May 16, 2006 Mr. Michael R. Kansler President Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601
SUBJECT:
PILGRIM NUCLEAR POWER STATION - REQUEST FOR ADDITIONAL INFORMATION REGARDING RELIEF REQUEST PRR-15, FOURTH 10-YEAR INSERVICE INSPECTION PROGRAM PLAN (TAC NO. MC8298)
Dear Mr. Kansler:
By letter dated June 29, 2005, Entergy Nuclear Operations, Inc. (the licensee) requested relief from requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code,Section XI, for Pilgrim Nuclear Power Station (Pilgrim). You requested specific austenitic reactor pressure vessel nozzle safe-end and dissimilar metal piping weld repair contingency criteria for the fourth 10-year inservice inspection interval at Pilgrim.
The Nuclear Regulatory Commission staff has been reviewing the submittal and has determined that additional information is needed to complete its review. The specific questions are found in the enclosed request for additional information (RAI). A response to this RAI is requested to be provided within 30 days.
Sincerely,
/RA/
James J. Shea, Project Manager Plant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-293
Enclosure:
As stated cc w/encl: See next page
May 16, 2006 Mr. Michael R. Kansler President Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601
SUBJECT:
PILGRIM NUCLEAR POWER STATION - REQUEST FOR ADDITIONAL INFORMATION REGARDING RELIEF REQUEST PRR-15, FOURTH 10-YEAR INSERVICE INSPECTION PROGRAM PLAN (TAC NO. MC8298)
Dear Mr. Kansler:
By letter dated June 29, 2005, Entergy Nuclear Operations, Inc. (the licensee) requested relief from requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code,Section XI, for Pilgrim Nuclear Power Station (Pilgrim). You requested specific austenitic reactor pressure vessel nozzle safe-end and dissimilar metal piping weld repair contingency criteria for the fourth 10-year inservice inspection interval at Pilgrim.
The Nuclear Regulatory Commission staff has been reviewing the submittal and has determined that additional information is needed to complete its review. The specific questions are found in the enclosed request for additional information (RAI). A response to this RAI is requested to be provided within 30 days.
Sincerely,
/RA/
James J. Shea, Project Manager Plant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-293
Enclosure:
As stated cc w/encl: See next page DISTRIBUTION:
PUBLIC RidsNrrDORLLpl1-1 RidsOgcRP EAndruszkiewicz LPLI-1 R/F RidsNrrLASLittle RidsAacrsAcnwMailCenter RidsNrrPMJShea RidsNrrDORLDpr RidsRgn1MailCenter Accession Number: ML061020041 OFFICE LPL1-1/PM LPL1-1/LA CFEB/BC LPL1-1/BC NAME JShea SLittle KGruss RLaufer DATE 4/17/06 4/20/06 4/27/06 5/16/06 Official Record Copy
REQUEST FOR ADDITIONAL INFORMATION (RAI)
PILGRIM RELIEF REQUEST NO. PRR-15 ENTERGY NUCLEAR OPERATIONS, INC.
PILGRIM NUCLEAR POWER STATION DOCKET NO. 50-293 By letter dated June 29, 2005, Entergy Nuclear Operations, Inc. (the licensee) requested relief from requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code,Section XI, for Pilgrim Nuclear Power Station (Pilgrim). You requested specific austenitic reactor pressure vessel nozzle safe-end and dissimilar metal piping weld repair contingency criteria for the fourth 10-year inservice inspection interval at Pilgrim.
The Nuclear Regulatory Commission staff has been reviewing the submittal and has determined that additional information is needed to complete its review.
1.
The Table on page 1 of the relief request states that the maximum diameter of the pipe to be overlaid is 13.38 inches yet on pages 3, 6 and 7 of the relief request, reference is made to a 29 inch O.D. nozzle. Since this overlay is for 13 inch diameter nozzles or smaller, delete all references to any size larger than 13 inches, i.e., 29 inches.
2.
The table on page 1 should identify the area (in square inches) of the repair that is in contact with the low alloy steel (P-No. 3) material for each overlay.
3.
On page 6 of the relief request, the statement is made, "Alloy 52 with its high chromium content provides a high level of resistance to hot cracking." Provide a justification for this statement.
4.
The "Basis for the Alterative," as noted on page 6 and continuing on page 7 of the relief request under "Exception from Code Case N-504-2 Paragraph (h)," is inadequate. The relief request should discuss the basis in more detail to justify the performance of an ultrasonic examination in lieu of a radiographic examination of the weld overlay repair.
Enclosure
Pilgrim Nuclear Power Station cc:
Regional Administrator, Region I U. S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406-1415 Senior Resident Inspector U. S. Nuclear Regulatory Commission Pilgrim Nuclear Power Station Post Office Box 867 Plymouth, MA 02360 Chairman, Board of Selectmen 11 Lincoln Street Plymouth, MA 02360 Chairman Nuclear Matters Committee Town Hall 11 Lincoln Street Plymouth, MA 02360 Chairman, Duxbury Board of Selectmen Town Hall 878 Tremont Street Duxbury, MA 02332 Office of the Commissioner Massachusetts Department of Environmental Protection One Winter Street Boston, MA 02108 Office of the Attorney General One Ashburton Place 20th Floor Boston, MA 02108 Director, Radiation Control Program Commonwealth of Massachusetts Executive Offices of Health and Human Services 174 Portland Street Boston, MA 02114 Secretary of Public Safety Executive Office of Public Safety One Ashburton Place Boston, MA 02108 Director, Massachusetts Emergency Management Agency Attn: James Muckerheide 400 Worcester Road Framingham, MA 01702-5399 Mr. William D. Meinert Nuclear Engineer Massachusetts Municipal Wholesale Electric Company P.O. Box 426 Ludlow, MA 01056-0426 Mr. Michael A. Balduzzi Site Vice President Entergy Nuclear Operations, Inc.
Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360-5508 Mr. Stephen J. Bethay Director, Nuclear Safety Assurance Entergy Nuclear Operations, Inc.
Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360-5508 Mr. Bryan S. Ford Manager, Licensing Entergy Nuclear Operations, Inc.
Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360-5508 Ms. Charlene D. Faison Manager, Licensing Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601
Pilgrim Nuclear Power Station cc:
Mr. Gary J. Taylor Chief Executive Officer Entergy Operations 1340 Echelon Parkway Jackson, MS 39213 Mr. John T. Herron Sr. VP and Chief Operating Officer Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601 Mr. Oscar Limpias Vice President, Engineering Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601 Mr. Christopher Schwarz Vice President, Operations Support Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601 Mr. John F. McCann Director, Nuclear Safety Assurance Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601 Mr. Michael J. Colomb Director of Oversight Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601 Mr. Travis C. McCullough Assistant General Counsel Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601 Ms. Stacey Lousteau Treasury Department Entergy Services, Inc.
639 Loyola Avenue New Orleans, LA 70113 Mr. James Sniezek 5486 Nithsdale Drive Salisbury, MD 21801-2490 Mr. Michael D. Lyster 5931 Barclay Lane Naples, FL 34110-7306