Entergy Nuclear Operations, Inc.Pilgrim Nuclear Power Station xe 600 Rocky Hill Road Plymouth, MA 02360 Michael A. Balduzzi Site Vice President January 25, 2006 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001

SUBJECT:

Entergy Nuclear Operations, Inc.Pilgrim Nuclear Power Station Docket No.: 50-293 License No.: DPR-35 License Renewal Application LETTER NUMBER: 2.06.003

Dear Sir or Madam:

Pursuant to 10 CFR 54.17, Entergy Nuclear Operations, Inc. hereby applies for the renewal of the operating license for Pilgrim Nuclear Power Station to extend the license for an additional 20 years beyond the current expiration date. With renewal, the Pilgrim Station operating license would be extended from midnight on June 8, 2012 to midnight on June 8, 2032.The enclosed License Renewal Application and related Appendices contain the information required by 10 CFR 54 for the contents of an application including an environmental report, entitled "Applicant's Environmental Report -Operating License Renewal Stage," (Appendix E) satisfying the applicable requirements of 10 CFR 51 Subpart A.As required by 10 CFR 54.21(b), current licensing basis changes which have a material effect on the content of this application, including the FSAR Supplement (Appendix A), will be identified at least annually while the application is under NRC review and at least three months prior to the scheduled completion of the NRC review.This application is submitted in accordance with 10 CFR 2 Subpart A, 10 CFR 50.4, and 10 CFR 50.30. Entergy Nuclear Operations, Inc. hereby submits the original (plus 80 CDs) of the application pursuant to 10 CFR 50.4(b), 10 CFR 51.55(a), and 10 CFR 54.17(a).Commitments contained in this application are summarized in the attachment.

Should you have any questions concerning this submittal, please contact Mr. Bryan Ford at (508) 830-8403.A9g5 c5/SP iPe>M,,o 0490A Iee/e a / /7/K14ccervff"'duwbef Entergy Nuclear Operations, Inc.Pilgrim Nuclear Power Station Letter Number 2.06.003 Page 2 I declare under penalty of perjury that the foregoing is true and correct. Executed on the a4? day of January 2006.Sincerely, Michael A. Balduzzi DWE/dm

Attachment:

List of Regulatory Commitments

Enclosures:

License Renewal Application Appendix A Updated Final Safety Analysis Report Supplement Appendix B Aging Management Programs and Activities Appendix C Response to BWRVIP Applicant Action Items Appendix D Technical Specifications Changes Appendix E Applicant's Environmental Report cc: with Attachment and Enclosures Ms. Kathy Weaver, Project Manager U.S. Nuclear Regulatory Commission Office 0-11 F1 11555 Rockville Pike Rockville, MD 20852 Mr. Joseph Rogers Commonwealth of Massachusetts Assistant Attorney General Division Chief, Utilities Division 1 Ashburton Place Boston, MA 02108 cc: without Attachment and Enclosures Mr. James Shea U.S. Nuclear Regulatory Commission Office 0-8B-1 One White Flint North 11555 Rockville Pike Rockville, MD 20852 Mr. Jack Strosnider, Director Office of Nuclear Material and Safeguards U.S. Nuclear Regulatory Commission Washington, DC 20555-00001 Mr. Samuel J. Collins, Administrator Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 NRC Resident Inspector Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360 Mr. Robert Walker, Director Massachusetts Department of Public Health Radiation Control Program 90 Washington Street, 2nd Floor Dorchester, MA 02121 Ms. Cristine McCombs, Director Massachusetts Emergency Management Agency 400 Worchester Road Framingham, MA 01702 Mr. James E. Dyer, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555-00001 Attachment to Letter Number 2.06.003 List of Regulatory Commitments Entergy Nuclear Operations, Inc.Pilgrim Nuclear Power Station Letter Number 2.06.003 Attachment Page 1 of 1 List of Regulatory Commitments The following table identifies those actions committed to by Entergy in this document.

Any other statements in this submittal are provided for information purposes and are not considered to be regulatory commitments.

TYPE SCHEDULED ONE- COMPLETION TIME CONTINUING DATE COMMITMENT ACTION COMPLIANCE Programs listed in Appendix B Section X June 8, 2012 B.1 of the license renewal application