Category:Letter
MONTHYEARML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status IR 05000293/20240022024-08-21021 August 2024 NRC Inspection Report No. 05000293/2024002 PNP 2024-030, Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 02024-08-0202 August 2024 Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 0 ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities ML24129A1042024-05-26026 May 2024 Preapplication Readiness Assessment Plan for the Holtec Decommissioning International License Termination Plan ML24135A3212024-05-14014 May 2024 Annual Radioactive Effluent Release Report, January 1 Through December 31, 2023 ML24136A2382024-05-14014 May 2024 Annual Radiological Environmental Operating Report for 2023 IR 05000293/20240012024-05-0707 May 2024 NRC Inspection Report No. 05000293/2024001 L-24-009, HDI Annual Occupational Radiation Exposure Data Reports - 20232024-04-29029 April 2024 HDI Annual Occupational Radiation Exposure Data Reports - 2023 L-24-010, Request for Preapplication Readiness Assessment of the Draft License Termination Plan2024-04-22022 April 2024 Request for Preapplication Readiness Assessment of the Draft License Termination Plan L-24-007, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations – Holtec Decommissioning International, LLC (HDI)2024-03-29029 March 2024 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations – Holtec Decommissioning International, LLC (HDI) IR 05000293/20230032024-02-29029 February 2024 NRC Inspection Report Nos. 05000293/2023003 and 05000293/2023004 L-24-002, Late LLRW Shipment Investigation Report Pursuant to 10 CFR 20, Appendix G2024-02-0202 February 2024 Late LLRW Shipment Investigation Report Pursuant to 10 CFR 20, Appendix G ML23342A1182024-01-0909 January 2024 Independent Spent Fuel Storage Installation Security Inspection Plan L-23-019, Proof of Financial Protection 10 CFR 140.152023-12-18018 December 2023 Proof of Financial Protection 10 CFR 140.15 ML23334A1822023-11-30030 November 2023 Biennial Report for the Defueled Safety Analysis Report Update, Technical Specification Bases Changes, 10 CFR 50.59 Evaluation Summary, and Regulatory Commitment Change Summary – November 2021 Through October 2023 L-23-012, Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point2023-11-13013 November 2023 Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point ML23306A0992023-11-0202 November 2023 And Indian Point Energy Center, Notification of Changes in Schedule in Accordance with 10 CFR 50.82(a)(7) ML23300A0022023-10-27027 October 2023 10 CFR 72.48 Biennial Change Summary Report IR 05000293/20234012023-08-31031 August 2023 NRC Inspection Report No. 05000293/2023401 & 2023001 (Cover Letter Only) IR 05000293/20230022023-08-0404 August 2023 NRC Inspection Report No. 05000293/2023002 ML23143A0872023-05-23023 May 2023 Correction to Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations – Holtec Decommissioning International, LLC (HDI) ML23135A2152023-05-15015 May 2023 Annual Radioactive Effluent Release Report, January 1 Through December 31, 2022 ML23136A7792023-05-15015 May 2023 Annual Radiological Environmental Operating Report, January 1 Through December 31, 2022 L-23-004, HDI Annual Occupational Radiation Exposure Data Reports - 20222023-04-24024 April 2023 HDI Annual Occupational Radiation Exposure Data Reports - 2022 L-23-003, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-31031 March 2023 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations ML23088A0382023-03-29029 March 2023 Stations 1, 2, & 3, Palisades Nuclear Plant, and Big Rock Point - Nuclear Onsite Property Damage Insurance ML23069A2782023-03-13013 March 2023 Request for Scoping Comments Concerning the Environmental Review of Monticello Nuclear Generating Plant, Unit 1 Subsequent License Renewal Application ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities IR 05000293/20220042023-02-15015 February 2023 NRC Inspection Report No. 05000293/2022004 ML22356A0712023-01-31031 January 2023 Issuance of Exemption for Pilgrim Nuclear Power Station ISFSI Regarding Annual Radioactive Effluent Release Report - Cover Letter ML22347A2782022-12-21021 December 2022 Independent Spent Fuel Storage Installation Security Inspection Plan Dated December 21, 2022 L-22-042, Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.152022-12-14014 December 2022 Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.15 L-22-041, Supplemental Information to Enhance Exemption Request Detail for Pilgrim ISFSI Annual Radioactive Effluent Release Report Due Date Extension2022-12-0909 December 2022 Supplemental Information to Enhance Exemption Request Detail for Pilgrim ISFSI Annual Radioactive Effluent Release Report Due Date Extension IR 05000293/20220032022-11-18018 November 2022 NRC Inspection Report No. 05000293/2022003 ML22276A1762022-10-24024 October 2022 Decommissioning International Proposed Revisions to the Quality Assurance Program Approval Forms for Radioactive Material Packages ML22266A1922022-09-23023 September 2022 And Pilgrim Nuclear Power Station - Request to Withdraw Prior Submissions from NRC Consideration ML22272A0352022-09-22022 September 2022 S. Lynch-Benttinen Letter Regarding U.S. Citizen Intent to Sue U.S. Fish and Wildlife and NOAA Fisheries Representing the Endangered Species (Na Right Whale) Which Will Be Adversely Affected by Holtec International Potential Actions ML22269A4202022-09-22022 September 2022 Citizen Lawsuit ML22241A1122022-08-29029 August 2022 Request for Exemption from 10 CFR 72.212(a)(2), (b)(2), (b)(3), (b)(4), (B)(5)(i), (b)(11), and 72.214 for Pilgrim ISFSI Annual Radioactive Effluent Release Report IR 05000293/20220022022-08-12012 August 2022 NRC Inspection Report No. 05000293/2022002 ML22215A1772022-08-0303 August 2022 Decommissioning International (HDI) Proposed Revisions to the Quality Assurance Program Approval Forms for Radioactive Material Packages ML22221A2592022-08-0101 August 2022 LTR-22-0217-1-NMSS - Town of Duxbury Letter Opposing the Irradiated Water Release from Pilgrim (Docket No. 05000293) ML22206A1512022-08-0101 August 2022 NRC Office of Investigations Case Nos. 1-2022-002 & 1-2022-006 ML22193A1662022-07-28028 July 2022 LTR-22-0154-1 - Heather Govern, VP, Clean Air and Water Program, Et Al., Letter Regarding Radioactive Wastewater Disposal from the Pilgrim Nuclear Power Station (Docket No. 05000293) ML22175A1732022-07-28028 July 2022 LTR-22-0153-1 - Response Letter to D. Turco, Cape Downwinders, from A. Roberts, NRC, Regarding Holtec-Pilgrim Plans to Dump One Million Gallons of Radioactive Waste Into Cape Cod Bay ML22154A4882022-06-0101 June 2022 Letter from Conservation Law Foundation Regarding Irradiated Water Release from Pilgrim ML22154A1622022-05-26026 May 2022 Letter and Email from Save Our Bay/Diane Turco Regarding Irradiated Water Release from Pilgrim ML22136A2602022-05-16016 May 2022 Submittal of Annual Radiological Environmental Operating Report for January 1 Through December 31, 2021 ML22136A2572022-05-16016 May 2022 Submittal of Annual Radioactive Effluent Release Report for January 1 Through December 31, 2021 2024-09-18
[Table view] |
Text
Entergy Entergy Nuclear Operations, Inc.Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360 Michael A. Balduzzi Site Vice President January 25, 2006 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001
SUBJECT:
Entergy Nuclear Operations, Inc.Pilgrim Nuclear Power Station Docket No.: 50-293 License No.: DPR-35.License Renewal Application Boundary Drawings
REFERENCE:
LETTER NUMBER: Entergy Nuclear Operations, Inc. letter number 2.06.003, License Renewal Application, dated January 25, 2006 2.06.004
Dear Sir or Madam:
By the referenced letter, Entergy Nuclear Operations, Inc. submitted the License Renewal Application for Pilgrim Nuclear Power Station. The License Renewal Application references boundary drawings used in the scoping phase of the license renewal project. Please find enclosed a copy of the boundary drawings to aid the Staff in the review of the application.
This letter contains no new commitments.
Please contact Mr. Bryan Ford at (508) 830-8403 if you have any questions regarding this subject.Sincerely, Mihaeld.Bamuzz4 DWE/dm
Enclosure:
License Renewal Application Boundary Drawings cc: See Page 2~51 5V 5IS0 O0-mp\~c~~
kW 'Wi~u tJklA 0eaQjer)// /ok-N Entergy Nuclear Operations, Inc.Pilgrim Nuclear Power Station Letter Number 2.06.004 Page 2 cc: with Enclosure Ms. Kathy Weaver, Project Manager U.S. Nuclear Regulatory Commission Office 0-11 F1 11555 Rockville Pike Rockville, MD 20852 cc: without Enclosure Mr. James Shea U.S. Nuclear Regulatory Commission Office 0-8B-1 One White Flint North 11555 Rockville Pike Rockville, MD 20852 Mr. Jack Strosnider, Director Office of Nuclear Material and Safeguards U.S. Nuclear Regulatory Commission Washington, DC 20555-00001 Mr. Samuel J. Collins, Administrator Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 NRC Resident Inspector Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360 Mr. Robert Walker, Director Massachusetts Department of Public Health Radiation Control Program 90 Washington Street, 2 nd Floor Dorchester, MA 02121 Ms. Cristine McCombs, Director Massachusetts Emergency Management Agency 400 Worchester Road Framingham, MA 01702 Mr. Joseph Rogers Commonwealth of Massachusetts Assistant Attorney General Division Chief, Utilities Division 1 Ashburton Place Boston, MA 02108 Mr. James E. Dyer, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555-00001 Entergy Nuclear Operations, Inc.Pilgrim Nuclear Power Station Letter Number 2.06.004 Enclosure Page 1 of 1 Enclosure to Letter Number 2.06.004 License Renewal Application Boundary Drawings THIS PAGE IS IN REFERENCE TO THE LICENSE RENEWAL APPLICATION BOUNDARY DRAWINGS FOR PILGRIM NUCLEAR POWER STATION DRAWINGS WERE SCANNED, ADDED TO ADAMS AND INCLUDED IN THE ADAMS PACKAGE WITH THE TRANSMITTAL LETTER.REFERENCE THE SUBSEQUENT INDICES IMMEDIATELY FOLLOWING THIS PAGE/IMAGE I .PNPS LRA DRAWING LIST Drawing Number Title Filename LRA-200 I P&ID Legend Ira-m-200-sh-01 e24 2 P&ID Legend Ira-m-200-sh-02 e26 LRA-203 _ Main Steam System Ira-m-203-sh-01_e44 3 Main Steam System Ira-m-203-sh-03 e43 Condensate
& Demineralized Water LRA-209 Storage & Transfer System Ira-m-209 e65 LRA-210 Air Injection
& Off-Gas System Ira-m-210 e65 LRA-212 1 Service Water System Ira-m-212-sh-01 e87 LRA-215 1 Cooling Water System -Reactor Bldg Ira-m-215-sh-01 e5O 2 Cooling Water System -Reactor Bldg Ira-m-215-sh-02 e47 3 Cooling Water System -Reactor Bldg Ira-m-215-sh-03 e39 4 Cooling Water System -Reactor Bldg Ira-m-215-sh-04 e45 LRA-218 1 Fire Protection System Ira-m-218-sh-01 e48 2 Fire Protection System Ira-m-218-sh-02 e45 3 Fire Protection System Ira-m-21 8-sh-03 e45 4 Fire Protection Halon Subsystems Ira-m-218-sh-04 eO7 5 Fire Protection System Deluge System Ira-m-218-sh-05 eO4 6 Fire Protection Deluge System Ira-m-218-sh-06 eO1 7 Fire Protection System _ra-m-218-sh-07 eOl 8 Fire Protection System Ira-m-218-sh-08_eO6 9 Fire Protection System Ira-m-218-sh-09 eO2 LRA-219 Diesel Generator Air Start System Ira-m-219_e21 LRA-220 2 Compressed Air System Ira-m-220-sh-02 e30 Compressed Air System Essential 3 Instrument Air Ira-m-220-sh-03 e69 LRA-223 Diesel Oil Storage & Transfer System Ira-m-223 e29 LRA-226 1 Miscellaneous Systems Ira-m-226-sh-01 35 Containment Atmospheric Control LRA-227 I System Ira-m-227-sh-01 e58 Containment Atmosppheric Control 2 System Ira-m-227-sh-02 e48 Fuel Pool Cooling & Demineralizer LRA-231 System Ira-m-231 e37 LRA-232 Radwaste Collection System Ira-m-232_e29 H2 & 02 Analyzer & Reactor Coolant Press Boundary Leak Detection LRA-239 1 Systems Ira-m-239-sh-01 e26 2 Post Accident Sampling System Ira-m-239-sh-02 e19 LRA-241 1 Residual Heat Removal System Ira-m-241-sh-01 e81 2 Residual Heat Removal System Ira-m-241-sh-02 e46 LRA-242 C:ore Spray System Ira-m-242_e50 LRA-243 HPCI System Ira-m-243 e51 LRA-244 1 HPCI System Ira-m-244-sh-01 e30 HPCI System 2 Turbine Lube and Control Oil Subsystem Ira-m-244-sh-02_eO9 LRA-245 RCIC System Ira-m-245 e35
.f- -Sheet Drawing Number Title Filename LRA-246 1 RCIC System Ira-m-246-sh-01 e32 2 RCIC System Turbine Oil Flow Ira-m-246-sh-02 eOl LRA-247 Reactor Water Clean-Up System Ira-m-247 e5O LRA-249 Standby Liquid Control System Ira-m-249 e29 LRA-250 1 Control Rod Drive Hydraulic System Ira-m-250-sh-01 e67 2 Control Rod Hydraulic System Ira-m-250-sh-02 e16 LRA-251 1 Recirculation Pump A Instrumentation Ira-m-251-sh-01_e16 2 Recirculation Pump B Instrumentation Ira-m-251-sh-02 e17 LRA-252 1 Nuclear Boiler Ira-m-252-sh-01 e63 2 Nuclear Boiler Ira-m-252-sh-02 e60 LRA-253 1 Nuclear BDiler Vessel Instrumentation Ira-m-253-sh-01 e42 2 Nuclear BDiler Vessel Instrumentation Ira-m-253-sh-02 e26 Diesel Generator Turbo Air Assist LRA-259 System Ira-m-259 e10 LRA-264 Station Blackout Diesel Generator Set Ira-m-264 e15 Safety Enhancement Program Diesel LRA-265 Pump lFuel Oil Transfer System Ira-m-265 eO3 Emergency Diesel Generator Lube Oil LRA-271 System Ira-m-271 eO6 Emergency Diesel Generator Jacket LRA-272 Water Cooling System Ira-m-272 eO8 Secondary Containment Isolation LRA-283 Control Diagram Ira-m-283 eO9 Heating, Ventilation
& Air Conditioning Temperature Control Diagram for Control Rm, Cable Spreading
&LRA-286 Computer Room Ira-m-286 e16 LRA-288 Turbine Building Air Flow Diagram Ira-m-288 e14 LRA-289 Reactor Building Air Flow Diagram Ira-m-289 e17 Control & Cable Spreading Room, Intake Structure, Access Control, Warehouse
&LRA-292 Machine Shop-Air Flow Diagrams Ira-m-292 e29 Heating Ventilation
& Air Conditioning Standby Gas Treatment System Control LRA-294 Diagram Ira-m-294 e26 LRA-67-96 Diesel Generators Ventilation Systems Ira-m-67-96 eO7