ML063070239
| ML063070239 | |
| Person / Time | |
|---|---|
| Site: | Pilgrim |
| Issue date: | 08/07/2006 |
| From: | Subbaratnam R Office of Nuclear Reactor Regulation |
| To: | Ellis D, Ford B, Mogolesko F Entergy Corp |
| References | |
| %dam200612, PA-LR, TAC MD2296 | |
| Download: ML063070239 (3) | |
Text
K ntHoward - Fwd: RAM:
Paae_1 From:
Ram Subbaratnam To:
bford@entergy.com; Dellisl @entergy.com; fmogole@entergy.com Date:
8/7/2006 9:13:23 AM
Subject:
Fwd: RAM:
Bryan & Fred:
Per direction from Jim here is a redirect for whatever action required. Incidentally, do you guys owe the audit team a final update of the Q/A database, If so, can you give me a heads up on it, meaning when can I expect it ? Also, for the six sets of RAIs out there with Entergy, if you need a conference call or clarifications, please let me know.
From my side, I have one set of RAI on the works, consisting of three Qs: 2 on the Civil side being the formal RAIs from the audit and one from Electrical on the need for XI.E6 program for electrical cable connections. On the TLAAs, the staff is still working on the issue, perhaps you will get two (what about the 1987 Entergy submittal on the crack growth flaw evaluation document that Fred promised ?).
Hope this clarifies.
Ram Subbaratnam PM Pilgrim LRA US NRC, (301) 415 1478
>>> James Medoff 08/03/2006 10:22 AM >>>
RAM:
Please forward this to Brian Ford and Fred Mogolesko in clarification of the Question tracking and summary table we sent to them yesterday.
When the subsequent amendments of the LRA are made to close out our questions on the Metal Fatigue TLAAs and the final revisions Commitments #31 and #35 are made, to please ensure thatthe following
,modifications of the FSAR Supplment Sections A.2.2.2.1 and A.2.2.2.3 are made:
- 1. Supplement A.2.2.2.1 of the LRA to add a sentence that:
"The TLAA on Metal Fatigue of Class 1 Components includes Commitments #31 and #35 on the PNPS LRA."
- 2. Supplement A.2.2.2.3 of the LRA to add a sentence that:
"The TLAA on Environmental Effects of Reactor Water on Fatigue Life includes Commitment #31 on the PNPS LRA."
We only need to reference the Commitments in the UFSAR Supplement sections because the actual details of the Commitments will be included in the Tracking List for the LRA and the Commitment tracking list will get incorporated as a supplement to the UFSAR Supplement prior to the completion of the licensing review process. In turn, the UFSAR Supplement will get incorporated as a license condition in the renewed operating license for PNPS, when it is issued.
- Thanks, Jim CC:
Dan Hoang; Duc Nguyen; Ganesh Cheruvenki; James Davis; James Medoff
ILE.\\teMR\\GW)00001.TMP
~c:\\ernpGW~OOO1 IMP age 11ii Mail Envelope Properties (44D73C73.D2D : 19: 10294)
Subject:
Fwd: RAM:
Creation Date 8/7/2006 9:13:23 AM From:
Ram Subbaratnam Created By:
RXS2@nrc.gov Recipients entergy.com bford (bford@entergy.com) dellisl (Dellisl @entergy.com) fmogole (fmogole @ entergy.com) nrc.gov OWGWPOO3.HQGWDO01 GSC CC (Ganesh Cheruvenki)
JAD CC (James Davis) nrc.gov OWGWPOO4.HQGWDO01 DVH CC (Dan Hoang) nrc.gov TWGWPO01.HQGWDO01 DTN1 CC (Duc Nguyen)
JXM CC (James Medoff)
Action Date & Time Post Office OWGWPOO3.HQGWDO01 OWGWPOO4.HQGWDO01 TWGWPOO1.HQGWDOO1 Delivered Pending Pending Pending Pending Route entergy.com nrc.gov nrc.gov nrc.gov Files MESSAGE Options Auto Delete:
Expiration Date:
Notify Recipients:
Priority:
ReplyRequested:
Return Notification:
Size 3241 Date & Time 8/7/2006 9:13:23 AM No None Yes Standard No None
1 c:\\temp\\GW}O0001.TMP Page 211 Concealed
Subject:
Security:
To Be Delivered:
Status Tracking:
No Standard Immediate Delivered & Opened