Technical Specification Pages Re Relocation of Technical Specifications Structural Integrity Requirements to Final Safety Analysis Report
ML062620240
Person / Time
Site: Pilgrim
Issue date: 09/14/2006
From: James Shea
NRC/NRR/ADRO/DORL/LPLI-1
To:
References
Download: ML062620240 (10)


Text

B. Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 22 , are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.

C. Records ENO shall keep facility operating records in accordance with the requirements of the Technical Specifications.

D. Equalizer Valve Restriction - DELETED E. Recirculation Loon Inoperable - DELETED F. Fire Protection ENO shall implement and maintain in effect all provisions of the approved fire protection program as described in the Final Safety Analysis Report for the facility and as approved in the SER dated December 21, 1978 as supplemented subject to the following provision:

ENO may make changes to the approved fire protection program without prior approval of the Commission only if those changes would not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire.

G. Physical Protection The licensee shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The combined set of plans, which contain Safeguards Information protected under 10 CFR 73.21, is entitled: "Pilgrim Nuclear Power Station Physical Security, Training and Qualification, and Safeguards Contingency Plan, Revision 0' submitted by letter dated October 13, 2004.

Amendment 224 I

TABLE OF CONTENTS LIMITING CONDITIONS FOR OPERATION SURVEILLANCE REQUIREMENTS 3.6 PRIMARY SYSTEM BOUNDARY 4.6 3/4.6-1 A. Thermal and Pressurization Limitations A 3/4.6-1 B. Coolant Chemistry B 3/4.6-3 C. Coolant Leakage C 3/4.6-4 D. Safety and Relief Valves D 3/4.6-6 E. Jet Pumps E 3/4.6-7 F. Recirculation Loops Operating F 3/4.6-8 BASES 63/4.6-1 3.7 CONTAINMENT SYSTEMS 4.7 3/4.7-1 A. Primary Containment A 3/4.7-1 B. Standby Gas Treatment System and Control B Room High Efficiency Air Filtration System 3/4.7-11 C. Secondary Containment C 3/4.7-16 BASES B3/4.7-1 3.8 PLANT SYSTEMS 4.8 3/4.8-1 3.8.1 Main Condenser Offgas 4.8.1 3/4.8-1 3.8.2 Mechanical Vacuum Pump 4.8.2 3/4.8-2 BASES B3/4.8-1 3.9 AUXILIARY ELECTRICAL SYSTEM 4.9 3/4.9-1 A. Auxiliary Electrical Equipment A 3/4.9-1 B. Operation with Inoperable Equipment B 3/4.9-4 BASES 83/4.9-1 3.10 CORE ALTERATIONS 4.10 3/4.10-1 A. Refueling Interlocks A 3/4.10-1 B. Core Monitoring B 3/4.10-1 C. Spent Fuel Pool Water Level C 3/4.10-2 D. Multiple Control Rod Removal D 3/4.10-2 BASES B3/4.10-1 3.11 REACTOR FUEL ASSEMBLY 4.11 3/4.11-1 A. Average Planar Linear Heat Generation Rate A (APLHGR) 3/4.11-1 B. Linear Heat Generation Rate (LHGR) B 3/4.11-2 C. Minimum Critical Power Ratio (MCPR) C 3/4.11-2 D. Power/Flow Relationship During Power D Operation 3/4.11-4 BASES B3/4.11-1 PNPS ii Amendment No.4-9,249,,

224

LIMITING CONDITIONS FOR OPERATION SURVEILLANCE REQUIREMENTS 3.6 PRIMARY SYSTEM BOUNDARY (Cont) 4.6 PRIMARY SYSTEM BOUNDARY (Cont)

F. Recirculation Loons Operatina F. Recirculation Loops Operatina During operation in the Run and Startup Recirculation pump speeds shall be Modes, at least one recirculation pump shall checked and logged at least once per day.

be operating.

1. Whenever both recirculation pumps are in operation, pump speeds shall be maintained within 10% of each other when power level is greater than 80%

and within 15% of each other when power level is less than or equal to 80%.

2. Whenever a single recirculation loop is operating, the following limits are applied when the associated LCO is applicable:

a) LCO 3.11.A, "Average Planar Linear Heat Generation Rate (APLHGR)," single loop operation limits specified In the COLR, b) LCO 3.11.C, "Minimum Critical Power Ratio (MCPR)," single loop operation limits specified in the COLR, and c) LCO 3.1, "Reactor Protection System," Average Power Range Monitor High Flux function, trip level setting for the flow bias function is reset for single loop operation per Table 3.1.1.

3. Ifthe requirements of Specification 3.6.F.1 or 3.6.F.2 are not met, restore compliance within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. If compliance is not restored or with no recirculation pumps in operation the reactor shall be in Hot Shutdown within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

Amendment No. 19, 93, 433, 10,'2244 3/4.6-8