Public Meeting Notice for the Annual Assessment Meeting with Entergy (Pilgrim Station) to Discuss CY2005 Performance
ML060940370
Person / Time
Site: Pilgrim
Issue date: 04/04/2006
From: Anderson C
NRC/RGN-I/DRP/PB5
To:
Anderson C J
Shared Package
ML060680613 List:
References
MN 06-012
Download: ML060940370 (5)


Text

MN No.06-012 U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF LICENSEE MEETING April 4, 2006 Licensee: Entergy Nuclear Operations, Inc.

Facility: Pilgrim Nuclear Power Station Docket No. 50-293 Date/Time: April 18, 2006 at 3:00 p.m.

Location: John Carver Inn 25 Summer Street Plymouth, MA 02360

Purpose:

The NRC requested an Annual Assessment Meeting with Entergy management to discuss NRCs assessment of the safety performance of the Pilgrim Nuclear Power Station for calendar year 2005. NRCs assessment is documented in a letter dated March 2, 2006.

Attendees:

NRC: D. Lew, Deputy Director, Division of Reactor Projects, Region I C. Anderson, Chief, Project Branch 5, Division of Reactor Projects T. Walker, Senior Project Engineer W. Raymond, Senior Resident Inspector, Pilgrim C. Welch, Resident Inspector, Pilgrim Licensee: M. Balduzzi, Site Vice President P. Dietrich, General Manager for Operations and Maintenance Public Participation: This is a Category 1 Meeting. The public is invited to observe the meeting. After the business portion, but before the NRC adjourns, the public will have an opportunity to communicate with the NRC regarding Entergys performance at Pilgrim and the role of the agency in ensuring safe plant operations.

Members of the public may provide questions or particular topics of interest for discussion in advance of the meeting to the meeting contact.

NRCs assessment letter can be found on the NRC website at http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/LETTERS/pilg_2005q4.pdf. This Meeting Notice with attached meeting agenda can be located in ADAMS with an accession number of ML060940370. The slides for the meeting can be located in ADAMS with an accession number of ML060940408. ADAMS is accessible from the NRC Web Site at http://www.nrc.gov/reading-rm/adams.html.

2 Additional information relative to the NRCs Annual Assessment process and the safety performance of Pilgrim can be found on the NRC Web Site at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.

Meeting

Contact:

Cliff Anderson, Chief, Projects Branch 5 (610) 337-5227 E-mail: cja@nrc.gov

  • Handicapped persons requiring assistance to attend or participate in the meeting shall make their requests known to the meeting contact no later than 2 business days prior to the meeting. Attendance by NRC personnel at this meeting should be made known by April 14, 2006, via telephone to the NRC meeting contact.

Approved by: /RA/

Clifford J. Anderson, Chief Projects Branch 5 Division of Reactor Projects

3 cc w/encl:

G. J. Taylor, Chief Executive Officer, Entergy Operations M. Kansler, President, Entergy Nuclear Operations, Inc.

J. T. Herron, Senior Vice President and Chief Operating Officer C. Schwarz, Vice-President, Operations Support S. J. Bethay, Director, Nuclear Safety Assurance O. Limpias, Vice President, Engineering J. F. McCann, Director, Licensing C. D. Faison, Manager, Licensing M. J. Colomb, Director of Oversight, Entergy Nuclear Operations, Inc.

B. S. Ford, Manager, Licensing, Entergy Nuclear Operations, Inc.

T. C. McCullough, Assistant General Counsel S. Lousteau, Treasury Department, Entergy Services, Inc.

R. Walker, Department of Public Health, Commonwealth of Massachusetts The Honorable Therese Murray The Honorable Vincent deMacedo Chairman, Plymouth Board of Selectmen Chairman, Duxbury Board of Selectmen Chairman, Nuclear Matters Committee Plymouth Civil Defense Director D. OConnor, Massachusetts Secretary of Energy Resources J. Miller, Senior Issues Manager Office of the Commissioner, Massachusetts Department of Environmental Protection Office of the Attorney General, Commonwealth of Massachusetts Electric Power Division, Commonwealth of Massachusetts R. Shadis, New England Coalition Staff D. Katz, Citizens Awareness Network Chairman, Citizens Urging Responsible Energy J. Sniezek, PWR SRC Consultant M. Lyster, PWR SRC Consultant C. McCombs, Director, MEMA and Commonwealth of Massachusetts, SLO Designee Commonwealth of Massachusetts, Secretary of Public Safety

Agenda NRCs Annual Assessment Meeting Pilgrim Nuclear Power Station April 18, 2006 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . NRC Review of Reactor Oversight Process and National Summary of Plant Performance . . . . NRC Discussion of Pilgrim Station Performance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . NRC Licensee Response and Remarks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Entergy Closing Remarks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . NRC Short Break . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (5 minutes)

NRC to address public questions . . . . . . . . . . . . . . . . . . . . . . . . . NRC/Members of the Public

ML060940370 Document Name: E:\Filenet\ML060940370.wpd SISP Review Complete: ____TEW_____ (Reviewers Initials)

After declaring this document An Official Agency Record it will be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP RI/DRP NAME TWalker/TEW CAnderson/CJA DATE 04/04/06 04/04/06