July 25, 2006LICENSEE:Entergy Nuclear Operations, IncFACILITY: Pilgrim Nuclear Power Station

SUBJECT:

SUMMARY

OF ENVIRONMENTAL SITE AUDIT RELATED TO THE REVIEWOF THE LICENSE RENEWAL APPLICATION FOR PILGRIM NUCLEARPOWER STATION (TAC NO. MC9676)From May 1, 2006, to May 5, 2006, a review team consisting of the U.S. Nuclear RegulatoryCommission (NRC) staff and contractors from Earth Tech participated in a site audit at thePilgrim Nuclear Power Station (Pilgrim) related to the environmental review of the Pilgrim license renewal application (LRA). The team consisted of nine Earth Tech contractors and nine NRC staff members. The primary goal of the site visit was to review documentation, gatherinformation to ensure that environmental requirements of license renewal as codified in Title 10 of the Code of Federal Regulations Part 51 (10 CFR Part 51) are met, and to interface with officials in Federal, State and local government agencies to obtain related information. Enclosure 1 is a list of NRC, EarthTech, and Entergy Nuclear Operations, Inc. (Entergy)representatives who participated in the site audit. Enclosure 2 is a table of documents provided by Entergy to assist the NRC staff in its review of the Pilgrim Environmental Report. Thesedocuments are publicly available, and can be found at the Agencywide Documents Access andManagement System (ADAMS); the accession numbers are listed in Enclosure 2. ADAMS is accessible at http://www.nrc.gov/reading-rm/adams.html or through the NRC's ElectronicReading Room link at http://www.nrc.gov. Persons who do not have access to ADAMS, or whoencounter problems in accessing the documents located in ADAMS, should contact the NRC'sPublic Document Room staff at 1-800-397-4209, 301-415-4737, or by e-mail at pdr@nrc.gov

.The site audit began with an introductory meeting and site tour on Monday, May 1, 2006. During the introductory meeting, Entergy provided a brief presentation on the history of Pilgrimand some of the current environmental monitoring programs. This was followed by a brief NRC presentation on the license renewal environmental review process. The site tour focused on areas relevant to the environmental review, including the intake and discharge canal, fish return system, and outside storage areas. During the rest of the site audit, review team membersbroke off into smaller groups with Entergy representatives to discuss specific aspects of the environmental review. These groups participated in various activities, including tours of the radioactive waste treatment stations, transmission line corridors and a winter flounder hatchery.

An onsite cultural resources survey also was conducted. In addition, during the site audit, review team members met offsite with staff representing theEnvironmental Protection Agency, Massachusetts Coastal Zone Management Agency, Massachusetts Division of Marine Fisheries, Massachusetts Department of Public Health's Radiation Control Program, and local governmental organizations (town planners and selectmen). Information gathered through these offsite meetings will assist the environmentalreview team in its evaluation. At the conclusion of the site visit, the NRC staff and Earth Tech contractors participated in asummary exit meeting with Entergy. The NRC staff indicated that the review team did not identify any significant issues during its site visit or the visits offsite with State and local agencies. Entergy provided all requested documentation and information to the NRC environmental review team. However, the NRC staff indicated that the review was ongoing andthat any additional information necessary to support the review would be formally requested as a request for additional information./RA/Alicia Williamson, Project M anagerEnvironmental Branch B Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-293

Enclosures:

As statedcc w/encls.: See next page In addition, during the site audit, review team members met offsite with staff representing theEnvironmental Protection Agency, Massachusetts Coastal Zone Management Agency, Massachusetts Division of Marine Fisheries, Massachusetts Department of Public Health's Radiation Control Program, and local governmental organizations (town planners and selectmen). Information gathered through these offsite meetings will assist the environmentalreview team in its evaluation. At the conclusion of the site visit, the NRC staff and Earth Tech contractors participated in asummary exit meeting with Entergy. The NRC staff indicated that the review team did not identify any significant issues during its site visit or the visits offsite with State and local agencies. Entergy provided all requested documentation and information to the NRC environmental review team. However, the NRC staff indicated that the review was ongoing andthat any additional information necessary to support the review would be formally requested as a request for additional information./RA/

Alicia Williamson, Project M anagerEnvironmental Branch B Division of License Renewal Office of Nuclear Reactor RegulationDocket No. 50-293

Enclosures:

As statedcc w /encls.: See next page DISTRIBUTION:E-MailF. Gillespie / P.T. Kuo (RidsNrrDlr)R. FranovichA. WilliamsonR. SubbaratnamR. SchaafJ. Shea A. MullinsC. Anderson, Region 1S. HoffmanW. Raymond, Region 1 S. UttalN. Sheehan, Region 1 C. JacobsRidsOGCMailRoomDLR/REBBB. Hurley (EarthTech) bobbie.hurley@earthtech.com J. Szeligowski (EarthTech) john.szeligowski@earthtech.com Adams Accession Nos.:1. Memo w/Svc. List, List of Encls: ML062070305Document name: E:\Filenet\ML062070305.wpdOFFICELA:DLRPM:DLR:REBBBC:DLR:REBBNAMEEdmonds/KingA. WiilamsonR.FranovichDATE 07/ 25 /06 07/ 25 /06 07/ 25 /06 OFFICIAL RECORD COPY LIST OF ATTENDEESPILGRIM NUCLEAR POWER STATION ENVIRONMENTAL SITE AUDITMAY 1-5, 2006REPRSENTATIVEAFFILIATIONEric BennerU.S. Nuclear Regulatory Commission (NRC)Jennifer DavisNRC Richard EmchNRC Jason FlemmingNRC Alicia MullinsNRC Harriet NashNRC Laura QuinnNRC Robert SchaafNRC Alicia WilliamsonNRC Nathan CraigEarth Tech Steve DillardEarth Tech Steve DudaEarth Tech Chuck FlynnEarth Tech Ed KaczmarczykEarth Tech Michael PappalardoEarth Tech Andrew ParkerEarth Tech Michael SperaEarth Tech John SzeligowskiEarth Tech Phil BenjaminEntergy Nuclear Operations, Inc. (Entergy)

Jill BrochuEntergy Rick BuckleyEntergy Laris ChanEntergy Joe EganEntergy Doug EllisEntergyBryan FordEntergy Joe GaedtkeEntergy Mike HettwerEntergy Bruce McDonaldEntergy Fred MogoleskoEntergy Jay SchefferEntergy Ken SejkoraEntergy Mike SherrerEntergy Tom SowdonEntergy Dave TarantinoEntergy References Collected at the Pilgrim Nuclear Power Station Site AuditMay 1-5, 2006Reference DocumentADAMS AccessionNumber 1.Cape Cod Commission, Regional Policy Plan, Barnstable, MA,November 1996ML061420365 2.Cape Cod Commission - Regional Policy Plan, September, 2003ML061390247 3.Old Policy Planning Council - Regional Policy Plans, October 2000ML061390248 4.NSTAR, "ENVIRO printouts," facsimile from B. Connors, NSTAR, toD. Thrall, Entergy, April 9, 2001ML061390250 5.TetraTech NUS, "Calculation of Induced Current for the LicenseRenewal Environmental Report - Pilgrim Nuclear Power Station,"Aiken, SC, April 23, 2001ML061390251 6.Massachusetts Executive Office of Environmental Affairs,"Massachusetts Geographic Information System - Land UseSummary Statistics - September 2003," Boston, MA, 2003, availableat http://www.state.ma.us/mgis/landuse_stats.htm, accessed January18, 2005ML061390252 7.Metropolitan Area Planning Council, Metro Plan: Summary of theRegional Plan for the Boston Metropolitan Area, Boston, MA, 2001ML061390255 8.Land use maps of site and Forest Management LandML061390256 9.PNPS Water BillsM L06139025810.Maccaferri, E., Jr., Town of Plymouth Treasurer, "Total revenues andoperating budget information," Facsimile transmission to E. N. H ill,TtNUS, Plymouth, MA, May 22, 2001ML06139026011.Massachusetts Department of Revenue Division of Local Services,"At a Glance Report for Plymouth (As of 4/16/02)," Boston, MA, April2002, available at http://orapps.dor.state.ma.us/ataglance/home/communitylist.ASP? report3, accessed January 12, 2005ML06139026112.Old Colony Planning Council, Regional Policy Plan: A Guide forShaping Our Communities and the OCPC Region, October 20, 2000ML06139024813.Pilgrim Nuclear Power Station, Population Projection Calculations forPilgrim Nuclear Power Station, Plymouth, MA, 2005ML06143017914.Town of Plymouth, Annual Report of the Town of Plymouth,Massachusetts for the Year Ending December 31, 2003, Plymouth,MA, 2004ML061390358 Reference DocumentADAMS AccessionNumber15.Vanasse & Associates, Inc., Traffic Data Technical Data PhasedReview Document: III, The Pinehills, Plymouth, Massachusetts,Volume II, Appendix E, Andover, MA, 2001 ML06139035916.Cape Cod Commission, CapeTrends: Demographic and EconomicCharacteristics and Trends, Barnstable County - Cape Cod, 5thEdition, Barnstable, MA, 1998ML06139036117.Bethnic Algal Monitoring at PNPS (Multi-year Analysis, 1980-1998)March 2000ML06142054118.Massachusetts Department of Environmental Protection, Bureau ofResource Protection - Drinking Water Program, 2003 Public WaterSupply Annual Statistical Report, Boston, MA, 2004ML06139028019.Town of Plymouth, Annual Report of the Town of Plymouth,Massachusetts for the Year Ending December 31, 2003, Plymouth,MA, 2004ML06139035820.Prescott, R., Email correspondence with J. Brochu, Entergy, January15, 2005ML06139028221.Potable Water Usage at PNPSML06143016722.Massachusetts Department of Revenue Division of Local Services,"Municipal Budgeted Revenues: Revenues by Source FY2000through 2004," Boston, MA, 2004, available athttp://www.dls.state.ma.us/mdmstuf/Municipal BudgetedRevenues/Revs0004.xls, accessed Jauary 12, 2005ML06139034823.Prescott, R., "Sea Turtles in New England Waters," in ConservationPerspectives, the on-line journal of the Massachusetts Chapter of theSociety for Conservation Biology, Inc., October 2000, available athttp://www.massscb.org/epublications/october2000/seaturtle.html,accessed December 4, 2001ML06139035524.Dose Data 2002 and 2005 inclusive (Occupational Reports last 4years)ML06143017725.Pilgrim Nuclear Power Station Radiological Effluent and WasteDisposal Report January 1 through December 31, 2005 (Entergy, 2005)ML06144063126.Pilgrim Nuclear Power Station Radiological Effluent and WasteDisposal Report January 1 through December 31, 2004 (Entergy, 2004)ML06142036727.Pilgrim Nuclear Power Station Radiological Effluent and WasteDisposal Report January 1 through December 31, 2003 (Entergy, 2003)ML061420372 Reference DocumentADAMS AccessionNumber28.Pilgrim Nuclear Power Station Radiological Effluent and WasteDisposal Report January 1 through December 31, 2002 (Entergy, 2002)ML06142037529.Pilgrim Nuclear Power Station Radiological Effluent and WasteDisposal Report January 1 through December 31, 2001 (Entergy, 2001)ML06142037630.SRO Reference Text for the Radwaste systemML06142037731.SRO Reference Text for the Standby Gas Treatment SystemML06139026232.MDEP 50% Facility Emission Cap Approval Letter, dated July 18,2005, including facility's BWPAQ Emissions Notification FormML06139026533.Monthly Emission Log for 50% Cap EmissionsML06139026734.2005 Source Registration Emission EstimatesML06139007535.Calculations - AREVA - Meteorology DocumentML06139007736.Dayian, L., Water System Data Provided by the MassachusettsEnvironmental Protection Department, personal communication withM. Hoganson, TtNUS, June 4, 2001ML06139008137.ENSR Corporation, Redacted Version 316 Demonstration Report -Pilgrim Nuclear Power Station, Document Number 0970-021-200,prepared for Entergy Nuclear Generation Company, Plymouth, MA,March 2000ML06139035738.Massachusetts Department of Environmental Protection, Emailcorrespondence between J. Drake (MDEP) and J. Brochu, Entergy,February 25, 2005ML061430441 39.Screenwash Biological Monitoring ProgramML06143016840.U.S. Nuclear Regulatory Commission, Environmental Assessment bythe Office of Nuclear Reactor Regulation Relating to the Change inExpiration Date of Facility Operating License No. DPR-35 BostonEdison Company for the Pilgrim Nuclear Power Station, Docket. 50-293, Washington, DC, November 27, 1990ML06139027541.U.S. Environmental Protection Agency, Water Management DivisionRegion 1, "Modification of Authorization to Discharge Under theNational Pollutant Discharge Elimination System, Federal Permit No.MA0003557, Modification No. 1," Boston, MA, August 30, 1994ML06142016642.Massachusetts Department of Environmental Protection, ExecutiveOffice of Environmental Affairs, Southeast Regional Office,Groundwater Discharge Permit, SE #2-389, Pilgrim Power StationWastewater Treatment Facility, Lakeville, MA, April 26, 1999ML061420180 Reference DocumentADAMS AccessionNumber43.Pilgrim Nuclear Power Station, Pilgrim Nuclear Power Station OffsiteDose Calculation Manual, Plymouth, MA, October 6, 2003ML06139042044.U.S. Environmental Protection Agency, "National Pollutant DischargeElimination System - Final Regulations to Establish Requirement forCooling Water Intake Structures at Phase II Existing Facilities," 69 FR41576, July 9, 2004ML06142018845.Site Contamination Assessment Report, including sample locationmap and lab data attachments (March 1999)ML06146000946.Copies of 2005/2006 Discharge Monitoring Reports with letters andattachments (GroundWater)ML06142018347.Copies of any NOVs in last 5 years or confirmation that no NOVshave been issuedML06142035248.Boring/Monitoring Well installation logsML06143016549.PNPS Marine Monitoring Program Report Series No.7, Final Reporton Bottom Trawl Survey and Impact Assessment of the ThermalDischarge from Pilgrim on Groundfish, 1970-1982, by Boston EdisonML06142011750.Copy of SPCCP, September 2004ML06143018251.Tank Integrity Testing Reports/Schedule for tank testingML06143018052.Culture Resources Site MapML06156021553.Response Action Outcome Report for last major spill M L06145010854.EG&G. 1995. PNPS Cooling Water Discharge Bottom TemperatureStudy. August, 1994. Final report to Boston Edison CompanyML06145006555.Performance monitoring and capacity information regarding on-sitesewage treatment system and leach fieldML06143044756.Appendix B of Section 3.2 (Entrainment Monitoring) in Marine EcologyStudies PNPS Report # 65. April 30, 2005ML06143044457.Galya et al. 1997. MWRA Outfall Monitoring Overview Report: 1996. MWRA Environmental Quality Department Technical Report Series97-8.ML06143044258.UST Testing Letter from Bryan Cournoyer of NEXTEST, dated August25, 2002ML06139028559.Capacity Factor Table 1993-2005, inclusiveML06139037460.Pilgrim Unit 2 PSAR, Section 2.5.1 (A),Core Borings/Soil SamplesML06139038161.Photographs of Greenwood Estate circa 1966-1967ML061390386 Reference DocumentADAMS AccessionNumber62.NSTAR Gas and Electric 2006 Vegetation Management PlanML06142019263.Pilgrim Nuclear Power Station Marine Environmental MonitoringProgram Report Series No. 1, Final Report on Dissolved GasSaturation in the Inshore Marine Waters of Cape Cod Bay andIncidents of Gas Bubble Disease at Pilgrim Nuclear Power Station1973-1985ML06142020164.Pilgrim Nuclear Power Station Marine Environmental MonitoringProgram Report Series No. 5, Final Report on Irish Moss (chondruscrispus) Harvesting Along the Plymouth Shoreline and ImpactAssessment of Pilgrim Station on the fishery, 1971-1982, by BostonEdison CompanyML06142021065.Entergy Nuclear Generation Company, Environmental ProtectionDepartment, Pilgrim Nuclear Power Station, Marine Ecology StudiesRelated to Operation of Pilgrim Station, Semi-Annual Report # 56(January - June 2000), Plymouth, MA, October 31, 2000.ML06143017366.Entergy Nuclear Generation Company, Forest Management Plan,prepared for Entergy by Benjamin Forestry Services, South Easton,Massachusetts, and submitted to Massachusetts Department ofEnvironmental Management, Division of Forests & Parks, Boston,MA, September 12, 2002ML06142012067.Plymouth Bay Aquatic Maps depicting larvae sampling stations andwater depth and tidal levelsML06142017368.CWS Configuration During a Thermal BackwashML06142017069.Marine Ecology Studies Related to Operation of Pilgrim StationSemi-Annual Report No. 66; Report Period: January 2005 throughJune 2005; Issued October 30, 2005ML06142012370.Sluiceway Modification 1979ML06143017671.Entergy Nuclear Review of New and Significant Information PNPSML06143017172.Marine Ecology Studies Pilgrim Nuclear Power Station; Report No. 65Report Period: January 2004 - December 2004, Issued April 30 2005ML06143044473.Stone and Webster Engineering Corporation. 1977. SupplementalAssessment in Support of the 316 Demonstration. Pilgrim NuclearPower Station - Units 1 and 2. Prepared for Boston Edison Company,Boston, MAML06144056574.Study of Winter Flounder Larval Transport in Coastal Cape Cod Bayand Entrainment at Pilgrim Nuclear Power Station, ENSR and MarineResearch, Inc, December 2002ML061420179 Reference DocumentADAMS AccessionNumber75.Study of Winter Flounder Larval Transport in Coastal Cape Cod Bayand Entrainment at Pilgrim Nuclear Power Station, ENSR and MarineResearch, Inc, February 2005ML06142017676.Electronic Map of Transmission LinesML06139028477.Town of Kingston Conservation Commission Memo, From: MaureenThomas, To: Kevin Donovan, Dated: February 14, 2006 in regards toPilgrim Nuclear Power Station Re-LicensingML06139042678.Study of Winter Flounder Larval Transport in Coastal Cape Cod Bayand Entrainment at Pilgrim Nuclear Power Station, ENSR and MarineResearch, Inc, November 2000ML06142012179.2002 Massachusetts Lobster Fishery Statistics, MassachusettsDivision of Marine Fisheries Technical Report TR-20, March 2004ML06139042980.Benthic algal monitoring at PNPS, March, 2000 ML06142054181.Lawton, et al. 1999, Annual Report on Assessment and Mitigation ofImpact of the PNPS on finfish populations in western Cape Cod BayIn: Marine Ecology Studies related to operation of Pilgrim Station. Semiannual report # 53ML06144056882.Stone and Webster Engineering Corporation. 1975 . 316Demonstration. Pilgrim Nuclear Power Station - Units 1 and 2. Prepared for Boston Edison Company, Boston, MA ML06144061383.Hartwell, A.D. and Mogolesko, F.J., Three-Dimensional Field Surveysof Thermal Plumes from Backwashing Operations at a Coastal PowerPlant Site in MassachusettsML06142052084.Marine Ecology Studies Related to Operation of PNPS Final ReportJuly 1969-December 1977, Volume 2 of 3ML06145005785.Baker, Edward, Stock Enhancement: An Overview (Draft)ML06156020986.The BSC Group, Inc, Supporting Information for Department of theArmy Permit; Maintenance Dredging of Pilgrim Nuclear Power StationIntake Canal, September 13, 1996ML06142051587.Environmental Protection Group, Pilgrim Nuclear Power StationMarine Ecology Studies Report No. 67, Report Period: January 2005-December 2005, April 30, 2006 ML06144062788.Final Report on Spawning Sea-Run Rainbow Smelt (Osmerusmordax) in the Jones River and Impact Assessment of Pilgrim Stationon the Population, 1979-1981, June 1990ML061420540 89.Final Report Winter Flounder (Pseudopleuronectes americanus)Studies (1993-1999) in Relation to Impact Assessment of PilgrimStation on the Local Population, March 2000ML061560277 Reference DocumentADAMS AccessionNumber 90.Final Report on Rainbow Smelt (Osmerus mordax) RestorationEfforts in the Jones River, 1994-1999, December 1999ML06156023191.Final Report Studies (1990-1997) and Impact Assessment of PilgrimStation on Cunner in Western Cape Cod Bay, January 2000ML06156025192.Final Report on Haul-Seine Survey and Impact Assessment of PilgrimStation on Shore-Zone Fishes, 1981-1991, December 30, 1992ML06156023393.Thermal Surveys of Backwashing Operations at Pilgrim StationDuring July 1997, August 1977ML06156029194.PNPS Intake Canal Discharge and Screenwash Sampling and TRCanalysisML06139042495.Simulation of Larvae Dispersion and Entrainment Near A CoastalPower StationML06156022896.PNPS Chlorination SystemML06139035197.Copies of 2005/2006 Discharge Monitoring Reports with letters andattachments (surfacewater)ML06144057598.Impingement Survival, 1980-1983 Studies, Final ReportML061420519 99.Local County Employment and Housing DataML061390329100.PNPS Impact on Commercial and/or Recreational FisheryML061390335101.Local Transient population information/DataML061390343102.Photos Taken on 5/4/06 of View from Junction of Pricilla and WhiteHorse Beaches ML062010490103.Marine Ecology Studies, Report #67, Appendix B, Jan-Dec. 2005,Geometric Mean Monthly Ichthyoplankton Densities ML062010482104.Entergy Response to 6/9/00 308 Letter and Other 316(b) QuestionsRaised at Meeting on 9/27/00ML061940214 Pilgrim Nuclear Power Station cc:

Mr. Gary J. TaylorChief Executive Officer Entergy Operations 1340 Echelon Parkway Jackson, MS 39213Mr. John T. HerronSr. VP and Chief Operating Officer Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601Mr. Christopher SchwarzVice President, Operations Support Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601Mr. Michael A. BalduzziSite Vice President Entergy Nuclear Operations, Inc.

Pilgrim Nuclear Power Station 600 Rocky Hill RoadPlymouth, MA 02360-5508Mr. Kevin H. BronsonGeneral Manager, Plant Operations Entergy Nuclear Operations, Inc.

Pilgrim Nuclear Power Station 600 Rocky Hill RoadPlymouth, MA 02360-5508Mr. Stephen J. BethayDirector, Nuclear Safety Assurance Entergy Nuclear Operations, Inc.

Pilgrim Nuclear Power Station 600 Rocky Hill RoadPlymouth, MA 02360-5508Mr. Oscar LimpiasVice President, EngineeringEntergy Nuclear Operations, Inc.440 Hamilton Avenue White Plains, NY 10601Mr. John F. McCannDirector, Licensing Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601Ms. Charlene D. FaisonManager, Licensing Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601Mr. Michael J. ColombDirector of Oversight Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601Mr. Bryan S. FordManager, Licensing Entergy Nuclear Operations, Inc.

Pilgrim Nuclear Power Station 600 Rocky Hill RoadPlymouth, MA 02360-5508Assistant General CounselEntergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601Mr. James H. Sniezek5486 Nithsdale Drive Salisbury, MD 21801-2490Mr. Michael D. Lyster5931 Barclay Lane Naples, FL 34110-7306Mr. Garrett D. Edwards814 Waverly Road Kennett Square, PA 19348Pilgrim Nuclear Power Station cc:

Mr. James RossNuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708Regional Administrator, Region IU. S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406-1415Senior Resident InspectorU. S. Nuclear Regulatory Commission Pilgrim Nuclear Power Station Post Office Box 867 Plymouth, MA 02360Chairman, Board of Selectmen11 Lincoln Street Plymouth, MA 02360ChairmanNuclear Matters Committee Town Hall 11 Lincoln Street Plymouth, MA 02360Chairman, Duxbury Board of SelectmenTown Hall 878 Tremont Street Duxbury, MA 02332Office of the CommissionerMassachusetts Department of Environmental ProtectionOne Winter StreetBoston, MA 02108Office of the Attorney GeneralOne Ashburton Place 20th Floor Boston, MA 02108Director, Radiation Control ProgramCommonwealth of Massachusetts Executive Offices of Health and Human Services 174 Portland Street Boston, MA 02114Secretary of Public SafetyExecutive Office of Public Safety One Ashburton Place Boston, MA 02108 Director, Massachusetts Emergency Management Agency Attn: James Muckerheide 400 Worcester Road Framingham, MA 01702-5399Mr. William D. MeinertNuclear Engineer Massachusetts Municipal Wholesale Electric Company P.O. Box 426Ludlow, MA 01056-0426Plymouth Public LibraryAttn: Ms. Dinah O'Brien 132 South Street Plymouth, MA 02360Duxbury Free LibraryAttn: Mr. David Murphy 77 Alden Street Duxbury, MA 02332Kingston Public Library Attn: Librarian Susan Olin 6 Green Street Kingston, MA 02364Pilgrim Nuclear Power Station cc:

Mark SylviaTown Manager Town of Plymouth 11 Lincoln St Plymouth, MA 02360Todd CallaghanOffice of Coastal Zone Management 251 Causeway St. Suite 800 Boston, MA 02114Ms. Becky Chin, Vice ChairDuxbury Nuclear Advisory Committee 31 Deerpath Trail North Duxbury, MA 02332Mr. Thomas Bott1 Maple Place Plymouth, MA 02360Mr. Andre MartecchiniDuxbury - Selectman 110 Heritage LaneDuxbury, MA 02332Mr. David Leonardi120 Bay State Drive Braintree, MA 02178Mr. Jeff BergerChairman - Plymouth Nuclear Matters Committee P.O. Box 1812 Plymouth, MA 02362-1812Mr. Paul Smith 122 Ellisville RoadPlymouth, MA 02360Mr. Jerry Benezra26 Island Rock Plymouth, MA 02360 Ms. Shelia HollisSuite 700 1667 K Street, NW Washington, DC 20006Mr. Brian DuBoisCarpenters L.V. 424 6 Skylark Avenue Plymouth, MA 02360Mr. Jim BurbaNew England Regional Coordinator of Carpenters 129 Pearl Street Stoughton, MA 02072Ms. Mary ShevoryMEMA 650 East Street Brockton, MA 02302Ms. Kate Francini23 Driftwood Lane Plymouth, MA 02360Mr. Richard A. RothsteinPlymouth Nuclear Matters Committee 32 Webster Reach Plymouth, MA 02360Mr. Mark Serrano19415 Deerfield Avenue Lansdowne, VA 20176Ms. Mary Ellen Burns13 Tavern Path Plymouth, MA 02360Mr. Rick BuckleyEntergy Nuclear P.O. Box 31995 Jackson, MS 39286Pilgrim Nuclear Power Station cc:Ms. Joyce McMahonMass AREA 15 1/2 Rowell Avenue Beverly, MA 01915Mr. Jim O'ConnellLlennoco, Inc.

P.O. Box 653 Chatham, MA 02633Mr. Pine DuBoisJones River Watershed Association

P.O. Box 73 Kingston, MA 02364Ms. Mary LampertDuxbury Nuclear Advisory Committee 148 Washington Street Duxbury, MA 02332Ms. Nancy Landgren625 Washington Street Duxbury, MA 02332Mr. Keith Maxwell19 Old Meeting House Green Norton, MA 02766Mr. Rick AndersonCarpenters Local 624 21 Mazzeo Drive Randolph, MA 02368Ms. Molly Barlett52 Crooked Lane Duxbury, MA 02332Ms. Megan Dempster18 Bartlett Road Plymouth, MA 02360Ms. Marie Fehlow9 Coles Lane Plymouth, MA 02360Mr. Larry HarringtonMDPH Radiation Coordinator175 Route 6A Sandwich, MA 02563Mr. Robert Hillman63 Cooke Road Plymouth, MA 02360Ms. Casey MeservePlymouth Bulletin 165 Enterprise Drive Marshfield, MA 02050Mr. Joseph Prall26 Sushala Way Plymouth, MA 02360Ms. Mary Valliere12 Harvest View Carver, MA 02330Mr. Robert R. RuddockGeneral Counsel Associated Industries of Massachusetts 22 Berkeley Street / P.O. Box 763 Boston, MA 02117-0763Ms. Anne D. Geller13 Vernon Street Plymouth, MA 02360Mr. Frank Collins P.O. Box 713 Manomet, MA 02345-0712Mr. Congressman Delahunt1250 Hancock Street, 8 th FloorQuincy, MA 02169Mr. J. Tarney-Manuel11 Elm Street Plymouth, MA 02360 Pilgrim Nuclear Power Station cc:

Alba C. Thompson 11 Westwood Rd.

Plymouth, MA 02360