RIC 2006 Presentation - T2E - Vincent Coulehan - Use of Operating Experience (Regulator/Operator/Licensee)
ML061780271
Person / Time
Site: Indian Point, Grand Gulf, Cooper, Pilgrim, Arkansas Nuclear, River Bend, Vermont Yankee, Waterford, FitzPatrick  Entergy icon.png
Issue date: 03/07/2006
From: Coulehan V
Entergy Nuclear Northeast
To:
NRC/FSME
References
Download: ML061780271 (9)


Text

RIC 2006 Session T2E Use of Operating Experience se and Application of Current Operating Experience incent R. Coulehan anager Operating Experience ntergy Nuclear Northeast arch 7, 2006 Entergy

James A FitzPatrick Arkansas Nuclear One Grand Gulf Indian Point Vermont Yankee Pilgrim Cooper Waterford 3 River Bend 2

OE Mission at Entergy

  • The Mission of the Entergy OE Program is to improve station performance by the internalization and use of operating experience information/lessons learned Entergy 3

Stakeholders

  • Senior Plant Management
  • Plant Supervisors
  • Craft and Technical Workers Entergy 4

Expectations Use of Operating Experience The use of Operating Experience begins with the expectations from the highest levels of Entergy Management Entergy 5

OE Lessons Incorporated into Actual work - A Success

- Exposure Reduction - Resin Transfer

  • Dose savings: 0.500 Rem -> 0.050 Rem
  • Pilgrim: Plant Reliability

- Prompt actions to remove a Unit Aux Transformer from service prior to failure

  • Lessons from prior industry events 6

OE Lessons Incorporated into Actual work - A Success

  • ANO: Safety Initiative:

- Prior to ANO Unit 1 steam generator replacement outage, an event at another station occurred with the same type of lifting device that ANO was using to move the steam generators. The event involved some hydraulic hoses to the wedge assemblies reversed during installation because the hoses had no identifying marks. This led to all the lifting strand wires falling out of the strand jack and landing on the reactor cavity deck approximately 100 feet below 7

Sharing & Learning From OE

  • Waterford 3

- Katrina Lessons from Hurricane Andrew allowed the response teams to develop a systematic and complete check list to allow the safe restart of WF3

  • Plant Re-Start OE Usage
  • Emergency Planning Actions Lessons Learned from 2004 and Andrew 8

OE in Closing Operating Experience is vital in:

- Improving Personnel Safety

- Reducing Human Performance Errors

- Improving Plant Performance

- Allows our workers to perform a job/task better