Use and Application of Current Operating Experience Use and Application of Current Operating Experience Vincent R. Coulehan Vincent R. Coulehan Manager Operating Experience Manager Operating Experience Entergy Nuclear Northeast Entergy Nuclear Northeast March 7, 2006 March 7, 2006 Entergy RIC 2006 RIC 2006 Session T2E Session T2E Use of Operating Experience Use of Operating Experience

2 Cooper James A FitzPatrick Indian Point Pilgrim Grand Gulf Vermont Yankee Arkansas Nuclear One Waterford 3 River Bend

3 OE Mission at Entergy OE Mission at Entergy

    • The Mission of the Entergy OE Program is to The Mission of the Entergy OE Program is to improve station performance by the improve station performance by the internalization and use of operating internalization and use of operating experience information/lessons learned experience information/lessons learned Entergy

4 Stakeholders Stakeholders

    • Senior Plant Management Senior Plant Management
    • Plant Supervisors Plant Supervisors
    • Craft and Technical Workers Craft and Technical Workers Entergy

5 Expectations Expectations Use of Operating Experience Use of Operating Experience The use of Operating Experience The use of Operating Experience begins with the expectations from the begins with the expectations from the highest levels of Entergy Management highest levels of Entergy Management Entergy

6 OE Lessons Incorporated into OE Lessons Incorporated into Actual work Actual work -- A Success A Success

-- Exposure Reduction Exposure Reduction -- Resin Transfer Resin Transfer

    • Dose savings: 0.500 Dose savings: 0.500 Rem Rem --> 0.050

> 0.050 Rem Rem

    • Pilgrim: Plant Reliability Pilgrim: Plant Reliability

-- Prompt actions to remove a Unit Aux Transformer Prompt actions to remove a Unit Aux Transformer from service prior to failure from service prior to failure

    • Lessons from prior industry events Lessons from prior industry events

7 OE Lessons Incorporated into OE Lessons Incorporated into Actual work Actual work -- A Success A Success

    • ANO: Safety Initiative:

ANO: Safety Initiative:

-- Prior to ANO Unit 1 steam generator replacement Prior to ANO Unit 1 steam generator replacement outage, an event at another station occurred with outage, an event at another station occurred with the same type of lifting device that ANO was using the same type of lifting device that ANO was using to move the steam generators. The event involved to move the steam generators. The event involved some hydraulic hoses to the wedge assemblies some hydraulic hoses to the wedge assemblies reversed during installation reversed during installation because the hoses had because the hoses had no identifying marks no identifying marks. This led to all the lifting

. This led to all the lifting strand wires falling out of the strand jack and strand wires falling out of the strand jack and landing on the reactor cavity deck approximately landing on the reactor cavity deck approximately 100 feet below 100 feet below

8 Sharing & Learning From OE Sharing & Learning From OE

    • Waterford 3 Waterford 3

-- Katrina Lessons from Hurricane Andrew allowed Katrina Lessons from Hurricane Andrew allowed the response teams to develop a systematic and the response teams to develop a systematic and complete check list to allow the safe restart of complete check list to allow the safe restart of WF3 WF3

    • Plant Re Plant Re--Start OE Usage Start OE Usage
    • Emergency Planning Actions Lessons Learned from Emergency Planning Actions Lessons Learned from 2004 and Andrew 2004 and Andrew

9 OE in Closing OE in Closing Operating Experience is vital in:

Operating Experience is vital in:

-- Improving Personnel Safety Improving Personnel Safety

-- Reducing Human Performance Errors Reducing Human Performance Errors

-- Improving Plant Performance Improving Plant Performance

-- Allows our workers to perform a job/task better Allows our workers to perform a job/task better

-- Capturing information for future workers Capturing information for future workers preventing us from making the same mistakes preventing us from making the same mistakes