Request for Additional Information Regarding Relief Request PRR-15, Fourth 10-Year Inservice Inspection Program Plan
ML061020041
Person / Time
Site: Pilgrim
Issue date: 05/16/2006
From: James Shea
Plant Licensing Branch III-2
To: Kansler M
Entergy Nuclear Operations
SHea J, NRR/DLPM, 415-1388
References
TAC MC8298
Download: ML061020041 (5)


Text

May 16, 2006 Mr. Michael R. Kansler President Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601

SUBJECT:

PILGRIM NUCLEAR POWER STATION - REQUEST FOR ADDITIONAL INFORMATION REGARDING RELIEF REQUEST PRR-15, FOURTH 10-YEAR INSERVICE INSPECTION PROGRAM PLAN (TAC NO. MC8298)

Dear Mr. Kansler:

By letter dated June 29, 2005, Entergy Nuclear Operations, Inc. (the licensee) requested relief from requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code,Section XI, for Pilgrim Nuclear Power Station (Pilgrim). You requested specific austenitic reactor pressure vessel nozzle safe-end and dissimilar metal piping weld repair contingency criteria for the fourth 10-year inservice inspection interval at Pilgrim.

The Nuclear Regulatory Commission staff has been reviewing the submittal and has determined that additional information is needed to complete its review. The specific questions are found in the enclosed request for additional information (RAI). A response to this RAI is requested to be provided within 30 days.

Sincerely,

/RA/

James J. Shea, Project Manager Plant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-293

Enclosure:

As stated cc w/encl: See next page

May 16, 2006 Mr. Michael R. Kansler President Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601

SUBJECT:

PILGRIM NUCLEAR POWER STATION - REQUEST FOR ADDITIONAL INFORMATION REGARDING RELIEF REQUEST PRR-15, FOURTH 10-YEAR INSERVICE INSPECTION PROGRAM PLAN (TAC NO. MC8298)

Dear Mr. Kansler:

By letter dated June 29, 2005, Entergy Nuclear Operations, Inc. (the licensee) requested relief from requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code,Section XI, for Pilgrim Nuclear Power Station (Pilgrim). You requested specific austenitic reactor pressure vessel nozzle safe-end and dissimilar metal piping weld repair contingency criteria for the fourth 10-year inservice inspection interval at Pilgrim.

The Nuclear Regulatory Commission staff has been reviewing the submittal and has determined that additional information is needed to complete its review. The specific questions are found in the enclosed request for additional information (RAI). A response to this RAI is requested to be provided within 30 days.

Sincerely,

/RA/

James J. Shea, Project Manager Plant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-293

Enclosure:

As stated cc w/encl: See next page DISTRIBUTION:

PUBLIC RidsNrrDORLLpl1-1 RidsOgcRP EAndruszkiewicz LPLI-1 R/F RidsNrrLASLittle RidsAacrsAcnwMailCenter RidsNrrPMJShea RidsNrrDORLDpr RidsRgn1MailCenter Accession Number: ML061020041 OFFICE LPL1-1/PM LPL1-1/LA CFEB/BC LPL1-1/BC NAME JShea SLittle KGruss RLaufer DATE 4/17/06 4/20/06 4/27/06 5/16/06 Official Record Copy

REQUEST FOR ADDITIONAL INFORMATION (RAI)

PILGRIM RELIEF REQUEST NO. PRR-15 ENTERGY NUCLEAR OPERATIONS, INC.

PILGRIM NUCLEAR POWER STATION DOCKET NO. 50-293 By letter dated June 29, 2005, Entergy Nuclear Operations, Inc. (the licensee) requested relief from requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code,Section XI, for Pilgrim Nuclear Power Station (Pilgrim). You requested specific austenitic reactor pressure vessel nozzle safe-end and dissimilar metal piping weld repair contingency criteria for the fourth 10-year inservice inspection interval at Pilgrim.

The Nuclear Regulatory Commission staff has been reviewing the submittal and has determined that additional information is needed to complete its review.

1. The Table on page 1 of the relief request states that the maximum diameter of the pipe to be overlaid is 13.38 inches yet on pages 3, 6 and 7 of the relief request, reference is made to a 29 inch O.D. nozzle. Since this overlay is for 13 inch diameter nozzles or smaller, delete all references to any size larger than 13 inches, i.e., 29 inches.
2. The table on page 1 should identify the area (in square inches) of the repair that is in contact with the low alloy steel (P-No. 3) material for each overlay.
3. On page 6 of the relief request, the statement is made, "Alloy 52 with its high chromium content provides a high level of resistance to hot cracking." Provide a justification for this statement.
4. The "Basis for the Alterative," as noted on page 6 and continuing on page 7 of the relief request under "Exception from Code Case N-504-2 Paragraph (h)," is inadequate. The relief request should discuss the basis in more detail to justify the performance of an ultrasonic examination in lieu of a radiographic examination of the weld overlay repair.

Enclosure

Pilgrim Nuclear Power Station cc:

Regional Administrator, Region I Secretary of Public Safety U. S. Nuclear Regulatory Commission Executive Office of Public Safety 475 Allendale Road One Ashburton Place King of Prussia, PA 19406-1415 Boston, MA 02108 Senior Resident Inspector Director, Massachusetts Emergency U. S. Nuclear Regulatory Commission Management Agency Pilgrim Nuclear Power Station Attn: James Muckerheide Post Office Box 867 400 Worcester Road Plymouth, MA 02360 Framingham, MA 01702-5399 Chairman, Board of Selectmen Mr. William D. Meinert 11 Lincoln Street Nuclear Engineer Plymouth, MA 02360 Massachusetts Municipal Wholesale Electric Company Chairman P.O. Box 426 Nuclear Matters Committee Ludlow, MA 01056-0426 Town Hall 11 Lincoln Street Mr. Michael A. Balduzzi Plymouth, MA 02360 Site Vice President Entergy Nuclear Operations, Inc.

Chairman, Duxbury Board of Selectmen Pilgrim Nuclear Power Station Town Hall 600 Rocky Hill Road 878 Tremont Street Plymouth, MA 02360-5508 Duxbury, MA 02332 Mr. Stephen J. Bethay Office of the Commissioner Director, Nuclear Safety Assurance Massachusetts Department of Entergy Nuclear Operations, Inc.

Environmental Protection Pilgrim Nuclear Power Station One Winter Street 600 Rocky Hill Road Boston, MA 02108 Plymouth, MA 02360-5508 Office of the Attorney General Mr. Bryan S. Ford One Ashburton Place Manager, Licensing 20th Floor Entergy Nuclear Operations, Inc.

Boston, MA 02108 Pilgrim Nuclear Power Station 600 Rocky Hill Road Director, Radiation Control Program Plymouth, MA 02360-5508 Commonwealth of Massachusetts Executive Offices of Health and Ms. Charlene D. Faison Human Services Manager, Licensing 174 Portland Street Entergy Nuclear Operations, Inc.

Boston, MA 02114 440 Hamilton Avenue White Plains, NY 10601

Pilgrim Nuclear Power Station cc:

Mr. Gary J. Taylor Mr. Michael J. Colomb Chief Executive Officer Director of Oversight Entergy Operations Entergy Nuclear Operations, Inc.

1340 Echelon Parkway 440 Hamilton Avenue Jackson, MS 39213 White Plains, NY 10601 Mr. John T. Herron Mr. Travis C. McCullough Sr. VP and Chief Operating Officer Assistant General Counsel Entergy Nuclear Operations, Inc. Entergy Nuclear Operations, Inc.

440 Hamilton Avenue 440 Hamilton Avenue White Plains, NY 10601 White Plains, NY 10601 Mr. Oscar Limpias Ms. Stacey Lousteau Vice President, Engineering Treasury Department Entergy Nuclear Operations, Inc. Entergy Services, Inc.

440 Hamilton Avenue 639 Loyola Avenue White Plains, NY 10601 New Orleans, LA 70113 Mr. Christopher Schwarz Mr. James Sniezek Vice President, Operations Support 5486 Nithsdale Drive Entergy Nuclear Operations, Inc. Salisbury, MD 21801-2490 440 Hamilton Avenue White Plains, NY 10601 Mr. Michael D. Lyster 5931 Barclay Lane Mr. John F. McCann Naples, FL 34110-7306 Director, Nuclear Safety Assurance Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601