NWýC FOR~vr386 (3.200¶)
U.S. NUCLEAR REGULATORY COMMISSION 08/02/2006 TIME I
TO NAME TELEPHONE Brian Ford/Fred Mogolesko 508-830-8403 NAME AND LOCATION OF COMPANY (If other than NRC)
PNPS Plymouth, MA TELECOPY NUMBER VERIFICATION NUMBER 508-830-8855 FROM NAME TELEPHONE MAIL STOP Ram Subbaratnam 301-415-1478 O-11F1 TELECOPY DATA NUMBER OF PAGES PRIORITY SIMMEDIATE THIS PAGE +
2 PAGES =
3 TOTAL IOTER
_-] OTHER (Specify)
SPECIAL INSTRUCTIONS Gentlemen, Commitment 32 in Amendment 3 to the LRA states "Implement the Bolting Integrity Program..." while Amendment 5 states "Enhance the Bolting Integrity Program..." Commitment 32 needs both Implement and enhance in it. Also, the next amendment needs to include the statement that the Bolting Integrity Program is a new program.
NRC FORM 388(3-2005)
PIiINTEO ON RECYCLED PAPER NRC FORM 386 (3-2005)
PRINTED ON RECYCLED PAPER
IMPLEMENTATION SCHEDULE SOURCE Related LRA Section No./
Comments I
4 4
a)
Prior to entering the period of extended operation, for each location that may exceed a CUF of 1.0 when considering environmental effects, PNPS will implement one or more of the following:
(1) further refinement of the fatigue analyses to lower the predicted CUFs to less than 1.0; (2) management of fatigue at the affected locations by an Inspection program that has been reviewed and approved by the NRC (e.g., periodic non-destructive examination of the affected locations at Inspection Intervals to be determined by a method acceptable to the NRC);
(3) repair or replacement of the affected locations.
Should PNPS select the option to manage the aging effects due to environmental-assisted fatigue during the period of extended operation, details of the aging management program such as scope, qualification, method, and frequency will be submitted to the NRC at least 2 years prior to the period of extended operation.
June 8, 2012 June 8, 2010 for submitting the aging management program if PNPS selects the option of managing the affects of aging due to environmentally assisted fatigue.
Letter 2.06.057 Audit item 302 32 Implement the Bolting Integrity Program In June 8, 2012 Letter Audit items accordance with a license renewal application 2.06.057 364, 373, amendment.
389, 390, 432,443, &
470 33 PNPS will Inspect the Inaccessible jet pump thermal As stated in the Letter Audit Item sleeve and core spray thermal sleeve welds If and commitment.
2.06.057 488 when the necessary technique and equipment become available and the technique Is demonstrated by the vendor, Including delivery system.
34 Within the first 6 years of the period of extended June 8, 2018 Letter Audit item operation and every 12 years thereafter, PNPS will 2.06.057 461 Inspect the access hole covers with UT methods.
Alternatively, PNPS will Inspect the access hole covers in accordance with BWRVIP guidelines should such guidance become available.
35 Perform a new feedwater nozzle fatigue analysis prior June 8, 2012 Letter Audit item to the period of extended operation.
2.06.057 345 36 To ensure that significant degradation on the bottom June 8, 2012 Letter Audit Item of the condensate storage tank Is not occurring, a 2.06.057 363 one-time ultrasonic thickness examination In accessible areas on the bottom of the condensate storage tank will be performed. Standard examination and sampling techniques will be utilized.
COMMITMENT IMPLEMENTATION] SOURCE Related SCHEDULE LRA Section NoJ Comments 31 At least 2 years prior to entering the period of extended operation, for the locations identified in NUREG/CR-6260 for BWRs of the PNPS vintage, PNPS will implement one or more of the following:
(1) Refine the fatigue analyses to determine valid CUFs less than 1 when accounting for the effects of reactor water environment. This Includes applying the appropriate Fen factors to valid CUFs determined in accordance with one of the following:
- 1. For locations with existing fatigue analysis valid for the period of extended operation, use the existing CUF to determine the environmentally adjusted CUF.
- 2. More limiting PNPS-specific locations with a valid CUF may be substituted for the NUREG/CR-6260 locations.
- 3. Representative CUF values from other plants, adjusted to or enveloping the PNPS plant specific external loads may be used if demonstrated applicable to PNPS.
- 4. An analysis using an NRC-approved version of the ASME code of NRC-approved alternative (e.g., NRC-approved code case) may be performed to determine a valid CUF.
(2) Manage the effects of aging due to fatigue at the affected locations by an Inspection program that has been reviewed and approved by the NRC (e.g., periodic non-destructive examination of the affected locations at inspection Intervals to be determined by a method acceptable to the NRC).
(3) Repair or replace the affected locations prior to the period of extended operation and the location exceeding a CUF of 1.0.
Should PNPS select the option to manage the aging effects due to environmental-assisted fatigue during the period of extended operation, details of the aging management program such as scope, qualification, method, and frequency will be submitted to the NRC at least 2 years prior to the period of extended June 8,2012 Letter 2.06.064 4.3.3/ Audit Items 302 &
346 June 8, 2010 for submitting the aging management program if PNPS selects the option of managing the affects of aging due to environmentally assisted fatigue.
oDeration.
32 Enhance the Bolting Integrity Program in accordance June 8, 2012 Letter Audit items with a license renewal application amendment.
2.06.057 364, 373, 389, 390, 432,443, &
470 6