FRN: General Notice, EA-06-137 Enclosure, Order Modifying Licenses (Effective Immediately)ML061600076 |
Person / Time |
---|
Site: |
Hatch, Monticello, Dresden, Peach Bottom, Browns Ferry, Nine Mile Point, Fermi, Oyster Creek, Watts Bar, Hope Creek, Cooper, Sequoyah, Pilgrim, Susquehanna, Columbia, Brunswick, Limerick, Vermont Yankee, Duane Arnold, Cook, Quad Cities, FitzPatrick, LaSalle |
---|
Issue date: |
06/20/2006 |
---|
From: |
Dyer J Office of Nuclear Reactor Regulation |
---|
To: |
Carolina Power & Light Co, Detroit Edison, Energy Northwest, Entergy Nuclear Operations, Exelon Generation Co, Nebraska Public Power District (NPPD), Nine Mile Point, Nuclear Management Co, Public Service Enterprise Group, Southern Nuclear Operating Co, Tennessee Valley Authority |
---|
Moroney B, NRR/DLPM, 415-3974 |
Shared Package |
---|
ML061600196 |
List: |
---|
References |
---|
EA-06-137 |
Download: ML061600076 (7) |
|
Similar Documents at Hatch, Monticello, Dresden, Peach Bottom, Browns Ferry, Nine Mile Point, Fermi, Oyster Creek, Watts Bar, Hope Creek, Cooper, Sequoyah, Pilgrim, Susquehanna, Columbia, Brunswick, Limerick, Vermont Yankee, Duane Arnold, Cook, Quad Cities, FitzPatrick, LaSalle |
---|
Category:Federal Register Notice
MONTHYEARML24022A1742024-02-0505 February 2024 Subsequent License Renewal Application - Receipt and Availability - FRN ML24005A1202024-02-0505 February 2024 Federal Register Notice: General Notice. Acceptance of Purdue Renewal of Special Nuclear Material-142 ML24003A8902024-01-24024 January 2024 Letter to P. Gerfen - Diablo Canyon Notice of Intent to Conduct Scoping and Prepare an Environmental Impact Statement ML24018A0792024-01-22022 January 2024 Individual Notice of Consideration of Issuance of Amendment to Renewed Facility Operating License, Proposed Nshcd and Opportunity for a Hearing (EPID L-2024-LLA-0007) (Letter) ML24018A0802024-01-22022 January 2024 Individual Notice of Consideration of Issuance of Amendment to Renewed Facility Operating License, Proposed Nshcd, and Opportunity for a Hearing (EPID L-2024-LLA-0007) (Federal Register Notice) ML24003A8892024-01-19019 January 2024 FRN - Diablo Canyon, Units 1 and 2, Notice of Intent to Conduct Scoping and Prepare an Environmental Impact Statement ML23355A1702024-01-11011 January 2024 FRN - Withdrawal of Palisades Nuclear Plant Amendment Request Re. License Amendment Request to Revise License Condition to Eliminate Cyber Security Plan Requirements ML23191A1422024-01-0404 January 2024 FRN - Palisades Nuclear Plant Exemption from the Requirements of 10 CFR 50.54(W)(1) Concerning Onsite Property Damage Insurance ML23340A2332023-12-28028 December 2023 Withdrawal of an Amendment Request to Revise Technical Specification 3/4.3.2 to Remove Exemption from Testing Certain Relays at Power to Support Elimination of Potential Single Point Vulnerability (EPID L-2022-LLA-0169)-FRN ML23192A1012023-12-28028 December 2023 FRN - Palisades Offsite Insurance Exemption 140.11(a)(4) ML23342A2132023-12-27027 December 2023 FRN Related to Request for Exemptions from Certain Emergency Planning Requirements ML23333A1092023-12-27027 December 2023 Federal Register Notice - Fort Calhoun Station, Unit 1, License Termination Plan Finding of No Significant Impact ML23355A1242023-12-26026 December 2023 Withdrawal of an Amendment Request Re License Amendment Request to Revise License Condition to Eliminate Cyber Security Plan Requirements ML23341A1662023-12-19019 December 2023 EA Fonsi FRN Related to Request for Exemptions from Certain Emergency ML23338A2532023-12-14014 December 2023 Federal Register Notice - Kairos Power LLC, Hermes Test Reactor Construction Permit ML23341A0032023-12-14014 December 2023 LRA Acceptance and Opportunity for Hearing FRN ML23306A0352023-12-0505 December 2023 Federal Register Notice: Issuance of Order Consenting to Indirect Transfer of Licenses ML23311A1952023-11-17017 November 2023 FRN: General Notice. Kairos Power LLC Hermes 2- Construction Permit Application; Opportunity to Request a Hearing and Petition for Leave to Intervene ML23320A1462023-11-17017 November 2023 Individual Notice of Consideration of Issuance of Amendment to Facility Operating License, Proposed No Significant Hazards Consideration Determination, & Opportunity for Hearing (Exigent Circumstances) (EPID L-2023-LLA-0155) - FRN ML23320A1502023-11-17017 November 2023 Individual Notice of Consideration of Issuance of Amendment to Facility Operating License, Proposed No Significant Hazards Consideration Determination, & Opportunity for Hearing (Exigent Circumstances) (EPID L-2023-LLA-0155) - LTR ML23293A1062023-11-16016 November 2023 LRA - Receipt and Availability - FRN ML23206A0572023-11-15015 November 2023 Direct Final Rule: Confirmation of Effective Date List of Approved Spent Fuel Storage Casks: Tn Americas LLC Standardized NUHOMS Horizontal Modular Storage System, Certificate of Compliance No. 1004, Renewed Amendment No 18 ML23312A0292023-11-0808 November 2023 Federal Register Notice: Comanche Peak Draft Supplemental Environmental Impact Statement Comment Period Correction ML23291A1982023-11-0808 November 2023 Withdrawal of Amendment Request Regarding Alternative Security Measures for Early Warning System (EPID: L-2022-LLA-0029) (Federal Register Notice) ML23297A2502023-11-0606 November 2023 Individual Notice of Consideration of Issuance of Amendment to Renewed Facility Operating License, Proposed No Significant Hazards Consideration Determination and Opportunity for a Hearing (EPID L-2022-LLA-0176) - Letter ML23297A2552023-11-0606 November 2023 Individual Notice of Consideration of Issuance of Amendment to Renewed Facility Operating License, Proposed No Significant Hazards Consideration Determination and Opportunity for a Hearing (EPID L-2022-LLA-0176) - FRN ML23283A2802023-11-0606 November 2023 Federal Register Notice: Receipt of Nist'S License Renewal Application and Opportunity to Request Hearing ML23279A0382023-10-30030 October 2023 Associated Independent Spent Fuel Storage Installation - Enclosure 1 -Order Approving Indirect Transfer of Licenses and Draft Conforming License Amendments (EPID L-2023-LLM-0004) (Order) ML23279A0342023-10-30030 October 2023 Associated Independent Spent Fuel Storage Installation - Order Approving Indirect Transfer of Licenses and Draft Conforming License Amendments (EPID L-2023-LLM-0004) (Letter) ML23271A0042023-10-24024 October 2023 Installation Support License Amendment Request Public Notice and Hearing Request Notice ML23234A1542023-10-11011 October 2023 Exemption from the Requirements of 10 CFR Part 50, Section 50.46, and Appendix K Regarding Use of M5 Cladding Material (EPID L-2022-LLE-0030) (FRN) ML23283A2922023-10-10010 October 2023 FRN - Construction Permit Transfer Application; Withdrawal by Applicant ML23272A1562023-10-0505 October 2023 Federal Register Notification of Amendment to Renewed Facility Operating License and Proposed No Significant Hazards Consideration Determination (Exigent Circumstances) (EPID L-2023-LLA-0134) FRN ML23249A1042023-10-0404 October 2023 Federal Register Notice: Notice of Intent to Conduct Scoping Process and Prepare an Environmental Impact Statement-Perry Nuclear Power Plant, Unit 1 ML23237B4412023-09-29029 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Federal Register Notice, Direct and Indirect License Transfer Issuance Order ML23264A0912023-09-22022 September 2023 Federal Register Notice - American Centrifuge Operating, LLC Confirmatory Order ML23237B4652023-09-11011 September 2023 FRN: General Notice. Acceptance for Docketing of the Kairos Power LLC Hermes 2 Test Reactor Construction Permit 2024-02-05 The following query condition could not be considered due to this wiki's restrictions on query size or depth: <code> [[:Hatch]] OR [[:Monticello]] OR [[:Dresden]] OR [[:Peach Bottom]] OR [[:Browns Ferry]] OR [[:Nine Mile Point]] OR [[:Fermi]] OR [[:Oyster Creek]] OR [[:Watts Bar]] OR [[:Hope Creek]] OR [[:Cooper]] OR [[:Sequoyah]] OR [[:Pilgrim]] OR [[:Susquehanna]] OR [[:Columbia]] OR [[:Brunswick]] OR [[:Limerick]] OR [[:Vermont Yankee]] OR [[:Duane Arnold]] OR [[:Cook]] OR [[:Quad Cities]] OR [[:FitzPatrick]] OR [[:LaSalle]] </code>.
[Table view]The following query condition could not be considered due to this wiki's restrictions on query size or depth: <code> [[:Hatch]] OR [[:Monticello]] OR [[:Dresden]] OR [[:Peach Bottom]] OR [[:Browns Ferry]] OR [[:Nine Mile Point]] OR [[:Fermi]] OR [[:Oyster Creek]] OR [[:Watts Bar]] OR [[:Hope Creek]] OR [[:Cooper]] OR [[:Sequoyah]] OR [[:Pilgrim]] OR [[:Susquehanna]] OR [[:Columbia]] OR [[:Brunswick]] OR [[:Limerick]] OR [[:Vermont Yankee]] OR [[:Duane Arnold]] OR [[:Cook]] OR [[:Quad Cities]] OR [[:FitzPatrick]] OR [[:LaSalle]] </code>. Category:Order Modifying License
MONTHYEARML22308A1772022-11-17017 November 2022 Enclosure - Zion License Transfer Order Fourth Extension ML20342A2012021-01-0101 January 2021 Order Modifying License to Suspend Certain Exports to the United Kingdom ML20342A2382020-12-16016 December 2020 Converdyn (XSOU8789) Orders ML20323A0352020-11-17017 November 2020 Confirmatory Order Modifying License - Palo Verde Nuclear Generating Station ML20255A2042020-09-11011 September 2020 Bellefonte Nuclear Plant, Units 1 & 2 - Supplement to Application for Order Approving Construction Permit Transfers and Conforming Administrative Amendments ML20240A0472020-08-31031 August 2020 FRN- Notice of Issuance of Order for Implementation of Additional Security Measures and Fingerprinting for Unescorted Access to Exelon Generation Company, LLC Three Mile Island Generating Station Independent Spent Fuel Storage Installation L-2019-155, NextEra Energy Duane Arnold, Llc'S Request for Rescission of Commission Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Beyond-Design Basis External Events2019-11-21021 November 2019 NextEra Energy Duane Arnold, Llc'S Request for Rescission of Commission Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Beyond-Design Basis External Events L-2019-141, NextEra Energy Duane Arnold, Llc'S Request for Rescission of Commission Order EA-12-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation.2019-08-0808 August 2019 NextEra Energy Duane Arnold, Llc'S Request for Rescission of Commission Order EA-12-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation. L-2019-142, NextEra Energy Duane Arnold, Llc'S Request for Rescission of Commission Order EA-13-109, Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions.2019-08-0808 August 2019 NextEra Energy Duane Arnold, Llc'S Request for Rescission of Commission Order EA-13-109, Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions. RS-18-106, Report of Full Compliance with Phase 1 and Phase 2 of June 6, 2013, Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions2018-11-14014 November 2018 Report of Full Compliance with Phase 1 and Phase 2 of June 6, 2013, Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions ML18256A0222018-09-24024 September 2018 Corrected V.C. Summer Unit 1 and Independent Spent Fuel Storage Installation Order Approving Indirect License Transfer ML18255A2562018-09-24024 September 2018 Correction to the Safety Evaluation and the Orders Approving Indirect Transfer of Licenses ML18255A2452018-09-24024 September 2018 Corrected V.C. Summer Unit 2 and 3 Order Approving Indirect License Transfer IR 05000416/20170142018-03-12012 March 2018 Confirmatory Order, NRC Inspection Report 05000416/2017014, and NRC Investigation Reports 4-2016-004 and 4-2014-021 ML16223A4672016-10-0303 October 2016 EA-16-163, Edwin I. Hatch Nuclear Plant Units 1 and 2, Confirmatory Order Modifying License LR-N16-0120, Compliance with March 12, 2012 NRC Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) and Final Integrated Plan2016-09-28028 September 2016 Compliance with March 12, 2012 NRC Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) and Final Integrated Plan L-16-230, Request for Schedule Relief/Relaxation from NRC Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)2016-07-11011 July 2016 Request for Schedule Relief/Relaxation from NRC Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) NG-16-0120, FLEX Strategies Phase 2 Staffing Assessment2016-06-0303 June 2016 FLEX Strategies Phase 2 Staffing Assessment LR-N16-0070, Compliance with March 12, 2012, NRC Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)2016-04-23023 April 2016 Compliance with March 12, 2012, NRC Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) NRC-2016-0087, EA-15-100 Waterford Steam Electric Station - Confirmatory Order Modifying License2016-04-18018 April 2016 EA-15-100 Waterford Steam Electric Station - Confirmatory Order Modifying License ML16098A3022016-04-18018 April 2016 EA-15-100 Waterford Steam Electric Station - Confirmatory Order Modifying License RBG-47618, Completion of Required Action by NRC Order EA-12-049, Issuance of Order to Modify Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events - River Bend Station, Unit 12015-09-29029 September 2015 Completion of Required Action by NRC Order EA-12-049, Issuance of Order to Modify Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events - River Bend Station, Unit 1 ML15246A1232015-08-27027 August 2015 Fifth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External. NLS2015101, Fifth Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)2015-08-27027 August 2015 Fifth Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) ONS-2015-098, Fifth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)2015-08-26026 August 2015 Fifth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) ONS-2015-099, Fifth Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)2015-08-26026 August 2015 Fifth Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) ET 15-0020, Operating Corporation'S Fifth Six-Month Status Report for the Implementation of Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events2015-08-25025 August 2015 Operating Corporation'S Fifth Six-Month Status Report for the Implementation of Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events L-2015-214, Fifth Six-Month Status Report in Response to March 12, 2012, Commission Order to Modify Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)2015-08-25025 August 2015 Fifth Six-Month Status Report in Response to March 12, 2012, Commission Order to Modify Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) NG-15-0260, NextEra Energy Duane Arnold Energy Center, Llc'S Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events...2015-08-14014 August 2015 NextEra Energy Duane Arnold Energy Center, Llc'S Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events... 1CAN041501, Completion of Required Action by NRC Order EA-12-051, Reliable Spent Fuel Pool Level (SFP) Instrumentation2015-04-14014 April 2015 Completion of Required Action by NRC Order EA-12-051, Reliable Spent Fuel Pool Level (SFP) Instrumentation ML12056A0442012-03-12012 March 2012 Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Effective Immediately) - to All Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status ML12056A0432012-03-12012 March 2012 Order Modifying Licenses with Regard to Reliable Hardened Containment Vents - to All Operating Boiling Water Reactor Licensees with Mark I and Mark II Containments ML12056A0452012-03-12012 March 2012 Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events ML12054A6792012-03-12012 March 2012 Issuance of Order to Modify Licenses with Regard to Reliable Spent Fuel Pool Instrumentation NRC-2012-0069, Order Modifying Licenses with Regard to Reliable Hardened Containment Vents - to All Operating Boiling Water Reactor Licensees with Mark I and Mark Ii Containments2012-03-12012 March 2012 Order Modifying Licenses with Regard to Reliable Hardened Containment Vents - to All Operating Boiling Water Reactor Licensees with Mark I and Mark Ii Containments NRC-2012-0067, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Effective Immediately) - to All Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status2012-03-12012 March 2012 Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Effective Immediately) - to All Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status NRC-2012-0068, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events2012-03-12012 March 2012 Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events ML12054A6942012-03-12012 March 2012 Issuance of Order to Modify Licenses with Regard to Reliable Hardened Containment Vents ML12054A7352012-03-12012 March 2012 Issuance of Order to Modify Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events NRC-2009-0245, University of Wisconsin, Order Modifying License No. R-74 to Convert from High to Low-Enriched Uranium Fuel (Amendment No. 17) - University of Wisconsin Nuclear Reactor (Tac No. MD9592)2009-06-11011 June 2009 University of Wisconsin, Order Modifying License No. R-74 to Convert from High to Low-Enriched Uranium Fuel (Amendment No. 17) - University of Wisconsin Nuclear Reactor (Tac No. MD9592) ML0916300852009-06-11011 June 2009 University of Wisconsin, Order Modifying License No. R-74 to Convert from High to Low-Enriched Uranium Fuel (Amendment No. 17) - University of Wisconsin Nuclear Reactor (Tac No. MD9592) ML0824014842008-09-0404 September 2008 Issuance of Order Modifying License No. R-76 to Convert from High-to Low-Enriched Uranium Fuel (Amendment No. 20) - Washington State University Triga Reactor ML0807303952008-04-0404 April 2008 Issuance of Order Modifying License No. R-106 to Amend Possession Limit for Uranium-235 Associated with Conversion from High- to Low-Enriched Uranium (Amendment No. 21) - Oregon State University Triga Reactor ML0735508392008-01-23023 January 2008 Issuance of Order Modifying License No. R-76 to Amend Possession Limit for Uranium-235 Associated with Conversion from High- to Low-enriched Uranium (Amendment No. 19) - Washington State University Triga Reactor ML0719201682007-08-0909 August 2007 Issuance of Order Modifying Facility Operating License No. R-87 to Convert from High to Low Enriched Uranium Fuel (Amendment No. 12) - Purdue University Research Reactor ML0720705962007-07-30030 July 2007 Michael A. Balduzzi Order (Effective Immediately) Modifying License for Indian Point Nuclear Generating Unit Nos. 2 and 3 ML0618104812006-07-21021 July 2006 Issuance of Order Modifying License No. R-83 to Amend Possession Limit for Uranium-235 Associated with Conversion from High to Low-Enriched Uranium - Texas A&M University Nuclear Science Center Triga Research Reactor ML0616000762006-06-20020 June 2006 FRN: General Notice, EA-06-137 Enclosure, Order Modifying Licenses (Effective Immediately) ML0519603542005-07-15015 July 2005 EA-04-224, Commitments to Be Confirmed by Order Modifying License (Effective Immediately) ML0424005752004-08-18018 August 2004 Issuance of Order for Implementation of Additional Security Measures Associated with Access Authorization for Calvert Cliffs Nuclear Power Plant, Units 1 and 2 (72-8) 2022-11-17 The following query condition could not be considered due to this wiki's restrictions on query size or depth: <code> [[:Hatch]] OR [[:Monticello]] OR [[:Dresden]] OR [[:Peach Bottom]] OR [[:Browns Ferry]] OR [[:Nine Mile Point]] OR [[:Fermi]] OR [[:Oyster Creek]] OR [[:Watts Bar]] OR [[:Hope Creek]] OR [[:Cooper]] OR [[:Sequoyah]] OR [[:Pilgrim]] OR [[:Susquehanna]] OR [[:Columbia]] OR [[:Brunswick]] OR [[:Limerick]] OR [[:Vermont Yankee]] OR [[:Duane Arnold]] OR [[:Cook]] OR [[:Quad Cities]] OR [[:FitzPatrick]] OR [[:LaSalle]] </code>.
[Table view]The following query condition could not be considered due to this wiki's restrictions on query size or depth: <code> [[:Hatch]] OR [[:Monticello]] OR [[:Dresden]] OR [[:Peach Bottom]] OR [[:Browns Ferry]] OR [[:Nine Mile Point]] OR [[:Fermi]] OR [[:Oyster Creek]] OR [[:Watts Bar]] OR [[:Hope Creek]] OR [[:Cooper]] OR [[:Sequoyah]] OR [[:Pilgrim]] OR [[:Susquehanna]] OR [[:Columbia]] OR [[:Brunswick]] OR [[:Limerick]] OR [[:Vermont Yankee]] OR [[:Duane Arnold]] OR [[:Cook]] OR [[:Quad Cities]] OR [[:FitzPatrick]] OR [[:LaSalle]] </code>. |
Text
7590-01-P UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of )
) Docket Nos. (as shown in Attachment 1)
OPERATING POWER REACTOR ) License Nos. (as shown in Attachment 1)
LICENSEES IDENTIFIED IN ATTACHMENT 1 ) EA-06-137 ORDER MODIFYING LICENSES (EFFECTIVE IMMEDIATELY)
I.
The licensees identified in Attachment 1 to this Order hold licenses issued by the U.S.
Nuclear Regulatory Commission (NRC or the Commission) authorizing operation of nuclear power plants in accordance with the Atomic Energy Act of 1954 and Title 10 of the Code of Federal Regulations (10 CFR) Part 50.
II.
On September 11, 2001, terrorists simultaneously attacked targets in New York, N.Y.,
and Washington, D.C., using large commercial aircraft as weapons. In response to the attacks and intelligence information subsequently obtained, the Commission issued a number of Safeguards and Threat Advisories to its licensees, and eventually Orders to selected licensees, to strengthen licensees' capabilities and readiness to respond to a potential attack on a nuclear facility. On February 25, 2002, the Commission issued an Order to all operating power reactor licensees that required certain compensatory measures be implemented (February 25th Order).
On December 2, 2005, the Commission issued a Demand for Information (DFI) to the power reactor licensees. The DFI required responses regarding whether certain identified key mitigative strategies, related to Section B.5.b. of the February 25th Order, for loss of large areas of the plant due to large fires or explosions were applicable to their facilities. The DFI also required certain related information, including whether the licensees acknowledged that the identified key strategies were required by Section B.5.b. of the February 25th Order. All licensees responded to the DFI with the required information but all responses stated that the strategies were not required by Section B.5.b.
As a result of the Commissions continued assessment of Section B.5.b mitigation strategies for loss of large areas of the plant due to large fires or explosions, the Commission has determined that it is necessary at this time to require implementation of certain key radiological protection mitigation strategies. The key radiological protection mitigation strategies are set forth in Attachment 21 of this Order. Each licensee must amend its site security plan, safeguards contingency plan, guard training and qualification plan, and emergency plan as appropriate to address the key radiological protection mitigation strategies identified for its facilities. The Commissions assessment of the other mitigating strategies required by Section B.5.b. of the February 25th Order is continuing.
Any needed changes to the physical security plan, safeguards contingency plan, guard training and qualification plan, and emergency plan required by 10 CFR 50.34(c), 50.34(d),
73.55(b)(4)(ii), and 50.47(b) respectively, shall be completed and implemented within 120 days of the date of this Order.
1 Attachment 2 contains Safeguards Information and will not be publicly disclosed.
Pursuant to 10 CFR 2.202, I find that in the circumstances described above, the public health, safety, and interest and the common defense and security require that this Order be immediately effective.
III.
Accordingly, pursuant to Sections 103, 104, 161b, 161i, 161o, 182, and 186 of the Atomic Energy Act of 1954, as amended, and the Commission's regulations in 10 CFR 2.202 and 10 CFR Parts 50 and 73, IT IS HEREBY ORDERED, EFFECTIVE IMMEDIATELY, THAT ALL LICENSES IDENTIFIED IN ATTACHMENT 1 TO THIS ORDER ARE MODIFIED AS FOLLOWS:
A. 1. Each licensee shall revise its physical security plan, safeguards contingency plan, guard training and qualification plan, and emergency plan prepared pursuant to 10 CFR 50.34(c), 50.34(d), 73.55(b)(4)(ii), and 50.47(b), as appropriate, to incorporate the key radiological protection mitigation strategies set forth in Attachment 2 to this Order. In addition, each licensee shall ensure that site procedures, and initial and recurring operations staff training programs, are updated to include the key radiological protection mitigation strategies set forth in Attachment 2 to this Order.
- 2. Each licensee shall implement any necessary changes to its physical security plan, safeguards contingency plan, guard training and qualification plan, emergency plan, and site procedures and training programs no later than 120 days from the date of this Order.
B. 1. Each licensee shall, within 35 days of the date of this Order, notify the Commission, (1) if the licensee is unable to comply with any requirements of this Order, (2) if compliance with any requirement of this Order is unnecessary in the licensees specific circumstances, or (3) if implementation of any requirement of this Order would cause the licensee to be in violation of the provisions of any Commission regulation or the facility license. The notification shall provide the licensees justification for seeking relief from, or variation of, any specific requirement.
- 2. Any licensee that considers that implementation of any of the requirements of this Order would adversely impact safe operation of the facility must notify the Commission, within 35 days of this Order, of the adverse safety impact, the basis for its determination that the requirement has an adverse safety impact, and either a proposal for achieving the same objectives of this Order, or a schedule for modifying the facilities to address the adverse safety condition. If neither approach is appropriate, the licensee must supplement its response to Condition B.1. of this Order to identify the condition as a requirement with which it cannot comply, with attendant justifications as required in Condition B.1.
C. Each licensee shall report to the Commission, in writing, when it has fully implemented this Order. The notification shall be made no later than 120 days from the date of the Order and include substitute security plan, safeguards contingency plan, guard training and qualification plan, and emergency plan pages that reflect any changes made to implement the Order.
D. All measures implemented or actions taken in response to this Order shall be maintained until the Commission determines otherwise, except that the licensee may change its physical security plans, safeguards contingency plans, and guard training and qualification plans if authorized by 10 CFR 50.54(p) and may change its revised emergency preparedness plan if authorized by 10 CFR 50.54(q).
Licensee responses to Conditions A.1., B.1., B.2., and C. above, shall be submitted in accordance with 10 CFR 50.4. In addition, licensee submittals that contain safeguards information shall be properly marked and handled in accordance with 10 CFR 73.21.
The Director, Office of Nuclear Reactor Regulation, may, in writing, relax or rescind any of the above conditions upon demonstration by the licensee of good cause.
IV.
In accordance with 10 CFR 2.202, the licensee must, and any other person adversely affected by this Order may, submit an answer to this Order, and may request a hearing on this Order, within 35 days of the date of this Order. Where good cause is shown, consideration will be given to extending the time to request a hearing. A request for an extension of time in which to submit an answer or request a hearing must be made in writing to the Director, Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, and include a statement of good cause for the extension. The answer may consent to this Order. Unless the answer consents to this Order, the answer shall, in writing and under oath or affirmation, specifically set forth the matters of fact and law on which the licensee or other person adversely affected relies and the reasons as to why the Order should not have been issued. Any answer or request for a hearing shall be submitted to the Secretary, Office of the Secretary of the Commission, U.S. Nuclear Regulatory Commission, ATTN: Rulemakings
and Adjudications Staff, Washington, DC 20555-0001. Copies also shall be sent to the Director, Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; the Assistant General Counsel for Materials Litigation and Enforcement at the same address; the Regional Administrator for NRC Region I, II, III, or IV, as appropriate for the specific facility; and the licensee if the answer or hearing request is by a person other than the licensee. Because of possible delays in delivery of mail to United States Government offices, it is requested that answers and requests for hearing be transmitted to the Secretary of the Commission either by means of facsimile transmission to 301-415-1101 or by e-mail to hearingdocket@nrc.gov and also to the Office of the General Counsel either by means of facsimile transmission to 301-415-3725 or by e-mail to OGCMailCenter@nrc.gov. If a person other than the licensee requests a hearing, that person shall set forth with particularity the manner in which his or her interest is adversely affected by this Order and shall address the criteria set forth in 10 CFR 2.309.
If a hearing is requested by the licensee or a person whose interest is adversely affected, the Commission will issue an Order designating the time and place of any hearing. If a hearing is held, the issue to be considered at such hearing shall be whether this Order should be sustained.
Pursuant to 10 CFR 2.202(c)(2)(i), the licensee may, in addition to demanding a hearing, at the time the answer is filed or sooner, move the presiding officer to set aside the immediate effectiveness of the Order on the ground that the Order, including the need for immediate effectiveness, is not based on adequate evidence but on mere suspicion, unfounded allegations, or error.
In the absence of any request for hearing, or written approval of an extension of time in which to request a hearing, the provisions specified in Section III above shall be final 35 days
from the date of this Order without further order or proceedings. If an extension of time for requesting a hearing has been approved, the provisions specified in Section III shall be final when the extension expires if a hearing request has not been received. AN ANSWER OR A REQUEST FOR HEARING SHALL NOT STAY THE IMMEDIATE EFFECTIVENESS OF THIS ORDER.
FOR THE NUCLEAR REGULATORY COMMISSION
/RA/
J. E. Dyer, Director Office of Nuclear Reactor Regulation Dated this 20th day of June 2006.