|
---|
Category:E-Mail
MONTHYEARML22335A2802022-11-0404 November 2022 11-4-2022 Email Transmitting Draft Questions Pertaining to Pilgrim ISFSI Exemption Request ML22270A0422022-09-26026 September 2022 Acknowledgement Email for Holtec'S Request for Reporting Exemption with Regards to the Pilgrim ISFSI Annual Radioactive Effluent Release Report (Docket No. 05000293) ML22154A1622022-05-26026 May 2022 Letter and Email from Save Our Bay/Diane Turco Regarding Irradiated Water Release from Pilgrim ML22007A2602021-12-0606 December 2021 E-mail from P. O'Brien, Holtec, to A. Snyder, NRC, on Pilgrim Effluent Discharge ML21287A6192021-10-14014 October 2021 E-mail from S. Phillips, MEMA, to A. Snyder, NRC, Pilgrim Nuclear Power Station, Commonwealth of Massachusetts Consultation Response to Amendment Review for Emergency Preparedness ML21266A2512021-09-23023 September 2021 Consultation with Commonwealth of Massachusetts Regarding Proposed Amendment Application for Emergency Plan and Emergency Action Levels ML21266A2772021-09-23023 September 2021 HDI Clarification of Exemption Requested from 10 CFR 20, Appendix G, Section Iii.E ML21267A0012021-09-23023 September 2021 E-mail from A. Snyder, NRC, to A. Sterdis, Holtec, - Pilgrim Nuclear Power Station - Request for Exemption from 10 CFR 20, Appendix G, Section Iii.E Acceptance Review ML21257A3832021-09-15015 September 2021 E-mail from A. Snyder, NRC, to A. Sterdis, Holtec, - Pilgrim Nuclear Power Station - Follow-on Request Re Request for Additional Information 2 Pilgrim - License Amendment Request Independent Spent Fuel Storage Installation Only Emergency Pl ML21211A5912021-07-22022 July 2021 Consultation Response from Commonwealth of Massachusetts Regarding Proposed Pilgrim ISFSI Only Technical Specifications ML21211A5162021-07-22022 July 2021 Consultation Response from Commonwealth of Massachusetts Regarding Proposed Pilgrim ISFSI Only Physical Security Plan ML21200A2352021-07-13013 July 2021 Consultation Request to Commonwealth of Massachusetts Regarding Proposed Pilgrim ISFSI Only Technical Specifications ML21200A1522021-07-13013 July 2021 Consultation Request to Commonwealth of Massachusetts Regarding Proposed Pilgrim Isfi Only Physical Security Plan ML21176A1842021-06-25025 June 2021 Email from HDI Regarding Pilgrim Nuclear Power Station Training ML21180A0582021-06-17017 June 2021 Email from Region I Regarding Pilgrim Nuclear Power Station Inspection - EA-13-132 ML21097A0402021-04-0606 April 2021 E-Mail Consult with Commonwealth of Mass Re - Amendment Application - Physical Security Plan for the Pilgrim Nuclear Power Station L-20-092, Email Pilgrim Nuclear Power Station-Exemption from Annual Force-On-Force Exercise Requirements of 10 CFR Part 73, Appendix B,2020-12-10010 December 2020 Email Pilgrim Nuclear Power Station-Exemption from Annual Force-On-Force Exercise Requirements of 10 CFR Part 73, Appendix B, L-20-096, Supplemental Information to Support Physical Security Plan Revision and License Amendment Request to Incorporate Alternate Measures - Holtec Email Dated December 10, 20102020-12-10010 December 2020 Supplemental Information to Support Physical Security Plan Revision and License Amendment Request to Incorporate Alternate Measures - Holtec Email Dated December 10, 2010 ML20328A2982020-11-16016 November 2020 Response from Commonwealth of Massachusetts on No Significant Hazard for Pilgrim ISFSI Amendment to Address ISFSI II Dated November 16, 2020 ML20297A2372020-10-22022 October 2020 Request for Additional Information - HDI Fleet Decommissioning Quality Assurance Program ML20266G4032020-09-22022 September 2020 Acceptance Review Email - Request for Approval of HDI Fleet Decommissioning Quality Assurance Program, Revision 0 ML20163A6802020-06-11011 June 2020 Confirmation of the Scope of the Requested Regulatory Relief for Pilgrim Security Qualifications ML20280A1912020-04-17017 April 2020 Request for Additional Information- Clarifying Information for Pilgrim ISFSI Physical Security Amendment Application ML20269A3542020-03-0505 March 2020 CFR 26.717 Reports 2019 Transmittal Email ML19336A0302019-11-27027 November 2019 OEDO-15-00479 - Re 2.206 Petition Regarding Pilgrim Nuclear Power Station'S Current Licensing Basis for Flooding ML19336A0332019-11-26026 November 2019 OEDO-15-00479 - E-mail to Petitioner - 2.206 Petition Regarding Pilgrim Nuclear Power Station'S Current Licensing Basis for Flooding (CAC No. MF6460; EPID L-2015-CRS-0002)- Issuance of Final Director'S Decision ML19331A1952019-11-21021 November 2019 NRR E-mail Capture - (External_Sender) Pilgrim Nuclear Power Station - Commonwealth Consultation Response - Amendment Regarding Site Emergency Plan and Emergency Action Level Scheme ML19331A1732019-11-12012 November 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station -Consult with Commonwealth - Amendment Regarding Cyber Security Plan ML19331A1642019-11-0505 November 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station -Consult with Commonwealth - Amendment Regarding Site Emergency Plan and Emergency Action Level Scheme ML19331A1792019-11-0505 November 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - EA and Fonsi for Pilgrim Emergency Planning Exemption CY-19-007, LTR-19-0441 Henrietta Cosentino, E-mail SECY-19-0078 Request by Entergy Nuclear Operations Inc. for Exemptions from Certain Emergency Planning Requirements for the Pilgrim Nuclear Power Station2019-11-0404 November 2019 LTR-19-0441 Henrietta Cosentino, E-mail SECY-19-0078 Request by Entergy Nuclear Operations Inc. for Exemptions from Certain Emergency Planning Requirements for the Pilgrim Nuclear Power Station ML19275H1962019-09-24024 September 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - Consult with Commonwealth - Amendment Regarding Permanently Defueled Technical Specifications (PDTS) ML19239A0372019-08-26026 August 2019 E-mail from Entergy Dated August 26, 2019, Notification of Pilgrim License Transfer ML19239A0262019-08-23023 August 2019 LTR-19-0330 Janet Azarovitz, E-mail a Plea for More Time and Reasonable Discussion Including the Citizens of the Commonwealth in the Sale of the Pilgrim Nuclear Power Station ML19234A2072019-08-20020 August 2019 LTR-19-0328 Lawrence Delafield, President, Six Ponds Improv Assoc., Plymouth, Ma, Ltr Requests NRC to Postpone Consideration of Transferring the Licenses for the Pilgrim Nuclear Power Until the NRC Has Answered Concerns by Pilgrim Watch, Se ML19232A4032019-08-20020 August 2019 LTR-19-0322 Diane Turco, Director, Cape Downwinders, Massachusetts, Letter/E-mail Requests Suspension of the Pilgrim License Transfer from Entergy to Holtec Until the Adjudicatory Hearing Is Held and Raised Contentions Are Resolved ML19308A9942019-08-19019 August 2019 Entergy Nuclear Operations, Inc. Confirmatory Order Rescission Supplemental Information ML19226A3912019-08-14014 August 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - EA and Fonsi for Pilgrim Decommissioning Trust Fund Exemption (Holtec) ML19226A3962019-08-14014 August 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station -Consult with Commonwealth - Conforming Amendment in Support of Pilgrim License Transfer Application ML19226A1212019-08-13013 August 2019 OEDO-15-00479-2.206 Petition Regarding Pilgrim Nuclear Power Station'S Current Licensing Basis for Flooding - Status (CAC No. MF6460; EPID L-2015-CRS-0002) ML19227A1032019-08-0707 August 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - Draft Wording for Potential Condition of License Transfer Order ML19207B3662019-07-26026 July 2019 NRR E-mail Capture - Pilgrim - RAI Direct and Indirect Transfer of Lic.; Conforming Lic. Amend.; Req. for Exemption 10 CFR 50.82(A)(8)(I)(A) for Holtec Decom. International, Llc ML19176A3452019-06-25025 June 2019 2.206 Petition Regarding Pilgrim Nuclear Power Station'S Current Licensing Basis for Flooding - Information (OEDO-15-00479) (CAC No. MF6460; EPID L-2015-CRS-0002) ML19154A0652019-06-0303 June 2019 NRR E-mail Capture - Pilgrim - Permanent Cessation of Power Operations ML19154A5242019-06-0303 June 2019 NRR E-mail Capture - RAI - Pilgrim Post-Decommissioning Technical Specifications (PDTS) License Amendment Request (LAR) ML19161A2122019-05-20020 May 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - Acceptance of License Amendment Request to Remove Cyber Security Plan Requirements ML19123A0332019-05-0101 May 2019 NRR E-mail Capture - Logbook Entry: 05/01/2019 Endangered Species Report Regarding a Confirmed Sighting of North Atlantic Right Whale(S) (Balaena Glacialis) ML19122A4912019-04-29029 April 2019 NRR E-mail Capture - Logbook Entry: 04/29/2019 Regarding the Confirmed Sighting of Ten North Atlantic Right Whales (Balaena Glacialis) ML19108A2372019-04-18018 April 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - Acceptance of Requested Licensing Action, Proposed Exemptions from 10 CFR 50.54(w)(1) - On-Site Property Damage Insurance ML19108A2362019-04-18018 April 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - Acceptance of Requested Licensing Action, Proposed Exemptions from 10 CFR 140.11(a)(4) - Primary and Secondary Liability Insurance 2022-09-26
[Table view] Category:Meeting Agenda
MONTHYEARML19070A0962019-03-11011 March 2019 Notice of Category 3 Public Meeting - Annual Assessment Meeting for Pilgrim Nuclear Power Station ML18127A0282018-05-0707 May 2018 Annual Assessment Meeting for Pilgrim Nuclear Power Station - Entergy Presentation Slides ML18073A1402018-03-14014 March 2018 Notice of Category 1 Public Meeting - Annual Assessment Meeting for Pilgrim Nuclear Power Station ML17179A0822017-06-28028 June 2017 Open Regulatory Conference July 13, 2017 ML17020A0032017-01-19019 January 2017 1/31/2017 - Notice of Category 3 Public Meeting - Preliminary Findings and Status of 95003 Inspection at Pilgrim Nuclear Power Station ML16090A2332016-03-30030 March 2016 4/13/2016 - Notice of Category 1 Public Meeting - Annual Assessment of Safety Performance at the Pilgrim Nuclear Power Station for 2015 ML15208A4582015-07-0808 July 2015 July 8, 2015 - Pilgrim SRV Reg Conf Agenda ML15062A0872015-03-0404 March 2015 3/18/2015 - Notice of Category 1 Public Meeting - Pilgrim 2014 Annual Assessment Meeting ML14098A3162014-04-0808 April 2014 5/1/2014 - Notice of Category 1 Public Meeting to Discuss Entergy Performance at Pilgrim Nuclear Power Station During Cy 2013 ML13108A3282013-04-22022 April 2013 Notice of Forthcoming Meeting with Petitioners Requesting Action Against Entergy Nuclear Operations, Inc., Regarding Operations at FitzPatrick, Pilgrim, and Vermont Yankee Nuclear Power Stations (TAC Nos. MF1092, MF1093, and MF1094) ML11250A1712011-09-14014 September 2011 Notice of Forthcoming Meeting with Petitioner Requesting Action Under 10 CFR 2.206 Regarding Immediate Suspension of the Operating Licenses of General Electric (GE) Mark 1 Boiling Water Reactors (Bwrs) ML1117906392011-06-28028 June 2011 Summary of Meeting with Entergy Operations Inc ML1115704052011-06-0606 June 2011 Notice of Meeting with Entergy Operations, Inc., to Discuss Implementation of Quality Oversight and Verification Programs at Entergy Sites Including Actions Being Taken to Enhance Effectiveness ML11126A0962011-05-12012 May 2011 Notice of Meeting with Petitioner Requesting Action Under 10CFR2.206 Regarding Immediate Suspension of Operating Licenses of General Electric Mark 1 Boiling Water Reactors ML1107504052011-03-21021 March 2011 Notice of Meeting with Entergy Operations, Inc., to Discuss Fleetwide Submittal for Proposed Technical Specification and Quality Assurance Program Manual Changes Related to Unit Staff Qualification Requirements ML0906807852009-03-0909 March 2009 Notice of Meeting to Discuss Nrc'S Assessment of the Safety Performance of Pilgrim Nuclear Power Plant for Calendar Year 2008 and the Role of the Agency in Ensuring Safe Plant Operations ML0807100682008-03-10010 March 2008 Notice of Meeting with Entergy Nuclear Operations to Discuss Nrc'S Assessment of the Safety Performance of the Pilgrim Nuclear Power Station for Calendar Year 2007 ML0709204592007-03-30030 March 2007 Meeting with Entergy Nuclear Operations, Inc., to Discuss Nrc'S Assessment of the Safety Performance of the Pilgrim Nuclear Power Station for Calendar Year 2006 ML0705402052007-03-0101 March 2007 01/24/2007 Summary of Meeting with Pilgrim on the Draft Supplemental Environmental Impact Statement Regarding Pilgrim License Renewal Review ML0703305582007-01-24024 January 2007 Meeting Agenda for Public Meeting to Discuss the Draft Supplemental Environmental Impact Statement for the License Renewal of Pilgrim Nuclear Power Station ML0618104242006-06-30030 June 2006 2006/06/30- 07/19/2006 Notice of Forthcoming Exit Meeting with Entergy Nuclear Operations, Inc., on License Renewal Scoping and Screening Methodology and the Aging Management Program / Aging Management Review Audits for Pilgrim Nuclear Powe ML0614201642006-05-17017 May 2006 Pilgrim Nuclear Power Station Environmental Scoping Meeting Handouts ML0634700722006-05-0202 May 2006 2006/05/02-(PD) Pilgrim Nuclear Power Station License Renewal Site Audit Off-Site Meetings May 2-4, 2006 Draft Meeting Notes ML0611804242006-04-28028 April 2006 2006/04/28- 05/17/2006 Notice of Meeting to Discuss the Environmental Scoping Process for Pilgrim Nuclear Power Station, License Renewal Application (LRA) ML0634703242006-04-12012 April 2006 2006/04/12-E-MAIL: (Intergovernmental) May 3 Meeting - Pilgrim NPS License Renewal (List for Kingston Meeting) ML0634703262006-04-12012 April 2006 2006/04/12-E-MAIL: (Intergovernmental) May 3 Meeting - Pilgrim NPS License Renewal (List for Duxbury Meeting) ML0609403702006-04-0404 April 2006 Public Meeting Notice for the Annual Assessment Meeting with Entergy (Pilgrim Station) to Discuss CY2005 Performance ML0604405432006-02-13013 February 2006 03/08/2006 Notice of Forthcoming Public Information Session for the U.S. Nuclear Regulatory Commission (NRC) Staff to Describe the License Renewal Process ML0507500032005-03-16016 March 2005 Revised - Pilgrim Annual Assessment Meeting Notice W/Nrc Slides ML0406406352004-03-0404 March 2004 Agenda for the Nrc'S Annual Assessment Meeting Pilgrim Nuclear Power Station ML17252A1551977-09-19019 September 1977 Summary of Meeting with Representatives of the Mark I Owner'S Group and GE to Discuss the Structural Acceptance Criteria for the Mark I Containment Ltp ML17252A1571977-09-14014 September 1977 Summary of Meeting Held with Representatives of the Mark I Owner'S Group to Discuss the Structural Acceptance Criteria for the Mark I Containment Long Term Program 2019-03-11
[Table view] |
Text
Page 1 of I Provenzano, Susan From: Provenzano, Susan Sent: Wednesday, April 12, 2006 3:54 PM To: 'kdonovan@
kdngstonmass.org'
Subject:
May 3 meeting -Pilgrim NPS license renewal Attachments:
List for Kingston meeting.doc Mr. Donovan, As I mentioned during our telephone conversations on March 29 and April 5, I am sending you a list of items we would like to discuss at our upcoming meeting with your municipality to gather information for the Environmental Impact Statement for the Pilgrim Nuclear Power Station license renewal. We scheduled the meeting for Wednesday, May 3, at 9:00 am. Andrew Parker, my colleague at Earth Tech, and I will attend, as well as a representative from the Nuclear Regulatory Commission.
Andrew will be addressing the socioeconomic components of the EIS and I will be examining land use and related topics.The attached list is quite large and covers a wide range of topics. I realize that you may not be able to help us with all of them, and we would request that you direct us to the appropriate source of information in those instances.
You can contact me at the number below if you would like to discuss this further. I look forward to meeting with you and other Town personnel in May.Sincerely yours, Susan Provenzano, AICP Environmental Scientist/Planner Earth Tech, Inc.10 Patewood Dr, Bldg VI, Suite 500 Greenville, SC 29615 Tel. 864-234-3591 10/25/2006 ISSUES FOR DISCUSSION AND INFORMATION REQUESTS MAY 3,2006 MEETING -TOWN OF KINGSTON CONCERNING ENVIRONMENTAL REVIEW FOR PILGRIM NUCLEAR POWER STATION LICENSE RENEWAL Participants:
Town of Kingston, Nuclear Regulatory Commission, and Earth Tech Land Use and Zoning* Existing land use in the Town; is MassGIS data layer for land use accurate/up-to-date?* Current zoning.* Development projects recently approved, proposed, or being considered in the Town; land use trends.* Future land use plans.* Coastal Zone Management (CZM) -coastal policy, revitalization efforts.Transportation" Adequacy of existing road system." Transportation issues; planned roadway improvements.
Water Supply* Most recent data on consumption and capacity of public water suppliers.
- Areas of Town without public water supply (i.e., supplied by private wells).* Projected future demand for potable water from public suppliers and options for meeting that demand.* Is saltwater intrusion a concern?Recreation 9 Recreational use of Plymouth Bay shoreline, including CZM implications.
Cultural Resources* Local ordnances/review processes protecting cultural resources.
- Listings/maps of town historic districts, historic buildings, scenic view sheds/roadways, and archeological sites.* Local Native American tribal issues.Socioeconomics
- Any current population estimates and projections.
- Housing units added since 2000 (Building permit/COs).
-summer visitors/second home residents; and migrant agricultural workers, etc.* Any information on major Employers in the town (name/location/employees).
- Any information on local fishing industry -applicable (both commercial and recreational)