Fourth Ten-Year In-Service Testing (IST) Program, IST Relief Request PR-03, Rev. 3
ML061870492
Person / Time
Site: Pilgrim
Issue date: 06/29/2006
From: Bethay S
Entergy Nuclear Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
2.06.008, TAC MB8773
Download: ML061870492 (88)


Text

'Entergy Entergy Nuclear Operations, Inc.

Pilgrim Station 600 Rocky Hill Road Plymouth, MA 02360 Stephen J. Bethay Director, Nuclear Assessment June 29, 2006 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555-0001

SUBJECT:

Entergy Nuclear Operations, Inc.

Pilgrim Nuclear Power Station Docket No. 50-293 License No. DPR-35 Pilgrim Fourth Ten-Year In-service Testing (IST) Program, IST Relief Request PR-03, Rev. 3 LETTER NUMBER:

REFERENCES:

2.06.008

1.

NRC Letter, Pilgrim Nuclear Power Station-Entergy Relief Request PR-03, High Pressure Coolant Injection Pump (TAC NO. MB8773) dated August 29, 2005

2.

Entergy Letter No. 2.05.012, Pilgrim Fourth Ten-Year In-service Testing (IST) Program, IST Relief Request PR-03, dated February 24, 2005

Dear Sir or Madam:

By this letter Entergy submits the HPCI Pump Relief Request PR-03, Revision 3 for NRC approval to continue for the remaining duration of the IST interval the alternative testing previously approved by the NRC in Reference 1. The PR-03 Rev. 3 includes updated information based on the results of NRC approved alternative comprehensive test and additional information concerning the alternative testing.

Entergy submitted Relief Request, PR-03, Rev. 2 by Reference 2 for the fourth IST interval and NRC approved the alternative testing for use until August 29, 2008. The fourth IST interval began on December 7, 2002 and ends on December 6, 2012.

The scope of this relief applies to ASME OMa-1996, ISTB 5.2.3, Comprehensive Test for HPCI pumps and includes confirmation of operational readiness of HPCI pumps based on the NRC approved alternative comprehensive test results and historical pump test data.

Pursuant to 10 CFR 50.55 a(a)(3)(i), Entergy proposes to continue to use the alternative testing to comply with ISTB 5.2.3. The proposed alternative provides an acceptable level of quality and safety because it verifies the operational readiness of the as-built configuration of the HPCI pump, and the historical data has shown no signs of degradation in the HPCI pump.

206008

Entergy Nuclear Operations, Inc.

Letter Number: 2.06.008 Pilgrim Nuclear Power Station Page 2 Pilgrim intends to continue to perform the alternative comprehensive HPCI surveillance test as approved for the remaining duration of the Fourth IST interval.

This letter contains no new commitments.

If you have any questions or require additional information, please contact Mr. Bryan Ford, Licensing Manager, at (508) 830-8403.

Sincerely, S3tep~h J.Bhay u

WGL/dm

Attachment:

HPCI Pump Relief Request, PR-03, Revision 3 (86 pages) cc:

Mr. James J. Shea, Project Manager Office of Nuclear Reactor Regulation Mail Stop: 0-8B-1 U.S. Nuclear Regulatory Commission 1 White Flint North 11555 Rockville Pike Rockville, MD 20852 U.S. Nuclear Regulatory Commission Region 1 475 Allendale Road King of Prussia, PA 19406 Senior Resident Inspector Pilgrim Nuclear Power Station 206008

ATTACHMENT HPCI Pump Relief Request, PR-03, Revision 3, (8 pages) to PR-03, Rev. 3 (11 pages) to PR-03, Rev. 3 (66 pages)

(Total 86 paqes)

PUMP RELIEF REQUEST PR-03. Revision 3 PUMP:

P-205 (Main/Booster)

SYSTEM:

High Pressure Coolant Injection (HPCI)

CLASS:

2 FUNCTION:

Provides emergency core cooling subsequent to a small break LOCA.

TEST REQUIREMENTS:

ASME OM Code OMa-1996, ISTB 5.2.3, Comprehensive Test ISTB 5.2.3(d): Vibration (displacement or velocity) shall be determined and compared with corresponding reference values. Vibration measurements are to be broad band (unfiltered). If velocity measurements are used, they shall be peak. If displacement amplitudes are used, they shall be peak-to-peak.

ISTB 5.2.3(e): All deviations from the reference values shall be compared with the ranges of Tables ISTB 5.2.1-1 and ISTB 5.2.3-1 and corrective action taken as specified in paragraph ISTB 6.2. The vibration measurements shall be compared to the relative and absolute criteria shown in the Alert and Required Action Ranges of Table ISTB 5.2.1-1. For example, if vibration exceeds either 6 Vr or 0.7 in./sec, the pump is in the Required Action Range.

RELIEF REQUESTED:

Relief is requested from the ASME OMa-1996, ISTB 5.2.3(d) required method of determining the vibration velocity (Vv) overall value for surveillance test use and for establishing reference values for the HPCI Main pump inboard (turbine side) bearing horizontal point (P3H) and the Main pump outboard (gearbox side) bearing horizontal point (P4H). PNPS proposes that the vibration occurring at the discrete frequency component that is at exactly 4x Booster pump RPM not be included as part of the vibration spectrum vector summing process to obtain the Main pump overall value for these points during comprehensive pump testing. This method is equivalent to extracting the discrete frequency component that is at exactly 4x Booster pump RPM from the broad band vibration spectrum. Since ISTB 5.2.3(d) requires broad band vibration measurements, NRC approved alternative testing is required to demonstrate the operational readiness of the HPCI pump taking into account the as-built configuration of the HPCI pump as specified in ISTB 4.3(g) and associated footnote.

Pilgrim requests relief from the Code requirements of paragraph ISTB 5.2.3(e) for the HPCI Main and Booster Pumps specifically from the vibration velocity (Vv) acceptance criteria specified in Table ISTB 5.2.1-1 for all Main pump and Booster pump vibration points except for the Booster pump outboard horizontal axial vibration point (P8A). Pilgrim proposes to expand the Acceptable Range identified in Table ISTB 5.2.1-1, for pump Quarterly and Biennial Comprehensive vibration monitoring.

BASIS FOR RELIEF:

Relief from the referenced Code requirements is based on the determination that the proposed alternative testing would provide an acceptable level of quality and safety in accordance with 10 CFR 50.55 a(a)(3)(i), as evidenced by the results of recent pump tests performed in November 2005 and February 2006, and historical vibration test data.

Page 1 of 8

Historic testing and analysis performed on the HPCI System by PNPS (and the pump manufacturer) have consistently revealed characteristic pump vibration levels that exceed the acceptance criteria stated in Table ISTB 5.2.1-1. High vibration appears on the Main pump bearing housings at approximately 2x RPM in the horizontal direction, which is caused by Booster pump excitation (at 4x RPM of the booster pump). Under normal circumstances at 4000 rpm, the vibration amplitude at the Main pump bearings in the horizontal direction exceeds the OM Code absolute vibration Required Action Range of > 0.7 in./sec. Additionally, under the same conditions, all of the remaining HPCI Main and Booster pump vibration monitoring points, except for two, typically exceed the OM Code absolute acceptable range upper value of 0.325 in./sec.

The vibration characteristics of the HPCI pump are predominantly a function of the pump design and should be identified as such rather than attributed to pump degradation. The high vibration has been present to the same order of magnitude since the pump was new. Although existing vibration levels of the HPCI pump are higher than the acceptance criteria provided in Table ISTB 5.2.1-1, they reflect the unique operating characteristics of the HPCI pump design configuration. There are no major vibrational concerns that would result in pump degradation or would prevent the HPCI pump from performing its design safety function for an extended period of operation.

The purpose of the Code required testing is to demonstrate the operational readiness of the HPCI pump by monitoring pump vibrations for degradation and taking corrective actions when those vibration levels exceed the Code specified values. The Code specifies in ISTB 4.3(g) footnote that the reference vibration measurements should be representative of the pump and that the measured vibration will not prevent the pump from fulfilling its function. Accordingly, Pilgrim is proposing an alternative testing to demonstrate the operational readiness by taking into consideration the vibration measurements representative of the as-built configuration of the HPCI pump.

Alternate Testing to the ASME OMa-1 996 Code:

Pilgrim proposes alternative testing as follows.

1. The alternative testing proposes to remove the 4x Booster pump RPM frequency component (discrete peak) from the vibration spectrum of the Main pump since its amplitude is not related to the physical condition or rotating dynamics of the Main pump rotor or bearing system. The Main pump vibration spectrum, with this single 4x Booster pump RPM frequency component removed, has been shown to be stable and more useful for monitoring actual pump condition. When this vibration frequency component at 4x Booster pump RPM is subtracted from the Main pump vibration spectrum the remaining vibration, which is attributed to the Main pump, is below the OM Code Required Action Range. This corrected vibration level provides a more representative measurement of the pump condition to be used for trending.
2. All other discrete vibration peaks observed at the Main pump horizontal vibration points will be evaluated during each pump vibration test, and will have an Acceptable Range upper limit of 1.05 V, and an Alert Range upper limit 1.3 Vr. The reviews of the frequency spectrum data ensure that any significant change in the vibration signature will be noted regardless of whether the severity causes the overall level to exceed its criteria. For example, if the overall vibration level is acceptable but the lx RPM component has increased to greater than 1.3 times the reference value overall level (Vr),

then the pump will be placed in the vibration Required Action Range (>0.7in./sec).

Page 2 of 8

3. PNPS will increase the ASME OMa-1 996, ISTB 5.2.3 required frequency for vibration monitoring (that is part of the comprehensive testing) from once/2 years to once/year.

The Code required comprehensive test for flow rates would continue to be once/2 years.

Given that the HPCI vibration will normally exceed the OM Code limiting Alert Range of

>0.325 in./sec, the once/year frequency will be doubled to twice/year. The twice/year frequency will be the commitment frequency. However, the normal PNPS practice will be to monitor vibration in the same manner during each of the Quarterly Group B Hydraulic Tests, whenever practicable. Thus, vibration monitoring will be performed up to 8 times in two years as part of the Group B Hydraulic Tests; instead of once/2 years as part of the Comprehensive pump tests.

4. As normal practice, Pilgrim will continue to monitor vibration of HPCI pump during each of the Quarterly Group B Hydraulic Tests in the same manner as required by the OM Code. The preventive maintenance (PM) procedure will also typically be performed, which provides for vibration monitoring of specific pumps for preventive maintenance and balancing, and includes vibration monitoring and trending of the HPCI pump to detect and monitor changes in equipment conditions. As shown in the HPCI pump configuration figure, vibration monitoring is performed at locations required by the OM Code and at additional locations within the scope of the PM procedure (perpendicular to the shaft in the horizontal and vertical positions at each bearing locations and at axial direction to the shaft). Vibration monitoring is thereby routinely performed for the Main pump, Booster pump, Speed Reduction Gearbox, and Steam Turbine. Using the vibration data collected at these points, an accurate diagnosis is made by analyzing the vibration spectrum and planned maintenance is determined to prevent failures. Thus, HPCI pump vibration monitoring will be performed up to 8 times in 2 years as part of Group B Hydraulic Tests and preventive or corrective maintenance will be implemented as necessary to prevent failures. Enclosures 1 and 2 provide HPCI pump vibration spectrum at locations required by the OM Code procedure.
5. Pilgrim will continue current HPCI pump and turbine monitoring and maintenance activities, with changes as conditions warrant, as follows:

Quarterly pump and valve operability tests will be performed to ensure the HPCI pump and turbine function for the intended safety function.

" Quarterly lubrication oil sampling and periodic laboratory analysis as appropriate for the pressure-fed bearings on the Turbine, Main pump, and Gear Reducer and once/cycle (2 years) sampling and analysis for the non-pressure fed Booster pump will be performed. Lubrication oil analysis currently performed includes viscosity, acidity, residue, water content, metals by A.E. spectrometry, and ferrogram readings.

This type of monitoring will detect degradation of the turbine or pump bearings due to accelerated wear, fretting, surface fatigue, or oil contamination.

" HPCI pump and Turbine lube oil system is serviced as-needed weekly. HPCI gland seal condenser hot well pump and motor bearings and HPCI auxiliary lube oil pump and motor bearings are serviced semiannually for lubrication.

HPCI Turbine/Main pump, Main pump/Reducer, and Reducer/Booster pump gear-type shaft couplings are cleaned, examined, and grease-lubricated every 2 years.

These examinations detect excessive wear, fretting, heating, or fatigue due to any unusual loading conditions.

Past monitoring and maintenance activities have shown no evidence or observations of degradation in the HPCI Turbine, Main pump, Gear Reducer, or Booster pump. The Page 3 of 8

attached HPCI and Booster pump historical vibration spectrum (Attachment 4) supports this conclusion. Thus, the continuation of the above periodic monitoring and maintenance activities will ensure that the HPCI pump remains in a high level of operational readiness and that degradation of HPCI pump mechanical condition, reliability, or performance will be detected and corrected in a timely manner.

Technical Justification:

PNPS has conducted an evaluation of the HPCI pump vibration characteristics. An important conclusion of this evaluation is that the mechanical condition of the Main pump can be monitored satisfactorily by disregarding the single frequency component caused by the excitation at 4x Booster pump RPM. The four-vane impeller of the Booster pump generates the excitation force hydraulically. This small pressure pulsation force exists at the vane passing frequency (number of vanes times RPM) for all centrifugal pumps and is usually seen as a significant but not particularly troublesome component on the frequency spectrum for vibration measurements taken at the bearing housings. For the HPCI pump, this vane passing frequency is a problem because it coincides with a hydraulic standing wave resonance in the cross-over piping from the Booster pump to the Main pump when the machine is operating at the rated speed of 4000 RPM. There is an acoustic pressure standing wave pattern, at the 4x RPM frequency, whose wavelength in water is equal to an even fraction (1/4 or 1/2) of the dimensional length inside the cross-over pipe. This is the same principle on which an organ pipe generates a pure tone pneumatic pressure standing wave.

In addition, and exacerbating the vibration resonance condition, the Main pump pedestal experiences a horizontal structural primary rocking mode of the pump pedestal at this same frequency when the Main pump is operating at the rated speed of 4000 RPM. The vibration mode is the second fundamental rocking mode, which is a torsional or twisting mode where the two end bearings move 180 degrees out of phase horizontally. The result of these coincident acoustic and structural resonances is that the Main pump exhibits high vibration in the horizontal direction at the 4x Booster pump RPM frequency. This is solely due to the excitation from the Booster pump being amplified by the coincident resonances. This level of vibration at 4x Booster pump RPM would be seen on the Main pump bearing housings even if the Main pump was not actually running (which is not possible as both pumps are on the same drive train).

The resonant vibration condition at the 4000 RPM operating speed is not detrimental and will not prevent the HPCI pump from fulfilling its function. At the 134 Hz frequency of the resonant vibration on the Main pump, caused by the excitation at 4x Booster pump RPM, the actual displacement amplitude at 0.7 in/sec peak velocity amplitude is 0.0017 inches peak-to-peak.

This displacement imposes negligible alternating stresses on the pump pedestal, housings, and connected piping. The peak-to-peak displacement is also less than the Main pump fluid film journal bearing clearances and would impose negligible loading to these bearings.

The purpose of the ASME OM Code for pump testing is to monitor pumps for degradation. The concept of vibration monitoring is to establish baseline values for vibration when the pump is known to be in good working condition, such as after a maintenance overhaul. From that reference point, trending is performed to monitor for degradation based on the ratio of subsequent vibration levels relative to the reference values. The OM Code also establishes absolute vibration level criteria for Alert (>0.325 in/sec) and Required Action (>0.7 in/sec). In doing so, it was recognized that absolute vibration level limits (as opposed to relative change or ratio limits) are not always quantitatively linked directly with pump physical condition and the following remarks are stated in the ASME OMa Code 1996:

"Vibration measurements of pumps may be foundation, driver, and piping dependent.

Therefore, if initial vibration readings are high and have no obvious relationship to the Page 4 of 8

pump, then vibration measurements should be taken at the driver, at the foundation, and on the piping and analyzed to ensure that the reference vibration measurements are representative of the pump and that the measured vibration levels will not prevent the pump from fulfilling its function."

An important conclusion of the PNPS HPCI pump vibration evaluation is that the mechanical condition of the Main pump can be monitored satisfactorily by disregarding the single frequency component caused by the excitation at 4x Booster pump RPM. A single peak frequency component can be effectively isolated and deleted from a vibration spectrum using the mean-squared subtraction method, that is, the discrete component amplitude (in/sec peak) is squared and subtracted from the spectrum overall level squared, then the square root of that difference represents the overall vibration level that exists without the energy contributed by the deleted component. It has been found that when this method is used, the remaining vibration overall level is much more consistent, stable, and trendable.

This method of vibration level correction has been applied to historical spectrums. The 4x Booster pump RPM component was taken out of the calculation for the main pump overall vibration level. This data shows that when the 4x Booster pump RPM component is deleted from the Main pump vibration, the level is below the Required Action Range (> 0.7 in./sec) but still within the Alert Range (> 0.325 in./sec). It was also shown that the potential effects from the dynamic alignment of pump shaft couplings (at 2X Main pump RPM) can still be monitored effectively.

The vibration spectra derived from the NRC approved alternative test conducted in November 2005 conforms to the historical vibration spectra documented since 1994. Enclosure 1 provides the November 2005 test results and Enclosure 2 provides the historical tests results. Since the observed vibration spectra have not changed, no degradation in the established operational readiness of the HPCI pump has taken place. Also, the alternative test verifies the operational readiness of the HPCI pump in its as-built configuration as stipulated by ISTB 4.3(g) with corresponding footnote.

Impact of Potential Modifications:

For the HPCI Main and Booster pumps, it has been determined that the vibration is foundation and piping dependent. To reduce the HPCI Main and Booster pump vibration down to levels that meet acceptable OM Code vibration criteria requires modifications to the HPCI pump, mounting components, foundation and/or cross-over (interconnecting) piping.

As suggested in a Byron Jackson Tech Note, this vibration may be improved by modifying the interconnecting piping and the Main pump mounting pedestal. The alternative modification changes the Booster pump impeller from four to five vanes to alter the forcing function of the standing wave resonance.

The proposed Byron Jackson modifications, other than replacing the Booster pump impeller, are generally very difficult to implement successfully. Altering the natural frequency of a large pump installation requires either considerable additions of stiffening components or substantial additions of mass. Often the results of such design changes are unsuccessful or unfavorable due to the variable speed operation requirements.

Modification of the HPCI Booster pump would require replacing the current four-vane impeller with an upgraded five-vane impeller. The impeller modification, although yielding predictable results, requires extensive work to the HPCI pump at a time when such a major rebuild of this pump is not otherwise necessary or desired. The expected result would be a modest decrease in the vibration caused on the Main pump at 4000 RPM, although the vibration would remain Page 5 of 8

above the 0.325 inch/sec Alert Range criteria. A small decrease in hydraulic performance is also expected when changing from a four to five-vane impeller. The proposed major modification would cost approximately $500,000 without a compensating improvement in the pump vibration. Most HPCI pump vibration points would remain above the 0.325 in./sec Alert Criteria. Accordingly, the proposed modification would not achieve the underlying objective of performing the Code required testing without the need for Code relief.

PNPS has also concluded that none of the possible modifications that could be performed on the HPCI pump, mounting pedestal, or cross-over piping are necessary. This is primarily due to the nature of the HPCI pump service profile. The Byron Jackson Tech Note describes the following consideration in the Technical Discussion:

Pumping systems in which the vane passing pressure pulsations form standing waves in the attached piping are not unusual, especially if the pumps have a variable speed driver.

Standing waves are highly dependent upon water temperature. Thus, measured vibration amplitudes often vary from test to test."

The HPCI pump service is such that the pump runs for short periods of time at highly variable speeds. The pump inservice testing at PNPS is performed with the pump operating at or close to its rated speed (4000 RPM) and flow conditions (4250 GPM) that are unique to PNPS. For this particular pump configuration, this pump speed corresponds to the point where the acoustic resonant vibration is typically most pronounced. In actual service for high pressure coolant injection to the reactor, the pump will operate at the speed that the flow controller requires to maintain reactor water level. The flow rate of 4250 GPM is the maximum makeup flow rate for which the HPCI System was intended to be capable of maintaining reactor water level. This flow rate is far in excess of the decay heat makeup water requirements for the reactor in the isolated condition in the absence of a major leak. The pump speed required is also dependent on reactor pressure with the required speed decreasing along with reactor pressure.

The same general HPCI pump configuration is used at other plants but often with different pump impellers, rated speeds and plant design flow rates. For these plants the vibration characteristics at the inservice testing points are markedly different for that reason. The vibration monitoring performed (including a frequency spectral review) to date under the IST program and the PNPS Pump Vibration Monitoring Program has shown that there has not been degradation of these HPCI pump components.

Inservice Testing can be successfully performed for the PNPS HPCI pump using the methods proposed in this relief request, along with monitoring and maintenance activities currently in practice. Any significant degradation of the HPCI pump components will be readily identified using the vibration spectral analysis methods and other preventive monitoring activities described in this relief request. Therefore, Entergy believes that the proposed alternative testing and monitoring for the PNPS HPCI pump will provide an acceptable level of quality and safety in accordance with 10 CFR 50.55 a(a)(3)(i).

ALTERNATE TESTING:

To allow for practicable monitoring of vibration levels on the HPCI pump, alternate vibration acceptance criteria are necessary. A full spectrum review will be performed for all IST vibration points during each proposed comprehensive test, utilizing the following criteria.

The table below provides the acceptance criteria that are applied to the overall vibration level for the Main pump. The note explains that for the horizontal Main pump points, the discrete frequency component at 4x Booster pump RPM will be extracted from the overall value using the mean-squared subtraction. The two extracted discrete peaks (points P3H and P4H) will be Page 6 of 8

evaluated separately, and will have an Acceptance Range upper limit of 1.05Vr and Alert Range upper limit of 1.3Vr (where Vr equals the vibration reference overall value).

The table boxes in bold italics have values that have been modified from the OM Code vibration criteria. The Alert vibration range of 1.5Vr to 6Vr (in lieu of the OM Code range of 2.5Vr to 6Vr) has been applied as the modified OM vibration criteria. The absolute limiting upper Alert Values (i.e. 0.375, 0.450, 0.500, 0.550, and 0.600) are based upon existing pump reference values, and fall between the values of 1.25Vr and 1.5Vr. All of the modified Alert Values have been compared to historical pump vibration data.

The Table row for P8A is in compliance with the OM Code vibration criteria, and has been placed into this relief request for information only.

MAIN PUMP**

Test Vibration Point Acceptable Range Alert Range Required Action Parameter Range V

Main pump**

S1.5 Vr

> 1.5 Vr to 6 Vr

> 6 Vr Horizontal but not or or Inboard (P3H)

> 0.550 inlsec

> 0.550 to 0.70

> 0.70 in./sec in.1sec Vv Main pump**

S1.5 V,

> 1.5 V, to 6 V,

> 6 Vr Horizontal but not or or Outboard (P4H)

> 0.600 inlsec

> 0.600 to 0.70

> 0.70 in./sec

_inisec V

Main pump S1.5 V,

> 1.5 Vr to 6 V,

> 6 Vr Vertical but not or or Inboard (P3V)

> 0.450 ln.Isec

> 0.450 to 0.70

> 0.70 in./sec in./sec Vv Main pump S1.5 V,

> 1.5 V, to 6 V,

> 6 Vr Vertical but not or or Outboard (P4V)

> 0.375 inlsec

> 0.375 to 0.70

> 0.70 in./sec in.1sec V

Main pump S1.5 Vr

> 1.5 V, to 6 Vr

> 6 Vr Axial but not or or Inboard (P3A))

> 0.500 inlsec

> 0.500 to 0.70

> 0.70 in./sec I_

InJsec

    • Note: For Main pump Horizontal vibration points P3H and P4H, a frequency spectrum analysis will be performed for each pump vibration operability test and the discrete peak at 4x Booster pump RPM will be extracted (using mean-squared subtraction method) from the vibration spectrum overall value. In addition, all other vibration spectrum discrete peaks (including the extracted discrete peak) will be evaluated during each test, and will have an Acceptable Range upper limit of 1.05 Vr and an Alert Range upper limit 1.3 Vr.

Page 7 of 8

BOOSTER PUMP Test Vibration Point Acceptable Ranae Alert Range Required Action Parameter Ranae V

Booster pump S 1.5 V,

> 1.5 V, to 6 V,

> 6 Vr Horizontal but not or or Inboard (P7H)

> 0.450 Inlsec

> 0.450 to 0.70

> 0.70 in./sec inisec V

Booster pump S*1.5 V,

> 1.5 V, to 6 V,

> 6 Vr Horizontal but not or or Outboard (P8H)

> 0.500 inlsec

> 0.500 to 0.70

> 0.70 in./sec In.sec V

Booster pump

  • 1.5 V,

> 1.5 Vt to 6 V,

> 6 Vr Vertical but not or or Inboard (P7V)

> 0.400 in.Isec

> 0.400 to 0.70

> 0.70 in./sec in.1sec V

Booster pump S*1.5 V,

> 1.5 V, to 6 V,

> 6 V, Vertical but not or or Outboard (P8V)

> 0.500 inlsec

> 0.500 to 0.70

> 0.70 in./sec inisec v

Booster pump

< 2.5 Vr

> 2.5 Vr to 6 Vr

> 6 Vr Axial but not or or Outboard (P8A)

> 0.325 in./sec

> 0.325 to 0.70

> 0.70 in./sec in./sec DURATION OF PROPOSED ALTERNATIVE The proposed alternative testing shall apply for the remainder of the 4 th Inservice Testing Interval at Pilgrim.

REFERENCES

1.

NRC Letter, Pilgrim Nuclear Power Station-Entergy Relief Request PR-03 High Pressure Coolant Injection Pump (TAC NO. MB8773), dated August 29, 2005

2.

Entergy Letter No. 02.05.042, Response to NRC Request for Additional Information Related to Pilgrim In-service Testing (IST) Relief Request PR-03 (TAC NO.

MB8773), dated May 24, 2005

3.

Entergy Letter No. 02.05.012, Pilgrim Fourth Ten-year In-Service Testing Program, IST relief Request PR-03, dated February 24, 2005 ENCLOSURES :

HPCI pump November 2005 Vibration Test Results (11 pages) :

HPCI pump Configuration and Historical Vibration Test Results (66 pages)

Page 8 of 8

ENCLOSURE 1 HPCI PUMP NOVEMBER 2005 VIBRATION TEST RESULTS (11 oaaes)

(Pilgrim Seeks Relief for P3H and P4H Points.

Data for the remaining point is provided for information)

1. Relief Point P3H Data
2. Relief Point P4H Data
3. Point P3V Data
4. Point P3A Data
5. Point P4V Data
6. Point P7H Data
7. Point P7V Data
8. Point P8H Data
9. Point P8V Data
10. Point P8A Data encOOl.PDF

1.0 0.8 IST - IST, P205 HPCI @42.5k HPCI ISTR -P3H #3 BEARING-PUMP HORIZONTAL

'I p

l ROUTE SPECTRUM 22-NOV-05 22:3924 OVRALL=.8148 V-DG PK =.057 LOAD =4250.0 RPM = 3983.

RPS = 66.39

.5I 0.

0.6 0.4 0.2 0

Delete Discrete Peak 0 4x Booster Punp RPM:

(0.815)f (OA Level)2

- (0.664) - (4x BP RPM Peak)2 Subtrat Sq Values (0223)f = 0.473 WSOC OA ROUTE WAVEFORM 22-NOV-05 22:39:.24 PK =.9590 PK(+) = 1.47 PK(-)

1.34 CRESTF= 2.15 Frequency in Order 2.0 1.5 1.0 0.5

.5I 0

-0.5

-1.0

-1.5

-2.0 0

40 80 120 160 Time in mSecs 200 Ordr.

Freq:

Spec:

2.017 133.90

.664

i i -II,tI,'25 HPCI 042.5k 1.0 HPCI ISTR -P4H11 #4 BEARING-PUMP HORIZONTAL 1.0 ROUTE SPECTRUM 22-NOV-05 22:41:44 OVRALLU-

.5589 V-DG 0.8 PK =.5528 LOAD =4250.0 RPM= 3981.

0.6 RPS - 66.34

  • 0.4 t

04_

Delete Dicrete Peak O"

0 4x Booster Pump RPM:

0.2 (0.559)f - (OA Level)2

- (o.8)= = (4x BP RPM Peak)2 Subtract Sq Values S

(0.19a)°= 0.445 INSec OA 0

1 3

4 5

6 Frequency in Order 2.0 ROUTE WAVEFORM 1.5 22-NOV-05 22:41:44 PK =.6636 1.0 PK(+) =.9470 PK(.) - 1.09 0.5 CRESTF& 2.33

-1.5

-2.0 Otdr 2.017 40 80 120 160 200 Freq:

133.81 Time In mSe Spec:

.338

ib I - IS r, P205 HPCI @42.5k ISTR -P3V #3 BEARING-PUMP VE 1.0 0.8 ROUTE SPECTRUM 22-NOV-05 22:40:42 OVRALL=.3270 V-DG PK -

.3196 LOAD =4250.0 RPM= 3974.

RPS - 6623 CI 0.4 0.2 Frequency In Order

'1 4,

2.0 1.5 1.0 0.5

-0.5

-1.0

-1.5

-2.0 ROUTE WAVEFORM 22-NOV-05 22:40:42 PK =.3506 PK(+) -. 539 PK(-) =.6753 CRESTF= 2.73 0

40 80 120 160 200 Time In mSecs Ordr Freq:

Spec:

2.019 133.69

.197

MIT -*AT P2BE UNPUM 042.5kAX IIPCI ISTR -P3A #3 BEARING-PUMP AXIAL

'1 I

a.

1.0 0.8 0.6 0.4 0.2 0

2.0 1.5 1.0 Frequency In Order ROUTE SPECTRUM 22-NOV-05 22:41:12 OVRALLU.3736 V-DG PK =.3717 LOAD -4250.0 RPM= 3982.

RPS =66.37 ROUTE WAVEFORM 22-NOV-05 22:41:12 PK =.3731 PK(+) =.5387 PK(-) =.5155 CRESTF-2.07 Ordr 2

Freq:

1" Spec:

I I

0.5 0

-0.5

-1.0

-1.5

-2.0 0

40 80 120 160 Time in mSecs .017 33.86 327

IST - IST, P205 HPCI 042.5k:

HPCI ISTR -P4V #4 BEARING-PUMP VERTICAL 9

1.0 0.8 0.6 0.4 0.2 I

I-7 0I ROUTE SPECTRUM 22-NOV-05 22:42:30 OVRALL=.1547 V-DG PK =.1429 LOAD =4250.0 RPM= 3983.

RPS -= 66.39

(

0 1

3 Frequency In Order 4

5 6

2.0 4

1.5 1.0 0.5 0~

I I

1 ROUTE WAVEFORM 22-NOV-05 22:42:30 PK -.1629 PK(+)

.2951 PK(-) =.2861 CRESTF= 2.61 I

'I

-0.5

-1.0

-1.5

-2.0 J.

0 40 80 120 Time in mSom 160 200 Ordr.

Freq:

Spec:

2.017 133.93

.103

itsT - IST, P205 HPCI @42.5k1,

-P7H #7 BEARING-PUMP INBOARD HORIZ 1.0 0.8 0.6 0.4 0.2 ROUTE SPECTRUM 22-NOV-05 22:45:44 OVRAL-L

.3329 V-DG PK =.2524 LOAD =4250.0 RPM= 2005.

RPS - 33.42 Frequancy in Order Z

2.0 1.5 1.0 0.5

-0.5 ROUTE WAVEFORM 22-NOVrO5 22:45:44 PK =.3577 PK(+) =.5876 PK(-) =.6811 CRESTF= 2.69

-1.0

-1.5

-2.0 0

40 80 120 160 Tint in mSocs 200 Ordr Freq:

Spec:

4.000 133.67

.211

m 1 - IbT, P25 HPCI @42.5k ISTR -P7V #7 BEARING-PUMP INWARD VERTICAL 1.0 0.8 4

n 0.6 0.4 ROUTE SPECTRUM 22-NOV-05 22:46:12 OVRALL, 2396 V-DG PK =.1263 LOAD =4250.0 RPM m 2007.

RPS a 33.45 ROUTE WAVEFORM 22-NOV-05 22:46:12 PK =.2212 PK(+) =.4963 PK(-) =.489W CRESTF= 3.17 0.2 0

2.0 1.5 1.0 Frequency In Order 4

I 0.5

-0.5

-1.0

-1.5

-2.0 0

0 40 80 120 160 200 Timne in mSecs Ordr.

Freq:

Spec:

3.997 133.70

.09500

IST - IST, P20M HPCI 042.51(

-P8H #8 BEARING-PUMP OUTB 1.0 0.8 IL 0.6 0.4 ROUTE SPECTRUM 22-NOV-05 22:46:56 OVRALL=.3670 V-DG PK =.2548 LOAD =4250.0 RPM = 2007.

RPS = 33.44 T ROUTE WAVEFORM 22-NOV-05 22:46:56 PK =.3745 PK(+) =.8933 PK(-) =.6987 CRESTF= 3.37 0.2 C

2.0 1.5 1.0 Frequency in Order LI

.2I

'S 0.5

-0.5

-1.0

-1.5

-2.0 0

40 80 120 160 Time In mSwe 200 Ordr:

Freq:

Spec:

4.000 133.79

.216

1.0 0.8 ROUTE SPECTRUM 22-NOV-05 22:4720 OVRALL-=.3521 V-DG PK =.1665 LOAD =4250.0 RPM= 1989.

RPS - 33.15 4

C 0

0~

0.6 0.4 0.2 Frequency In Order 2.0 1.5 1.0 ROUTE WAVEFORM 22-NOV-05 22:47:20 PK =.3768 PK(+) =.6217 PK(-) =.7122 CRESTF= 2.67 4

I 0.5 0

-0.5

-1.0

-1.5

-2.0 0

40 80 120 160 Time in mSecs 200 Ordr.

Freq:

Spec:

4.031 133.65

.129

1ST - IST, P205 HPCI 042.5k

-P8A #8 BEARING-PUMP OUTE 1.0 0.6 0.6 0.4 0.2 ROUTE SPECTRUM 22-NOV-05 22:47:46

OVRALL,

.1726 V-DG PK -

.1483 LOAD --4250.0 RPM m 2004.

iPS =:33.39 Frequency in Order 2.0 1.5 1.0 ROUTE WAVEFORM 22-NOV-05 22:47:46 PK =.1899 PK(+) =.4590 PK(-) -.3625 CRESTF= 3.42 I

'p 0.5

-0.5

-1.0

-1.5

-2.0 0

40 80 120 160 Time in mSets 200 Ordr.

Freq:

Spec:

4.003 133.67

.03494

ENCLOSURE2 HPCI PUMP CONFIGURATION AND HISTORICAL VIBRATION TEST RESULTS (Total 66 Pages)

(Pilgrim seeks Relief for P3H and P4H Points. Data for the remaining point is provided for information)

HPCI Pump Layout

1. HPCI Pump Configuration
2. HPCI Pump Configuration
3. HPCI Pump Configuration
4. HPCI Pump Vibration Monitoring Program Relief Point P3H Data
5. P3H HPCI Vibration Spectrum Data, Nov. 24, 2004
6. P3H HPCI Vibration Spectrum Data, Aug. 24, 2004
7. P3H HPCI Vibration Spectrum Data, Dec. 17,1997
8. P3H HPCI Vibration Spectrum Data, May 06,1996
9. P3H HPCI Vibration Spectrum Data, Nov. 20,1995
10. P3H HPCI Vibration Spectrum Data, May 25, 1994 Relief Point P4H Data
11. P4H HPCI Vibration Spectrum Data, Nov. 24, 2004
12. P4H HPCI Vibration Spectrum Data, Aug. 24, 2004
13. P4H HPCI Vibration Spectrum Data, Dec. 17,1997
14. P4H HPCI Vibration Spectrum Data, May 06,1996
15. P4H HPCI Vibration Spectrum Data, Nov. 20,1995
16. P4H HPCI Vibration Spectrum Data, May 25, 1994 Point P3V Data
17. P3V HPCI Vibration Spectrum Data, Nov. 24, 2004
18. P3V HPCI Vibration Spectrum Data, Aug. 24, 2004
19. P3V HPCI Vibration Spectrum Data, Dec. 17,1997
20. P3V HPCI Vibration Spectrum Data, May 06, 1996
21. P3V HPCI Vibration Spectrum Data, Nov. 20, 1995
22. P3V HPCI Vibration Spectrum Data, May 25,1994 Point P3A Data
23. P3A HPCI Vibration Spectrum Data, Nov. 24, 2004
24. P3A HPCI Vibration Spectrum Data, Aug. 24, 2004
25. P3A HPCI Vibration Spectrum Data, Dec. 17,1997
26. P3A HPCI Vibration Spectrum Data, May 06,1996
27. P3A HPCI Vibration Spectrum Data, Nov. 20,1995
28. P3A HPCI Vibration Spectrum Data, May 25, 1994 Point P4V Data
29. P4V HPCI Vibration Spectrum Data, Nov. 24, 2004
30. P4V HPCI Vibration Spectrum Data, Aug. 24, 2004
31. P4V HPCI Vibration Spectrum Data, Dec. 17,1997
32. P4V HPCI Vibration Spectrum Data, May 06,1996
33. P4V HPCI Vibration Spectrum Data, Nov. 20,1995
34. P4V HPCI Vibration Spectrum Data, May 25,1994
35. P7H
36. P7H
37. P7H
38. P7H
39. P7H
40. P7H Point P7H Data HPCI Vibration Spectrum HPCI Vibration Spectrum HPCI Vibration Spectrum HPCI Vibration Spectrum HPCI Vibration Spectrum HPCI Vibration Spectrum Data, Nov. 24, 2004 Data, Aug. 24, 2004 Data, Dec. 17,1997 Data, May 06, 1996 Data, Nov. 20, 1995 Data, May 25, 1994 41.

42.

43.

44.

45.

46.

Point P7V Data P7V HPCI Vibration Spectrum Data, Nov. 24, 2004 P7V HPCI Vibration Spectrum Data, Aug. 24, 2004 P7V HPCI Vibration Spectrum Data, Dec. 17,1997 P7V HPCI Vibration Spectrum Data, May 06,1996 P7V HPCI Vibration Spectrum Data, Nov. 20,1995 P7V HPCI Vibration Spectrum Data, May 25, 1994 Point P8H Data

47. P8H HPCI Vibration Spectrum Data,
48. P8H HPCI Vibration Spectrum Data,
49. P8H HPCI Vibration Spectrum Data,
50. P8H HPCI Vibration Spectrum Data,
51. P8H HPCI Vibration Spectrum Data,
52. P8H HPCI Vibration Spectrum Data, Nov. 24, 2004 Aug. 24, 2004 Dec. 17,1997 May 06, 1996 Nov. 20,1995 May 25, 1994
53. P8V
54. P8V
55. P8V
56. P8V
57. P8V
58. P8V
59. P8A
60. P8A
61. P8A
62. P8A
63. P8A
64. P8A Point P8V Data HPCI Vibration Spectrum Data, Nov. 24, 2004 HPCI Vibration Spectrum Data, Aug. 24, 2004 HPCI Vibration Spectrum Data, Dec. 17, 1997 HPCI Vibration Spectrum Data, May 06,1996 HPCI Vibration Spectrum Data, Nov. 20,1995 HPCI Vibration Spectrum Data, May 25, 1994 Point P8A Data HPCI Vibration Spectrum Data, Nov. 24, 2004 HPCI Vibration Spectrum Data, Aug. 24, 2004 HPCI Vibration Spectrum Data, Dec. 17, 1997 HPCI Vibration Spectrum Data, July 31, 1996*

HPCI Vibration Spectrum Data, Nov. 20,1995 HPCI Vibration Spectrum Data, May 25,1994

  • July 31, 1996 data is submitted since May 06, 1996 data is not available for point P8A.

encOOl.PDF

HPCI Pump Configuration P8H

P8V, Main Pump Booster Pump

HPCI Pump Configuration

HPCI Pump Configuration

HPCI Pump Vibration Monitoring Program GOH GOV GOA P8H

P8V, P3H P3V P3A P4H P4V P7H P7V P8H P8V P8A Other points are monitored as part of Vibration Monitoring for Preventive Maintenance and Balance

HPCI Data November 24,2004 OWIALLm "ev"M 0.4U 0.

PA tW S 0.211 0MM 1

f" 1"

1uIx~ft~f ape=

Msp p

HPCI Data August 24, 2004 WT - WT. PM5 WO 044M tipc lMM -MS #8 mWARPRW MMMDNAL 24,M0,0O4 NA OVMNLX "15 VOG LOOD w4W f*

a M.

UE.6.

U030M pme

-PALWW)

-(49 S'P SIPM

'X

&40 S-Vb-sO tUAI P*0"

- owfw.mO ImIW'Mrdr zRM ia g3y 0

W 117 ape An

RX - X203,P205 HPCI TURB & PUMP X203 HPCI -P3H #3 BEARING-PUMP HORIZONTAL CL 1.0 0.8 0.6 0.4 ROUTE SPECTRUM 17-DEC-97 16:49:30 OVRALL= 1.42 V-AP PK =.6617 LOAD =4250.0 RPM= 3997.

RPS = 66.61 Delete Discrete Peak o 4x Booster Pump RPM:

(0.662)2 = (OA Level)2

- (0.519)2 - (4x BP RPM Peak)2 Subtract Sq Values (0.169)0-5 = 0.411 In/Sec OA 0.2 0

Frequency in Order 2.0 1.5 1.0 WAVEFORM DISPLAY 17-DEC-97 16:49:30 PK =.6854 PK(+) = 1.17 PK(-) = 1.54 CRESTF= 2.87 U,

C 0.5

-0.5

-1.0

-1.5

-2.0 0

40 80 120 160 Time in mSecs 200 Ordr:

Freq:

Spec 2.016 134.27

.519

RX - X203,P205 HPCI TURB & PUMP X203 HPCI -P3H #3 BEARING-PUMP HORIZONTAL 1.0 0.8

-i 0.6 0.4 ROUTE SPECTRUM 06-MAY-96 09:21:06 OVRALLI=.8251 V-DG PK =.8208 LOAD =4250.0 RPM= 4004.

RPS = 66.73 Delete Discrete Peak 0 4x Booster Pump RPM:

(0.825)2 = (OA Level)2

- (0.727)f = (4x BP RPM Peakf)

Subtract Sq Values (0.152)°

= 0.390 InrSec OA 0.2 Frequency In Order 2.0 1.5 1.0 WAVEFORM DISPLAY 06-MAY-96 09:21:06 PK =.9211 PK(+) =1.30 PK(-) = 1.51 CRESTF= 2.26 8

0.5

-0.5

-1.0

-1.5

-2.0 0

40 s0 120 160 Time In mSecs 200 Ordr.

Freq:

apea.

2.016 134.53

.727

RX - X203, P205 HPCI TURB & PUMP X203 HPCI -P3H #3 BEARING-PUMP HORIZONTAL S

(L 1.0 0.8 0,6 OA ROUTE SPECTRUM 20-NOV-95 01:58:31 OVRALL=.6703 V-DG PK =.6638 LOAD =4250.0 RPM-3998.

RPS = 66.63 Delete Discrete Peak

@ 4x Booster Pump RPM:

(0.670)2 = (OA Level)2

-. (0.518)f (4x BP RPM Peak)2

-Subtract Sq Values (0.181)" - 0.425 In/Sec OA 0.2 0

Frequency in Order 2.0 1.5 1.0 WAVEFORM DISPLAY 20-NOV-95 01:58:31 PK =.7635 PK(+) - 1.23 PK(-) = 1.18 CRESTF= 2.16 C

I

'I 0.5 0

-0.5

-1.0

-1.5

-2.0 0

40 80 120 160 Time in mSecs 200 Ordr.

Freq:

Spec.

2.016 134.34

.515

RX -X203, P205 HPCI TURB & PUMP X203 HPCI -P3H #3 BEARING-PUMP HORIZONTAL CL 1.0 0.8 0.6 0.4

'I

.V ROUTE SPECTRUM 25-MAY-94 09-27:30 OVRALL-.8515 V-DO PK =.8488 LOAD =4250.0 RPM 4060.

RPS-67.66 4x BOOSTER PUMP RPM 0.2 n

lx RPM 2x RPM it Delete Discrete Peak

  • 4x Booster Pump RPM:

(0.852)'f-(OA Level)f

- (0.710) -

(4x BP RPM Peak)f Subtmc Sq Vale (0.222)o

- 0.471 ln/Sec OA A

Iv

-~.-.----

-i 0

1 3

Frequency In Order 4

5 6

2.0 1.5 1.0 0.5 WAVEFORM DISPLAY 25-MAY-94 09".27:30 PK =.8944 PK(+) - 1.16 PK(-) = 1.43 CRESTF-2.43 t

C 0

0

-0.5

-1.0

-1.5

-2.0 0

40 80 120 160 Time in mSecs 200 Ordr.

Freq:

Spec 2.015 136.32

.710

4 1.0 0.8 I4 0.6 0.4 0.2 ROUTE SPECTRUM 24-NOV-04 00:54:26 OVRALL=!.6774 V-DG PK =.6719 LOAD =4250.0 RPM= 4017.

RPS = 66.95 Delete Discrete Peak o 4x Booster Pump RPM:

(0.677)2.

(OA Level*)

- (0.319)2 = (4x BP RPM Peak)2 Subtract Sq Values (0.357)" = 0.597 IrVSOC OA Frequency in Order 2.0 1.5 1.0 ROUTE WAVEFORM 24-NOV-04 00:54:26 PK =.6896 PK(+) = 1.09 PK(-) = 1.13 CRESTF= 2.35 4

0.5 0

-0.5

-1.0

-1.5

-2.0 0

40 80 120 160 Time in mSecs 200 Ordr.

Freq:

Spev:

2.017 135.05

.319

j IST - IST, P205 HPCI 042.5k HPCI ISTR -P4H #4 BEARING-PUMP HORIZONTAL II C

0~

1.0 0.8 0.6 0.4 ROUTE SPECTRUM 24-AUG-04 20.48:20 OVRALL=.6479 V-DG PK =.6427 LOAD =4250.0 RPM= 3973.

RPS = 88.22 0.2

(

2.0 1.5 1.0 Delete Discrete Peak o 4x Booster Pump RPM:

(0.648) -

(OA LevO)

- (0.425)f (4x BP RPM Peak)f Subtract Sq Values (0.239)"*-

0.489 In/Sec OA ROUTE WAVEFORM 24-AUG-04 20-48:20 PK =.5804 PK(+) = 1.08 PK(-)

1.08 CRESTF= 2.48 Frequency In Order 0

C I

0.5 0

-0.5

-1.0

-1.5

-2.0 0

40 80 120 160 Time in mSecs 200 Ordr.

Freq:

Spea.

2Z017 133.57

.425

.. t RX - X203,P205 HPCI TURB & PUMP X203 HPCI -P4H #4 BEARING-PUMP HORIZI a.

1.0 0.8 0.6 0.4 ROUTE SPECTRUM 17-DEC-97 16:53:18 OVRALL= 1.11 V-AP PK =.5153 LOAD -425O.0 RPM= 3996.

RPS = 66.61 Delete Discrete Peak 0 4x Booster Pump RPM:

(0.515)2 = (OA Level)

- (0.272) = (4x BP RPM Peak)

Subtract Sq Values (0.191)0-s - 0.437 InSec OA 0.2 0

Frequency in Order 2.0 1.5 1.0 WAVEFORM DISPLAY 17-DEC-97 16:53:18 PK =.4948 PK(+) =.9773 PK(-) =.7628 CRESTF= 3.15 C

I 0.5 0

-0.5

-1.0

-1.5

-2.0 0

40 80 120 160 Time in mSecs 200 Ordr Freq:

Spec.

2.013 134.11

.272

RX - X203,P205 HPCI TURB & PUMP X203 HPCI, -P4H #4 BEARING-PUMP HORIZONTAL p

1.0 0.8 Y.

IL 0.6 0.4 ROUTE SPECTRUM 06-MAY-96 09:23:46 OVRALL=.6006 V-DG PK =.6001 LOAD =4250.0 RPM= 4009.

RPS = 68.82 Delete Discrete Peak o 4x Booster Pump RPM:

(0.601)2 = (OA Level)2

- (0.421)f = (4x BP RPM Peak)2 Subtract Sq Values (0.184)" - 0.429 In/Sac OA 0.2 0

Frequency in Order 2.0 1.5 1.0 WAVEFORM DISPLAY 06-MAY-96 09:23:46 PK =.5673 PK(÷) = 1.10 PK(-)

1.03 CRESTF= 2.44 V

4%

0.5 0

-0.5

-1.0

-1.5

-2.0 0

40 80 120 160 Time In mSecs 200 Ordr Freq:

Spec:

2.013 134.53 A21

RX - X203, P205 HPCI TURB & PUMP X203 HPCI -P4H #4 BEARING-PUMP HORIZONTAL Ij.

1.0 0.8 0.6 0.4 0.2 0

ROUTE SPECTRUM 20-NOV-95 02:00:49 OVRALL=-.4777 V-DG PK =.4756 LOAD -4250.0 RPM= 4000.

RPS = 66.66 Delete Discrete Peak

@ 4x Booster Pump RPM:

(0.478)2 - (OA Level) 2

-(0.251)f - (4xBPRPM Peak)

Subtract Sq Values (0.166)"

= 0.407 In/Sec OA WAVEFORM DISPLAY 20-NOV-95 02:00:49 PK =.4798 PK(+) =.9286 PK(-) =.9515 CRESTF= 2.55 Frequency in Order 2.0 1.5 1.0 0.5 I

C 0

-0.5

-1.0

-1.5

-2.0 0

40 80 120 160 200 Time in mSecs Ordr:

Freq:

Spec:

2.014 13425 251

IL 1.0 0.B 0.6 0.4 I

RX - X203. P205 HPCI TURB & PUMP X203 HPCI -P4H #4 BEARING-PUMP HORIZONTAL ROUTE SPECTRUM 254MAY-94 09:30:18 OVRALL-.6818 V-DG PK =.6814 LOAD m4250.0 RPM m 4061.

RPS,, 67.69 lxRP 4x BOOSTER SPUMP RPM 0.2-n 2x RPM Delete Discrete Peak 0 4x Booster Pump RPM:

(0.682)2 - (OA Le)

- (0.38)'

(4x BP RPM Peak)f Subirct Sq Values (0.316f6 = 0.562 Ir/SOC OA I

i W

8 0

1 9

3 Frequency In Order 4

5 6

2.0 1.5 1.0 WAVEFORM DISPLAY 25-MAY-94 09:.30.18 PK -.6957 PK(+)

1.12 PK(-) = 1.07 CREST'F= 2.47 4

I

'I 0.5 0

-0.5

-1.0

-1.5

-2.0 0

40 80 120 160 Time In mSecs 200 Ordr.

Freq:

Spec:

2.013 136.28

.386

iST - 15T. P205 HPCI @42.5k HPCI ISTR -P3V #3 BEARING-PUMP VERTICAL CL 1.0 0.8 0.6 0.4 ROUTE SPECTRUM 24-NOV-04 00:4620 OVRALLz.3093 V-DG PK m.3198 LOAD =4250.0 RPM -

4014.

RPS = 66.90 02 Frequency in Order I

2.0 1.5 1.0 0.5

-0.5

-1.0

-1.5

-2.0 ROUTE WAVEFORM 24-NOV-04 00:46820 PK =.3405 PK(+) -. 5724 PK(-) =.6078 CRESTF= 2.59 0

40 80 120 160 200 Time In mSecs or&.

Freq:

Spec:

2.018 135.00

.157

j I!

0.

1.0 0.8 0.6 0.4 IST - IST, P205 HPCI @42.5k HPCI ISTR -P3V #3 BEARING-PUMP VERTICAL ROUTE SPECTRUM 24-AUG-04 20:47:06 OVRALL=.2864 V-DG PK =.2821 LOAD,4250.0 RPM= 3971.

RPS n 66.18 0.2 0

2.0 1.5 1.0 Frequency in Order ROUTE WAVEFORM 24-AUG-O4 20:47:06 PK =.2857 PK(+) -.6158 PK(-) =.5457 CRESTF= 3.05 0.5 0

-0.5

-1.0

-1.5

-2.0 0

40 80 120 160 Time in mSecs 200 Ordr.

Freq:

Spec:

2.019 133.59

.151

RX - X203,P205 HPGI TURB & PUMP X203 HPCI -P3V #3 BEARING-PUMP VERTICAL CL 1.0 0.8 0.6 0.4 ROUTE SPECTRUM 17-DEC-97 16:51"14 OVRALL-.6209 V-AP PK-2802 LOAD w4250.0 RPMa= 3990.

RPS -66.50 02 Frequency In Order 2.0 1.5 1.0 WAVEFORM DISPLAY 17-DEC-97 16:51:14 PK = 2687 PK(+) =.4631 PK(-) =.4749 CRESTF= 2.58

~1 I

0.5

-0.5

-1.0

-1.5

-2.0 0

40 80 120 160 Tim in moScs 200 Freq:

Spec:

2.015 134.01

.118

I t

Am 1.0 0.8 0.6 0.4 02 ROUTE SPECTRUM W-MAY-96 09.22:06 OVRALL=.2M85 V-DG PK =.2818 LOAD -4250.0 RPM-4003.

RPS = 66.72 Frequency in Ord&

I 2.0 1.5 1.0 0.5

-0.5

-1.0

-1.5

-2.0 WAVEFORM DISPLAY 06-MAY-96 09-.22 PK

.2677 PK(+) -.5314 PK(-) =.4947 CRESTF-2.63 0

0 40 80 120 160 200 Trme in mSecs Ordr.

Freq:

Spec:

2.016 134.49

.125

i FX - X203, P205 KPCI TURB & PUMP X203 HPCI -P3V #3 BEARING-PUMP VERT C-1.0 0.8 0.6 0A ROUTE SPECTRUM 20-NOV-95 01:59:30 OVRALL-=.2902 V-OG PK=.2885 LOAD m4250.0 RPM-4001.

WS 66.68 02 Frequency in Order 2.0 1.5 WAVEFORM DISPLAY 20-NOV-95 01:59:30 PK =.3051 PK(+) =.5425 PK(-) =.4714 CRESTF-2.72 I

1.0 0.5

-0.5

-1.0

-1.5

-2.0 0

0 40 80 120 160 TIM in msecs 200 Odr:.

Freq:

Spec:

2.016 134.42

.140

RX -X203, P205 HPCI TURB & PUMP X203 HPCI -P3V #3 BEARING-PUMP VERT 1*

1.0 0.8 0.6 0.4 ROUTE SPECTRUM 25-MAY-94 09:28:50 OVRALL=.2848 V-OG PK =.2827 LOAD =4250.0 RPM = 4075.

RPS = 67.92 L

T WAVEFORM DISPLAY 25-MAY-94 09:28:50 PK =.2926 PK(+) -. 5419 PK(-) =.584 CRESTF= 279 0.2 0

2.0 1.5 1.0 Frequency in Order C

0.5 0

-0.5

-1.0

-1.5

-2.0 0

40 80 120 160 Time In mSecs 200 Ordr.

Freq:

Spec 2.006 136.26

.100

I 4

1.0 0.8 0.6 0.4 ROUTE SPECTRUM 24-NOV-04 00:51:19 OVRALL-=.3549 V-DG PK,.3531 LOAD -4250.0 RPM-4018.

RPS-66.97 ROUTE WAVEFORM 24-NOV-04 00:51:19 PK m.3707 PK(+)-.5139 PK(-).. 220 CRESTF-2.31 0.2 C

2.0 1.5 1.0 Frequency in Ogc-dr 4

i 0.5

-0.5

-1.0

-1.5

-2.0 0

40 80 120 160 200 Tim. In mSam Ordr.

Frq:

Spec:

2.016 135.00 289

IST - IST, P205 HPCI 042.5k HPCI ISTR -P3A #3 BEARING-PUMP AXIAL 1.0 I

0.8 7

0.6 0.4 a.

ROUTE SPECTRUM 24-AUG-04 20:47:48 OVRALL=.4050 V-DG PK =.4031 LOAD -4250.0 RPM - 3975.

RPS = 66.25 0.2 h

0 0

1 3

Frequency In Order 4

5 6

2.0 1.5 1.0 ROUTE WAVEFORM 24-AUG-O4 20:47:48 PK =.4090 PK(+) =.604m PK(-) =.6451 CRESTF-2.24 8

£I 0.5

-0.5

-1.0

-1.5

-2.0 0

40 80 120 160 200 Tune in mSets Ordr:

Freq:

SPec:

2.017 133.63

.363

RX - X203,P205 HPCI TURD & PUMP X203 4PCI -P3A #3 BEARING-PUMP AXI 1.0 0.8 ROUTE SPECTRUM 17-DEC-97 16:52:30 OVRALL-.6150 V-AP PK =.3046 LOAD m4250.0 RPM - 3998.

RPS - 66.64 tI 0.0 0.4 0.2 Frequency in Order 2.0 1.5 WAVEFORM DISPLAY 17-DEC-97 16:52:30 PK =.3076 PK(+) -.4940 PK(-) =.59 CRESTF= 2.50 4

'pI.

1.0 0.5

-0.5

-1.0

.1.5

-2.0 0

0 40 80 120 160 200 Tkm In mSom Freq:

Spec:

2.014 13424 254

I PX -X2:W,P205 HPGI TURB & PUMP X203 HPCI -P3A 3 BEARING-PUMP AXIAL IL 1.0 0.8 0.6 0.4 ROUTE SPECTRUM 06-MAY-96 09.23:10 OVRALL=.3468 V-DG PK w.3533 LOAD "425M.0 RPM-4008.

RPS-68.80 0.2 Frequency in Order 2.0 1.5 1.0 WAVEFORM DISPLAY 06-MAY-96 09.23:10 PK =.3319 PK(+) -. 6491 PK(-).. 4948 CRESTF-2.71 I

0.5

-0.5

-1.0

-1.5

-2.0 0

40 80 120 160 200 Time In mSecs Freq:

Spec:

2.014 134.56

.310

RX - X200, P205 HPCI TURB & PUMP 1.0 X203 HPCI -P3A #3 BEARING-PUMP AXIAL ROUTE SPECTRUM 20-NOV-95 02:00:22 OVRALL-.3028 V-DG 0.8 PK =.3110 LOAD =4250.0 RPM a 4002.

0.

RPS n6.69 0.6 0.4 0.2 0

1 3

4 5

6 Frequency in Order 2.0--

WAVEFORM DISPLAY 1.5 20-NOV-95 02:0022 PK=.2803 1.0 PK(+) -.5178 PK(-) sm.4524 0CRESTF=

2.46 0

-0.5

-1.0-11

-2.0 Oiik 2.014 40 80 120 160 200 Frq:

134.29 Trm In reset Spec:

.258

RX - X203, P205 HPCI TURB & PUMP X203 HPCI -P3A #3 BEARING-PUMP AXI a-1.0 0.8 0.6 0.4 ROUTE SPECTRUM 25-MAY-94 09:29:50 OVRALL=.3312 V-DG PK =.3370 LOAD -4250.0 RPM =4059.

RPS m67.64 0.2 Frequency in Order 2.0 1.5 1.0 WAVEFORM DISPLAY 25-MAY-94 09:29:50 PK c.3123 PK(,) -.4462 PK(-) -. 4855 CRESTF-2.25 C

0.5 0

-0.5

-1.0

-1.5

-2.0 40 80 120 160 Time In mSecs 200 Ordr.

Freq:

Spec:

2.014 136.23 2.80

IST - 1ST, P2M5 HPCI O42,5k HPCI ISTR -P4V #4 BEARING-PUMP V 0

C-1.0 0.8 0.6 0.4 ROUTE SPECTRUM 24-NOV-04 00:52:14 OVRALLx.1642 V-DG PIK

.1516 LOAD -4250.0 RPM= 4019.

RPS= 66.98 02 Frequency in Order 2.0 1.5 1.0 I

I Freqer,*

In rde I

ROUTE WAVEFORM 24-NOV-04 00:52:14 PK -.1506 PK(+) -.2755 PK(-) u.3887 CRESTF-3.57 I

0.5 0

-0.5

-1.0

-1.5 1

-2.0 III--

0 40 80 120 T"me in mSecs 160 200 Ordr.

Fraq:

Spec:

2.016 135.00

.07664

IST - IST, P205 HPCI @42.5k HPCI ISTR -P4V #4 BEARING-PUMP VERTICAL 1.0 ROUTE SPECTRUM 24-AUG-04 20:48:46 OVRALL=.1474 V-DG 0.8 PK =.1341 LOAD =4250.0 RPM= 3976.

RPS, 66.27 0.6 0.4 o0.

0.2 0-0 3

4 5

6 Frequency In Order 2.0 -.

ROUTE WAVEFORM 1.5 24-AUG-04 20:48:46 PK =.1549 1.0PK(+)

=.3373 1.0 PK(-) =.2904 CRESTF=- 3.07 0.5

~0,

).

-0.5

-1.0

-1.5

-2.0 Ordr:

2.016 0

40 80 120 160 200 Freq:

133.59 Time in mSecs Spec:

.07974

a RX - X203,P205 HPCI TURB & PUMP X203 HPCI -P4V #4 BEARING-PUMP VERTICAL S

1.0 0.8 0.6 0.4 0.2 I

'I I

4I ROUTE SPECTRUM 17-DEC-97 16:53:54 OVRALL=.3621 V-AP PK =.1326 LOAD -4250.0 RPM= 3966.

RPS= 66.4 43 "I

I 0

0 123 4

6 Frequency In Order 2.0 1.5 1.0 A lJ d AIAAi JiJ I

4 WAVEIORM UDISMAY 17-DEC-97 16:53:54 PK =.1347 PK(+) =.2797 PK(-) a.2385 CRESTF= 3.03 I

0.5 0-

-0.5

-1.0

-1.5

-2.0 0

40 80 120 Time In mSecs 160 200 Freq:

Spec:

2.017 133.97

.07982

4 FIX

- Xw0.,PW05 HPOI TUFIB & PUMP X203 HPCI -P4V #4 BEARING-PUMP VERTICAL 1.0 ROUTE SPECTRUM 064-AY-96 09'2424 OVRALb..1621 V-DG 0.8 PK -.1533 LOAD i=4250.0 RPM= 3999.

0.6

RPS, 68.68 0.4 I.

0.2 0/

0 1

3 4

5 6

Frequency in Order 2.0-WAVEFORM DISPLAY 1.5 064MAY-96 09.2424 PK,=.1704 1.0 PK(÷) -. 3405 PK(-) -.2944 0.5 CRESTF= 2.88

~O_

-0.5

-1.0

-1.5 Ordr.

2.017 0

40 80 120 160 200 Freq:

134.47 S

in mSecs Spec:

.08144

'I 0.

1.0 0.8 0.6 0.4 ROUTE SPECTRUM 20-NOV-95 02:01:17 OVRALL=.1456 V-DG PK -.1376 LOAD -4250.0 RPM,, 3992.

RPS = 88.54 02 Frequeny in Order 2.0 2.0 1.5 1.0

'S1~

WAVEFORM DISPLAY 20-NOV-95 02-.01:17 PK =.1486 PK(+) =.3M39 PK(-)a-.2796 CRESTF-3.26 0.5-0

-0.5

-1.0

-1.5

-2.0 I

0 40 60 120 T"r.ne in mSem 160 200 Ordr~

Freq:

Spec:

2.016 134.17

.06989

RX - X203, P205 HPCI TURB & PUMP X203 HPCI -P4V #4 BEARING-PUMP VERTICAL 4L 1.0 0.8 0.6 0.4 0.2 I

II I

ROUTE SPECTRUM 25-4AY-94 09:30:46 OVRALL-=.1682 V-DG PK =.1634 LOAD =4250.0 RPM= 4055.

RPS =67.58 WAVEFORM DISPLAY 25-MAY-94 09*.30:46 PK =.1584 PK(+) =.3902 PK(-) =.2620 CRESTF= 3.35 0

o 0

1 3

4 5

6 Frequency In Order 2.0 1.5 1.0 4

C

1.

Iiii I

I 0.5 0

-0.5

-1.0

-1.5

-2.0

.1.

0 40 80 120 Time In mSecs 160 200 ordr.

Freq:

Spam 2.016 136.25

.07871

4 IST - 1ST, P205 HPCI @42.5k HPCI ISTR -P7H #7 BEARING-PUMP INBOARD HORIZ II I

1.0 0.8 0.6 0.4 0.2

..I ROUTE SPECTRUM 24-NOV-04 0W*.47:45 OVRALL=

-2981 V-DG PK =.1027 LOAD -4250.0 RPM a 2008.

RPS - 33.47 0

1 2

3 Frequency In Order 41 5

6 2.0 1.5 ROUTE WAVEFORM 24-NOV-04 00W.47:45 PK =.3023 PK(+) -.5694 PK(-) =.6280 CRESTF-2.94 4

1.0 0.5

-0.5

-1.0

-1.5

-2.0 0

40 80 120 160 TIMeIin mSeow 200 Ordr Freq:

Spec:

4.035 135.04

.06375

IST - 1IST, P205 HKPCI 042.5k HPCI ISTR -P7H #7 BEARING-PUMP INBOARD HORIZ U

C

1' 0

1.0 0.8 0.6 0.4 ROUTE SPECTRUM 24-AUG-04 20:51:42 OVRALL=.3277 V-DG PK m.2404 LOAD =4250.0 RPM,= 2005.

RPS 33.42 L

ROUTE WAVEFORM 24-AUG-04 20:51:42 PK = 3180 PK(+) =.6541 PK(-) =.6249 CRESTF-2.91 0.2 C

2.0 1.5 1.0 Frequency In Order 0

0.5

-0.5

-1.0

-1.5

-2.0 0

0 40 80 120 160 Time in mSecs 200 Ordr Freq:

Spec:

4.002 133.75

.178

RX -X203,P205 lPCI TURB & PUMP X203 HPCI -P7H #7 BEARING-PUMP INBOARD t1 1.0 0.8 0.6 0.4 ROUTE SPECTRUM 17-DEC-97 21.49;48 OVRAI.I 1.98 V-AP PK =.6538 LOAD =4250.0 RPM-1993.

RPS= 3321 0.2 0

Frequency In Order 2.0 1.5 1.0 WAVEFORM DISPLAY 17-DEC-97 21:49.48 PK -.4823 PK(+) = 1.14 PK(-) =121 CRESTF= 3.11 I

0.5

-0.5

-1.0

-1.5

-2.0 0

40 80 120 160 200 Thme in MSocs Froq:

Spec:

4.033 133.95 214

RX - X203,P205 HPCI TURB & PUMP X203 HPCI -P7H #7 BEARING-PUMP INBOARD HORIZ 4

C I

1.0 0.8 0.6 0.4 ROUTE SPECTRUM 06-MAY-96 09:2926 OVRALI..3314 V-DG PK up.5015 LOAD na4250.0 RPM.= 2010.

RPS = 33.50 02 Frequenwcy In Order 2.0 1.5 1.0 WAVEFORM DISPLAY 06-MAY-96 W9-29=26 PK -.5512 PK(+)

1.09 PK(.) = 1.16 CRESTF-2.71 4

I 0.5

-0.5

-1.0

-1.5

-2.0 0

40 80 120 160 200 Tme in mSecs Fraq:

Spec:

4.022 134.75

.144

F'X - X203, P205 i

TURB & PUMP PCI -P7H #7 BEARING-PUMP INBOARE 4

S I-1.0 0.8 0.6 0.4 ROUTE SPECTRUM 20-NOV-95 02:04:06 OVRALL-.3748 V-DG PK =.5115 LOAD M-4250.

RPM= 2002.

RPS-33.36 i WAVEFORM DISPLAY 20-NOV-96 02:04:06 PK =.5685 PK(+), 1.32 PK(-)

1.41 CRESTF= 2.37 0.2 0

2.0 1.5 1.0 Froquenoy In Order 4

0.5 0

-0.5

-1.0

-1.5

-2.0 0

40 80 120 160 Time In mSecs 200 Ordr:.

Freq:

Spec:

4.033 134.55

.134

RX - X203, P205 HPCI TURB & PUMP X203 HPCI -P7H #7 BEARING-PUMP IN1OARD HORIZ (L

1.0 0.8 0.6 0.4 0.2 ROUTE SPECTRUM 25-MAY-94 09:33:50 OVRALL=.3657 V-DG PK =.6181 LOAD -4250.0 RPM= 2029.

RPS = 33.81 01 Frequency In Order

(

C 2.0 1.5 1.0 0.5

-0.5

-1.0

-1.5

-2.0 WAVEFORM DISPLAY 25-MAY-94 09:33:50 PK =.6344 PK(+) = 1.20 PK(-) = 1.13 CRESTF= 2.74 0

40 80 120 160 Time in mSecs 200 Ordr Freq:

Spec:

4.033 136.36

.198

1.0 0.8 0.6 0.4 0.2 RfOMTE SPECTRUM 24-NOV-04 00:48:16 OVRALU-

.3021 V-DG PK =.1053 LOAD -4250.0 RPM-2007.

RPS = 33.45 Frequency In Order I

2.0 1.5 1.0 0.5

-0.5

-1.0

-1.5

-2.0 ROUTE WAVEFORM 24-NOV-04 00:48:16 PK =.3217 PK(+) =.2W52 PK(-) =.794W CRESTF= 3A9 0

40 80 120 160 200 Time In meses Ordr.

Freq:

Spec:

4.033 134.90

.06539

IST - IST, P205 HPCI 042.5k HPCI ISTR -P7V #7 BEARING-PUMP INBOARD SI 1.0

-]

0.8 0.6 0.4 0.2 C

2.0 1.5 1.0 Frequency In Order ROUTE SPECTRUM 24-AUG,04 20:52:14 OVRALL=.2490 V-DG PK =.1579 LOAD =4250.0 RPM= 2000.

BPS = 33.33 ROUTE WAVEFORM 24-AUG-04 20:52:14 PK=.2830 PK(+) -. 5877 PK(-) =.5496 CRESTF= 2.84 Ordr:

4 200 Freq:

1" Spec:

.0 II I.

-i 0.5

-0.5

-1.0

-1.5

-2.0 0

0 40 80 120 160 Time in mSam 2

.010 13.67 8995

RX -X2M0,P205 HPCI TURB & PUMP X203 HPCI -P7V #7 BEARING-PUMP INBOARD VERTICAL CL 1.0 0.8 0.6 0.4 0.2 C

2.0 1.5 1.0 ROUTE SPECTRUM 17-DEC-97 21:50:32 OVRALLw 1.54 V-AP PK =.4760 LOAD -4250.0 RPM= 2011.

RPS = 33.52 i WAVEFORM DISPLAY 17-DEC-97 21:50:32 PK =.4769 PK(+) =1.02 PK(-)

1.76 CRESTF= 4.05 Frequency in Order S1~

0.5

-1.0

-1.5

-2.0 0

40 80 120 160 200 Time in mSecs Freq:

Spec:

4.000 134.06

.07595

0 RX - X203,P205 HPCI TURB & PUMP

I.P7V #7 BEARING-PUMP INBOARD' (4

1.0 0.8 0.6 0.4 ROUTE SPECTRUM 08-MAY-96 09:30:48 OVRALL..3408 V-DG PK =.5168 LOAD -4250.0 RPM = 2010.

RPS - 33.50 6

TWAVEFORM DISPLAY 06-MAY-.96 09:30:48 PK =.5329 PK(+) =.9047 PK(-)

1.34 CRESTF= 324 0.2 C

2.0 1.5 1.0 0

1 2

3 Frequency In Order 4

5 4

0

-0.5

-1.0

-1.5

-2.0 0

40 80 120 160 Tirm In mSem 200

RX - X203, P205 HPCI TUBB & PUMP X203 HPCI -P7V #7 BEARING-PUMP INBOARD VERTICAL 1.0 0.8 ROUTE SPECTRUM 20-NOV-95 02.05:02 OVRALL.3429 V-DG PK =.4597 LOAD -4250.0 RPM - 2016.

RPS = 33.60 S

Y.

0.

0.6 0.4 02 Frequency in Order

.5 I

2.0 1.5 1.0 0.5

-0.5

-1.0

-1.5

-2.0 WAVEFORM DISPLAY 20-NOV-95 02:05:02 PK =,3802 PK(+) -1.98 PK(-) - 2.04 CRESTF= 2.88 0

40 80 120 160 200 Tlm In mSem Ordr.

Freq:

Spec:

4.001 134.46

.07230

RX - X203, P205 HPCI TURB & PUMP X203 HPOI -P7M

  1. 7 BEARING-PUMP INBOARD VERTICAL CI, n.

1.0 0.8 0.6 0.4 0.2 2.0 1.5 ROUTE SPECTRUM 25-MAY-94 09:35:00 OVRALL=.3629 V-DG PK =.4330 LOAD =4250.0 RPM= 2045.

RPS = 34.08 WAVEFORM DISPLAY 254-AY-94 09:35:00 PK m.8398 PK(+) = 1.41 PK(-) 2.08 CRESTF= 2.97 Frequency In Order 1'

1.0 0.5 0

-0.5

-1.0

-1.5

-2.0 0

40 80 120 160 200 Ordr.

Freq:

Spec:

4.000 136.34

.08568 rime in mSecs

1.0 0.8 0.6 0.4 0.2 C

2.0 1.5 1.0 ROUTE SPECTRUM 24,NOV04 00:57:35 OVRALL,-.3549 V-DG PK -. 2767 LOAD =4250.0 RPM-2030.

RPS. 33.84 SROUTE WAVEFORM 24-NOV-04 00:57:35 PK =.3686 PK(+) -. 7586 PK(-) =.7927 CRESTF= 3.04 Frequency in Order I>

0.5

-0.5

-1.0

-1.5

-2.0 0

40 80 120 160 200 Time In mSecs Ord.I Freq:

Spec:

4.000 135.33

.22

IST - [ST, P206 HPCI @42.5k SH #8 BEARING-PUMP OUTB I,

1.0 0.8 0.6 0A ROUTE SPECTRUM 24-AUG-04 205.2:44 OVRALL-.4133 V-DG PK =.3018 LOAD =4250.0 RPM-2004.

RPS 33.40 t ROUTE WAVEFORM 24-AUG-04 20:52:44 PK =.4196 PK(+) =.8194 PK(-) =.8358 CRESTF-2.82 0.2 0

2.0 1.5 1.0 Frequency In Order

1' 0.5

-0.6

-1.0

-1.5

-2.0 0

40 80 120 160 Tirme in m~ecs 200 Orir.

Fraq:

Spec:

3.999 133.58

.266

RX -X2Oa,P205 HPClI TURB & PUMP C0 -PSH #8 BEARING-PUMP OUTBOARD HORIZ I?

1.0 0.8 0.6 0A ROUTE SPECTRUM 17-DEC-97 21:53:40 OVRALU= 1.07 V-AP PK =.3725 LOAD w4250.0 RPM = 2009.

RPS = 33.48 0.2 Frequency in Order 2.0 1.5 1.0 0.5 0

-0.5

-1.0

-1.5

-2.0 WAVEFORM DISPLAY 17-DEC-97 21:53:40 PK =.4679 PK(+) =.8102 PK(-) -. 8M95 CRESTF-2.81 L

Ordr 3.

0 Freq:

13 Spec:

0 40 80 120 160 20 Tune in mSecs 999 3.87 285

a FX - X2z03,P205 HPCI TUBB & PUMP X203 HPCI -P8H #8 BEARING-PUMP OUTBOARD HORIZ I

I II 4L 1.0 0.8 0.6 0.4 0.2 0

2.0 1.5 1.0 ROUTE SPECTRUM 064MAY-96 09.31.54 OVRALL=.3510 V-DG PK -.3499 LOAD m4250.0 RPM 2010.

RPS= 33.50 WAVEFORM DISPLAY 06-MAY-96 09:31:54 PK =.3538 PK(+)

.8159 PK(-)

.7937 CRESTF= 3.05 Frequency In Order 4

I 0.5 0

-0.5

-1.0

-1.5

-2.0 0

40 80 120 160 TUMe in mSecs Ordr Fraq:

Spec:

4.023 134.78 234

FiX - X2W, P20 HPCI TUFIB & PUMP X203 HPCI -P8H #8 BEARING-PUMP OUTBOAF

'1

.5 0.

1.0 0.8 0.6 0.4 ROUTE SPECTRUM 20-NOV-95 02:.0621 OVRA.L,

.3581 V-DG PK -.3339 LOAD =4250.0 RPMz= 2018.

RPS = 33.63 0.2 Frequency in Order 2.0 1.5 1.0 WAVEFORM DISPLAY 20-NOV-95 02:06:21 PK =.4641 PK(÷) -.8959 PK(-) =.9681 CRESTF= 3.11 C

I 0.5

-0.5

-1.0

-1.5

-2.0 0

40 80 120 160 200 Time In mSecs Ordr Fraq:

Spec:

3.999 134.49

.210

RX - X203, P205 HPCI TURB & PUMP 0I -P8H #8 BEARING-PUMP OUTBOAF I

1.0 0.8 0.6 0.4 0.2 ROUTE SPECTRUM 25-MAY-94 09:38:10 OVRALL=.3571 V-DG PK =.4744 LOAD -4250.0 RPM-2046.

RPS= 34.11 Frequency in Order 2.0 1.5 1.0 0.5 0

-0.5

-1.0

-1.5

-2.0 WAVEFORM DISPLAY 25-MAY-84 09:36:10 PK =.6248 PK(+) =.93M0 PK(-) = 123 CRESTF-2.71 0

40 80 120 160 Time In mSecs 200 Ordr Freq:

Spec 3.999 136.38

.248

IST - 1ST, P205 HPCI 042.5k HPCI ISTR -P8V #8 BEARING-PUMP OUTBOARD VERTICL I

II' C

I C-1.0 0.8 0.6 0.4 0.2 ROUTE SPECTRUM 24-NOV-04 00:50:19 OVRALL=.3576 V-DG PK =.1753 LOAD -4250.0 RPM= 2007.

RPS = 33.45 0

Frequency In Order 2.0 1.5 1.0 ROUTE WAVEFORM 24-NOV-04 00:60:19 PK -.3635 PK(+) =.7824 PK(-) =.6216 CRESTF-3.04 C

I 0.5 0

-0.5

-1.0

-1.5

-2.0 0

40 80 120 160 TIM in mSocs 200 Ordr:

Freq:

Spec:

4.036 135.00

.133

IST - IST, P205 HPCI 042.5k HPCI ISTR -P8V #8 BEARING-PUMP OUTB(

-i 1.0 0.8 0.6 0.4 ROUTE SPECTRUM 24-AUG-04 20:53:08 OVRALL=

W333 V-DG PK =.1177 LOAD =4250.0 RPM= 1985.

RPS - 33809 0.2 Frequency in Order C

Q 2.0 1.5 1.0 0.5

-0.5

-1.0

-1.5

-2.0 ROUTE WAVEFORM 24-AUG04 20:53:08 PK =.3259 PK(+) =.7410 PK(-) =.7385 CRESTF= 3.22 0

0 40 80 120 160 Time In mSecs 200 Ordr:

Freq.

Spec 4.033 133.44

.06510

I I

a.

1.0 0.8 0.6 0.4 0.2 ROUTE SPECTRUM 17-DEC-97 21:54:16 OVRAPtj.

1.16 V-AP PK =.3738 LOAD

-4250.0 RPM.

1992.

RPS, 3.20 Frequency In Order 2.0 1.5 1.0 WAVEFORM DISPLAY 17-DEC-97 21:54:16 PK -.5256 PK(+)

.7513 PK(-)

1.03 CRESTF= 3.02

~1 I

0.5

-0.5

-1.0

-1.5

-2.0 0

40 80 120 160 200 Time in mScs Freq:

Spec:

4.038 134.06

.0=9*

FIX - X203,P205 HPCI TURB & PUMP X203 HPCI -PBV #8 BEARING-PUMP OUTBOARD VERTICL 4

ii 1.0 0.3 0.6 0.4 ROUTE SPECTRUM 04-MAY-96 09-.32:30 OVRALL

.3159 V-DG PK -.3983 LOAD -4250.0 RPM - 2010.

RPS - 33.50 0.2 Frequency in Order 4

I 2.0 1.5 1.0 0.5

-0.5

-1.0

-1.5

-2.0 WAVEFORM DISPLAY 06-MAY-96 09:32:30 PK -.3&%

PK(+) -.7723 PK(-) = 1.08 CRESTF, 3.44 0

40 80 120 160 200 Tune In mSecs Ordr.

Freq Spec:

4.020 134.65

.102

9.

FIX - X2O3, P2M9 HPCI TURB & PUMP X203 HPCi -PBV #8 BEARING-PUMP OUTBOARD VERTICL 1.0 0.8 0.6 I

I

'I 4

I C.

ROUTE SPECTRUM 20-NOV-95 02:06:48 OVRALU-.2974 V-DG PK =.4175 LOAD,4250.0 RPM-2001.

RPS - 33.34 0.4 0.2 0

4 i2==

0 1

2 3

Froquoncy In Order 41 5

6 4

2.0 1.6 1.0 0.5

-0.5

-1.0

-1.5

-2.0 WAVEFORM DISPLAY 20-NOV-95 02.00:48 PK =.4490 PK(+) =.8496 PK(-) =.9198 CRESTF= 2.82 0

40 80 120 160 Tme in reSets 200 Ordr.

Freq:

Spec:

4.034 134.52

.09m21

RX -X203, P205 HPCI TURB & PUMP X203 HPCI -PBV #8 BEA-TING-PUMP OUTBOARr IL 1.0 0.8 0.6 0.4 ROUTE SPECTRUM 25-MAY-94 09:38:36 OVRALL= 3279 V-DG PK 4

A190 LOAD =4250.0 RPM= 2025.

RPS= 33.75 0.2 Frequency in Order C

-I 2.0 1.5 1.0 0.5

-0.5

-2.0

-1.5

-2.0 WAVEFORM DISPLAY 25-MAY-94 0936:36 PK =.5485 PK(W).8559 PK(-) =1.89 CRESTF= 4.52 0

40 80 120 160 lime in mSecs 200 Ordr.

Freq:

Spec:

4.035 136.18

.107

4 IST - I1ST, P205 HPCI @42.5k KPCI ISTR -PSA #8 BEARING-PUMP OUTBOARD AXIAL I

1.0 0.8 0.6 0.4 0.2 I

I I

I O0 rOUTE SPECTRUM W4-N0V-04 00:57:05 VRALL,-.1761 V-DG PK =.1523 LOAD,4250.0 RPM=, 2017.

RPS m 33.62 ROUTE WAVEFORM 24-NOV-04 00:57:05 PK =.1719 PK(+) =.38M PK(-)-.3766 CRESTF= 3.21 4?

ol, 0n3 4

5O6 Frequarncy in Order 2.0 1.5 1.0 SI I

0.5 0

I I

I I

-0.5

-1.0

-1.5

-2.0 0

40 80 120 TuineIn mSecs 160 200 Ordr Freq:

Spec:

2.008 67.50

.04798

,r e-IST - IST, P205 HPCI @42.5k HPCI ISTR -PSA #8 BEARING-PUMP OUTBOARD AXIAL I

I IL 1.0 0.8 0.6 0.4 ROUTE SPECTRUM 24-AUG-04 20:53:30 OVRALL=.1736 V-OG PK -.1499 LOAD =4250.0 RPM-2003.

RPS - 33.38 0.2 Frequency In Order 2.0 1.5 1.0 ROUTE WAVEFORM 24-AUG-04 20:53:30 PK =.2222 PK(+) = A984 PK(-) =.4466 CRESTF-3.17 C

I 0.5 0

-0.5

-1.0

-1.5

-2.0 0

40 80 120 160 Time in mSecs 200 Ordr.

Freq:

SW.c 4.000 133.51

.03090

/

RX - X203,P205 HPCI TURB & PUMP X203 HPCI -P8A #8 BEARING4-PUMP OUTBOARD AXIAL I

I" Is CL 1.0 0.8 0.6 0.4 0.2 0

0

!~~

ROUTE SPECTRUM 17-DEC-97 21:54:44 OVRALL= 1.01 V-AP PK =.2335 LOAD "425O.0 RPM -

2004.

BPSw 33.40 6

A 1

2 3

Frequonoy In Order 4

5 2.0 1.5 1.0 0.5

-0.5

-1.0

-1.5

-2.0 WAVEFORM DISPLAY 17-DEC-97 21:54:44 PK

.2835 PK(+) -.6054 PK(-) =.6909 CRESTF= 3.19 0

0 40 80 120 160 200 Time In mSocs Freq:

Spec:

4.005 133.75

.04397

!, I RX - X203,PZO0 IPOI TURB & PUMP X203 HPCI -P8A #8 BEARING-PUMP OUTBOARD AXIAL SI I

C-1.0 0.8 0.6 0.4 02 0

2.0 1.5 1.0 0.5 C

-0.5

-1.0

-1.5

-2.0 ROUTE SPECTRUM 31-JUL-96 09:54:50 OVRALL= 2W007 V-DG PK=.2261 LOAD,4250.0 RPM= 225.

RPS -

3.75 WAVEFORM DISPLAY 31-JUL-96 09:54:60 PK =.497 PK(+)

.9066 PK(-) = 1.54 CRESTF= 3.25 0

1 2

3 FrequeLy In Order 4

5 6

0 40 s0 120 180 Tlm In imSece 200

.0

.d RX - X203, P205 HPCI TURB & PUMP X203 HPCI -PSA 18 BEARING-PUMP OUTBOARD AXIAL 1.0 t....

lROUTE SPECTRUM 20-NOV-95 02:07:18 OVRALL-= 2017 V-DG 0.8 PK m 2314 LOAD -4250.0 RPM.= 2087.

0.6 RPS-34.78 II 0.4 02 0

2 3

4 5

6 Frequency in Order WAVEFORM DISPLAY 1.5 20-NOV-95 02:07:18 PK-.2857 1.0 PK(+) --. 5738 PK(-) = 1.01 0.5 CRESTF= 3.37

-0.5

-1.0

-1.5

-2.0 0

40 80 120 160 200 Tim in nifocs

RX - X203. P205 HPCI TURB & PUMP X203 HPCI -PMA #8 BEARING-PUMP OUT13OAF p

p I.

0.

1.0 0.8 0.6 0.4 ROUTE SPECTRUM 25-MAY-94 09:37:08 OVRALL=.2237 V-DG PK =.2715 LOAD -4250.0 RPM -2042.

RPS= 34.03 T WAVEFORM DISPLAY 25-MAY-94 09:37:08 PK =.3873 PK(+) - 1.02 PK(-) =.8513 CRESTFa 2.65 0.2 2.0 1.5 1.0 Frequency In Order 0.5

-0.5

-1.0

-1.5

-2.0 0

0 40 80 120 160 Time in mSecs 200 OrdI Freq:

Spec:

4.008 136.40

.05659