E-MAIL: (PA) NRC Issues Notice of Intent to Prepares EIS Pilgrim LRAML063470100 |
Person / Time |
---|
Site: |
Pilgrim |
---|
Issue date: |
04/18/2006 |
---|
From: |
Shaaf R Office of Nuclear Reactor Regulation |
---|
To: |
Arcate C, Demacedo V, Giarrusso J, Murray T, Nadeau R, Packard C, Plumley K, Sylvia M, Tavares K, Timmermann T, Walker B City of Plymouth, MA, State of MA, Environmental Protection Agency |
---|
References |
---|
%dam200612, TAC 3698 |
Download: ML063470100 (16) |
|
|
---|
Category:E-Mail
MONTHYEARML22335A2802022-11-0404 November 2022 11-4-2022 Email Transmitting Draft Questions Pertaining to Pilgrim ISFSI Exemption Request ML22270A0422022-09-26026 September 2022 Acknowledgement Email for Holtec'S Request for Reporting Exemption with Regards to the Pilgrim ISFSI Annual Radioactive Effluent Release Report (Docket No. 05000293) ML22154A1622022-05-26026 May 2022 Letter and Email from Save Our Bay/Diane Turco Regarding Irradiated Water Release from Pilgrim ML22007A2602021-12-0606 December 2021 E-mail from P. O'Brien, Holtec, to A. Snyder, NRC, on Pilgrim Effluent Discharge ML21287A6192021-10-14014 October 2021 E-mail from S. Phillips, MEMA, to A. Snyder, NRC, Pilgrim Nuclear Power Station, Commonwealth of Massachusetts Consultation Response to Amendment Review for Emergency Preparedness ML21266A2512021-09-23023 September 2021 Consultation with Commonwealth of Massachusetts Regarding Proposed Amendment Application for Emergency Plan and Emergency Action Levels ML21266A2772021-09-23023 September 2021 HDI Clarification of Exemption Requested from 10 CFR 20, Appendix G, Section Iii.E ML21267A0012021-09-23023 September 2021 E-mail from A. Snyder, NRC, to A. Sterdis, Holtec, - Pilgrim Nuclear Power Station - Request for Exemption from 10 CFR 20, Appendix G, Section Iii.E Acceptance Review ML21257A3832021-09-15015 September 2021 E-mail from A. Snyder, NRC, to A. Sterdis, Holtec, - Pilgrim Nuclear Power Station - Follow-on Request Re Request for Additional Information 2 Pilgrim - License Amendment Request Independent Spent Fuel Storage Installation Only Emergency Pl ML21211A5912021-07-22022 July 2021 Consultation Response from Commonwealth of Massachusetts Regarding Proposed Pilgrim ISFSI Only Technical Specifications ML21211A5162021-07-22022 July 2021 Consultation Response from Commonwealth of Massachusetts Regarding Proposed Pilgrim ISFSI Only Physical Security Plan ML21200A2352021-07-13013 July 2021 Consultation Request to Commonwealth of Massachusetts Regarding Proposed Pilgrim ISFSI Only Technical Specifications ML21200A1522021-07-13013 July 2021 Consultation Request to Commonwealth of Massachusetts Regarding Proposed Pilgrim Isfi Only Physical Security Plan ML21176A1842021-06-25025 June 2021 Email from HDI Regarding Pilgrim Nuclear Power Station Training ML21180A0582021-06-17017 June 2021 Email from Region I Regarding Pilgrim Nuclear Power Station Inspection - EA-13-132 ML21097A0402021-04-0606 April 2021 E-Mail Consult with Commonwealth of Mass Re - Amendment Application - Physical Security Plan for the Pilgrim Nuclear Power Station L-20-092, Email Pilgrim Nuclear Power Station-Exemption from Annual Force-On-Force Exercise Requirements of 10 CFR Part 73, Appendix B,2020-12-10010 December 2020 Email Pilgrim Nuclear Power Station-Exemption from Annual Force-On-Force Exercise Requirements of 10 CFR Part 73, Appendix B, L-20-096, Supplemental Information to Support Physical Security Plan Revision and License Amendment Request to Incorporate Alternate Measures - Holtec Email Dated December 10, 20102020-12-10010 December 2020 Supplemental Information to Support Physical Security Plan Revision and License Amendment Request to Incorporate Alternate Measures - Holtec Email Dated December 10, 2010 ML20328A2982020-11-16016 November 2020 Response from Commonwealth of Massachusetts on No Significant Hazard for Pilgrim ISFSI Amendment to Address ISFSI II Dated November 16, 2020 ML20297A2372020-10-22022 October 2020 Request for Additional Information - HDI Fleet Decommissioning Quality Assurance Program ML20266G4032020-09-22022 September 2020 Acceptance Review Email - Request for Approval of HDI Fleet Decommissioning Quality Assurance Program, Revision 0 ML20163A6802020-06-11011 June 2020 Confirmation of the Scope of the Requested Regulatory Relief for Pilgrim Security Qualifications ML20280A1912020-04-17017 April 2020 Request for Additional Information- Clarifying Information for Pilgrim ISFSI Physical Security Amendment Application ML20269A3542020-03-0505 March 2020 CFR 26.717 Reports 2019 Transmittal Email ML19336A0302019-11-27027 November 2019 OEDO-15-00479 - Re 2.206 Petition Regarding Pilgrim Nuclear Power Station'S Current Licensing Basis for Flooding ML19336A0332019-11-26026 November 2019 OEDO-15-00479 - E-mail to Petitioner - 2.206 Petition Regarding Pilgrim Nuclear Power Station'S Current Licensing Basis for Flooding (CAC No. MF6460; EPID L-2015-CRS-0002)- Issuance of Final Director'S Decision ML19331A1952019-11-21021 November 2019 NRR E-mail Capture - (External_Sender) Pilgrim Nuclear Power Station - Commonwealth Consultation Response - Amendment Regarding Site Emergency Plan and Emergency Action Level Scheme ML19331A1732019-11-12012 November 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station -Consult with Commonwealth - Amendment Regarding Cyber Security Plan ML19331A1642019-11-0505 November 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station -Consult with Commonwealth - Amendment Regarding Site Emergency Plan and Emergency Action Level Scheme ML19331A1792019-11-0505 November 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - EA and Fonsi for Pilgrim Emergency Planning Exemption CY-19-007, LTR-19-0441 Henrietta Cosentino, E-mail SECY-19-0078 Request by Entergy Nuclear Operations Inc. for Exemptions from Certain Emergency Planning Requirements for the Pilgrim Nuclear Power Station2019-11-0404 November 2019 LTR-19-0441 Henrietta Cosentino, E-mail SECY-19-0078 Request by Entergy Nuclear Operations Inc. for Exemptions from Certain Emergency Planning Requirements for the Pilgrim Nuclear Power Station ML19275H1962019-09-24024 September 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - Consult with Commonwealth - Amendment Regarding Permanently Defueled Technical Specifications (PDTS) ML19239A0372019-08-26026 August 2019 E-mail from Entergy Dated August 26, 2019, Notification of Pilgrim License Transfer ML19239A0262019-08-23023 August 2019 LTR-19-0330 Janet Azarovitz, E-mail a Plea for More Time and Reasonable Discussion Including the Citizens of the Commonwealth in the Sale of the Pilgrim Nuclear Power Station ML19234A2072019-08-20020 August 2019 LTR-19-0328 Lawrence Delafield, President, Six Ponds Improv Assoc., Plymouth, Ma, Ltr Requests NRC to Postpone Consideration of Transferring the Licenses for the Pilgrim Nuclear Power Until the NRC Has Answered Concerns by Pilgrim Watch, Se ML19232A4032019-08-20020 August 2019 LTR-19-0322 Diane Turco, Director, Cape Downwinders, Massachusetts, Letter/E-mail Requests Suspension of the Pilgrim License Transfer from Entergy to Holtec Until the Adjudicatory Hearing Is Held and Raised Contentions Are Resolved ML19308A9942019-08-19019 August 2019 Entergy Nuclear Operations, Inc. Confirmatory Order Rescission Supplemental Information ML19226A3912019-08-14014 August 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - EA and Fonsi for Pilgrim Decommissioning Trust Fund Exemption (Holtec) ML19226A3962019-08-14014 August 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station -Consult with Commonwealth - Conforming Amendment in Support of Pilgrim License Transfer Application ML19226A1212019-08-13013 August 2019 OEDO-15-00479-2.206 Petition Regarding Pilgrim Nuclear Power Station'S Current Licensing Basis for Flooding - Status (CAC No. MF6460; EPID L-2015-CRS-0002) ML19227A1032019-08-0707 August 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - Draft Wording for Potential Condition of License Transfer Order ML19207B3662019-07-26026 July 2019 NRR E-mail Capture - Pilgrim - RAI Direct and Indirect Transfer of Lic.; Conforming Lic. Amend.; Req. for Exemption 10 CFR 50.82(A)(8)(I)(A) for Holtec Decom. International, Llc ML19176A3452019-06-25025 June 2019 2.206 Petition Regarding Pilgrim Nuclear Power Station'S Current Licensing Basis for Flooding - Information (OEDO-15-00479) (CAC No. MF6460; EPID L-2015-CRS-0002) ML19154A0652019-06-0303 June 2019 NRR E-mail Capture - Pilgrim - Permanent Cessation of Power Operations ML19154A5242019-06-0303 June 2019 NRR E-mail Capture - RAI - Pilgrim Post-Decommissioning Technical Specifications (PDTS) License Amendment Request (LAR) ML19161A2122019-05-20020 May 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - Acceptance of License Amendment Request to Remove Cyber Security Plan Requirements ML19123A0332019-05-0101 May 2019 NRR E-mail Capture - Logbook Entry: 05/01/2019 Endangered Species Report Regarding a Confirmed Sighting of North Atlantic Right Whale(S) (Balaena Glacialis) ML19122A4912019-04-29029 April 2019 NRR E-mail Capture - Logbook Entry: 04/29/2019 Regarding the Confirmed Sighting of Ten North Atlantic Right Whales (Balaena Glacialis) ML19108A2372019-04-18018 April 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - Acceptance of Requested Licensing Action, Proposed Exemptions from 10 CFR 50.54(w)(1) - On-Site Property Damage Insurance ML19108A2362019-04-18018 April 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - Acceptance of Requested Licensing Action, Proposed Exemptions from 10 CFR 140.11(a)(4) - Primary and Secondary Liability Insurance 2022-09-26
[Table view] Category:Federal Register Notice
MONTHYEARML21267A5202021-10-18018 October 2021 Exemption 10 CFR Part 20, Appendix G Acceptance Review Federal Register Notice ML21270A0762021-10-18018 October 2021 Enclosure - Pilgrim Nuclear Power Station - Exemption 10 CFR Part 20, Appendix G Acceptance Review Order ML21097A0412021-02-0202 February 2021 E-Mail Attachment - Copy of Federal Register Notice Vol. 82, No. 20 2-2-2021, Page 7885 ML19281D7432020-01-0909 January 2020 FRN, Exemption from 10 CFR 50.54(w)(1) - Onsite Property Damage Insurance ML19282A0192020-01-0707 January 2020 FRN, Exemption from 10 CFR 140.11(a)(4) - Primary and Secondary Liability Insurance ML19281D7402020-01-0606 January 2020 Exemption from 10 CFR 50.54(w)(1) - Onsite Property Damage Insurance ML19142A0732019-12-18018 December 2019 Federal Register Notice, Exemption to Allow Reduced Emergency Planning Requirements; Revise Radiological Emergency Response Plan Consistent with Permanently Defueled Reactor ML18332A0992019-12-13013 December 2019 Letter, Environmental Assessment and Finding of No Significant Impact; Exemption to Allow Reduced Emergency Planning Requirements; Revise Radiological Emergency Response Plan Consistent with Permanently Defueled Reactor ML18332A0632019-12-13013 December 2019 Environmental Assessment and Finding of No Significant Impact Exemption to Allow Reduced Emergency Planning Requirements; Revise Radiological Emergency Response Plan Consistent with Permanently Defueled Reactor ML19303B7932019-11-25025 November 2019 OEDO-15-00479 - Federal Register Notice with Pilgrim Nuclear Power Station - Director'S Decision 2.206 Petition Regarding Current Licensing Basis for Flooding ML19170A2572019-08-22022 August 2019 Federal Register Notice, Order Approving Direct and Indirect Transfer of Renewed Facility Operating License to Holtec Pilgrim, LLC, Owner and Holtec Decommissioning International, LLC, Operator (L-2018-LLO-0003) ML19192A0872019-08-22022 August 2019 FRN, Request to Exempt Holtec Decommissioning International from Requirements of 10 CFR 50.82(a)(8)(i)(A) Related to Decommissioning Trust Fund ML19191A0052019-08-15015 August 2019 FRN, Environmental Assessment and Finding of No Significant Impact - Request to Exemption Holtec Decommissioning International from Requirements of 10 CFR 50.82(a)(8)(i)(A) Related to Decommissioning Trust Fund ML19163A0022019-07-23023 July 2019 FRN, Exemption from 10 CFR 50.82(a)(8)(i)(A) to Allow Use of Funds from Nuclear Decommissioning Trust for Spent Fuel Management and Site Restoration Activities ML19163A0012019-07-22022 July 2019 Exemption from 10 CFR 50.82(a)(8)(i)(A) to Allow Use of Funds from Nuclear Decommissioning Trust for Spent Fuel Management and Site Restoration Activities ML19136A1762019-06-26026 June 2019 FRN, Environmental Assessment and Finding of No Significant Impact; Exemption from 10 CFR 50.82(a)(8)(i)(A), Allow Use of Funds from Nuclear Decommissioning Trust for Spent Fuel Management and Site Restoration Activities ML20042D6972019-01-31031 January 2019 Federal Register Notice - Pilgrim Nuclear Station; Consideration of Approval of Transfer of License and Conforming Amendment (January 31, 2019; 84 Fr 816) ML18337A4302019-01-0202 January 2019 Letter, Notice of Application for Order for Direct and Indirect Transfer of Renewed Facility Operating License and Conforming License Amendment to Holtec Pilgrim, LLC and Holtec Decommissioning International, LLC ML18337A4182019-01-0202 January 2019 FRN, Notice of Application for Order for Direct and Indirect Transfer of Renewed Facility Operating License and Conforming License Amendment to Holtec Pilgrim, LLC and Holtec Decommissioning International, LLC ML18331A1492018-12-18018 December 2018 Federal Register Notice, Notice of Receipt, Public Meeting, and Request for Comment on Post-Shutdown Decommissioning Activities Report and Site-Specific Decommissioning Cost Estimate ML18331A1292018-12-18018 December 2018 Letter, Notice of Receipt, Public Meeting, and Request for Comment on Post-Shutdown Decommissioning Activities Report and Site-Specific Decommissioning Cost Estimate ML18295A7442018-10-25025 October 2018 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: 11/06/18 ML17353A1922017-12-21021 December 2017 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: January 2, 2018 NRC-2017-0238, Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: January 2, 20182017-12-21021 December 2017 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: January 2, 2018 ML17059D7672017-05-16016 May 2017 Pilgrim Nuclear Power Station - FRN, Exemption from Specific Provisions in 10 CFR 73.55 Related to Suspension of Security Measures for Licensed Senior Operator or Certified Fuel Handler (CAC No. MF9274) ML15356A7352016-02-11011 February 2016 OEDO-15-00479: David Lochbaum and Others 2.206 Petition Regarding Pilgrim'S Current License Basis for Flooding Acknowledgement Letter ML15356A7442016-02-11011 February 2016 OEDO-15-00479: Federal Register Notice 2.206 Petition Regarding Pilgrim'S Current License Basis for Flooding NRC-2016-0035, OEDO-15-00479: Federal Register Notice 2.206 Petition Regarding Pilgrim'S Current License Basis for Flooding2016-02-11011 February 2016 OEDO-15-00479: Federal Register Notice 2.206 Petition Regarding Pilgrim'S Current License Basis for Flooding ML15162A6902015-08-27027 August 2015 G20130211 - Transmittal Letter to Petitioner Judson Regarding Final Director'S Decision for James A. FitzPatrick Power Plant, Pilgrim Nuclear Power Station and Vermont Yankee Nuclear Power Station ML13018A2392015-04-0808 April 2015 G20110171 - Letter to Petitioner Saporito on Proposed Director'S Decision Regarding 2.206 Petition Dated: March 12, 2011 ML15051A0242015-03-0606 March 2015 Individual Notice of Consideration of Issuance of Amendment to Facility Operating License, Proposed No Significant Hazards Consideration Determination & Opportunity for a Hearing & Order Imposing Procedures for Document Access (MF5431) NRC-2015-0053, Federal Register Notice - License Amendment Application; Opportunity to Comment, Request a Hearing, and Petition for Leave to Intervene; Order for Entergy Nuclear Operations, Inc. Pilgrim Nuclear Power Station2015-03-0606 March 2015 Federal Register Notice - License Amendment Application; Opportunity to Comment, Request a Hearing, and Petition for Leave to Intervene; Order for Entergy Nuclear Operations, Inc. Pilgrim Nuclear Power Station ML15051A0272015-03-0606 March 2015 Federal Register Notice - License Amendment Application; Opportunity to Comment, Request a Hearing, and Petition for Leave to Intervene; Order for Entergy Nuclear Operations, Inc. Pilgrim Nuclear Power Station ML14335A6302015-01-15015 January 2015 G20110262 - Final Response to Paul Gunter and Kevin Kamps Letter 2.206 - Immediately Suspend the Operating License of General Electric Boiling Water Reactors Mark I Units NRC-2015-0009, G20110262 - FRN - Paul Gunter and Kevin Kamps Letter 2.206 - Immediately Suspend the Operating License of General Electric Boiling Water Reactors Mark I Units2015-01-15015 January 2015 G20110262 - FRN - Paul Gunter and Kevin Kamps Letter 2.206 - Immediately Suspend the Operating License of General Electric Boiling Water Reactors Mark I Units ML14335A6482015-01-15015 January 2015 G20110262 - FRN - Paul Gunter and Kevin Kamps Letter 2.206 - Immediately Suspend the Operating License of General Electric Boiling Water Reactors Mark I Units ML14255A4352014-09-15015 September 2014 Transmittal LTR for Individual Notice of Consideration of Issuance of Amendment to Facility Operating License, Proposed No Significant Hazards Consideration Determination, and Opportunity for Hearing ML14189A6652014-07-24024 July 2014 Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving Proposed No Significant Hazards Considerations and Containing Sensitive Unclassified Non-Safeguards Information - August 5, 2014 NRC-2012-0186, G20100454 - Federal Register Notice 2.206 Petition (Pilgrim Watch) - Non-EQ Inaccessible Cables and Wiring at Pilgrim Nuclear Power Station2013-09-26026 September 2013 G20100454 - Federal Register Notice 2.206 Petition (Pilgrim Watch) - Non-EQ Inaccessible Cables and Wiring at Pilgrim Nuclear Power Station ML13255A1912013-09-26026 September 2013 G20100454 - Transmittal Letter 2.206 Petition (Pilgrim Watch)-Non-EQ Inaccessible Cables and Wiring at Pilgrim Nuclear Power Station ML13255A1932013-09-26026 September 2013 G20100454 - Federal Register Notice 2.206 Petition (Pilgrim Watch) - Non-EQ Inaccessible Cables and Wiring at Pilgrim Nuclear Power Station ML13225A5572013-08-12012 August 2013 Rescission of Certain Security Orders Concerning Spent Nuclear Fuel in Transit ML13154A3312013-08-0707 August 2013 G20130211 - Federal Register Notice - 2.206 Petition from Tim Judson Financial Qualifications Fitzpatrick/Vermont Yankee/Pilgrim ML13154A3132013-08-0707 August 2013 G20130211 Letter to Timothy Judson 2.206 Financial Qualifications Fitzpatrick/Vermont Yankee/Pilgrim ML13018A4572013-03-20020 March 2013 Proposed Director'S Decision - Entergy'S Management of Non-Environmentally Qualified Inaccessible Cables & Wiring at Pilgrim ML13025A3212013-03-14014 March 2013 ANO 1 & 2, Big Rock, FitzPatrick, GGNS, Indian Point 1, 2 & 3, Palisades, Pilgrim, RBS, Vermont Yankee, and Waterford - Correction FRN, Biweekly Notice of Issuance of Amendments Published on 1/22/13, Revise QA Program Manual and Staff Quali ML1034303362012-08-0202 August 2012 G20100454/EDATS: OEDO-2010-0589 - Federal Register Notice - Receipt of Request for Action Under 10 CFR 2.206 Entergy'S Management of Non-Environmentally Qualified Inaccessible Cables & Wiring at Pilgrim ML1219102272012-08-0202 August 2012 G20100454/EDATS: OEDO-2010-0589 - Acknowledgement Letter to Mary Lampert Re 2.206 - Inadequate of Entergy'S Management of Non-Environmentally Qualified Inaccessible Cables & Wiring at Pilgrim ML0910404232012-05-29029 May 2012 Issuance of Renewed License for Pilgrim Nuclear Generating Station NRC-2012-0002, 03/30/2012 Commission Meeting - FRN2012-03-23023 March 2012 03/30/2012 Commission Meeting - FRN 2021-02-02
[Table view] Category:Letter
MONTHYEARL-24-002, Late LLRW Shipment Investigation Report Pursuant to 10 CFR 20, Appendix G2024-02-0202 February 2024 Late LLRW Shipment Investigation Report Pursuant to 10 CFR 20, Appendix G ML23342A1182024-01-0909 January 2024 Independent Spent Fuel Storage Installation Security Inspection Plan L-23-019, Proof of Financial Protection 10 CFR 140.152023-12-18018 December 2023 Proof of Financial Protection 10 CFR 140.15 ML23334A1822023-11-30030 November 2023 Biennial Report for the Defueled Safety Analysis Report Update, Technical Specification Bases Changes, 10 CFR 50.59 Evaluation Summary, and Regulatory Commitment Change Summary November 2021 Through October 2023 L-23-012, Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point2023-11-13013 November 2023 Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point ML23306A0992023-11-0202 November 2023 and Indian Point Energy Center, Notification of Changes in Schedule in Accordance with 10 CFR 50.82(a)(7) L-23-011, 10 CFR 72.48 Biennial Change Summary Report2023-10-27027 October 2023 10 CFR 72.48 Biennial Change Summary Report IR 05000293/20234012023-08-31031 August 2023 NRC Inspection Report No. 05000293/2023401 & 2023001 (Cover Letter Only) IR 05000293/20230022023-08-0404 August 2023 NRC Inspection Report No. 05000293/2023002 L-23-008, Correction to Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations Holtec Decommissioning International, LLC (HDI)2023-05-23023 May 2023 Correction to Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations Holtec Decommissioning International, LLC (HDI) ML23136A7792023-05-15015 May 2023 Annual Radiological Environmental Operating Report, January 1 Through December 31, 2022 ML23135A2152023-05-15015 May 2023 Annual Radioactive Effluent Release Report, January 1 Through December 31, 2022 L-23-004, HDI Annual Occupational Radiation Exposure Data Reports - 20222023-04-24024 April 2023 HDI Annual Occupational Radiation Exposure Data Reports - 2022 L-23-003, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-31031 March 2023 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations ML23088A0382023-03-29029 March 2023 Stations 1, 2, & 3, Palisades Nuclear Plant, and Big Rock Point - Nuclear Onsite Property Damage Insurance ML23069A2782023-03-13013 March 2023 Request for Scoping Comments Concerning the Environmental Review of Monticello Nuclear Generating Plant, Unit 1 Subsequent License Renewal Application ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities IR 05000293/20220042023-02-15015 February 2023 NRC Inspection Report No. 05000293/2022004 ML22356A0712023-01-31031 January 2023 Issuance of Exemption for Pilgrim Nuclear Power Station ISFSI Regarding Annual Radioactive Effluent Release Report - Cover Letter ML22347A2782022-12-21021 December 2022 Independent Spent Fuel Storage Installation Security Inspection Plan Dated December 21, 2022 L-22-042, Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.152022-12-14014 December 2022 Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.15 L-22-041, Supplemental Information to Enhance Exemption Request Detail for Pilgrim ISFSI Annual Radioactive Effluent Release Report Due Date Extension2022-12-0909 December 2022 Supplemental Information to Enhance Exemption Request Detail for Pilgrim ISFSI Annual Radioactive Effluent Release Report Due Date Extension IR 05000293/20220032022-11-18018 November 2022 NRC Inspection Report No. 05000293/2022003 L-22-036, Decommissioning Trust Fund Agreement2022-11-0808 November 2022 Decommissioning Trust Fund Agreement ML22276A1762022-10-24024 October 2022 Decommissioning International Proposed Revisions to the Quality Assurance Program Approval Forms for Radioactive Material Packages ML22266A1922022-09-23023 September 2022 and Pilgrim Nuclear Power Station - Request to Withdraw Prior Submissions from NRC Consideration ML22272A0352022-09-22022 September 2022 S. Lynch-Benttinen Letter Regarding U.S. Citizen Intent to Sue U.S. Fish and Wildlife and NOAA Fisheries Representing the Endangered Species (Na Right Whale) Which Will Be Adversely Affected by Holtec International Potential Actions ML22269A4202022-09-22022 September 2022 Citizen Lawsuit ML22241A1122022-08-29029 August 2022 Request for Exemption from 10 CFR 72.212(a)(2), (b)(2), (b)(3), (b)(4), (B)(5)(i), (b)(11), and 72.214 for Pilgrim ISFSI Annual Radioactive Effluent Release Report IR 05000293/20220022022-08-12012 August 2022 NRC Inspection Report No. 05000293/2022002 ML22215A1772022-08-0303 August 2022 Decommissioning International (HDI) Proposed Revisions to the Quality Assurance Program Approval Forms for Radioactive Material Packages ML22206A1512022-08-0101 August 2022 NRC Office of Investigations Case Nos. 1-2022-002 & 1-2022-006 ML22221A2592022-08-0101 August 2022 LTR-22-0217-1-NMSS - Town of Duxbury Letter Opposing the Irradiated Water Release from Pilgrim (Docket No. 05000293) ML22193A1662022-07-28028 July 2022 LTR-22-0154-1 - Heather Govern, VP, Clean Air and Water Program, Et Al., Letter Regarding Radioactive Wastewater Disposal from the Pilgrim Nuclear Power Station (Docket No. 05000293) ML22175A1732022-07-28028 July 2022 LTR-22-0153-1 - Response Letter to D. Turco, Cape Downwinders, from A. Roberts, NRC, Regarding Holtec-Pilgrim Plans to Dump One Million Gallons of Radioactive Waste Into Cape Cod Bay ML22154A4882022-06-0101 June 2022 Letter from Conservation Law Foundation Regarding Irradiated Water Release from Pilgrim ML22154A1622022-05-26026 May 2022 Letter and Email from Save Our Bay/Diane Turco Regarding Irradiated Water Release from Pilgrim ML22136A2602022-05-16016 May 2022 Submittal of Annual Radiological Environmental Operating Report for January 1 Through December 31, 2021 ML22136A2572022-05-16016 May 2022 Submittal of Annual Radioactive Effluent Release Report for January 1 Through December 31, 2021 ML22102A0932022-05-12012 May 2022 LTR-22-0067 Response to Matthew P. Levesque, President, Barnstable Town Council Regarding Irradiated Water Release from Pilgrim IR 05000293/20220012022-05-11011 May 2022 NRC Inspection Report No. 05000293/2022001 ML22104A0542022-04-30030 April 2022 LTR-22-0093 Response to Sheila Lynch-Benttinen, Regarding Irradiated Water Release from Pilgrim L-22-026, Occupational Radiation Exposure Data Report - 20212022-04-29029 April 2022 Occupational Radiation Exposure Data Report - 2021 ML22152A2592022-04-25025 April 2022 Zaccagnini Letter Dated 04/25/22 ML22152A2642022-04-19019 April 2022 Flynn Letter Dated 04/19/22 ML22091A1062022-04-0101 April 2022 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) L-22-022, and Indian Point Nuclear Generating Stations 1, 2, & 3 - Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations - Holtec.2022-03-25025 March 2022 and Indian Point Nuclear Generating Stations 1, 2, & 3 - Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations - Holtec. ML22130A6762022-03-14014 March 2022 Decola Ltr Dtd 03/14/22 Re Potential Discharge of Radioactive Water from Pilgrim Nuclear Power Station ML22041B0762022-03-0707 March 2022 03-07-22 - Letter to the Honorable William R. Keating, Responds to Letter Regarding Proposed Release of Irradiated Water at Pilgrim Nuclear Power Station Into Cape Cod Bay ML22054A2962022-02-23023 February 2022 Annual ISFSI Radioactive Effluent Release Report for 2021 2024-02-02
[Table view] |
Text
From: Robert Schaaf To: Bob.Walker@state.ma.us; Christine.Packard@state.ma.us; cynthia.arcate@state.ma.us; Dhadd2218@yahoo.com; John.Giarrusso@state.ma.us; Ken. Plumley@state.ma.us; Kennethtavares@gmail.com; MSylvia@townhall.plymouth.ma.us; Robert.Nadeau@state.ma.us; Therese Murray; Timmermann.Timothy@epamail.epa.gov; Vinny deMacedo Date: Tue, Apr 18, 2006 3:14 PM
Subject:
NRC Issues Notice of Intent to Prepare EIS for Pilgrim LRA This e-mail is to inform you that by letter dated April 7, 2006 (attached), the NRC issued its Notice of Intent to Prepare an Environmental Impact Statement and Conduct Scoping Process for the Pilgrim license renewal application. The Notice appeared in the April 14, 2006, Federal Register (72 FR 19554) and includes information regarding the opportunity for public comment on the scope of the environmental review that extends to June 16, 2006. The letter and FR notice also provide information regarding public comment meetings scheduled for May 17, 2006, at the Radisson Plymouth Harbor Ballroom. The NRC will be issuing a press release regarding this notice and the forthcoming public meetings approximately one week prior to the meetings. We will also be posting notice of the public meetings on our web site at least 2 weeks prior to the meetings. The attached letter is also publically available via the NRC's electronic document system (ADAMS) accessible at http:/twww.nrc.-gov/readinaq-rm/adams.html. The ADAMS accession number for the letter is ML061000261.
Robert Schaaf, Sr Project Manager Environmental Branch B Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 0-11 F1 Washington, DC 20555 301-415-1312 rqs(&nrc.gov CC: Alicia Mullins; Alicia Williamson; Christopher Welch; Cliff Anderson; David McIntyre; Diane Screnci; Frank Gillespie; James Shea; John Wray; Kathy Weaver; Neil Sheehan; Pao-Tsin Kuo; Raeann Shane; Rani Franovich; Richard Musiol; Robert Bores; Rosetta Virgilio; William Raymond
=ae ag
- c:xtem ,vv uuu222I Mail Envelope Properties (44453AB0.A77: 19: 35564)
Subject:
NRC Issues Notice of Intent to Prepare EIS for Pilgrim LRA Creation Date Tue, Apr 18, 2006 3:14 PM From: Robert Schaaf Created By: RGS@nrc.gov Recipients Action Date & Time epamail.epa.gov Timmermann.Timothy (Timmermann.Timothy@epamail.epa.gov) Transferred 04/18/06 3:15 PM gmail.com Kennethtavares (Kennethtavares@gmail.com) Transferred 04/18/06 3:15 PM hou.state.ma.us rep.vinnydemacedo (Vinny deMacedo) Transferred 04/18/06 3:15 PM nrc.gov FPG CC (Frank Gillespie) Delivered 04/18/06 3:15 PM Opened 04/20/06 12:46 PM PTK CC (Pao-Tsin Kuo) Opened 04/18/06 3:32 PM RLF2 CC (Rani Franovich) Opened 04/18/06 7:13 PM nrc.gov AXM7 CC (Alicia Mullins) Delivered 04/18/06 3:15 PM Opened 04/18/06 3:33 PM DTM CC (David McIntyre) Opened 04/18/06 3:20 PM nrc.gov ARW1 CC (Alicia Williamson) Delivered 04/18/06 3:15 PM Opened 04/19/06 8:10 AM JJS CC (James Shea) Opened 04/18/06 5:22 PM KDW CC (Kathy Weaver) Opened 04/18/06 3:33 PM RMS2 CC (Raeann Shane) Opened 04/18/06 5:08 PM ROV CC (Rosetta Virgilio) Opened 04/18/06 3:17 PM nrc.gov CJA CC (Cliff Anderson) Delivered 04/18/06 3:15 PM Opened 04/24/06 10:06 AM CRW CC (Christopher Welch) Opened 04/19/06 8:19 AM DPS CC (Diane Screnci) Opened 04/19/06 1:37 PM JRW3 CC (John Wray) Opened 04/19/06 7:16 AM
I
- ! C:\temD\GVV*00OO2.fMP I-'a*e zl ie~temDw~w~uUuu2. IMP ra~ie LI NAS CC (Neil Sheehan) Opened 04/18/06 3:40 PM RIB CC (Robert Bores) Opened 04/18/06 3:18 PM WJR CC (William Raymond) Opened 04/19/06 8:05 AM state.ma.us Bob.Walker (Bob.Walker@state.ma.us) Transferred 04/18/06 3:15 PM Christine.Packard (Christine.Packard@state.ma.us) cynthia.arcate (cynthia.arcate@state.ma.us)
John.Giarrusso (John.Giarrusso@state.ma.us)
Ken.Plumley (Ken.Plumley@state.ma.us)
Richard.Musiol CC (Richard Musiol)
Robert.Nadeau (Robert.Nadeau@state.ma.us)
Therese.Murray (Therese Murray) townhall.plymouth.ma.us MSylvia (MSylvia@townhall.plymouth.ma.us) Transferred 04/18/06 3:15 PM yahoo.com Dhadd2218 (Dhadd2218@yahoo.com) Transferred 04/18/06 3:15 PM Post Office Delivered Route epamail.epa.gov gmail.com hou.state.ma.us nrc.gov nrc.gov nrc.gov nrc.gov state.ma.us townhall.plymouth.ma.us yahoo.com.
Files Size Date & Time MESSAGE 2392 Tuesday, April 18, 2006 3:14 PM Notice of Intent ML061000261.pdf 481906 Tuesday, April 18, 2006 1:23 PM Options Auto Delete: No Expiration Date: None Notify Recipients: No Priority: Standard ReplyRequested: No Return Notification: None
fl.~ a ~
- .%~.........%flIAflflflflflfl -i-par. rag-qe
Concealed
Subject:
No Security: Standard To Be Delivered: Immediate Status Tracking: Delivered & Opened
April 7, 2006 Mr. Michael Kansler President Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601
SUBJECT:
NOTICE OF INTENT TO PREPARE AN ENVIRONMENTAL IMPACT STATEMENT AND CONDUCT SCOPING PROCESS FOR LICENSE RENEWAL FOR THE PILGRIM NUCLEAR POWER STATION (TAC NO. MC9676)
Dear Mr. Kansler:
The U.S. Nuclear Regulatory Commission (NRC) staff has received your application on January 25, 2006, for the renewal of the Operating License DPR-35 for the Pilgrim Nuclear Power Station (Pilgrim). In support of the application and in accordance with Title 10 of the Code of FederalRegulations(10 CFR) Part 51 and 10 CFR Part 54, Entergy Nuclear Operations, Inc. (Entergy) submitted an environmental report (ER). This letter provides information related to the staffs review of the Pilgrim ER.
The NRC has prepared a Notice of Intent advising the public that the NRC intends to gather information necessary to prepare a plant-specific supplement to the Commission's "Generic Environmental Impact Statement for License Renewal of Nuclear Plants," (NUREG-1437). This relates to the review of the application for the renewal of the Pilgrim operating license.
Enclosed is a copy of the Notice of Intent, which has been forwarded to the Office of the FederalRegisterfor publication.
Pursuant to 10 CFR 51.28, Entergy is invited to participate in the environmental scoping process. As discussed in the enclosed notice, the staff is providing the public with two opportunities to participate in the environmental scoping meetings to be held May 17, 2006.
The meetings will be held at the Radisson Hotel Plymouth Harbor Ballroom, 180 Water Street, Plymouth, Massachusetts 02360. The first session will be held in the afternoon and the second session, covering the same subjects, will be held in the evening. The NRC will present an overview of the environmental review process and will describe how the process will be implemented for the review of the Pilgrim license renewal application. Entergy is invited to participate in both sessions of the meeting by providing a brief description of the proposed action and the ER submitted as part of the application for license renewal.
M. Kansler A separate NRC meeting notice with a more detailed agenda is forthcoming. You will be provided a copy of that notice.
In the interim, should you have any questions regarding the scoping meeting, please contact the NRC's Environmental Project Manager, Mr. Robert Schaaf, at 301-415-1312 or by e-mail at RGScnrc.gov.
Sincerely, IRA/
Rani Franovich, Branch Chief Environmental Branch B Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-293
Enclosure:
As stated cc w/encl: See next page
M. Kansler A separate NRC meeting notice with a more detailed agenda is forthcoming. You will be provided a copy of that notice.
In the interim, should you have any questions regarding the scoping meeting, please contact the NRC's Environmental Project Manager, Mr. Robert Schaaf, at 301-415-1312 or by e-mail at RGS(cnrc.,qov.
Sincerely,
/RA/
Rani Franovich, Branch Chief Environmental Branch B Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-293
Enclosure:
As stated cc w/encl: See next page Distribution: See next page ADAMS Accession no.: ML061000261 Document Name:E:\Filenet\ML061000261.wpd OFFICE LA:DLR PM:DLR:REBB PM:DLR:REBB OGC BC:DLR:REBB NAME Y.Edmonds A.Mullins R.Schaaf S.Uttal R.Franovich DATE 3/31/06 3/31/06 3/31/06 4/4/06 4/7/06 OFFICIAL RECORD COPY
7590-01 -P UNITED STATES NUCLEAR REGULATORY COMMISSION ENTERGY NUCLEAR OPERATIONS. INC.
PILGRIM NUCLEAR POWER STATION NOTICE OF INTENT TO PREPARE AN ENVIRONMENTAL IMPACT STATEMENT AND CONDUCT SCOPING PROCESS DOCKET NO. 50-293 Entergy Nuclear Operations, Inc. (Entergy) has submitted an application for renewal of Facility Operating License DPR-35 for an additional 20 years of operation at the Pilgrim Nuclear Power Station (Pilgrim). Pilgrim is located on the western shore of Cape Cod in the Town of Plymouth, Plymouth County, Massachusetts. It is 38 miles southeast of Boston, Massachusetts, and 44 miles east of Providence, Rhode Island.
The operating license for Pilgrim expires on June 8, 2012. The application for renewal was received on January 25, 2006, pursuant to Title 10 of the Code of FederalRegulations (10 CFR) Part 54. A notice of receipt and availability of the application, which included the environmental report (ER), was published in 'the FederalRegister on February 6, 2006 (71 FR 6101). A notice of acceptance for docketing of the application for renewal of the facility operating license was published in the FederalRegister on March 27, 2006 (71 FR 15222).
The purpose of this notice is to inform the public that the U.S. Nuclear Regulatory Commission (NRC) will be preparing an environmental impact statement (EIS) in support of the review of the license renewal application and to provide the public an opportunity to participate in the environmental scoping process, as defined in 10 CFR 51.29. In addition, as outlined in Title 36 of the Code of the FederalRegulations Part 800.8, "Coordination with the National Environmental Policy Act," the NRC plans to coordinate compliance with Section 106 of the
National Historic Preservation Act in meeting the requirements of the National Environmental Policy Act of 1969 (NEPA).
In accordance with 10 CFR 51.53(c) and 10 CFR 54.23, Entergy submitted the ER as part of the application. The ER was prepared pursuant to 10 CFR Part 51 and is publicly available for inspection at the NRC Public Document Room (PDR), located at One White Flint North, 11555 Rockville Pike (first floor), Rockville, Maryland, 20852, or from the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Public Electronic Reading Room on the NRC's Web Site at http://www.nrc.qov/readinq-rm/adams/web-based.html. The Accession Number for the ER is ML060830611. Persons who do not have access to ADAMS, or who encounter problems in accessing the documents located in ADAMS, should contact the NRC's PDR reference staff by telephone at 1-800-397-4209, or 301-415-4737, or by e-mail at pdr@nrc.gov. In addition, the Plymouth Public Library, located at 132 South Street, Plymouth, MA 02360 and the Duxbury Free Library, located at 77 Alden Street, Duxbury, MA 02332 have agreed to make the ER available for public inspection.
This notice advises the public that the NRC intends to gather the information necessary to prepare a plant-specific supplement to the Commission's "Generic Environmental Impact Statement (GELS) for License Renewal of Nuclear Plahts," (NUREG-1437) related to the review of the application for renewal of the Pilgrim operating license for an additional 20 years.
Possible alternatives to the proposed action (license renewal) include no action and reasonable alternative energy sources. The NRC is required by 10 CFR 51.95 to prepare a supplement to the GElS in connection with the renewal of an operating license. This notice is being published in accordance with National Environmental Policy Act of 1969 (NEPA) and the NRC's regulations found in 10 CFR Part 51.
The NRC will first conduct a scoping process for the supplement to the GElS and, as
soon as practicable thereafter, will prepare a draft supplement to the GElS for public comment.
Participation in the scoping process by members of the public and local, State, Tribal, and Federal government agencies is encouraged. The scoping process for the supplement to the GElS will be used to accomplish the following:
- a. Define the proposed action which is to be the subject of the supplement to the GELS.
- b. Determine the scope of the supplement to the GElS and identify the significant issues to be analyzed in depth.
- c. Identify and eliminate from detailed study those issues that are peripheral or that are not significant.
- d. Identify any environmental assessments and other EISs that are being or will be prepared that are related to, but are not part of the scope of the supplement to the GElS being considered.
- e. Identify other environmental review and consultation requirements related to the proposed action.
- f. Indicate the relationship between the timing of the preparation of the environmental analyses and the Commission's tentative planning and decision-making schedule.
- g. Identify any cooperating agencies and, as appropriate, allocate assignments for preparation and schedules for completing the supplement to the GElS to the NRC and any cooperating agencies.
- h. Describe how the supplement to the GElS will be prepared, and include any contractor assistance to be used.
The NRC invites the following entities to participate in scoping:
- a. The applicant, Entergy Nuclear Operations, Inc. (Entergy).
- b. Any Federal agency that has jurisdiction by law or special expertise with respect to any environmental impact involved, or that is authorized to develop and enforce
relevant environmental standards.
- c. Affected State and local government agencies, including those authorized to develop and enforce relevant environmental standards.
- d. Any affected Indian tribe.
- e. Any person who requests or has requested an opportunity to participate in the scoping process.
- f. Any person who has petitioned or intends to petition for leave to intervene.
In accordance with 10 CFR 51.26, the scoping process for an EIS may include a public scoping meeting to help identify significant issues related to a proposed activity and to determine the scope of issues to be addressed in an EIS. The NRC has decided to hold public meetings for the Pilgrim license renewal supplement to the GELS. The scoping meetings will be held at the Radisson Hotel Plymouth Harbor Ballroom, 180 Water Street, Plymouth, Massachusetts 02360, on May 17, 2006. There will be two sessions to accommodate interested parties. The first session will convene at 1:30 p.m. and will continue until 4:30 p.m.,
as necessary. The second session will convene at 7:00 p.m. with a repeat of the overview portions of the meeting and will continue until 10:00 p.m., as necessary. Both meetings will be transcribed and will include: (1) an overview by the NRC staff of the NEPA environmental review process, the proposed scope of the supplement to the GELS, and the proposed review schedule; and (2) the opportunity for interested government agencies, organizations, and individuals to submit comments or suggestions on the environmental issues or the proposed scope of the supplement to the GELS. Additionally, the NRC staff will host informal discussions one hour prior to the start of each meeting at the same location. No formal comments on the proposed scope of the supplement to the GElS will be accepted during the informal discussions. To be considered, comments must be provided either at the transcribed public meetings or in writing, as discussed below. Persons may register to attend or present oral
comments at the meetings on the scope of the NEPA review by contacting the NRC Environmental Project Manager Mr. Robert Schaaf, by telephone at 1-800-368-5642, extension 1312, or by e-mail to the NRC at PilQrimEIS(anrc.oov no later than May 12, 2006. Members of the public may also register to speak at the meeting within 15 minutes of the start of each session. Individual oral comments may be limited by the time available, depending on the number of persons who register. Members of the public who have not registered may also have an opportunity to speak, if time permits. Public comments will be considered in the scoping process for the supplement to the GELS. Mr. Schaaf will need to be contacted no later than May 3, 2006, if special equipment or accommodations are needed to attend or present information at the public meeting, so that the NRC staff can determine whether the request can be accommodated.
Members of the public may send written comments on the environmental scope of the Pilgrim license renewal review to Chief, Rules and Directives Branch, Division of Administrative Services, Office of Administration, Mailstop T-6D59, U.S. Nuclear Regulatory Commission, Washington, D.C., 20555-0001, and should cite the publication date and page number of this FederalRegisternotice. Comments may also be delivered to the NRC at Room T- 6D59, Two White Flint North, 11545 Rockville Pike, Rockville, Maryland 20852, from 7:30 a.m. to 4:15 p.m. during Federal workdays. To be considered in the scoping process, written comments should be postmarked by June 16, 2006. Electronic comments may be sent by e-mail to the NRC at PilarimEIS(*-nrc.aov and should be sent no later than June 16, 2006, to be considered in the scoping process. Comments will be available electronically and accessible through NRC's ADAMS link at Ihttp://www.nrc.qov/reading-rm/adams.html at the NRC Homepage.
Participation in the scoping process for the supplement to the GElS does not entitle participants to become parties to the proceeding to which the supplement to the GElS relates.
Notice of opportunity for a hearing regarding the renewal application was the subject of the aforementioned FederalRegister notice (71 FR 15222). Matters related to participation in any hearing are outside the scope of matters to be discussed at this public meeting.
At the conclusion of the scoping process, the NRC will prepare a concise summary of the determination and conclusions reached, including the significant issues identified, and will send a copy of the summary to each participant in the scoping process. The summary will also be available for inspection in NRC's ADAMS link at http:llwww.nrc..qov/reading-rm/adams.html.
The staff will then prepare and issue for comment the draft supplement to the GELS, which will be the subject of separate notices and separate public meetings. Copies will be available for public inspection at the above-mentioned addresses, and one copy per request will be provided free of charge. After receipt and consideration of the comments, the NRC will prepare a final supplement to the GELS, which will also be available for public inspection.
Information about the proposed action, the supplement to the GELS, and the scoping process may be obtained from Mr. Schaaf at the aforementioned telephone number or e-mail address.
Dated at Rockville, Maryland, this 7 day of April 2006.
FOR THE NUCLEAR REGULATORY COMMISSION IRA/
Rani Franovich, Branch Chief Environmental Branch B Division of License Renewal Office of Nuclear Reactor Regulation
Letter to: Michael Kansler from Robert Schaaf, dated: April 7, 2006
SUBJECT:
NOTICE OF INTENT TO PREPARE AN ENVIRONMENTAL IMPACT STATEMENT AND CONDUCT SCOPING PROCESS FOR LICENSE RENEWAL FOR THE PILGRIM NUCLEAR POWER STATION (TAC NO. MC9676)
DISTRIBUTION:
F. Gillespie / P.T. Kuo (RidsNrrDIr)
T. Combs, OCA T. Madden, OCA R. Shane, OCA B. Keeling, OCA R. Franovich (RidsNrrDIrRebb)
R. Schaaf A. Mullins R. Emch J. Szeligowski S. Hoffman K. Weaver J. Shea C. Anderson, Region 1 W. Raymond, Region 1 OPA (RidsOpaMail)
D. McIntyre, OPA N. Sheehan, Region I S. Uttal, OGC F. Cameron, OGC OGC (RidsOGCMailRoom)
DLRPREBB
Pilgrim Nuclear Power Station cc:
Regional Administrator, Region I Secretary of Public Safety U. S. Nuclear Regulatory Commission Executive Office of Public Safety 475 Allendale Road One Ashburton Place King of Prussia, PA 19406-1415 Boston, MA 02108 Senior Resident Inspector Director, Massachusetts Emergency U. S. Nuclear Regulatory Commission Management Agency Pilgrim Nuclear Power Station Attn: James Muckerheide Post Office Box 867 400 Worcester Road Plymouth, MA 02360 Framingham, MA 01702-5399 Chairman, Board of Selectmen Mr. William D. Meinert 11 Lincoln Street Nuclear Engineer Plymouth, MA 02360 Massachusetts Municipal Wholesale Electric Company Chairman P.O. Box 426 Nuclear Matters Committee Ludlow, MA 01056-0426 Town Hall 11 Lincoln Street Mr. Michael A. Balduzzi Plymouth, MA 02360 Site Vice President Entergy Nuclear Operations, Inc.
Chairman, Duxbury Board of Selectmen Pilgrim Nuclear Power Station Town Hall 600 Rocky Hill Road 878 Tremont Street Plymouth, MA 02360-5508 Duxbury, MA 02332 Mr. Stephen J. Bethay Office of the Commissioner Director, Nuclear Safety Assurance Massachusetts Department of Entergy Nuclear Operations, Inc.
Environmental Protection Pilgrim Nuclear Power Station One Winter Street 600 Rocky Hill Road Boston, MA 02108 Plymouth, MA 02360-5508 Office of the Attorney General Mr. Bryan S. Ford One Ashburton Place Manager, Licensing 20th Floor Entergy Nuclear Operations, Inc.
Boston, MA 02108 Pilgrim Nuclear Power Station 600 Rocky Hill Road Director, Radiation Control Program Plymouth, MA 02360-5508 Commonwealth of Massachusetts Executive Offices of Health and Mr. Gary J. Taylor Human Services Chief Executive Officer 174 Portland Street Entergy Operations Boston, MA 02114 1340 Echelon Parkway Jackson, MS 39213
Pilgrim Nuclear Power Station cc:
Mr. John T. Herron Ms. Stacey Lousteau Sr. VP and Chief Operating Officer Treasury Department Entergy Nuclear Operations, Inc. Entergy Services, Inc.
440 Hamilton Avenue 639 Loyola Avenue White Plains, NY. 10601 New Orleans, LA 70113 Mr. Oscar Limpias Mr. James Sniezek Vice President, Engineering 5486 Nithsdale Drive Entergy Nuclear Operations, Inc. Salisbury, MD 21801 440 Hamilton Avenue White Plains, NY 10601 Mr. Travis C. McCullough Assistant General Counsel Mr. Christopher Schwarz Entergy Nuclear Operations, Inc.
Vice President, Operations Support 440 Hamilton Avenue Entergy Nuclear Operations, Inc. White Plains, NY 10601 440 Hamilton Avenue White Plains, NY 10601 Mr. James Ross Nuclear Energy Institute Mr. John F. McCann 1776 1Street, NW, Suite 400 Director, Nuclear Safety Assurance Washington, DC 20006-3708 Entergy Nuclear Operations, Inc.
440 Hamilton Avenue Plymouth Public Library White Plains, NY 10601 132 South Street Plymouth, MA 02360 Ms. Charlene D. Faison ATTN: Ms. Dinah O'Brien Manager, Licensing Entergy Nuclear Operations, Inc. Duxbury Free Library 440 Hamilton Avenue 77 Alden Street White Plains, NY 10601 Duxbury, MA 02332 ATTN: Ms. Elaine Winquist Mr. Michael D. Lyster 5931 Barclay Lane Naples, FL 34110-7306 Mr. Michael J. Colomb Director of Oversight Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601