SCREENING METHODOLOGY AND THE AGING MANAGEMENT PROGRAM AND THE AGING MANAGEMENT REVIEW AUDITS FOR THE PILGRIM NUCLEAR POWER STATION (TAC NO. MC 9669)The U.S. Nuclear Regulatory Commission (NRC) staff conducted a public audit status briefingmeeting with Entergy Nuclear Operations, Inc. (Entergy). The public meeting was conducted on Wednesday, July 19, 2006, in the Duxbury Room at the Radisson Hotel Plymouth Harbor Ballroom, 180 Water Street, Plymouth, Massachusetts. The subject of the meeting was to summarize the staff's audit findings associated with the scoping and screening methodology and the aging management program (AMP) and aging management review (AMR) audits of the Pilgrim Nuclear Power Station license renewal application (LRA). Twenty-three people attended the meeting which included members of the NRC staff, Entergy and a few citizensfrom the town of Plymouth, MA (Enclosure). This was a Category 1 Meeting. The following is a summary of the meeting.The Project Manager for the LRA provided an introduction and said that since May 2006, thestaff conducted on-site audits on scoping and screening methodology, AMPs, AMRs and TLAAs on the information that Entergy submitted in the renewal application. One of themilestones of the project was to provide feedback on the ongoing review process. In fullfillingthat objective, on July 19, 2006, the staff met with the applicant to discuss the status of theaudits and also share the results with the public. The team leader for the scoping and screening methodology audit presented his findings on theportion of his audit as follows. During the week of June 6-9, 2006, the staff conducted a scoping and screening methodology audit at the Entergy Pilgrim Nuclear Power Station. Theaudit activities included a detailed review of the scoping and screening methodology and implementation of that methodology for the evaluation of plant mechanical and electricalsystems, as well as structures, in accordance with the requirements of 10 CFR 54.4(a) and 10 CFR 54.21, respectively. As a result of this audit, the staff gained valuable insights regarding the scoping and screening implementation processes and identified several areas where additional information will be required to complete the staff's final safety determination. At the end of the audit the staff needed additional information from the applicant and issued three requests for additional information. These related to (1) non-safety structure, system, andcomponents (SSCs) affecting safety-related SSCs, (2) quality control requirements applied to certain AMP attributes, and (3) the evaluation of SSCs credited for design-basis events. The team leader for the AMP/AMR audits presented his findings on the portion of his audits asfollows. During the weeks of May 22-26, 2006, June 19-23, 2006 and July 17 and 18, 2006, staff conducted the AMP/AMR audits at the Entergy Pilgrim Nuclear Power Station. NRCperforms audits early in the license renewal review process to evaluate whether the application is consistent with established guidance and NRC staff positions. The purpose of this auditstatus briefing was to summarize the audit findings and to provide the status of questions posed to the applicant during the audits. Pilgrim Nuclear Power Station submitted 38 AMPs and the safety audit team reviewed 37 of the programs. The remaining program was reviewed by NRC headquarters staff. In addition, the applicant added a new AMP on bolting integrity, which was not included in the original LRA. The audit team performed reviews on approximately 2800 components included in the various system that were scoped in the application. An AMR liststhe component, what the component is made from, the environment the component is exposedto, the anticipated aging effect(s), and the AMP or programs that is credited to manage theaging effects during the period of extended operation. There were 329 staff questions submitted to the applicant and the answers to 328 of the questions were found to be acceptable and documented as a part of the audits. This document was made available at the public meeting for interested members of the public (ML061940175). The ADAMS Public Electronic Reading Room is accessible at http://www.nrc.gov/reading-rm/adams.html on the NRC website. Persons who do not have access to ADAMS, should contact the NRC's Public DocumentRoom reference staff at 1-800-397-4209, or 301-415-4727, or by e-mail at pdr@nrc.gov. At theend of the audit the staff needed additional information from the applicant on the one remaining item and this was issued as request for additional information. The public was invited to observe the meeting and had an opportunity to communicate with theNRC staff after the business portion, but before the meeting was adjourned. The staff alsostayed behind and met with a few interested members of the public and addressed their specific questions personally. During the public question session one concerned citizen, Ms. Marie Fehlow, a resident of Plymouth, stated she had provided written comments on the publicfeedback form during the end-of-cycle meetings in 2004 and 2005, participated by the SeniorResident Inspector at the Pilgrim Nuclear Station. Although she requested on the forms thatNRC contact her, she was never contacted. The senior resident inspector who was present forthe July 19, 2006 meeting met with Ms. Fehlow after the formal meeting to apologize for the NRC's lack of response and obtained specifics on her concerns. Region I will be following-upwith her on this matter further./RA/Ram Subbaratnam, Project ManagerLicense Renewal Branch A Division of License Renewal Office of Nuclear Reactor RegulationDocket No. 50-293

Enclosure:

List of Participantscc w/encl: See next page

ML062280218E:\Filenet\ML062280218.wpdOFFICEPM:RLRA:DLRLA:DLRBC:REBB:DLRNAMERSubbaratnamYEdmondLLund (Rauluck for)DATE8/ 14 /068/ 11 /068/ 15 /06 Public Meeting Summary dated August 15, 2006

SUBJECT:

SUMMARY

OF PUBLIC AUDIT STATUS BRIEFING WITH ENTERGYNUCLEAR OPERATIONS, INC., ON LICENSE RENEWAL SCOPING AND SCREENING METHODOLOGY AND THE AGING MANAGEMENT PROGRAM AND THE AGING MANAGEMENT REVIEW AUDITS FOR THE PILGRIM NUCLEAR POWER STATION (TAC NO. MC 9669)HARD COPYDLR R/FE-MAIL:JFairRWeisman AMurphy RPettis GGalletti DShum GBagchi SSmith (srs3)

SDuraiswamy YL (Renee) Li RidsNrrDlr RidsNrrDlrRlra RidsNrrDlrRlrb RidsNrrDe RidsNrrDci RidsNrreEemb RidsNrrDeEeeb RidsNrrDeEqva RidsNrrDss RidsNrrDnrl RidsOgcMailCenter RidsNrrAdes DLR Staff


RSubbaratnam SHoffman SUttal JShea NSheihan GWilson CAnderson, Region 1 WRaymond, Region 1 NSheehan, Region 1 ENCLOSURELIST OF PARTICIPANTS FOR THEPILGRIM ENVIRONMENTAL SCOPING MEETINGS July 19, 2006PARTICIPANTSAFFILIATIONRam SubbaratnamU.S. Nuclear Regulatory Commission (NRC)James DavisNRC Peter WenNRC Dan HoangNRC Don JacksonEntergy Nuclear Operations, Inc. (Entergy)

Mike BalduzziEntergy Ken ChangNRC Gary G. YoungEntergy David J. LachEntergy Bryan FordEntergy Greg GallettiNRC Fred MogoleskoEntergy Laris ChanEntergy James MedoffNRC Fred Di CristofaroLocal 369 (Entergy)

Kevin BronsonEntergy Carol WicohtmanEntergy Bill RogersNRCAlan CoxEntergy Marie FehlowPlymouth William D. Meinert, P.E.Public Frank GillespieNRC William J. RaymondSenior Resident Inspector, Pilgrim Pilgrim Nuclear Power Station cc:

Regional Administrator, Region IU. S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406-1415Senior Resident InspectorU. S. Nuclear Regulatory Commission Pilgrim Nuclear Power Station Post Office Box 867 Plymouth, MA 02360Chairman, Board of Selectmen11 Lincoln Street Plymouth, MA 02360ChairmanNuclear Matters Committee Town Hall 11 Lincoln Street Plymouth, MA 02360Chairman, Duxbury Board of SelectmenTown Hall 878 Tremont Street Duxbury, MA 02332Office of the CommissionerMassachusetts Department of Environmental Protection One Winter Street Boston, MA 02108Office of the Attorney GeneralOne Ashburton Place 20th Floor Boston, MA 02108MA Department of Public HealthRadiation Control Program Schrafft Center, Suite 1M2A 529 Main Street Charlestown, MA 02129Secretary of Public SafetyExecutive Office of Public Safety One Ashburton Place Boston, MA 02108 Director, Massachusetts Emergency Management Agency Attn: James Muckerheide 400 Worcester Road Framingham, MA 01702-5399Mr. William D. MeinertNuclear Engineer Massachusetts Municipal Wholesale Electric Company

P.O. Box 426 Ludlow, MA 01056-0426Mr. Michael A. BalduzziSite Vice President Entergy Nuclear Operations, Inc.

Pilgrim Nuclear Power Station 600 Rocky Hill RoadPlymouth, MA 02360-5508Mr. Stephen J. BethayDirector, Nuclear Safety Assurance Entergy Nuclear Operations, Inc.

Pilgrim Nuclear Power Station 600 Rocky Hill RoadPlymouth, MA 02360-5508Mr. Bryan S. FordManager, Licensing Entergy Nuclear Operations, Inc.

Pilgrim Nuclear Power Station 600 Rocky Hill RoadPlymouth, MA 02360-5508Mr. Gary J. Taylor Chief Executive Officer Entergy Operations 1340 Echelon Parkway Jackson, MS 39213 Pilgrim Nuclear Power Station cc:

Mr. John T. HerronSr. VP and Chief Operating Officer Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601Mr. Oscar LimpiasVice President, Engineering Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601Mr. Christopher SchwarzVice President, Operations Support Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601 Mr. John F. McCannDirector, Nuclear Safety Assurance Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601Ms. Charlene D. FaisonManager, Licensing Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601Mr. Michael D. Lyster5931 Barclay Lane Naples, FL 34110-7306Mr. Michael J. ColombDirector of Oversight Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601Ms. Stacey LousteauTreasury Department Entergy Services, Inc.

639 Loyola Avenue New Orleans, LA 70113Mr. James Sniezek5486 Nithsdale Drive Salisbury, MD 21801Mr. Travis C. McCulloughAssistant General Counsel Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601Mr. James RossNuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708Plymouth Public LibraryAttn: Dinah O'Brien 132 South Street Plymouth, MA 02360Duxbury Free LibraryATTN: Ms. Elaine Winquist 77 Alden Street Duxbury, MA 02332

Kingston Public Library ATTN: Reference Librarian 6 Green Street Kingston, MA 02364Ms. Mary LampertDuxbury Nuclear Advisory, Chair Pilgrim Watch, Director 148 Washington Street Duxbury, MA 02332