ML062350440

From kanterella
Jump to navigation Jump to search

2006/08/22-Requests for Additional Information for the Review of the Pilgrim Nuclear Power Station License Renewal Application
ML062350440
Person / Time
Site: Pilgrim
Issue date: 08/22/2006
From: Subbaratnam R
NRC/NRR/ADRO/DLR/RLRA
To: Kansler M
Entergy Nuclear Operations
Ellis, Twana, NRR/DLR/RLRA 301-415-3134
References
%dam200612, TAC MC9669
Download: ML062350440 (8)


Text

August 22, 2006Mr. Michael KanslerPresident Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601-1839

SUBJECT:

REQUESTS FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THEPILGRIM NUCLEAR POWER STATION LICENSE RENEWAL APPLICATION(TAC MC9669)

Dear Mr. Kansler:

By letter dated January 25, 2006, Entergy Nuclear Operations, Inc. submitted an applicationpursuant to 10 CFR Part 54, to renew the operating license for Pilgrim Nuclear Power Stationfor review by the U.S. Nuclear Regulatory Commission (NRC). The NRC staff is reviewing theinformation contained in the license renewal application and has identified, in the enclosure,areas where additional information is needed to complete the review. These requests for additional information address license Renewal Section 2.4, "Scoping and Screening Results:

Structures."These questions were discussed with a member of your staff, Bryan Ford, and a mutuallyagreeable date for this response is within 30 days from the date of this letter. If you have any questions, please contact me at 301-415-1478 or e-mail RXS2@nrc.gov

. Sincerely, /RA/Ram Subbaratnam, Project ManagerLicense Renewal Branch A Division of License Renewal Office of Nuclear Reactor RegulationDocket No. 50-293

Enclosure:

Requests for Additional Informationcc w/encl: See next page

ML062350440E:\Filenet\ML062350440.wpdOFFICEPM:RLRA:DLRLA:RLRA:DLRBC:REBB:DLROGCNAMERSubbaratnamIKingLLund(Rauluck for)MZoblerDATE8/15/068/14/068/18/068/22/06 Letter to Michael Kansler from Ram Subbaratnam dated: August 22, 2006

SUBJECT:

REQUESTS FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THEPILGRIM NUCLEAR POWER STATION LICENSE RENEWAL APPLICATION(TAC MC9669)HARD COPYDLR R/FE-MAIL:JFairRWeisman AMurphy RPettis GGalletti DShum GBagchi SSmith (srs3)

SDuraiswamy YL (Renee) Li RidsNrrDlr RidsNrrDlrRlra RidsNrrDlrRlrb RidsNrrDe RidsNrrDci RidsNrreEemb RidsNrrDeEeeb RidsNrrDeEqva RidsNrrDss RidsNrrDnrl RidsOgcMailCenter RidsNrrAdes DLR Staff----------RSubbaratnam SHoffman SUttal JShea AWilliamson DJeng RKaras Sai Wah NG GWilson CAnderson, Region 1 WRaymond, Region 1 NSheehan, Region 1 Pilgrim Nuclear Power Station cc:

Regional Administrator, Region IU. S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406-1415Senior Resident InspectorU. S. Nuclear Regulatory Commission Pilgrim Nuclear Power Station Post Office Box 867 Plymouth, MA 02360Chairman, Board of Selectmen11 Lincoln Street Plymouth, MA 02360ChairmanNuclear Matters Committee Town Hall 11 Lincoln Street Plymouth, MA 02360Chairman, Duxbury Board of SelectmenTown Hall 878 Tremont Street Duxbury, MA 02332Office of the CommissionerMassachusetts Department of Environmental Protection One Winter Street Boston, MA 02108Office of the Attorney GeneralOne Ashburton Place 20th Floor Boston, MA 02108Director, Radiation Control ProgramCommonwealth of Massachusetts Executive Offices of Health and Human Services 174 Portland Street Boston, MA 02114Secretary of Public SafetyExecutive Office of Public Safety One Ashburton Place Boston, MA 02108 Director, Massachusetts Emergency Management Agency Attn: James Muckerheide 400 Worcester Road Framingham, MA 01702-5399Mr. William D. MeinertNuclear Engineer Massachusetts Municipal Wholesale Electric Company

P.O. Box 426 Ludlow, MA 01056-0426Mr. Michael A. BalduzziSite Vice President Entergy Nuclear Operations, Inc.

Pilgrim Nuclear Power Station 600 Rocky Hill RoadPlymouth, MA 02360-5508Mr. Stephen J. BethayDirector, Nuclear Safety Assurance Entergy Nuclear Operations, Inc.

Pilgrim Nuclear Power Station 600 Rocky Hill RoadPlymouth, MA 02360-5508Mr. Bryan S. FordManager, Licensing Entergy Nuclear Operations, Inc.

Pilgrim Nuclear Power Station 600 Rocky Hill RoadPlymouth, MA 02360-5508Mr. Gary J. Taylor Chief Executive Officer Entergy Operations 1340 Echelon Parkway Jackson, MS 39213 Pilgrim Nuclear Power Station cc:

Mr. John T. HerronSr. VP and Chief Operating Officer Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601Mr. Oscar LimpiasVice President, Engineering Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601Mr. Christopher SchwarzVice President, Operations Support Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601 Mr. John F. McCannDirector, Nuclear Safety Assurance Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601Ms. Charlene D. FaisonManager, Licensing Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601Mr. Michael D. Lyster5931 Barclay Lane Naples, FL 34110-7306Mr. Michael J. ColombDirector of Oversight Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601Ms. Stacey LousteauTreasury Department Entergy Services, Inc.

639 Loyola Avenue New Orleans, LA 70113Mr. James Sniezek5486 Nithsdale Drive Salisbury, MD 21801Mr. Travis C. McCulloughAssistant General Counsel Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601Mr. James RossNuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708Plymouth Public LibraryAttn: Dinah O'Brien 132 South Street Plymouth, MA 02360Duxbury Free LibraryATTN: Ms. Elaine Winquist 77 Alden Street Duxbury, MA 02332Kingston Public LibraryATTN: Reference Librarian 6 Green Street Kingston, MA 02364Ms. Mary LampertDuxbury Nuclear Advisory, Chair Pilgrim watch, Director 148 Washington Street Duxbury 02332 ENCLOSUREREQUEST FOR ADDITIONAL INFORMATIONPILGRIM LICENSE RENEWAL APPLICATION (LRA)SECTION 2.4 SCOPING AND SCREENING RESULTS: STRUCTURESSection 2.4.1Primary ContainmentRAI 2.4.1-1Table 2.4-1, Primary Containment of the license renewal application (LRA) does not includedrywell head closure bolts, backing plates, spring seals, and removable guard rings. These components have the intended function of pressure boundary and support for criterion (a)(1) equipment. The staff requests the applicant provide justification for not including them in the scope of license renewal.RAI 2.4.1-2Neither Table 2.4-1, Primary Containment, nor Table 2.4-2, Reactor Building, of the LRAincorporates refueling cavity seal components within the scope of license renewal. The proposed license renewal interim staff guidance LR-ISG-2006-01, "Plant Specific Aging Management Program for Inaccessible Areas of Boiling Water Reactor Mark 1 SteelContainment Drywell Shell," which was published in the Federal Register on May 9, 2006, stated that the most likely cause of corrosion of the drywell shell in the sand-pocket areas (near the bottom of the drywell), and in the spherical portion of the drywell at higher elevations, was the water in the gap between the drywell and the concrete shield, and the source of the waterwas noted as leakage through the seal between the drywell and the refueling cavity. Therefore, the staff requests the applicant include all the refueling cavity seal components within the scope of license renewal and provide a drawing that depicts the refueling cavity seal components.RAI 2.4.1-3Table 2.4-2, Reactor Building, of the LRA lists the biological shield wall concrete as acomponent within the scope of license renewal. Clarify if the Pilgrim Nuclear Power Station (Pilgrim) plant needs a cooling system to maintain the temperature of the biological shield wallconcrete within its design limit temperatures. If yes, confirm that the cooling system is includedwithin the scope of license renewal and list the system in Table 2.4-2. RAI 2.4.1-4Table 2.4-1, Primary Containment, of the LRA lists "Floor slabs, walls (EQ Zone 1.30, DrywellEl. 9'-2")." It is unclear to the staff if the above referenced slab is the same as the one located at the elevation of the moisture barrier which serves as the interface between the drywell floorconcrete slab and the drywell shell. Provide a drawing to depict the "Floor slabs, walls (EQ Zone 1.30, Drywell El. 9'-2")," and indicate whether all floor slabs and walls inside the primary containment are within the scope of license renewal. RAI 2.4.1-5Table 2.4-1, Primary Containment, of the LRA does not include the reinforced concrete shieldplugs that provide shielding over the top of the drywell. The staff requests the applicant providejustification for not including them in the scope of license renewal. Exclusion of the reinforced concrete shield plugs from the scope of license renewal may lead to long-term unmanaged degradation of the plugs (e.g., full sectional concrete cracking, rebar corrosion, loss of bond, partial spalling or cracking of concrete due to handling, loss of load carrying capacity of plug attachments, etc.) with a seismic II/I implication potentially affecting the structural integrity of thedrywell head.RAI 2.4.1-6Table 2.4-1, Primary Containment, of the LRA only lists the reactor vessel and drywell bellows. Confirm that items such as backing plates, spring seals, and removable guard rings are within the scope of license renewal and list the items in Table 2.4-1. Section 2.4.3Intake Structure RAI 2.4.3-1Table 2.4-3, Intake Structure, of the LRA does not include intake structure components specificto Pilgrim, such as sluice gates, trash racks, traveling screens, cranes and water proofingmembranes, etc. within the scope of license renewal. As applicable, the staff requests the applicant provide justification for not including them in the scope of license renewal.Section 2.4.4Process Facilities RAI 2.4.4-1Section 2.4.4, Process Facilities, of the LRA under Main Stack and Filter Building states that"The main stack is a safety-related and seismic Class I structure but is not designed to withstand tornado loadings since it is located sufficiently far from other seismic Class I structures to preclude interaction." The staff needs additional information regarding the potential interaction between some seismic Class II structure, system, and components (SSCs)and the tornado-induced failure of the main stack. Specifically, the licensee is requested to confirm that appropriate measures have been taken to preclude potential interactions between the main stack and some nearby seismic Class II SSCs whose failure might have adverse effects on seismic Class I SSCs. Section 2.4.5Yard Structures RAI 2.4.5-1Table 2.4-5, Yard Structures, of the LRA does not include, the plant system portion ofswitchyard circuit breakers, transformers, transmission towers, and transmission tower foundations. As part of the list to comply with interim staff guidance(ML020920464) concerning scoping of offsite power systems necessary to support the Station Blackout Rule (10 CFR50.63), the staff requests the applicant include these components in the scope of license renewal. The ADAMS Public Electronic Reading Room is accessible athttp://www.nrc.gov/reading-rm/adams.html on the NRC web site. Persons who do not haveaccess to ADAMS, should contact the NRC's Public Document Room reference staff at1-800-397-4209, or 301-415-4727, or by e-mail at pdr@nrc.gov. Section 2.4.6Bulk CommoditiesRAI 2.4.6-1Table 2.4-6, Bulk Commodities, of the LRA provides a list of bulk commodities for Pilgrim. Thelocation of each commodity is unclear to the staff. The staff requests the applicant describe all commodities on the list as well as provide a comprehensive listing of components and locations for each commodity.RAI 2.4.6-2Table 2.4-6, Bulk Commodities, of the LRA lists "Insulation" with its intended functions. It isunclear to the staff why "Support for Criterion (a)(1) equipment" is not part of the intended functions when Table 2.0-1 defines the intended function of insulation as "provide insulating characteristics to reduce heat transfer," which is meant to apply to safety related and non-safety related components. The staff requests the applicant provide additional information on insulation and a list of in-scope components that have insulation included with their intended functions.RAI 2.4.6-3Table 2.4.6 lists steel "Flood curbs" as a component with intended functions for flood barrierand shelter or protection, and another component concrete "Flood curbs" with an intended function for flood barrier. The staff requests the applicant provide clarifications for the two different components by listing all structural members (elements) under each component.