Issue date | Title | Topic | |
---|---|---|---|
ML17284A898 | 14 October 1999 | Forwards Rev 0 to WNP-2 Cycle 15,COLR 99-15, IAW Requirements of TS 5.6.5 | |
ML17292B759 | 24 September 1999 | Forwards Rev 24 to WNP-2 Emergency Plan,Iaw 10CFR50.4(b), 50.54(q) & 10CFR50 App E.Detailed Synopsis of Changes,Encl | |
ML17284A888 | 24 September 1999 | Informs NRC of Change in Schedule Pertaining to Final Implementation of Reactor Stability long-term Solution for WNP-2 | |
ML17284A906 | 24 September 1999 | Forwards Final Rept for 990812 out-of-sequence Drills for Energy Northwest Washington Nuclear Power Project 2 (Lab, Food Control Point & Milk Sampling).No Deficiences & No Areas Requiring C/A Identified in Three Drills | |
ML17292B758 | 22 September 1999 | Forwards NRC Forms 396 & 398 for Nl Hancock,License SOP-50027-3,AR Herrington,License OP-50013-3,WH Sawyer, License SOP-50023-3 & Dl Strote,License SOP-50031-3,for Renewal of Licenses.Without NRC Forms 396 & 398 | |
ML17284A881 | 9 September 1999 | Forwards Response to NRC 990623 RAI to Support Review of Pending Request for Amend to Reactor pressure-temp Limit Curve TS | |
GO2-99-168, Forwards Rev 40 to Physical Security Plan.Rev Withheld,Per 10CFR2.790(a)(3) | 8 September 1999 | Forwards Rev 40 to Physical Security Plan.Rev Withheld,Per 10CFR2.790(a)(3) | |
ML17284A871 | 30 August 1999 | Informs Staff of Errors in world-wide-web Database Related to WNP-2 Reactor Vessel Structural integrity.Marked-up Pages Containing Errors or Omissions Will Be Forwarded by 991201 | |
ML17284A872 | 30 August 1999 | Forwards Proprietary Info to Support Review of Request for Amend to License NPF-21,re Min Critical Power Ratio Safety Limits Tss,As Requested During 990816 Conversation. Proprietary Encl Withheld | |
ML17284A875 | 30 August 1999 | Provides Correct Page from License NPF-21 Marked to Show Rev Addressed in 990729 Application for Amend,Which Included Page That Was Inadvertently Included as Attachment 4.Replace Attachment 4 with Attached Page & Disregard Attachment 5 | |
ML17292B753 | 24 August 1999 | Requests That Eleven Individuals Listed Below Take BWR Generic Fundamentals Examination to Be Administered on 991006 | Generic Fundamentals Examination |
ML17292B751 | 24 August 1999 | Forwards Fitness for Duty (FFD) Semiannual Performance Data Rept for Jan-June 1999,per 10CFR26.71(d) | Fitness for Duty |
ML17292B750 | 19 August 1999 | Informs Staff That Licensee Has Completed Review of NRC SER for B&Wog Util Resolution Guidance Document Addressing ECCS Suction Strainer Blockage | |
ML17284A870 | 19 August 1999 | Forwards NRC Form 396, Certification of Medical Exam by Facility Licensee & NRC Form 398, Personal Qualification Statement - Licensee, for Jd Prescott (License SOP-50262-1).Without Encls | |
ML17284A868 | 12 August 1999 | Submits Two ISI Program Plan Relief Requests for NRC Review & Approval,Per 10CFR50.55a(a)(3)(i).Proposed Alternatives Provide Acceptable Level of Quality & Safety | Nondestructive Examination |
ML17284A854 | 2 August 1999 | Forwards Proprietary Addl Info to Support Review of Pending Request for Amend to MCPR Safety Limit Ts.Info Consists of Proprietary Ltr from Abb Combustion Engineering,Inc.Encl Withheld | |
ML17284A853 | 30 July 1999 | Forwards Estimate of Number of Licensing Action Requests Planned for Submittal in Future,As Requested in Administrative Ltr 99-02.Twenty-nine Submittals Scheduled for Fy 2000 & Four for Fy 2001 | |
ML17284A830 | 22 July 1999 | Clarifies Change of Licensee Name from Wpps to Energy Northwest & Change of Facility Name from Wppss Nuclear Project Number 2 to WNP-2,as Requested in 990719 Telcon with Js Cushing of NRC.Marked-up OL Pages,Encl | |
ML17292B745 | 20 July 1999 | Forwards Rev 23 to WNP-2 Emergency Plan,Iaw 10CFR50.4(b) & 50.54(q) & 10CFR50 App E.Rev 23 Provides Updated Description Re Establishment of Separate Emergency Operation Centers for Benton & Franklin Counties | |
ML17292B739 | 16 July 1999 | Submits Withdrawal of Request for Amend to Secondary Containment & Standby Gas Treatment Sys Ts.Util Currently Plan to re-submit Amend Request in Entirety by 991112 | |
ML17292B738 | 12 July 1999 | Forwards NRC Form 396 & NRC Form 398,for If Sumsion,License OP-50487 & Ga Westergard,License SOP-50415 for Renewal of Operator Licenses.Without Encls | |
ML17292B717 | 6 July 1999 | Provides Notification of Early Completion on 990630 of Exception Noted in 990629 Ltr.Equipment within Scope of GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants, Evaluated & Y2K Ready | |
ML17292B718 | 2 July 1999 | Responds to 990623 RAI to Support Review of Evaluation of Planar Indication Found on Weld Number 24RRC(2)A-1 During 1998 RO | Safe Shutdown Earthquake Operating Basis Earthquake |
ML17292B716 | 30 June 1999 | Forwards Addl Info Requested in 990513 Ltr to Support Review of Pending Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power Operated Gate Valves. | Power-Operated Valves |
ML17292B713 | 29 June 1999 | Forwards Response to NRC GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Npps. | |
ML17292B709 | 21 June 1999 | Forwards Proprietary Response to NRC 990603 RAI Re Licensee Request for Amend to MCPR Safety Limit Tss.Proprietary Info Withheld IAW Requirements of 10CFR2.790 | |
ML17292B704 | 17 June 1999 | Forwards NRC Forms 396 & 398 for Three Individuals Listed Below for Renewal of Operator Licenses.Without Encls | |
ML17292B703 | 10 June 1999 | Forwards Response to NRC 990511 RAI Re License Request for Amend to Secondary Containment & SGTS Tss.Results of Addl Benchmark of Gothic Computer Code Performed to Demonstrate Modeling Capability of Drawdown Response,Encl | Emergency Lighting |
ML17292B684 | 4 June 1999 | Forwards Response to NRC 990326 RAI Re WNP-2 GL 96-05 Program for Periodic Verification of design-basis Capability of MOVs | |
ML17292B685 | 1 June 1999 | Forwards 1999 Quality Audit of WNP-2 Emergency Preparedness Program, Per NUREG-0654,Section Ii,Criteria P.9.Seven Problem Evaluation Requests & Nine Recommendations for Improvement Were Issued as Result of Audit Activities | |
ML17292B683 | 25 May 1999 | Informs That Request for NRC Approval of Changes to Emergency Plan Requesting Reduction in on-shift HP Staffing, Is Retracted.Util Will Resubmit Request with Required Addl Info at Later Date | |
ML17292B675 | 25 May 1999 | Forwards Proprietary ABB-CE Ltr Re WNP-2 Cycle 15 SLMCPR & Core Reload Design Rept,Per Util Request for Amend Re MCPR Safety Limits.Proprietary Info Withheld,Per 10CFR2.790 | Minimum Critical Power Ratio |
ML17292B666 | 7 May 1999 | Requests Exemption to Requirement in 10CFR55.59(a)(2) Re Annual Operating Test requirements.One-time Exemption from Requirement to Period Not to Exceed 15-months from Last Date of Passing Operating Exam for Licensee at Facility | Exemption Request |
ML17292B653 | 3 May 1999 | Forwards Response to NRC 990402 RAI Re Licensed Operator Positive Drug Test.Encl Withheld,Per 10CFR2.790 | Fitness for Duty |
ML17292B656 | 29 April 1999 | Forwards Rev 0 to Calculation ME-02-98-04, Fracture Mechanics Evaluation of N1 Safe End & Calculation Mod Record CMR-98-0243, Fracture Mechanics Evaluation of N1A Nozzle Safe End, as Suppl Info to ISI Exam | Safe Shutdown Earthquake Operating Basis Earthquake |
ML17292B642 | 19 April 1999 | Responds to NRC 990319 Ltr Re Violations Noted in Insp Rept 50-397/99-01.Corrective Actions:Provisions Are Presently in Place to Maintain Adequate Level of Security | |
GO2-99-073, Forwards Rev 39 to WNP-2 Physical Security Plan,Per 10CFR50.54(p).Changes Do Not Decrease Effectiveness of Approved Plan.Encl Withheld IAW 10CFR73.21 & 10CFR2.790 | 19 April 1999 | Forwards Rev 39 to WNP-2 Physical Security Plan,Per 10CFR50.54(p).Changes Do Not Decrease Effectiveness of Approved Plan.Encl Withheld IAW 10CFR73.21 & 10CFR2.790 | |
ML17292B640 | 13 April 1999 | Requests That WNP-2 Operator Requalification Program Be Granted one-time Extension Beyond Requirement in 10CFR55.59(a)(2) for Annual Operating Tests | |
ML17292B637 | 12 April 1999 | Forwards Response to NRC 990211 RAI Re Util Request for Amend to Secondary Containment & SBGTS TS | |
ML17292B628 | 6 April 1999 | Informs NRC That Insp Interval Ending Date for ISI Program Plan Has Been Extended by One Year to Dec 12,2005 Due to Changes in Plant Refueling Outage Schedule | |
GO2-99-060, Submits Rept of Status of WNP-2 Decommissioning Fund as of 981231,IAW 10CFR50.75(f)(1) | 26 March 1999 | Submits Rept of Status of WNP-2 Decommissioning Fund as of 981231,IAW 10CFR50.75(f)(1) | |
ML17292B613 | 24 March 1999 | Forwards Rev 0 to Calculation ME-02-98-04, Fracture Mechanics Evaluation of N1 Nozzle Safe End. Info Will Be Used to Assist NRC in Review of WNP-2 ISI Activities Associated with Evaluation of Planar Indication | |
ML17292B600 | 16 March 1999 | Responds to Weakness Noted in Insp Rept 50-397/98-24. Corrective Actions:Developed Document to Identify Areas Needing Improvement,Assigned Responsibility for Actions & Provided Milestones for Achievement | |
ML17292B599 | 16 March 1999 | Informs That Listed Property & Liability Insurance Coverage for WNP-2 Is in Force,In Compliance with Licensing Responsibilities Delineated in 10CFR50.54(w)(3) | |
ML17292B594 | 16 March 1999 | Forwards NRC Form 396, Certification of Medical Exam by Facility Licensee, & NRC Form 398, Personal Qualification Statement - Licensee, for MD Comstock,Mc Naulty & RR Nelson.Without Encls | |
ML17292B591 | 16 March 1999 | Forwards 1998 Environ Operating Rept, Per Reporting Requirements of Section 5.4.1 of WNP-2 Epp.No Design or Operational Changes or Tests in 1998 Involved Unreviewed Environ Question | |
ML17292B590 | 11 March 1999 | Forwards Hard Copy of Addl Occupational Exposure Data Requested in GL 94-04,per 990303 e-mail.Original Electronic Version Was Corrupted | |
ML17292B568 | 1 March 1999 | Forwards Radioactive Effluent Release Rept for 1998, IAW 10CFR50.36a(a)(2) & TS 5.6.3 & Complete Copy of WNP-2 ODCM Per TS 5.5.1 | Offsite Dose Calculation Manual |
ML17292B565 | 22 February 1999 | Forwards Relief Request 2ISI-20,proposing Alternate Exam Expected to Reduce Dose Significantly & Still Provide Adequate Safety & Quality.Attached Relief Request Will Be Used to Support ALARA Dose Reduction Efforts During Maint | |
ML17292B558 | 4 February 1999 | Requests Change to Co Which Modified WNP-2 OL to Reflect Schedule for Implementing Thermo-Lag 330-1 Fire Barrier C/As.Change Requested to Reflect That Final Implementation of C/As Will Be Completed During Fall 1999 Not Spring 1999 | Fire Barrier |
ML17292B551 | 4 February 1999 | Forwards Copies of NRC Form 396 & 398 for Listed Individuals Who Will Be Taking NRC License Exam at WNP-2 During Week of 990308.Without Encls | |
ML17292B560 | 3 February 1999 | Forwards COLR 98-14,rev 1,IAW Requirements of WNP-2 TS 5.6.5.COLR Was Revised to Change Certain MCPR Values | |
ML17292B552 | 2 February 1999 | Forwards WNP-2 Fitness for Duty Semiannual Performance Data Rept for Jul-Dec 1998,per 10CFR26.71(d).Data Has Been Analyzed & Mgt Actions Have Been Taken to Enhance FFD Program | Fitness for Duty |
ML17292B550 | 29 January 1999 | Informs NRC That Amend 156 of Facility Ts,Issued by NRC on 990127,implemented on 990128 | |
ML17292B536 | 15 January 1999 | Informs That Go Smith Has Been Appointed Vice President, Generation/Plant General Manager.Updated Distribution List for NRC Correspondence,Encl | |
GO2-99-011, Forwards Rev 38 to Physical Security Plan,Per 10CFR50.54(p). Rev Does Not Decrease Effectiveness of Approved Plan.Encl Withheld,Per 10CFR2.790(a)(3) | 15 January 1999 | Forwards Rev 38 to Physical Security Plan,Per 10CFR50.54(p). Rev Does Not Decrease Effectiveness of Approved Plan.Encl Withheld,Per 10CFR2.790(a)(3) | |
ML17292B518 | 28 December 1998 | Requests Change to Confirmatory Order Which Modified WNP-2 OL to Reflect Schedule for Implementing Thermo-Lag 330-1 Fire Barrier Corrective Actions,Per GL 92-08 | Fire Barrier |
ML17292B497 | 21 December 1998 | Forwards Plant Simulation Facility Four Year Rept,Per 10CFR55.45(b)(5)(ii) | Shutdown Margin Scram Discharge Volume Power change |
ML17292B496 | 18 December 1998 | Responds to NRC 981112 Ltr Re Violations Noted in Insp Rept 50-397/98-20.Corrective Actions:Implemented Interim Actions to Assure That Significant Pressure Surges Do Not Occur in Plant Fire Protection Sys | Safe Shutdown Enforcement Discretion |
ML17292B478 | 15 December 1998 | Forwards Addl Info Re Weld Examination Including Analytical Evaluation of Examination Results for Indication as Required by Subsection IWB-3134(b) of ASME Section XI,1989 Edition | |
ML17292B471 | 10 December 1998 | Submits Guarantee of Payment of Deferred Premium in Compliance with 10CFR140.21 | |
ML17292B476 | 9 December 1998 | Provides Supplemental Info & Clarification of Proposed Rev 29 to Operational QA Program Description Submitted in 981023 Ltr | |
ML17284A824 | 7 December 1998 | Responds to NRC 981106 Ltr Re Violations Noted in Insp Rept 50-397/98-15.Corrective Actions:Implemented ACs to Ensure That Adequate Supply of Water Is Maintained in Each Storage Tank to Provide Vol Suction Source for HPCS & RCIC Pumps | Reactor Vessel Water Level Fire Barrier |
ML17284A819 | 3 December 1998 | Forwards WNP-2 Feedwater Nozzle Insp Rept for R-13 Maint & Refueling Outage.Rept Submitted Pursuant to Commitments Made in Response to NUREG-0619, BWR Feedwater Nozzle & Control Rod Drive Return Line Nozzle Cracking. | Liquid penetrant |
ML17284A809 | 12 November 1998 | Confirms Extension Until 981218,for Responding to Apparent Violation Identified in Insp Rept 50-397/98-20 & NOV Dtd 981016.Extension Allows Util to Provide Final Design Mod Description & Schedule for Implementation | |
IR 05000397/1998020 | 12 November 1998 | Confirms Extension Until 981218,for Responding to Apparent Violation Identified in Insp Rept 50-397/98-20 & NOV Dtd 981016.Extension Allows Util to Provide Final Design Mod Description & Schedule for Implementation | |
ML17284A811 | 12 November 1998 | Forwards Response to Violations Noted in Insp Rept 50-397/98-20.Corrective Actions:Replaced Air Operator & Cleaned 4-way Pilot Valve Associated with Floor Drain cross-connect Valve FDR-V-609 | |
ML17292B453 | 11 November 1998 | Responds to NRC 981108 Ltr Re Violations Noted in Insp Rept 50-397/98-18.Corrective Actions:Will Conduct Remedial Training for HP Technicians & Supervisors on Procedural Requirements & Will Procure Battery Powered Samples for OSC | |
ML17284A812 | 11 November 1998 | Forwards Response to RAI Re GL 98-04, Potential for Degradation of ECCS & CSS After LOCA Because of Const & Protective Coating Deficiencies & Foreign Matl in Containment. | Commercial Grade Dedication Coatings |
ML17284A795 | 23 October 1998 | Forwards Rev 28 & Proposed Rev 29 to Operational QA Program Description, WPPSS-QA-004.Rev 28 Has Minor Change to Section 1.3.3.1.1 to Restructure Quality Svcs Group.Proposed Rev 29 Modifies Sections 1,2,4,6,12,15,18 & App I,Ii & III | |
ML17284A791 | 15 October 1998 | Forwards Copies of NRC Forms 396 & 398 for Listed Individuals Taking NRC License Exam at WNP-2 During Wk of 981102.Without Encl | |
ML17284A776 | 30 September 1998 | Informs NRC of Change to Commitment Made in Response to Violation Noted in Insp Rept 50-397/98-10 Re Reviews of Outage Exposure Goals.Spring Refueling Outage Rescheduled for Sept 1999.Dose Goals Review Will Be Conducted by 990331 | |
ML17284A777 | 30 September 1998 | Informs That Util Implemented Severe Accident Mgt Program with Issuance of Revised EOPs & Severe Accident Guidelines (Sags) on 980715,per Commitment in 950328 ltr.WNP-2 Eop/Sag Differences to BWROG Epg/Sag Noted in Encl App a | |
ML17284A779 | 30 September 1998 | Forwards Response to NRC 980730 RAI Re GL 96-06 Relative to Waterhammer & two-phase Flow in Containment Air Cooler Water Sys | |
GO2-98-168, Requests That Severity Level of Wpps NOV (EA 97-138) Be Decreased to Either Severity Level IV or non-cited Violation.Util Would Like NRC to Provide Full Explanation If Such Action Is Not Warranted | 11 September 1998 | Requests That Severity Level of Wpps NOV (EA 97-138) Be Decreased to Either Severity Level IV or non-cited Violation.Util Would Like NRC to Provide Full Explanation If Such Action Is Not Warranted | Enforcement Discretion Systematic Assessment of Licensee Performance |
ML17284A747 | 10 September 1998 | Forwards WNP-2 Inservice Insp Summary Rept for Refueling Outage RF13 Spring,1998, Per Section XI of ASME Boiler & Pressure Vessel Code Article IWA-6240 | |
ML17284A754 | 8 September 1998 | Requests Withdrawal of 980805 Proposed TS Amend,Modifying SR 3.8.4.7 to Allow Performance Discharge Test of SR 3.8.4.8 to Be Performed in Lieu of Battery Svc Test | Enforcement Discretion Nondestructive Examination |
ML17292B437 | 27 August 1998 | Forwards Response to Violations Noted in Insp Rept 50-397/98-14.Corrective Actions:Individuals Involved in Emergency Plan Rev Process Counseled Re Need to Ensure Emergency Plan Meets Requirements of 10CFR50 App E | |
ML17284A744 | 19 August 1998 | Forwards Draft DOE/EA-1259, Environ Assessment for Wppss Sublease for Aluminum Smelter Plant, for NRC Review Prior to Finalization | |
ML17284A732 | 18 August 1998 | Forwards fitness-for-duty semi-annual Performance Data Rept for 980101-0630,per 10CFR26.71(d).Data Has Been Analyzed & Mgt Actions Have Been Taken to Enhance Program | Fitness for Duty |
ML17284A727 | 13 August 1998 | Requests Withdrawal of 980717 Exigent TS Amend Request to SR 3.8.4.7 to Allow Performance Discharge Test to Be Performed in Lieu of Battery Svc Test for Div 2,125 Vdc,Battery E-B1-2 | Enforcement Discretion |
GO2-98-145, Submits Response to 980514 RAI Re Reactor Pressure Vessel Integrity | 12 August 1998 | Submits Response to 980514 RAI Re Reactor Pressure Vessel Integrity | |
ML17284A725 | 8 August 1998 | Submits 90-day Response to GL 98-01, Year 2000 Readiness of Computer Sys at Nuclear Power Plants. | |
ML17292B427 | 30 July 1998 | Forwards Response to Violations Noted in Insp Rept 50-397/98-09.Corrective Actions:Conducted Briefing with Mechanical Shop Personnel on Event,Stressing Need to Review & Comply W/All Procedural Prerequisites | Half scram Condition Adverse to Quality |
ML17284A715 | 28 July 1998 | Requests That Subject TS Amend Dtd 980717 Be Processed in Exigent Fashion So as to Reasonably Minimize Time Period During Which WNP-2 Is Operating Outside of Literal Compliance W/Ts Associated W/Lco 3.8.4 | Enforcement Discretion Missed surveillance |
ML17284A710 | 23 July 1998 | Forwards LER 98-006-01,discussing Results of Root Cause Analysis & Addl Corrective Actions Taken to Rectify Deficiencies in Wnp,Unit 2,10CFR50,App R High Impedance Fault Calculations | |
GO2-98-129, Forwards Proprietary Rev to Annual Rept of Individual Monitoring. WNP-2.Occupational Doses of 47 Mrem & 31 Mrem for Two Individuals Have Been Deleted Because Doses Determined to Be Medical Doses.Rept Withheld | 22 July 1998 | Forwards Proprietary Rev to Annual Rept of Individual Monitoring. WNP-2.Occupational Doses of 47 Mrem & 31 Mrem for Two Individuals Have Been Deleted Because Doses Determined to Be Medical Doses.Rept Withheld | |
ML17284A697 | 16 July 1998 | Requests Enforcement Discretion from TS Surveillance Requirement 3.8.4.7 for One Time Exemption for Completion of Battery Svc Test for Division 2,125 Vdc,Battery E-B1-2.TS Amend Request Is Being Submitted Under Separate Cover | Enforcement Discretion |
ML17292B426 | 15 July 1998 | Responds to NRC 980618 Ltr Re Violations Noted in Insp Rept 50-397/98-10.Corrective Actions:Individual Has Been Designated W/Responsibility for Assuring Ssac Meeting Minutes Are Maintained Per Procedure | |
ML17284A699 | 15 July 1998 | Forwards Copy of Scenario Package for Supply Sys'S 1998 NRC Graded Exercise to Be Conducted on 980916.Util Requests That NRC Review & Provide Comments No Later than 45 Days Prior to Exercise | |
ML17284A686 | 14 July 1998 | Provides Addl Info Concerning 9.5 Plate Section W/Regards to Current WNP-2 P/T Limit Curves | |
ML17292B420 | 13 July 1998 | Forwards Rev 20 to WNP-2 Emergency Plan IAW 10CFR50.4(b), 50.54(q) & 10CFR50,App E.Detailed Synopsis of Changes,Encl. Changes Do Not Reduce Effectiveness of Plan | Safe Shutdown Health Physics Network High winds Ultimate heat sink Offsite Dose Calculation Manual Anticipated operational occurrence Internal Flooding Safeguards Contingency Plan Earthquake Deep Dose Equivalent Unidentified leakage Siren |
ML17284A680 | 9 July 1998 | Provides Addl Perspective on Apparent Violation Noted in Insp Rept 50-397/98-01.Clearer Understanding of Issue Has Been Provided by Addl Testing & Analysis by Siemens Power Corp | |
IR 05000397/1998001 | 9 July 1998 | Provides Addl Perspective on Apparent Violation Noted in Insp Rept 50-397/98-01.Clearer Understanding of Issue Has Been Provided by Addl Testing & Analysis by Siemens Power Corp | |
ML20203G029 | 1 July 1998 | Forwards Proposed Exam Outlines,Checklist & Security Agreement for SRO & RO License Exams Scheduled for Week of 981102 at WNP-2 | Safe Shutdown High winds Packing leak High Radiation Area Stroke time Post Accident Monitoring Contraband Operating Basis Earthquake Squib Job Performance Measure Scram Discharge Volume Overtravel Earthquake Power change Downpower Flow Induced Vibration Coast down Unidentified leakage |
ML17292B417 | 30 June 1998 | Responds to NRC 980601 Ltr Re Violations Noted in Insp Rept 50-397/98-07.Corrective Actions:Plan Was Established & Implemented to Reduce Potential for Airborne Radioactivity & Surveys Were Conducted of Adjacent Areas Outside Wetwell | |
ML17284A667 | 25 June 1998 | Informs That DW Coleman Has Been Appointed Regulatory Affairs Manager & Records Should Be Corrected to Reflect Change | |
ML17284A672 | 25 June 1998 | Submits Response to NRC Bulletin 96-03, Potential Plugging of ECC Suction Strainers by Debris in Bwrs. Vacuuming of Suppression Pool Scheduled During 1999 Refueling Outage. Licensee Maintains Foreign Matl Control Program | |
ML17284A660 | 19 June 1998 | Documents Util Restart Commitment Subsequent to Recovery from Fire Header Line Break Which Resulted in Equipment Room Flooding | |
ML17284A661 | 19 June 1998 | Forwards LER 98-006-00 Discussing Items of Reportability, Corrective Action Taken & Action to Preclude Recurrence,Per 10CFR50.73 | |
ML17284A659 | 18 June 1998 | Provides Requested 30 Day Rept Re Insp of Reactor Core Shroud Welds for Indications of Stress Corrosion Cracking. Shroud Insp Requested by 940725 Ltr Has Been Completed | |
ML17292B414 | 15 June 1998 | Forwards Response to Violations Noted in Insp Rept 50-397/98-06.Corrective actions:10CFR5.59 SE Performed to Determine,Present closed-in-standby Position of RHR Min Flow Valves Does Not Represent Unreviewed Safety Question | High Radiation Area Stroke time Enforcement Discretion |
ML17284A785 | 10 June 1998 | Forwards Emergency Preparedness Exercise Objective & Limitations for WNP-2 Exercise to Be Conducted on 980916,IAW 10CFR50.47(b)(14) | |
ML17284A647 | 3 June 1998 | Forwards Rev 0 to COLR 98-14, Cycle 14 Core Operating Limits Rept, for WNP-2 | |
ML17284A650 | 2 June 1998 | Provides Update on 971029 Telcon Received from Siemens Power Corp (SPC) Re Biennial Exercise of Hazmat Drill Scenario. Copy of SPC Ltr & Draft Rept of Response to 980415 Fire at SPC in Richland,Wa Encl | Tritium Exit Sign |
ML17284A654 | 2 June 1998 | Withdraws 970716 Request for Amend to TS Re Vessel Leak Testing,Based Upon Commitment Contained in Util 970424 Ltr Concerning Surveillance Matls Testing & Analysis Rept | |
ML17284A620 | 22 May 1998 | Responds to NRC 980424 Ltr Re Violations Noted in Insp Rept 50-397/98-05.Corrective Actions:Event Notification Was Made to NRC Upon Discovery That HPCS Injection Had Occurred Subsequent to 980311 Scram | |
ML17284A625 | 22 May 1998 | Submits Amended Response to GL 94-03, Intergranular Stress Corrosion Cracking of Core Shrouds in Bwrs. | |
ML17284A621 | 20 May 1998 | Informs That Licensee Plans to Continue to Participate in Joint Owners' Group MOV Periodic Verification Program as Member of Bwrog,In Response to GL 96-05 | |
ML17284A622 | 20 May 1998 | Documents Util Outage Schedule Change & That Licensee Has Performed SE in Support of Current Outage Plan,Per 980416 Request for Amend Re ECCS Suction Strainers | |
ML17284A619 | 19 May 1998 | Informs That Noted Action Re Insp Rept 50-397/97-13 Was Completed on 980511 When Final Ack from off-site Member of Corporate Nuclear Safety Review Board Was Received | |
IR 05000397/1997013 | 19 May 1998 | Informs That Noted Action Re Insp Rept 50-397/97-13 Was Completed on 980511 When Final Ack from off-site Member of Corporate Nuclear Safety Review Board Was Received | |
ML17284A615 | 8 May 1998 | Forwards Results of Linear Elastic Fracture Mechanics Analysis & ASTM A262 Practice E Test (Strauss Test) as Addl Info to 980416 Request for Amend to License NPF-21 | Earthquake |
ML17292B369 | 6 May 1998 | Responds to NRC 980408 Ltr Re Violations Noted in Insp Rept 50-397/98-04.Corrective Actions:Revision to SWP-ASU-01 to Require Radiochemist Be Assigned to Effluent Audits | Offsite Dose Calculation Manual |
ML17292B364 | 29 April 1998 | Responds to NRC 980331 Ltr Re Violations Noted in Insp Rept 50-397/98-03.Corrective Actions:Amend Request Will Be Submitted to Remove Standby Gas Treatment Sys from TS 5.5.2 | High Radiation Area Condition Adverse to Quality |
ML17292B366 | 28 April 1998 | Forwards Audit 298-008, WNP-2 Emergency Preparedness Program, Per NUREG-0654,Section Ii,Criteria P.9 | |
ML17292B365 | 28 April 1998 | Forwards Supplemental Info Re Request for Amend Concerning ECCS Suction Strainers | |
ML17292B357 | 24 April 1998 | Submits Proprietary & non-proprietary Info Re Request for Amend to TS to Establish Safety Limits for Cycle 14.Encls Contain Info Re Effects of Channel Bow & Changing Core Design on Safety Limits.Proprietary Info Withheld | Minimum Critical Power Ratio |
ML17292B325 | 9 April 1998 | Forwards LER 98-002-00,which Discusses Items of Reportability,Corrective Actions Taken & Action to Preclude Recurrence | |
ML17292B327 | 7 April 1998 | Forwards Individual Monitoring Rept for CY97,submitted in Electronic Format Using Format Recommendations in Reg Guide 8.7,rev 1.W/o Diskette | Deep Dose Equivalent |
ML17292B320 | 7 April 1998 | Notifies That Sk Drinkard,License OP-42542,will No Longer Be Maintaining License in Accordance W/Util Licensed Operator Requalification Program | |
GO2-98-062, Withdraws 970325 Request for Amend to Plant Physical Security Plan,In Light of NRC Final Rule Published in Fr That Revises NRC Regulations Associated W/Internal Threat Contained in 10CFR73 | 31 March 1998 | Withdraws 970325 Request for Amend to Plant Physical Security Plan,In Light of NRC Final Rule Published in Fr That Revises NRC Regulations Associated W/Internal Threat Contained in 10CFR73 | |
ML17292B304 | 23 March 1998 | Responds to NRC 980219 Ltr Re Violations Noted in Insp Rept 50-397/97-20.Corrective Actions:Three Sealed Bags Containing High Efficiency Particulate Air Filters Were Properly Labeled as Radioactive Material Immediately After Discovery | Enforcement Discretion |
ML17292B297 | 23 March 1998 | Submits Response to Violations Noted in Insp Rept 50-397/97-13.Corrective Actions:Action Initiated to Communicate Mgt Expectations Re Extension Allowances for Corrective Action Due Dates | |
ML17292B296 | 23 March 1998 | Submits Response to Violations Noted in NRC Insp Rept 50-397/97-13.Corrective Actions:All Pertinent RCIC Components Have Been Upgraded as Necessary,W/Exception of Two Rupture Disks | |
ML17292B293 | 19 March 1998 | Responds to NRC 980220 Ltr Re NOV & Exercise of Enforcement Discretion in Insp Rept 50-397/96-22.Review of SEs & Associated Activities Was Completed on 980316 | Enforcement Discretion |
ML17292B280 | 10 March 1998 | Responds to NRC 980209 Ltr Re Violations Noted in Insp Rept 50-397/97-13.Corrective Actions:Performed Followup Assessment of Operability Which Determined RCIC Sys to Be Operable But Nonconforming & Upgraded RCIC Components | Enforcement Discretion Probabilistic Risk Assessment |
ML17292B278 | 10 March 1998 | Responds to NRC 980209 Ltr Re Violations Noted in Insp Rept 50-397/97-13 on 970715-0802.Corrective Actions:Per Was Initiated After Unplanned Start of Reactor Recirculation Pump | Condition Adverse to Quality |
ML17292B276 | 10 March 1998 | Submits Rept of Listed Property & Liability Insurance Coverage for WNP-2 in Force,Per 10CFR50.54(w)(3) | |
ML17292B281 | 9 March 1998 | Provides Mod to 971204 Request for Amend to Licnese NPF-21, Establishing Interim SLMCPR for Siemens Power Corp ATRIUM-9X Fuel Applicable to Cycle 14 Only,As Identified by T Huang (NRR) During 980211 Site Visit | |
ML17292B277 | 9 March 1998 | Forwards Supplemental Evaluation of Effect of Revised Safety Limit on Cycle 8 Operations at WNP-2,in Response to Two Unresolved Issues Noted in Insp Rept 50-397/97-11 | |
ML17292B262 | 4 March 1998 | Forwards Copy of Performance Self-Assessment,WNP-2, Documenting Results of Assessment,Which Was Conducted 971006-31,of Key Functional Areas | |
ML17292B267 | 3 March 1998 | Forwards Proprietary Response to 980212 RAI Re License Amend Request on Min Critical Power Ratio Safety Limits.Encl Withheld,Per 10CFR2.790 | Minimum Critical Power Ratio |
ML17292B256 | 23 February 1998 | Forwards Annual Radioactive Effluent Release Rept for Jan-Dec 1997 Which Includes Summary of Quantities of Radioactive Liquid & Gaseous Effluents & Solid Waste Released from WNP-2 During Reporting Period.Odcm,Encl | Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report |
ML17292B244 | 12 February 1998 | Responds to NRC 980115 Ltr Re Violations Noted in Insp Rept 50-397/97-18.Corrective Actions:Five Ladders Standing in Reactor Water Cleanup Pump & Heat Exchanger Rooms Were Immediately Removed & Stored Properly | Fire Protection Program Scaffolding |
ML20202G667 | 11 February 1998 | Forwards Rev 36 to Physical Security Plan,Per 10CFR50.54(p). Plan Withheld IAW CFR73.21 & 10CFR2.790(a)(3) | |
GO2-98-027, Forwards Rev 37 to Physical Security Plan,Per 10CFR50.54(p). Plan Withheld IAW 10CFR73.21 & 10CFR2.790(a)(3) | 11 February 1998 | Forwards Rev 37 to Physical Security Plan,Per 10CFR50.54(p). Plan Withheld IAW 10CFR73.21 & 10CFR2.790(a)(3) | |
ML17292B246 | 9 February 1998 | Informs That DW Coleman Now Acting as Manager,Regulatory Affairs for Facility.Std Distribution for Documents Sent to Util Should Be Modified | |
ML17292B236 | 29 January 1998 | Forwards Fitness for Duty Semiannual Performance Data Rept for 970701-1231 | Fitness for Duty |
ML17292B238 | 28 January 1998 | Forwards 971105 Ltr from Abb to Wppss Re Plant Cycle 14 Safety Limit MCPR for SVEA-96 Fuel Bases on Reference Core | Minimum Critical Power Ratio |
GO2-98-016, Informs That Commitment to Perform Chemical Decontamination of Reactor Recirculation Sys Discharge Piping During R13 Outage in Spring 1998,is Modified.Chemical Decontamination Will Not Be Performed During R13 Outage | 27 January 1998 | Informs That Commitment to Perform Chemical Decontamination of Reactor Recirculation Sys Discharge Piping During R13 Outage in Spring 1998,is Modified.Chemical Decontamination Will Not Be Performed During R13 Outage | |
ML17292B232 | 20 January 1998 | Responds to NRC 971203 Ltr Re Violations Noted in Insp Rept 50-397/96-22 on 960924-0926.CAs:Supply Sys Was Granted Notice of Enforcement Discretion Not to Enforce Compliance W/Actions in TS SR 3.3.1.1.15,3.3.6.1.7 & 3.3.5.1.7 | Reactor Vessel Water Level Enforcement Discretion |
ML17292B233 | 19 January 1998 | Responds to NRC 971218 Ltr Re Violations Noted in Insp Rept 50-397/97-17.Corrective Actions:Technician Visually Verified Area to Be Clear of Personnel & Immediately Locked Gate & Performed Walkdown to Verify Locked Status of Similar Areas | High Radiation Area |
ML17292B231 | 16 January 1998 | Provides Info Re Intended Scope & Methodolody of Core Shroud & Insp,Per GL 94-03, Intergranular Stress Corrosion Cracking of Core Shrouds in Bwrs. | |
ML17292B182 | 5 January 1998 | Informs That Testing of Whittaker fire-rated Cables Will Take Place During Week of 980302,at Stated Facility | Fire Barrier |
ML17292B179 | 5 January 1998 | Forwards 90-day Response to GL 97-04, Assurance of Sufficient Net Positive Suction Head for ECC & Containment Heat Removal Pumps. | |
ML17292B208 | 2 January 1998 | Submits Commitments Made in Response to NUREG-0619,re BWR Feedwater Nozzle & CR Drive Return Line Nozzle Cracking. WNP-2 Feedwater Nozzle Insp Rept for R-12 Maintenance & Refueling Outage Attached | Liquid penetrant |
ML17292B176 | 23 December 1997 | Confirms That Response to 971202 RAI Re Plant Response GL 88-20,Suppl 4, IPEEE, Will Be Submitted on or Before 980330 | |
ML17292B173 | 23 December 1997 | Provides Amended Response to Violations Noted in Insp Rept 50-397/96-11.Corrective Actions:Portions of RCIC Sys Required to Support Reactor Vessel Inventory Makeup Will Be Reclassified as safety-related & Seismic Category I | Safe Shutdown Probabilistic Risk Assessment |
ML17292B169 | 23 December 1997 | Forwards Hardware or Software Changes Which Affect Transmitted Data Points Identified in ERDS Data Point Library,Per 10CFR50 App E,Section VI.3a | Reactor Vessel Water Level Met Tower |
GO2-97-224, Forwards Response to Violations Noted in Insp Rept 50-397/97-07.Corrective Actions:Compensatory Measures Immediately Employed to Ensure Integrity of Vehicle Barrier Sys | 17 December 1997 | Forwards Response to Violations Noted in Insp Rept 50-397/97-07.Corrective Actions:Compensatory Measures Immediately Employed to Ensure Integrity of Vehicle Barrier Sys | |
ML17292B142 | 15 December 1997 | Provides Info in Compliance w/10CFR140.21,which Requires Annual Filing of Guarantee of Payment of Deferred Premiums in Amount of $10 Million for Each Licensed Reactor | |
ML17292B143 | 10 December 1997 | Ack Receipt of 971203 Transmittal of Insp Rept 50-397/96-22. Response to Subject Insp Rept Will Be Submitted on or Before 980121,as Discussed in Telcon | |
ML17292B139 | 4 December 1997 | Forwards Rev 27 to Operational QA Program Description (OQAPD) (WPPSS-QA-004), to Reflect Organizational Change of Relocating Supplier Quality & Receiving Insp Functions from Procurement Dept to Quality Dept | |
ML17292B133 | 4 December 1997 | Forwards Addl Info Requested by NRC 971015 Ltr Re Util 961015 Request for Amend to Secondary Containment & SGTS TS, in Accordance W/Schedule Provided in Util 971107 Ltr | Emergency Lighting |
ML17292B120 | 25 November 1997 | Forwards Evaluation of Effect of Revised Safety Limit on Past Operations at WNP-2,in Response to Unresolved Items in Insp Rept 50-397/97-11 | Stroke time Anticipated operational occurrence Feedwater Controller Failure |
ML17292B119 | 24 November 1997 | Informs That Util Intends to Implement Rev 26 to Operational QA Program Description,Including Clarifications Requested by NRC to App Iii.Description of Clarifications & Paragraphs Modified,Per Agreement Encl | Offsite Dose Calculation Manual Process Control Program |
ML17292B118 | 20 November 1997 | Responds to NRC 971021 Ltr Re Violations Noted in Insp Rept 50-397/97-16 on 970815.Corrective Actions:Additional Training for Operations Personnel Will Be Given to Review Requirements of TS Surveillance Interval | High Radiation Area Condition Adverse to Quality |
ML17292B113 | 7 November 1997 | Forwards LER 97-010-00 Concerning Item of Generic Interest Applicable to Facilities That Have Implemented Improved TSs (ITS) to Highlight Differences Between Reporting Guidelines of NUREG-1022 & Requirements of ITS | |
ML17292B109 | 7 November 1997 | Informs That Util Will Not Be Able to Provide Response for Staff to Maintain Review Schedule within 30-day Time Period. Info Will Be Provided on or Before 971205 | |
ML17292B104 | 4 November 1997 | Submits 30-day Response to GL 97-04, Assurance of Sufficient Net Positive Suction Head for ECC & Containment Heat Removal Pumps. | |
ML17292B097 | 30 October 1997 | Informs NRC of Change to Plant Reactor Stability Long Term Solution from Option I-A to Option III & to Provide Update to Implementation Schedule | |
ML17292B096 | 28 October 1997 | Provides Clarification on Two Points Made by Staff in 970523 Ltr Re Request for Extension of Exam Interval for IGSCC Category C Welds for Unit 2 | |
ML17292B095 | 24 October 1997 | Submits COLR 97-13,rev 2,IAW Requirements of WNP-2 TS 5.6.5 | |
ML17292B086 | 16 October 1997 | Responds to NRC 970916 Ltr Re Violations Noted in Insp Rept 50-397/97-14.Corrective Actions:Issued Operations Night Order Directing Review of Event & Reinforcing Mgt Expectation That Plant Procedure 4.1.1.7A Be Used | Time of Discovery High Radiation Area Missed surveillance Deep Dose Equivalent |
ML17292B083 | 14 October 1997 | Resubmits Response to NOV for Insp Rept 50-397/97-10 Dtd 971002.Two Pages Were Inadvertently Missing from Ltr | |
ML17292B082 | 2 October 1997 | Provides Update of Process Re Revs to WNP-2 Inservice Testing Program Plan for Pumps & Valves That Result from Change in Classification.Process Will Incorporate Guidelines Provided in NUREG-1482,Section 7.2, Design Basis Reviews. | |
ML17292B081 | 2 October 1997 | Responds to NRC 970902 Ltr Re Violations Noted in Insp Rept 50-397/97-10.Corrective Actions:Established Event Evaluation Team & Independent Evaluation Team to Investigate Reactor Feedwater Pump Trip Test & Reactor Scram of 970327 | Reactor Vessel Water Level |
ML17292B080 | 2 October 1997 | Submits Rept on Impact of non-significant Changes & Errors Discovered in ECCS Evaluation Methodology Used in Licensing of WNP-2 Core.Rept Submitted Per Requirements of 10CFR50.46 | |
ML17292B076 | 2 October 1997 | Forwards WNP-2 ISI Summary Rept for Refueling Outage RF12. | |
ML17292B072 | 30 September 1997 | Forwards Proprietary Info Which Supplements Response to Violations Noted in Insp Rept 50-397/97-11.Encl Withheld,Per 10CFR2.790(b) | |
ML17292B066 | 24 September 1997 | Provides Addendum to NRC Response to Unresolved Items 96-201-02 & 96-201-10 Contained in Insp Rept 50-397/96-201. Util Response Modified as Follows to Reflect Revised Position on ADS Design Compliance W/Reg Guide 1.62 | |
ML17292B052 | 15 September 1997 | Forwards Amended Radioactive Effluent Release Rept for Jan-Dec 1996, Which Includes Summary of Quantities of Radioactive Liquid & Gaseous.Rept Revised Due to Correction to Meteorology Data for Third & Fourth Quarters | |
ML17292B042 | 3 September 1997 | Provides Addl Info to 970428 Response to NOV to Insp Rept 50-397/97-03.Training Was Provided to Chemistry Technicians Pertaining to Access Control,Hp Coverage for Response Actions,Personnel Monitoring & Dosimetry | |
ML17292B035 | 19 August 1997 | Forwards Fitness for Duty Semiannual Performance Data Rept for Jan-June 1997 | Fitness for Duty |
ML17292A967 | 12 August 1997 | Requests Enforcement Discretion from Required Actions Associated W/Ts Action 3.6.1.3.A Which Requires That Penetration Flow Path W/Inoperable Primary Containment Isolation Valve Be Isolated | Enforcement Discretion |
ML17292A955 | 4 August 1997 | Submits Results of Drywell & Suppression Pool Inspections,In Response to NRC Bulletin 96-003, Potential Plugging of Emergency Core Cooling Suction Strainers by Debris in Bwrs. | Scaffolding |
ML17292A936 | 14 July 1997 | Forwards Rev 1 to COLR 97-13,resulting from Cycle 13 Reload & Licensing Analyses That Have Been Evaluated Against Criteria of 10CFR50.59 | |
ML17292A924 | 3 July 1997 | Forwards Applicable FOL Page W/Addl License Condition Added Re TS Amend of Min Critical Power Ratio Safety Limits | |
ML17292A923 | 3 July 1997 | Forwards Retyped Version of Applicable FOL Page W/Addl License Condition Added Re TS Amend of Min Critical Power Ratio Safety Limits | |
ML17292A921 | 30 June 1997 | Provides Staff W/Results of Detailed Review of Reactor Bldg Crane Design in Response to RAI Re NRC Bulletin 96-002, Movement of Heavy Loads Over Spent Fuel,Over Fuel in Reactor or Over SR Equipment. | Safe Shutdown Earthquake Overtravel Control of Heavy Loads |
IR 05000397/1997011 | 25 June 1997 | Forwards Proprietary Addl Info to Resolve Issue 3 Re Insp Rept 50-397/97-11,contained in Ltr Dtd 970620.Encl Withheld Per 10CFR2.790(b) | Affidavit |
ML17292A914 | 25 June 1997 | Forwards Proprietary Addl Info to Resolve Issue 3 Re Insp Rept 50-397/97-11,contained in Ltr Dtd 970620.Encl Withheld Per 10CFR2.790(b) | |
ML17292A913 | 25 June 1997 | Forwards Response to Requested Info in 970604 Ltr Re Reactor Feedwater Pump Trip Test & Reactor Scram Which Occurred on 970327 | Reactor Vessel Water Level Anticipated operational occurrence |
ML17292A902 | 20 June 1997 | Forwards Proprietary Response to RAI Re Violations Noted in Insp Rept 50-397/97-11.Affidavit of IC Rickard,Also Encl. Proprietary Response Withheld,Per 10CFR2.790(b) | |
ML17292A907 | 18 June 1997 | Forwards Rev 26 to WPPSS-QA-004, Operational QA Program Description. Change Considered Reduction in Commitments & Required NRC Approval Prior to Implementation | |
ML17292A906 | 16 June 1997 | Provides Response to Violations Noted in Insp Rept 50-397/96-201.Corrective Actions:Proper Installation of Ultrasonic Flowmeter Confirmed Prior to Rhr,Loop B,Test Performed on 970328 | Ultimate heat sink |
ML17292A898 | 12 June 1997 | Forwards Proprietary Addl Info Requested by NRC Insp Team Conducting Insp 50-397/97-11.Encl Withheld,Per 10CFR2.790(b) | |
ML17292A895 | 12 June 1997 | Forwards Monthly Operating Rept for May 1997 for WNP-2. Format of Rept Amended IAW Guidance Contained in GL-97-02 | |
ML17292A888 | 6 June 1997 | Withdraws Request for Amend of Slmcpr.Requested Changes to 970520 Ltr Included & TS Page 2.0-1,modified to Indicate That SLMCPR for ATRIUM-9X Fuel Applies Only to Cycle 13, Forwarded W/Corresponding Bases Page | |
ML17292A881 | 29 May 1997 | Provides Summary of Corrective Actions & Implementation Schedule Necessary to Ensure That Piping Sys Are Not Exposed to Thermal Overpressurization Concerns Identified in GL 96-06, Assurance of Equipment Operability.... | |
IR 05000397/1996011 | 21 May 1997 | Informs That Util Will Submit Addl Info No Later than 970526 Re NRC Insp Rept 50-397/96-11 & Notice of Violation | |
ML17292A874 | 21 May 1997 | Informs That Util Will Submit Addl Info No Later than 970526 Re NRC Insp Rept 50-397/96-11 & Notice of Violation | |
ML17292A866 | 19 May 1997 | Responds to RAI Re Second Ten Yr Interval ISI Program Relief 2ISI-15 for Exam Category C-G Pump Casing Welds | Hydrostatic Nondestructive Examination VT-2 |
ML17292A862 | 19 May 1997 | Responds to NRC 970415 Ltr Re Insp Rept 50-397/97-08.Util Recently Completed Annual Concerns Program Training Cycle Which Included Survey of 971 Supply Sys & Contractor Employees.Insp Rept Points Out Some Areas of Improvement | |
ML17292A860 | 14 May 1997 | Submits Response to Request for Addl Info Re Response Time Testing | |
ML17292A859 | 13 May 1997 | Submits Response to Request for Commitment Re Suction Strainers | |
ML17292A858 | 12 May 1997 | Forwards Licensee Current Distribution List for NRC Correspondence | |
ML17292A857 | 9 May 1997 | Responds to NRC 970411 Ltr Re Violations Noted in Insp Rept 50-397/97-04.Corrective Actions:Overcurrent Relay Settings for SSW Pump & LPCS Pump Were Revised | |
ML17292A855 | 9 May 1997 | Forwards MOR for Apr 1997 & Correction Page for Mar MOR | |
GO2-97-094, Forwards Rev 35 to Physical Security Plan.Rev Withheld,Per 10CFR73.21 | 9 May 1997 | Forwards Rev 35 to Physical Security Plan.Rev Withheld,Per 10CFR73.21 | |
ML17292A849 | 1 May 1997 | Informs Staff That Util Has Implemented Improved TS for WNP-2 on 970310 | |
ML17292A837 | 29 April 1997 | Forwards Audit 297-005, WNP-2 Emergency Preparedness Program. Three Problem Evaluation Requests & 10 Recommendations for Improvement Issued as Result of Audit Activities | Fitness for Duty High winds Job Performance Measure |
ML17292A832 | 28 April 1997 | Responds to NRC 970328 Ltr Re Violations Noted in Insp Rept 50-397/97-03.Corrective Actions:Operations Manager Issued Night Order Stressing Importance of Reviewing Impact Statement Prior to Removing Equipment from Svc | Scaffolding |
ML17292A828 | 24 April 1997 | Forwards WNP-2 RPV Surveillance Matls Testing & Analysis, Rept,Iaw 10CFR50,App H.Util Evaluated Surveillance Matl Test Results to Determine Whether Analyses in NEDO-32205 Are Applicable to WNP-2 Reactor Vessel Matl | |
ML17292A807 | 15 April 1997 | Forwards Response to RAI Related to Response Time Testing. W/Related Info | Reactor Vessel Water Level Stroke time Enforcement Discretion |
ML17292A790 | 9 April 1997 | Forwards Response to RAI Re Response Time Testing | Stroke time |
ML17292A784 | 9 April 1997 | Forwards Rev 25 to Operational QA Program Description (WPPS-QA-004). | |
ML17292A791 | 3 April 1997 | Responds to Staff Request to Provide Evaluation of Spent Fuel Storage Cask Crane Design,Storage Cask Load Path & Storage Cask Loading & Unloading Process Per NRC Bulletin 96-002 | Control of Heavy Loads |
ML17292A781 | 3 April 1997 | Provides Addl Description of Exigent Circumstances for 970322 Request for Amend Re TS Response Time Testing | Enforcement Discretion |
ML17292A779 | 2 April 1997 | Submits Info to Be Added to Initial Evaluation Re TS Response Time Testing | |
ML17292A773 | 28 March 1997 | Forwards Figures 1-6,inadvertently Omitted from Ltr Dtd 961227 | |
GO2-97-059, Requests Amend to WNP-2 Physical Security Plan in Response GL 96-02, Reconsideration of Nuclear Power Plant Security Requirements Associated W/Internal Threat. Encl Withheld | 25 March 1997 | Requests Amend to WNP-2 Physical Security Plan in Response GL 96-02, Reconsideration of Nuclear Power Plant Security Requirements Associated W/Internal Threat. Encl Withheld | |
ML17292A759 | 24 March 1997 | Forwards Rev 5 of TS Bases,Rev 7 of Licensee Controlled Spec Manual & Rev 1 of COLR 96-12 | |
ML17292A751 | 20 March 1997 | Forwards Request for Enforcement Discretion to TS Response Time Testing Requirements | Enforcement Discretion |
ML17292A745 | 17 March 1997 | Forwards Changes to WNP-2 ERDS Data Point Library | Reactor Vessel Water Level |
ML17292A744 | 17 March 1997 | Submits List of Individuals Requesting Renewal of Operating Licenses.Nrc Forms 396 & 398,encl.W/o Encl | |
ML17292A742 | 13 March 1997 | Submits Repts That Listed Property & Liability Insurance Coverage for Plant in Force | |
ML17292A741 | 13 March 1997 | Forwards Response to GL 96-05,re Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves. | Stroke time |
ML17292A727 | 6 March 1997 | Forwards Response to NRC 970205 Ltr Re Violations Noted in Insp Rept 50-397/96-26.Corrective Actions:Modified Channel Check Procedure to Use Alternate Source of Core Flow Data Instead of MS-SUM-608 | |
ML17292A725 | 28 February 1997 | Forwards Radioactive Effluent Release Rept for 1996 & Offsite Dose Calculation Manual. | Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report |
GO2-97-039, Confirms Electronic Transfer of $100,000 as Payment for Civil Penalty Imposed in EA 96-327 Re Insp Rept 50-397/96-19 | 27 February 1997 | Confirms Electronic Transfer of $100,000 as Payment for Civil Penalty Imposed in EA 96-327 Re Insp Rept 50-397/96-19 | |
ML17292A712 | 26 February 1997 | Forwards Fitness for Duty Semiannual Performance Data Rept for Jul-Dec 1996 | Fitness for Duty |
ML17292A716 | 19 February 1997 | Forwards Revs 23 & 24 to TR WPPS-QA-004, Operational QA Program Description. Revs Reflect Organizational Changes & Modifies Reporting Requirements as Listed | |
ML17292A711 | 19 February 1997 | Discusses Request for Extension of GL 88-01 Re Category C Exam Interval.Summary of Welds Fabrication & Insp History Also Encl | |
ML17292A702 | 10 February 1997 | Comments on Final Dser,Including Request to Increase Allowable Start Times for EDGs | Stroke time |
ML17292A700 | 10 February 1997 | Notifies That Kj Hlavaty Will No Longer Be Maintaining SRO License at Plant,Effective 970201 | |
ML17292A695 | 7 February 1997 | Forwards Response to NRC Requirement to Provide Info Re Adequacy & Availability of Design Bases Info for Plant | Safe Shutdown Shutdown Margin Offsite Dose Calculation Manual Fire Barrier Stroke time Anticipated operational occurrence Commercial Grade Dedication Enforcement Discretion Coatings Nondestructive Examination Temporary Modification Emergency Lighting Condition Adverse to Quality Systematic Assessment of Licensee Performance Maintenance Rule Program Biofouling Fire Protection Program Scaffolding Weak link |
ML17292A675 | 31 January 1997 | Comments on Final Draft SE of Proposed Conversion to Improved TS | |
ML17292A667 | 29 January 1997 | Requests Withdrawal of Request for Amend to TS 6.0, Administrative Controls. | |
ML17292A668 | 28 January 1997 | Responds to GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions. | |
GO2-97-009, Forwards Rev 34 to WNP-2 Physical Security Plan.Encl Withheld | 16 January 1997 | Forwards Rev 34 to WNP-2 Physical Security Plan.Encl Withheld | |
ML17292A657 | 14 January 1997 | Forwards Final Copy of Improved Std TS Developed for WNP-2 Which Reflects Compilation of TS Change Requests Submitted to NRC in Ltrs Dtd 951208,960709 & 1212.List of Relocated Requirements & Planned New Activities,Encl | Safe Shutdown Unanalyzed Condition Shutdown Margin Reactor Vessel Water Level High Radiation Area Ultimate heat sink Grab sample Stroke time Anticipated operational occurrence Post Accident Monitoring Hydrostatic Met Tower Squib Qualified Offsite Circuit Emergency Lighting Abnormal operational transient Scram Discharge Volume Feedwater Controller Failure Spiral reload Battery sizing Overtravel Power Operated Valves Fuel cladding Pressure Boundary Leakage Offsite Circuit Coast down Unidentified leakage |
ML17292A656 | 14 January 1997 | Requests Closure of Post-TMI Commitment to Submit Quarterly Safety Relief Valve in-service Repts to GE Nuclear Energy | |
IR 05000397/1996018 | 2 January 1997 | Submits Supplemental Info & Corrective Actions to Insp Rept 50-397/96-18.Corrective Actions:Problem Evaluation Rept 296-0802 Generated to Document & Resolve Failure to Link PSA Results W/Maint Rule Reliability Criteria | Temporary Modification Maintenance Rule Program |
ML17292A651 | 2 January 1997 | Submits Supplemental Info & Corrective Actions to Insp Rept 50-397/96-18.Corrective Actions:Problem Evaluation Rept 296-0802 Generated to Document & Resolve Failure to Link PSA Results W/Maint Rule Reliability Criteria | Temporary Modification Maintenance Rule Program |
ML17292A642 | 31 December 1996 | Informs of Change of Address for Corporate Offices.Current Distribution List for Nrc,Encl | |
ML17292A640 | 27 December 1996 | Forwards Rept Qualification of Supply Sys Use of RODEX2 Code, for Gap Conductance Calculation in Topical Rept WPPSS-FTS-131, Applications Topical Rept for BWR Design & Analysis. Rept Provides Justification for Use of Code | |
GO2-96-250, Forwards Response to NRC Re NOV & Proposed Imposition of Civil Penalty Re Insp Rept 50-397/96-19. Corrective Actions:Need for Maintaining Focus on Plant Conditions Was Emphasized | 23 December 1996 | Forwards Response to NRC Re NOV & Proposed Imposition of Civil Penalty Re Insp Rept 50-397/96-19. Corrective Actions:Need for Maintaining Focus on Plant Conditions Was Emphasized | Enforcement Discretion |
ML17292A654 | 20 December 1996 | Requests Enforcement Discretion from DG Testing Per TS 3.8.1.1.A.Request Specifically Asks That SR 4.8.1.1.2.a.4 Not Be Repeated for Duration of Current Entry to TS Action 3.8.1.1.a | Enforcement Discretion Offsite Circuit Power change |
ML17292A650 | 18 December 1996 | Forwards Final Rept for 960925,plume Exposure Pathway Exercise of Offsite Radiological Emergency Response Plans for Washington Nuclear Plant 2.Rept Also Contains Results of out-of-sequence Drills | |
ML17292A639 | 17 December 1996 | Submits Response to GL 94-02,Action 2, Long-Term Solutions & Upgrade of Interim Operating Recommendations for Thermal- Hydraulic Instabilities in Boiling Water Reactors. | |
ML17292A632 | 12 December 1996 | Submits Proposed Mod to Amend Requests Revs a & B Re Overall Conversion of Current TS to Improved TS Based Upon NUREG-1434,rev 1 | Safe Shutdown Shutdown Margin Reactor Vessel Water Level High Radiation Area Ultimate heat sink Grab sample Offsite Dose Calculation Manual Stroke time Anticipated operational occurrence Post Accident Monitoring Hydrostatic Met Tower Squib Qualified Offsite Circuit Emergency Lighting Pressure and Temperature Limits Report Scram Discharge Volume Process Control Program Feedwater Controller Failure Battery sizing Fuel cladding Pressure Boundary Leakage Offsite Circuit |
ML17292A630 | 9 December 1996 | Forwards Util Rept on FW Nozzle Exams Performed During Spring 1996 Refueling Outage | |
ML17292A621 | 6 December 1996 | Responds to NRC 961107 Ltr Re Violations Noted in Insp Rept 50-397/96-16.Corrective Actions:Asd Testing Stopped & site- Wide Timeout for All Employees Conducted | |
GO2-96-236, Forwards Rev 33 to WNP-2 Physical Security Plan.Encl Withheld | 6 December 1996 | Forwards Rev 33 to WNP-2 Physical Security Plan.Encl Withheld | |
ML17292A620 | 4 December 1996 | Submits Cycle 12 Startup Rept for Plant Per Ts.Encl Repts Provide Descriptions of Startup & Power Ascension Testing Activities | Shutdown Margin Reactor Vessel Water Level Operator Manual Action Feedwater Controller Failure |
ML17292A669 | 2 December 1996 | Submits Guarantee of Payment of Deferred Premium for $10 Million Dollars,Per 10CFR140.21 | |
ML17292A613 | 25 November 1996 | Submits Response to SE on Inservice Testing Program Relief Requests for Pumps & Valves. WNP-2 IST Program Plan (Pumps & Valves) 2nd Interval (941213-041212), Rev 1 Encl | Stroke time |
ML17292A608 | 25 November 1996 | Responds to Request for MOV Actuator Capability Calculations for HPCS Injection Valve HPCS-V-4 & RCIC Suppression Pool Suction Valve RCIC-V-31 | |
ML17292A607 | 25 November 1996 | Responds to NRC 961025 Ltr Re Exercise Weakness in Insp Rept 50-397/96-14.Corrective Actions:Reiterated Mgt Expectations Associated W/Offsite Notification Process to Appropriate Personnel Responsible for Protective Action Recommendations | |
ML17292A588 | 7 November 1996 | Provides Required 60-day Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves. | |
ML17292A586 | 4 November 1996 | Submits Response to NRC Bulletin 96-003, Potential Plugging of Emergency Core Cooling Suction Strainers by Debris in Bwrs. | |
GO2-96-219, Forwards Decommissioning Trust Fund Agreement Between Grantor & Trustee.Trust Fund Agreement Between Bonneville Power Administration & Util Also Attached | 4 November 1996 | Forwards Decommissioning Trust Fund Agreement Between Grantor & Trustee.Trust Fund Agreement Between Bonneville Power Administration & Util Also Attached | |
IR 05000397/1996016 | 1 November 1996 | Provides Addl Info to Assist NRC in Evaluating Issues in Insp Rept 50-397/96-16 & NOV | |
ML17292A585 | 1 November 1996 | Provides Addl Info to Assist NRC in Evaluating Issues in Insp Rept 50-397/96-16 & NOV | |
ML17292A575 | 30 October 1996 | Informs That Written Summary Rept Will Be Submitted to NRC Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions, within 120 Days | |
ML17292A572 | 28 October 1996 | Responds to NRC 960912 Ltr Re Violations Noted in Insp Rept 50-397/96-16.Corrective Actions:Log Entry Corrected | |
ML17292A547 | 16 October 1996 | Responds to Addl Request by Staff That Plants W/Spring 1997 Refueling Outages Make Plant Specific Submittals Justifying Not Meeting Bulletin 96-003 Implementation Schedule.Summary of Significant Barriers to Spring 1997 & Justification,Encl | Pressure Boundary Leakage Pressure boundary leak |
ML17292A545 | 15 October 1996 | Provides Response to Request for Addl Info on GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power Operated Gate Valves. | |
ML17292A544 | 15 October 1996 | Responds to NRC 960912 Ltr Re Violations Noted in Insp Rept 50-397/96-11.Corrective Actions:Design Engineering Manager Approval of All TER Changes Required.On 960724 Scaffolding Stockpiles in RCIC & RHR a & B Rooms Removed | Safe Shutdown Reactor Vessel Water Level Loop seal Stroke time Squib Condition Adverse to Quality Scaffolding |
ML17292A543 | 14 October 1996 | Forwards Response to NRC 960912 Ltr Re Violations Noted in Insp Rept 50-397/96-16.Corrective Action:Cro Log Has Been Corrected | |
ML17292A542 | 14 October 1996 | Informs That Change to Met Tower Data Point Ids Reflects Configuration for Weather (Met) Signal Point Ids Associated W/Stability Class,Wind Speed & Wind Direction | Met Tower |
ML17292A536 | 2 October 1996 | Responds to Exercise Weakness in Insp Rept 50-397/96-13. Corrective Actions:Each Operating Crew Has Received Addl Training on Use of High Range Stack Monitor & Participated in Simulator Training | |
GO2-96-188, Forwards Rev 32 to WNP-2 Physical Security Plan.Withheld | 19 September 1996 | Forwards Rev 32 to WNP-2 Physical Security Plan.Withheld | |
ML17292A509 | 18 September 1996 | Forwards ISI Summary Rept for WNP-2's Eleventh Refueling Outage Including NIS-1 Owner'S Rept for ISI & NIS-2 Owner'S Repts for Repairs & Replacements | |
ML17292A487 | 14 September 1996 | Forwards Drawing Which Was Not Submitted in 960821 Ltr to Be Withheld from Public Disclosure | |
ML17292A452 | 12 September 1996 | Submits Response to Request for Addl Info Re Individual Plant Exam for Plant,Per GL 88-20 | Safe Shutdown Fire Barrier Internal Flooding |
ML17292A451 | 10 September 1996 | Provides 1995 Dose Assessment Exposure Info Requested by NRC in 960815 Ltr | |
ML17292A444 | 9 September 1996 | Submits Response to Violations Noted in Insp Rept 50-397/96-15.Corrective Actions:Individuals Involved in 1993 Mod & Startup Testing No Longer Employed by Util & Many Mgt Personnel Changes Taken Place,Resulting in Effective Mgt | |
ML17292A448 | 6 September 1996 | Provides Addl Info on Draft SER of Proposed Improved TS | Offsite Dose Calculation Manual |
GO2-96-176, Informs That Pilot Initial License Exam Outline to Be Administered by NRC on 961007,completed | 6 September 1996 | Informs That Pilot Initial License Exam Outline to Be Administered by NRC on 961007,completed | |
ML17292A441 | 30 August 1996 | Submits Comments on Draft SE of Proposed Improved Tech Specs | Temporary Modification Maintenance Rule Program |
ML17292A432 | 28 August 1996 | Advises NRC That Supply Sys Does Not Have a Need for Gfes Testing Planned to Be Administered at Facility on 961009. Candidates Currently Enrolled in WNP-2 Licensed Operator Training Program,Took the Test on 951003 | Generic Fundamentals Examination |
ML17292A427 | 21 August 1996 | Provides Addl Info Re Justification for Continued Operation for Sgts.Supply Sys Expects to Submit Request to Amend TS for Secondary Containment by 961015 | |
ML17292A426 | 21 August 1996 | Forwards Affidavit Requesting That Abb CE Nuclear Operations Drawing AA 263 843 U,Rev 1,Sheet 1 Be Withheld from Public Disclosure | |
ML17292A425 | 21 August 1996 | Forwards FFD Semiannual Performance Data Rept for 960101 to 0630 | Fitness for Duty |
ML17292A419 | 19 August 1996 | Responds to NRC 960719 Ltr Re Violations Noted in Insp Rept 50-397/96-10.C/A:initiated Immediate Evacuation of Drywell, re-established Function of Flashing Light & Counseled Personnel in Radiation Protection Department | |
ML17292A400 | 2 August 1996 | Responds to RAI Re Insp Rept 50-397/96-01.Plant Procedure PPM 1.3.42 Revised to Clarify Trouble Shooting Guidance & Restrictions | |
ML17292A387 | 31 July 1996 | Responds to Spent Fuel Pool Survey Commitment.Informs That Fuel Movement Delay Time Assumptions Were Added as Prerequisites to Appropriate Plant Procedure on 960413 | |
ML17292A388 | 30 July 1996 | Forwards WNP-2 Ten Mile EPZ Evacuation Time Estimate Study, Rev 3,June 1996 | |
ML17292A385 | 26 July 1996 | Informs That Pilot Initial License Exam Outline to Be Administered by NRC on 961007,completed | |
ML17292A376 | 19 July 1996 | Forwards Response to RAI Re NRC Bulletin 96-002, Movement of Heavy Loads Over Spent Fuel,Over Fuel in Reactor Core,Or Over Safety-Related Equipment. | Safe Shutdown |
ML17292A363 | 12 July 1996 | Provides Final Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power Operated Gate Valves. | Power-Operated Valves |
ML17292A354 | 9 July 1996 | Requests Amend to Ts,Revising Rev a, Including Changes in Vol 7.Proposed Rev Does Not Change Conclusion of Nhsc or Environ Assessment Provided in Rev a | High Radiation Area Post Accident Monitoring Maintenance Rule Program |
ML17292A333 | 14 June 1996 | Forwards Emergency Preparedness Exercise Objectives & Limitations for Exercise to Be Conducted 960925 | |
ML17292A317 | 10 June 1996 | Forwards Response to NRC 960509 Ltr Re Violations Noted in Insp Rept 50-397/96-03.Util Denies Violation a & No Corrective Actions Taken | Power change |
ML17292A308 | 5 June 1996 | Forwards Rev 0 to WNP-2 Cycle 12 COLR, Per Requirements of TS 6.9.3.4.COLR Reviewed & Approved by WNP-2 Plant Operating Committee | |
IR 05000397/1996002 | 4 June 1996 | Informs That Anticipated Date of Full Compliance for Both Violations a & B Noted in Insp Rept 50-397/96-02 Is 960930 | |
ML17292A294 | 4 June 1996 | Informs That Anticipated Date of Full Compliance for Both Violations a & B Noted in Insp Rept 50-397/96-02 Is 960930 | |
ML17292A290 | 31 May 1996 | Responds to NRC 960501 Ltr Re Violations Noted in Insp Rept 50-397/96-01.Corrective Actions:Reviewed Event W/Control Room Supervisor & Sys Engineer & Counseled Instrumentation & Controls Technician Re Need for self-checking | |
ML17292A287 | 29 May 1996 | Provides Suppl Info to TS Amend Request Re New Fuel Vendor | |
ML17292A275 | 16 May 1996 | Responds to Verbal Questions from NRC Staff Re Proposed Amend,Revising TS to Reflect Replacement of Existing Reactor Recirculation Flow Control Sys W/Adjustable Speed Drive Sys | |
ML17292A271 | 16 May 1996 | Provides Revised Std Distribution List for Correspondence Being Sent to Washington Nuclear Project | |
ML17292A272 | 14 May 1996 | Forwards Results of Exam & Evaluation of Flaw in Recirculation Piping Weld 20RRC(6)-8 in Ltrs Dtd 950526 & 15.Procedure Encl | |
ML17292A268 | 10 May 1996 | Submits Response to NRC Bulletin 96-002, Movement of Heavy Loads Over Spent Fuel,Over Fuel in Reactor Core or Over Safety-Related Equipment. | |
ML17292A179 | 8 May 1996 | Submits Formal Responses Provided Verbally to NRC in Discussions Conducted on 960425 Re Reactor Recirculation Sys Adjustable Speed Drive Upgrade | |
ML17292A171 | 3 May 1996 | Informs That Schedule for Resolution Has Been Updated to Reflect Recent Changes in Methodology,Available Fire Barrier Matls & Levelization of Available Resources,Per GL 92-08 | Safe Shutdown Fire Barrier |
ML17292A167 | 3 May 1996 | Withdraws Request for Exemption from Requirement in 10CFR73.55(e)(1), Detection Aid Requirements. | |
GO2-96-095, Forwards Rev 31 to Physical Security Plan.Rev Withheld,Per 10CFR73.21 | 3 May 1996 | Forwards Rev 31 to Physical Security Plan.Rev Withheld,Per 10CFR73.21 | |
ML17292A145 | 23 April 1996 | Forwards Audit 296-018, WNP-2 Emergency Preparedness Program Audit. | |
ML17292A149 | 22 April 1996 | Provides Suppl Info & Clarification of Ts,Describing Administrative & Editorial Changes to Section 6.0, Administrative Controls, of TS | |
ML17291B297 | 18 April 1996 | Forwards Response to Violations Noted in Insp Rept 50-397/96-02.Corrective Actions:Per 296-0152 Initiated | Time of Discovery Temporary Modification |
ML17291B298 | 16 April 1996 | Responds to NRC GL 96-01, Testing of Safety-Related Logic Circuits. | |
ML17291B291 | 4 April 1996 | Forwards Addl Supplemental Info Re Request for Amend to TSs on Reactor Recirculation Sys Adjustable Speed Drive Upgrade | |
ML17291B288 | 1 April 1996 | Submits Rept of Property & Liability Insurance Coverage for WNP-2 in Force | |
ML17291B274 | 19 March 1996 | Forwards Suppl Sys Nuclear Plant 2 1995 Annual Environ Operating Rept. Advises That No Design or Operational Changes or Tests in 1995 Involved Unreviewed Environ Questions | |
ML17291B268 | 14 March 1996 | Submits Correction of Info Supplied in Response to GL 94-08, Integranular Stress Corrosion Cracking of Core Shrouds. | |
ML17291B266 | 12 March 1996 | Provides Request for Addl Info Re Reactor Recirculation Sys Adjustable Speed Drive Upgrade.Attachment 1 Contains Detailed Response to Staff Questions.Attachment 2 Contains Schematic Diagram Showing Protective Devices Used for Sys | |
ML17291B264 | 12 March 1996 | Advises That WNP-2 Plant Reduced Power & Shutdown on 960302 at Request of Bpa.Period of Economic Dispatch Expected to Continue Until 1996 Refueling Outage Schedule for 960413. Plant Will Not Be Needed Until Jul 1996 | |
ML17291B241 | 29 February 1996 | Forwards WNP-2 Radioactive Effluent Release Rept Jan-Dec 1995. Rept Includes Entire Legible Copy of ODCM | Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report |
ML17291B251 | 28 February 1996 | Forwards Fitness for Duty Semiannual Performance Data Rept for Period Jul-Dec 1995 | Fitness for Duty |
ML17291B247 | 26 February 1996 | Forwards Revised Copy of TS Bases Which Include Minor Changes & Clarifications Made Per Requirements of 10CFR50.59 | |
ML17291B244 | 22 February 1996 | Rev to Response to NRC 951114 Ltr Re Violations Noted in Insp Rept 50-397/95-30 on 950925-28.Corrective Actions:Doors Modified to Incorporate Fixed Hasps Through Which Padlocks Are Used to Lock Doors | |
ML17291B234 | 20 February 1996 | Submits Supplement to Response to GL 94-03, Intergranular Stress Corrosion Cracking of Core Shrouds. | |
GO2-96-029, Forwards Resignation Ltrs & Appointment & Acceptance Re Decommissioning Trust Fund Trustee | 20 February 1996 | Forwards Resignation Ltrs & Appointment & Acceptance Re Decommissioning Trust Fund Trustee | |
ML17291B232 | 16 February 1996 | Informs of Organizational Enhancements at Company to Improve Efficiency.Revised Organizational Structure Shown on Encl Chart | |
ML17291B228 | 13 February 1996 | Submits Supplemental Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power Operated Gate Valves. | |
GO2-96-025, Forwards Rev 30 to WNP-2 Physical Security Plan,Per 10CFR50.54(p).Encl Withheld | 13 February 1996 | Forwards Rev 30 to WNP-2 Physical Security Plan,Per 10CFR50.54(p).Encl Withheld | |
ML17291B226 | 8 February 1996 | Requests for Exemption from Certain 10CFR73.55(e)(1) Re Detection Aid Requirements | Fitness for Duty Exemption Request |
ML17291B217 | 29 January 1996 | Informs of Mgt Changes at Facility.Jv Parrish to Be Util Managing Director Effective 960202 | |
ML17291B209 | 25 January 1996 | Forwards Response to Violation Noted in Insp Rept 50-397/95-31.Corrective Actions:Equipment Operator Involved Counselled on Proper Use of Protective Clothing & Importance of Adhering to Requirements of Radiation Work Permit | |
ML17291B197 | 15 January 1996 | Provides Response to GL 94-03, Integranular Stress Corrosion Cracking of Core Shrouds in Bwrs. | |
ML17291B193 | 11 January 1996 | Informs That Go Smith Became Plant Manager,Effective 951221.JH Swailes Formerly Plant General Manager,Assigned Position of Director,Engineer | |
GO2-96-003, Forwards Rev 29 to Physical Security Plan.Encl Withheld | 8 January 1996 | Forwards Rev 29 to Physical Security Plan.Encl Withheld | |
ML17291B186 | 22 December 1995 | Informs NRC of Changes to Commitments Pertaining to Maint Procedure Update Program | Systematic Assessment of Licensee Performance |
ML17291B168 | 21 December 1995 | Provides Supplemental Info Re Water Level Calculation in Retran Model | Feedwater Controller Failure |
ML17291B178 | 19 December 1995 | Requests Approval for Use Alternative to ASME Boiler & Pressure Vessel Code Requirements for Exam of Longitudinal Welds in Class 1 & 2 Piping | Nondestructive Examination |
ML17291B177 | 19 December 1995 | Provides Suppl Info Re Relief Request for Temporary non-code Repair of Standby Svc Water Piping,Per GL 90-05 | |
ML17291B170 | 15 December 1995 | Forwards Proposed Alternative Exams for 10CFR50.55a(g)(6), Augmented Exam of Rv & Requests That Proposed Alternate to 10CFR50.55a(g)(6) Be Accepted as Revised Relief Request 2-ISI-001 for First 10-yr ISI Interval | Nondestructive Examination |
ML17291B169 | 14 December 1995 | Withdraws Request for Amend to TS to Relocate Component Lists in Accordance W/Gl 91-08 & Selected Implementation of Commission'S Policy Statement on TS Improvements | |
ML17291B167 | 13 December 1995 | Forwards Second 10-Yr ISI Program Plan Relief Request for Exam Category B-F | Dissimilar Metal Weld |
ML17291B166 | 13 December 1995 | Responds to NRC 951113 Ltr Re Violations Noted in Insp Rept 50-397/95-29.Corrective Actions:Valve Tested & Degraded. Exercising Frequency for RCIC-V-28 Increased from Weekly to daily.RCIC-V-28 Replaced W/Swing Type Check Valve | |
ML17291B164 | 12 December 1995 | Responds to NRC 951114 Ltr Re Violation Noted in Insp Rept 50-397/95-30 on 950925-28.Corrective Actions:Door C-115 & Similar Doors Modified to Incorporate Fixed Hasps Through Which Padlocks Used to Lock Doors | |
ML17291B160 | 8 December 1995 | Forwards Rev 9 to Procedure Qci 6-4, Ultrasonic Exam Feedwater Nozzle Inner Radii, Per NUREG-0619 | |
ML20095A629 | 4 December 1995 | Disagrees W/Specific Points in Submitted in Reply to Request to Reevaluate Action Taken in Form of Severity Level III Violation | |
GO2-95-261, Provides Info on Recent Changes at Plant Re Security Force Personnel Now Performing Hourly Fire Patrols for Impairments of Fire Protection Features | 4 December 1995 | Provides Info on Recent Changes at Plant Re Security Force Personnel Now Performing Hourly Fire Patrols for Impairments of Fire Protection Features | |
ML17291B142 | 28 November 1995 | Submits Annual Filing of Guarantee of Payment of Deferred Premiums in Amount of $10 Million for Each Licensed Reactor | |
ML17291B141 | 27 November 1995 | Responds to SALP Insp Rept 50-397/95-99 for Period 940401- 950902 | Systematic Assessment of Licensee Performance |
ML20094M600 | 21 November 1995 | Forwards Final Rept of Investigation & Analysis of Event 29257 Re Substandard Fastner Processed & Sold by Cardinal Industrial Products,Lp,So That Customers Can Evaluate Situation in Light of 10CFR21.21(a)(1)(ii) & (b)(1) | |
ML17291B117 | 17 November 1995 | Forwards Rev 16 to Emergency Preparedness Plan. | |
ML17291B115 | 16 November 1995 | Responds to NRC Bulletin 95-002, Unexpected Clogging of RHR Pump Strainer While Operating in Suppression Pool Cooling Mode. | Coatings |
ML17291B097 | 3 November 1995 | Forwards Response to NRC Ltr Re Violations Noted in Insp Rept 50-397/95-26.Corrective Actions:Performed Independent Verification of Valves Manipulated During Performance of PPM 7.4.3.3.1.53 | |
ML17291B095 | 2 November 1995 | Forwards Final Response to rev1,suppl 1 of GL 92-01, Reactor Vessel Structural Integrity. | |
ML17291B091 | 26 October 1995 | Notifies That on 951009,State of Wa Energy Facility Site Evaluation Council Approved Renewal of Facility NPDES Permit for five-yr Term.Renewed Permit WA-002515-1 Encl | Grab sample Biofouling |
ML17291B088 | 13 October 1995 | Responds to GL 95-07 & Provides Requested Info Re Implementation Actions & Completion Schedule | Power-Operated Valves |
ML17291B079 | 10 October 1995 | Requests Approval to Revise Tornado Design Criteria | Tornado Generated Missile |
GO2-95-210, Forwards Response to NRC 950907 Re Violations Noted in Insp Rept 50-397/95-16.Corrective Actions:Implemented Extensive Performance Enhancement Strategy Program | 9 October 1995 | Forwards Response to NRC 950907 Re Violations Noted in Insp Rept 50-397/95-16.Corrective Actions:Implemented Extensive Performance Enhancement Strategy Program | High Radiation Area Incorporated by reference |
ML17291B074 | 6 October 1995 | Requests Review & Approval of Relief Request for Exam Category C-G Pump Casing Welds to Support Planning for Spring,1997 & Spring,1998 Refueling Outages | Nondestructive Examination VT-2 |
GO2-95-204, Informs That Ltr Submitted in Accordance W/License Condition 2.F Which Requires Written follow-up Rept within 14 Days of Facility Operation at Reactor Core Power Levels in Excess of Full Power | 3 October 1995 | Informs That Ltr Submitted in Accordance W/License Condition 2.F Which Requires Written follow-up Rept within 14 Days of Facility Operation at Reactor Core Power Levels in Excess of Full Power | |
ML17291B055 | 2 October 1995 | Provides Summary of Results of Review Re Potential Concerns About Certain Computer Software Used at WNP-2 | Scaffolding |
ML17291B041 | 27 September 1995 | Requests Extension of Exam Interval for GL 88-01 Category C Welds After Completion of Stress Improvements Process,From within 2 Refueling Outages of Stress Improvement to within 4 Yrs After Stress Improvement | Scaffolding |
ML17291B040 | 27 September 1995 | Forwards Relief Request 2ISI-16 for Temporary non-code Repair of Standby Svc Water Piping Per GL 90-05 | Safe Shutdown |
ML17291B043 | 25 September 1995 | Responds to NRC 950824 Ltr Re Violations Noted in Insp Rept 50-397/95-21.Corrective Actions:Repaired Affected Radiation Barrier | High Radiation Area Nondestructive Examination |
ML17291B042 | 25 September 1995 | Withdraws Request of Amend to TS 3/4.6.1.4, Main Steam Isolation Valve Leakage Control Sys. | |
GO2-95-194, Forwards Response to NRC Re Violations Noted in Insp Repts 50-397/95-07 & 50-397/95-13.Corrective Actions: on-coming Operator Questioned CRS & Obtained Permission to Close Valve | 25 September 1995 | Forwards Response to NRC Re Violations Noted in Insp Repts 50-397/95-07 & 50-397/95-13.Corrective Actions: on-coming Operator Questioned CRS & Obtained Permission to Close Valve | |
GO2-95-188, Notifies NRC Regional Administrator That Facility Operation at Reactor Core Power Levels in Excess of Full Power | 20 September 1995 | Notifies NRC Regional Administrator That Facility Operation at Reactor Core Power Levels in Excess of Full Power | Time of Discovery |
ML17291B030 | 15 September 1995 | Forwards Response to NRC 950816 Ltr Re Violations Noted in Insp Rept 50-397/95-20 on 950604-0715.Corrective Actions: New Maint Procedure Will Be Developed to Include Necessary Precautions | Reactor Vessel Water Level Hydrostatic Temporary Modification |
ML20092H907 | 12 September 1995 | Responds to NOV Issued 950817 Re Insp Rept 50-397/95-07 on 950602.Requests Reevaluation of Enforcement Action Taken Re Severity Level III Violation & That Actions Were Willful & Constituted Careless Disregard | |
ML17291B015 | 12 September 1995 | Forwards WNP-2 ISI Summary Rept for Tenth Refueling Outage, Including NIS-1 Owner Data Rept for ISI & NIS-2 Owner Repts for Repairs & Replacements | |
ML17291B011 | 28 August 1995 | Documents Util Understanding of Conditions Specified in NRC SER for TR WPPSS-FTS-131, Applications TR for BWR Design & Analysis, | Feedwater Controller Failure |
ML17291B004 | 25 August 1995 | Withdraws Request for Amend to TS to Clarify Instrumentation Testing Requirements | |
ML17291A973 | 25 August 1995 | Forwards Fitness for Duty Semiannual Performance Data Rept for Jan-June 1995 | Fitness for Duty |
ML17291A992 | 24 August 1995 | Forwards Fitness for Duty Semiannual Performance Data Rept for Jan-June 1995 | Fitness for Duty |
ML17291A994 | 23 August 1995 | Provides Info to Support Amend of TS 6.9.3.2 | |
ML17291A988 | 22 August 1995 | Informs of Changes to Commitments Made in 940722 Ltr Re Visual Insp & Replacement of Containment Penetration Modules | |
ML20094D868 | 18 August 1995 | Informs That Region IV Radiation Protection Meeting Scheduled for 950824 & 25 Has Been Postponed Due to Various Scheduling Conflicts for Licensees within Region.Meeting to Be Rescheduled for Mid Jan 1996 in Arlington,Tx | |
ML17291A977 | 18 August 1995 | Forwards Response to NRC 950720 Ltr Re Violation Noted in Insp Rept 50-397/95-19.Corrective Actions:Procedure PPM 1.3.1 Revised to Include Shift & Relief Turnover Practices,Including Checklists | |
ML17291A989 | 16 August 1995 | Forwards Revised Marked Up TS Page 3/4 4-4,incorporating Sruveillance Notes in Front of Surveillances 4.4.1.2.1 & 4.4.1.2.2 for Jet Pump Operability to Clarify That Notes Applicable for Each Surveillance Per Conversations W/Nrc | Exemption Request |
ML17291A969 | 16 August 1995 | Responds to Rev 1,Suppl 1 of GL 92-01, Rv Structural Integrity. | |
ML17291A939 | 1 August 1995 | Forwards Response to NRC 950705 Ltr Re Violations Noted in Insp Rept 50-397/95-15.Corrective Actions:Time Out Was Held W/Workers Qualified as Fire Watch to Reinforce Expectations | Fire Protection Program Fire Watch |
ML17291A931 | 28 July 1995 | Responds to NRC Ltr Re Violations Noted Insp Rept 50-397/95-18.Corrective Actions:Counseled Individuals Involved | Fire Protection Program |
ML17291A930 | 28 July 1995 | Informs That Actions Described in First Paragraph of Item I of GL 89-10,were Completed by 950628 | |
GO2-95-139, Informs of Change to Commitment Re Compensatory Posting of Vital Area Access Doors,Per NRC Concern Raised in Insp Rept 50-395/85-33 | 25 July 1995 | Informs of Change to Commitment Re Compensatory Posting of Vital Area Access Doors,Per NRC Concern Raised in Insp Rept 50-395/85-33 | |
ML17291A920 | 20 July 1995 | Responds to NRC Ltr Re Violations Noted in Insp Rept 50-397/95-16 on 950522-25.Corrective Actions:Documented Surveys of Dose Rates Around Barrel Performed & Series of Meetings Held & mock-up Training Conducted | High Radiation Area |
ML20091G947 | 20 July 1995 | Forwards Final Rept for 950412,ingestion Pathway Drill of Offsite Radiological Emergency Response Plans site-specific to WNP-2 Npp.No Deficiencies Noted | |
ML17291A925 | 18 July 1995 | Forwards Rev 22 to TR WPPSS-QA-004, Operational QA Program Description. Rev Reflects Mgt & Organizational Changes & Modifies Reporting Requirements as Listed | Fitness for Duty |
ML17291A909 | 17 July 1995 | Responds to NRC 950616 Ltr Re Violations Noted in Insp Rept 50-397/95-03.Corrective Actions:Drawing Revised to Include Piping Bypass & Procedure Extensively Revised to Correct Error Re Influence Adjustment Ring Setting on Relief Valve | Safe Shutdown Fire Protection Program |
ML17291A874 | 21 June 1995 | Responds to NRC 950522 Ltr Re Violation Noted in Insp Rept 50-397/95-09.Corrective Actions:Equipment Replacement Interval Reviewed for Safety Related Items for Which Basis for Qualified Life Other than Thermal Aging | |
GO2-95-114, Extends Invitation to NRC for 950824-25 Region IV Radiation Protection Meeting in Arlington,Tx | 21 June 1995 | Extends Invitation to NRC for 950824-25 Region IV Radiation Protection Meeting in Arlington,Tx | |
GO2-95-113, Responds to NRC Re Violations & Proposed Imposition of Civil Penalty Noted in Insp Rept 50-397/94-34. Corrective Actions:Fire Protection Program Implementation Procedure Revised to Ref Barrier Impairment Procedure | 20 June 1995 | Responds to NRC Re Violations & Proposed Imposition of Civil Penalty Noted in Insp Rept 50-397/94-34. Corrective Actions:Fire Protection Program Implementation Procedure Revised to Ref Barrier Impairment Procedure | Fire Protection Program |
ML20086B572 | 9 June 1995 | Forwards Final Repts for 950315,Oregon State Lab Drill & 950316,Washington State Lab Drill.No Deficiencies or Arcas Noted | |
ML17291A847 | 9 June 1995 | Forwards Revised Met Tower Stability Class Data Point Info File Indicating Point as Differential Temp in Degrees F | Met Tower |
ML17291A848 | 8 June 1995 | Forwards LER 95-006-01 Re Reactor Scram During Surveillance Testing Due to Protective Sys Relay Failure | |
ML17291A823 | 30 May 1995 | Forwards Rev 0 to Cycle 11,Core Operating Limits Rept. | |
ML17291A822 | 30 May 1995 | Requests Listed Addition/Deletion to Mailing List | |
ML17291A809 | 15 May 1995 | Forwards Results of Exam & Evaluation of Flaw in Recirculation Piping Weld 20RRC(6)-8.Concludes That Structural Integrity of Weld Will Be Maintained During Next Operating Cycle.Weld Will Remain in GL 88-01 Categorg F | |
ML17291A802 | 12 May 1995 | Forwards Info Supporting Review of First & Second 10-yr ISI Program Plans | Grab sample Offsite Dose Calculation Manual Fire Barrier Chernobyl |
IR 05000397/1995005 | 5 May 1995 | Provides Clarification to Paragraph 3.2.1.1 of NRC 950410 Ltr Re Insp Rept 50-397/95-05 | |
ML17291A806 | 5 May 1995 | Provides Clarification to Paragraph 3.2.1.1 of NRC 950410 Ltr Re Insp Rept 50-397/95-05 | |
ML17291A782 | 5 May 1995 | Forwards LER 95-007 Re Actuation of EDG | |
GO2-95-086, Forwards Revised Summary Description of Proposed Vehicle Control Measures.Encl Withheld Per 10CFR73.21 | 4 May 1995 | Forwards Revised Summary Description of Proposed Vehicle Control Measures.Encl Withheld Per 10CFR73.21 | |
ML17291A753 | 25 April 1995 | Forwards Amend to License NPF-21,adding RWCU Sys High Blowdown Containment Isolation Trip Function & Associated LCO & SR to Tables 3.3.2.-1,3.3.2-2 & 4.3.2.1-1 | Nondestructive Examination |
IR 05000397/1995008 | 17 April 1995 | Provides Notice of Planned Integrated Assessment Team Insp 50-397/95-08 | |
ML17291A728 | 17 April 1995 | Provides Notice of Planned Integrated Assessment Team Insp 50-397/95-08 | |
ML17291A726 | 12 April 1995 | Responds to Violations Noted in Insp Rept 50-397/94-33. Corrective Actions:Redundant Outboard Containment Isolation Valve Deactivated Isolating Associated Sample Line | Overtravel |
ML20087J109 | 11 April 1995 | Forwards Final Rept for 940625, Emergency Worker Assistance Ctr Drill Site-Specific to Plant | |
ML17291A733 | 7 April 1995 | Informs of Mod to WNP-2 FSAR Commitment Per Surveillance of post-irradiated Fuel | Fuel cladding |
ML20082L743 | 6 April 1995 | Forwards Final Rept for 950104 Drill site-specific to Plant. No Deficiencies Noted | |
GO2-95-064, Withdraws Requests for Withholding Portions of 950301 follow-up to Request for Exemption from Certain Requirements of 10CFR73.55(D)(5),requirements for Physical Protection Against Radiological Sabatoge from Public Public Disclosure | 3 April 1995 | Withdraws Requests for Withholding Portions of 950301 follow-up to Request for Exemption from Certain Requirements of 10CFR73.55(D)(5),requirements for Physical Protection Against Radiological Sabatoge from Public Public Disclosure | |
ML17291A718 | 31 March 1995 | Repts Listed Property & Liability Insurance Coverage,Per 10CFR50.54(w)(3) | |
GO2-95-062, Forwards Rev 28 to Physical Security Plan.Encl Withheld | 31 March 1995 | Forwards Rev 28 to Physical Security Plan.Encl Withheld | |
ML17291A711 | 28 March 1995 | Informs That Util Will Implement Formal Industry Position on Severe Accident Mgt Approved by Nuclear Energy Inst Nuclear Strategic Issues Advisory Committee on 941104 | |
ML17291A709 | 24 March 1995 | Addresses follow-up RAI Re GL 92-08, Thermo-Lag Fire Barriers, as Detailed in NRC 941229 Ltr | Safe Shutdown Fire Barrier |
ML20087H669 | 23 March 1995 | Forwards Final Exercise Rept for 940913-14,full- Participation Plume Exposure & Ingestion Pathway Joint Exercise of Offsite Radiological Emergency Response Plans site-specific for Plant | |
ML17291A700 | 20 March 1995 | Advises That Pr Bemis Appointed Director,Regulatory & Industry Affairs for Facility,Effective Immediately | |
ML17291A684 | 8 March 1995 | Forwards WNP-2 Cycle 10 COLR, COLR 94-10,Rev 2.Rev Incorporates Extended Single Loop Max Average Planar Linear Heat Generation Rate Limits for SPC 9x9 Reload & Lead Fuel Assembly Fuel | |
ML17291A678 | 2 March 1995 | Forwards LER 94-018-01,incorporating New Findings,Corrective Actions & Updates of Original Info | |
GO2-95-043, Requests Exemption to Requirement in 10CFR73.55(d)(5) Which States That Each Person W/Unescorted Access to Protected Area,Not Employed by Licensee,Receive Picture Badge Upon Entrance.Background & Justification Encl.Encl Withheld | 1 March 1995 | Requests Exemption to Requirement in 10CFR73.55(d)(5) Which States That Each Person W/Unescorted Access to Protected Area,Not Employed by Licensee,Receive Picture Badge Upon Entrance.Background & Justification Encl.Encl Withheld | Exemption Request |
ML17291A661 | 28 February 1995 | Forwards WNP-2 Radioactive Effluent Release Rept Jan-Dec 1994 & Amend 17 to WNP-2 Odcm. | Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report |
GO2-95-037, Forwards Summary Description of Proposed Vehicle Control Measures as Required by 10CFR73.55(c)(7) & Results of Vehicle Bomb Comparison as Required by 10CFR73.55(c)(8). Encl Withheld | 24 February 1995 | Forwards Summary Description of Proposed Vehicle Control Measures as Required by 10CFR73.55(c)(7) & Results of Vehicle Bomb Comparison as Required by 10CFR73.55(c)(8). Encl Withheld | |
ML17291A655 | 16 February 1995 | Forwards Fitness for Duty Semiannual Performance Data Rept for Jul-Dec 1994 | Fitness for Duty |
ML17291A657 | 15 February 1995 | Discusses Ref Ltr,Dtd 941201,advising NRC of Planned Extension of First 10-year IST & Isi.Second 10-year IST Implemented on 950113 & Second 10-year ISI Implemented on 950210 | |
ML17291A651 | 10 February 1995 | Provides Suppl Info to Util Request for Amend to TS for Jet Pump Operability.Informs That Change Would Modify Surveillance Acceptance Criteria from 10% to 20% for Individual Jet Pump diffuser-to-lower Plenum Pressure | Grace period |
ML17291A642 | 7 February 1995 | Informs That Licensee Discontinuing Pole Drop Testing & Justification for Continued Operation Re Emergency DG-2 Shorted Turns,Justification for Continued Operation | |
ML20080H296 | 31 January 1995 | Forwards Copy of Presentation Slides Used to Discuss Supply Sys Presentation Slides Concerning Configuration Mgt Insp (94-201) | Overtravel |
ML17291A626 | 26 January 1995 | Discusses Clarifications of NRC Approval of Proposed Changes to Oqa Program Description | |
ML17291A625 | 25 January 1995 | Confirms Discussions at Meeting Held on 941115 at NRR Headquarters Re Rev to Procedures for Control Room Fires | Hot Short Safe Shutdown Fuel cladding Fire Protection Program |
ML17291A622 | 25 January 1995 | Forwards Cycle 10 Colr. Informs That Committee Has Reviewed & Approved Rev 1 to COLR 94-10 | |
ML17291A621 | 18 January 1995 | Responds to NRC 940831 Ltr Re Violations Noted in Insp Rept 50-397/94-24.Corrective actions:one-over-one Review of LCO Entry Has Been Instituted as Mgt Expectation Through End of Mar 1995 | |
ML17291A602 | 13 January 1995 | Provides Response to Violations Noted in Insp Rept 50-397/94-29.Corrective Actions:Timeout Held W/Mechanical & Electrical Craft Personnel to Ensure They Understood Proper Storage Requirements for Hoists | Scaffolding |
ML17291A578 | 30 December 1994 | Forwards Updated Response to Deviations Noted in EOPs Insp Rept 50-397/91-27,satifying Commitment Made in 940425 Response to Insp Rept 50-397/94-01 | GOTHIC |
ML17291A570 | 29 December 1994 | Forwards Revs 18,19 & 20 to WPPSS-QA-004, Operational QA Program.... Revs 18 & 19 Reflect Mgt & Organizational Changes & Rev 20 Reflects Changes to Methods Used to Review Procurement Documents & Monitor Procurement Process | Fitness for Duty Fire Protection Program |
ML17291A567 | 29 December 1994 | Submits Simulator Facility Certification, for Wpps WNP-2 Per 10CFR55.45 | |
GO2-94-282, Forwards Rev 27 to Nuclear Plant 2 License NPF-21 WNP-2 Physical Security Plan.W/O Encl (Ref 10CFR73.21) | 19 December 1994 | Forwards Rev 27 to Nuclear Plant 2 License NPF-21 WNP-2 Physical Security Plan.W/O Encl (Ref 10CFR73.21) | |
ML17291A593 | 16 December 1994 | Responds to NRC 941109 Ltr Re Violations Noted in Insp Rept 50-397/94-28.Corrective Actions:Responsibility for Fire Protection Issues Centralized in One Organization to Provide Better Focus for Identification & Evaluation of Issues | Safe Shutdown Fire Barrier Fire Protection Program |
ML17291A554 | 16 December 1994 | Forwards Response to 941109 Ltr Re Violations Noted in Insp Rept 50-397/94-28.Corrective Actions:Responsibility for Protection Program Issues Was Centralized in One Organization in Spring of 1994 to Provide Better Focus | Safe Shutdown Fire Barrier Fire Protection Program |
ML18011B136 | 13 December 1994 | Responds to NRC RAI Re BWR Core Shroud Generic Safety Assessment Re Conductivity by Fuel Cycle.Ge Rept Providing Info W/Alpha Designations in Place of Plant Names Encl.Ge Ltr,Also Encl,Provides Plant Names.Encl Withheld | |
ML17291A543 | 9 December 1994 | Provides Update to Facility GL 89-10 MOV Program Status | |
ML17291A518 | 1 December 1994 | Files Annual Guarantee of Payment of Deferred Premiums in Amount of $10 Million for Each Licensed Reactor | |
ML17291A530 | 1 December 1994 | Informs NRC of Intent to Extend First 10-yr ISI & Test Interval for No Longer than Six Months | |
ML17291A531 | 1 December 1994 | Forwards Response to NRC Bulletin 90-002, Loss of Thermal Margin Caused by Channel Box Bow, Effect on Cycle 11 Operation | |
ML17291A516 | 23 November 1994 | Submits Schedule for Implementing Improved Tech Spec Program | |
ML17291A513 | 21 November 1994 | Responds to 941021 Ltr Re Violation Noted in Insp Rept 50-397/94-27.Corrective Actions:Operability Assessment of CAC B Unit Performed for as-found Condition Upon Identification of Problem & QC Inspector No Longer Employed | |
ML17291A509 | 17 November 1994 | Forwards Info Involving Change to Met Tower Stability Class Data Point of Data Point Library for ERDS | Met Tower |
ML17291A515 | 9 November 1994 | Forwards Response to NRC follow-up RAI Re GL 92-08, Thermo- Lag 330-1 Fire Barriers, as Detailed in NRC 940811 Ltr | Safe Shutdown Fire Barrier Fire Protection Program |
ML17291A473 | 31 October 1994 | Provides Clarification of Commitments Re Implementation of Improvements to Computerized Work Management Sys | Systematic Assessment of Licensee Performance |
ML17291A463 | 25 October 1994 | Advises That DA Swank Appointed Licensing Manager,Effective Immediately | |
ML17291A462 | 21 October 1994 | Requests NRC Approval of Rev to Operational QA Program Description for Supply Sys WNP-2 | |
ML17291A450 | 20 October 1994 | Forwards Completed NRC Form 536,providing Info on Estimate Number of Operator Candidates to Be Tested in FY95-98,in Response to Administrative Ltr 94-12 | |
ML17291A464 | 19 October 1994 | Submits Inservice Insp Summary Rept for Refueling Outage RF94A,Spring 1994. | |
ML17291A446 | 13 October 1994 | Forwards WNP-2 Response to Request for Addl Info on Emergency Classification. | Safe Shutdown High winds Ultimate heat sink Offsite Dose Calculation Manual Internal Flooding Operating Basis Earthquake Emergency Lighting Abnormal operational transient Safeguards Contingency Plan Battery sizing Earthquake Fuel cladding Pressure Boundary Leakage Offsite Circuit Fire Protection Program Power change Unidentified leakage |
ML17291A443 | 12 October 1994 | Forwards Corrections to Proposed Bases 3/4.2.6, Power/Flow Instability, Correcting Error Identified in Proposed Statement for Bases 3/4.2.6 to Reflect That Power/Flow Map, Region C Not Discussed in Context W/Figure 3.2.6-1 | |
ML17291A433 | 30 September 1994 | Responds to NRC 940831 Ltr Re Violations Noted in Insp Rept 50-397/94-24.C/A:event Discussed W/Operating Crew on 940728, Emphasizing Formal Entry Into EOPs & Lessons Learned from Event Incorporated Into Operator Requalification Training | Condition Adverse to Quality |
ML17291A402 | 22 September 1994 | Forwards Summary of Data Previously Reported in Table 3-4 of Ref Semiannual & Annual Effluent Release Repts,Reflecting Old Data & New Corrected Totals for I-131 | Offsite Dose Calculation Manual |
ML17291A404 | 21 September 1994 | Informs NRC of Addl Info Obtained During Requested Audit Followup Activities Per MSL Radiation Monitor Mod Audit by NRC on 940606-09,in Fulfillment of Audit Exit Meeting Commitment.No Safety or Licensing Concerns Noted | |
ML17291A403 | 16 September 1994 | Requests Enforcement Discretion from TS 3.6.3.a,for 14 Days Starting on 940915 to Allow Time to Process TS Amend Under Emergency Conditions | Enforcement Discretion Earthquake |
ML20082B698 | 13 September 1994 | FOIA Request for Documents Re Industrial Accident on 920308 at WPPSS | |
ML17291A382 | 9 September 1994 | Responds to NRC 940831 Ltr Re Violation Noted in Insp Rept 50-397/94-24.Corrective Action:Lessons Learned from Event Will Be Incorporated Into Licensed Operator Refresher Training by 940930 | |
ML17291A383 | 9 September 1994 | Informs That Agastat Relay Robbin Failures Was Not Reportable Event Per Requirements of 10CFR21 or 50.73 | |
ML17291A380 | 6 September 1994 | Responds to NRC 930325 Ltr Re Violations Noted in Insp Rept 50-397/92-41 on 921228.Corrective Actions:Mgt Improved Performance at Util & Provides Appropriate Conditions for Disposal of Contaminated Cooling Tower Sediment | |
ML17291A379 | 2 September 1994 | Discusses Withdrawal of Requests for Amend to Tech Specs | Scram Discharge Volume |
ML17291A362 | 29 August 1994 | Responds to Violations Noted in Insp Rept 50-397/94-19. Corrective Actions:Night Orders Issued Requiring That Health Physics Technicians Question Workers Wearing Protective Clothing to Ensure Wearing Required Dosimetry | Shutdown Margin High Radiation Area |
ML17291A364 | 29 August 1994 | Provides Response to GL 94-02 | |
ML17291A357 | 24 August 1994 | Responds to GL 94-03 Re IGSCC of Core Shrouds.Exam Summary Sheets for Facility H3 & H4 Core Shroud Welds & Drawings of Facility Core Shroud Weld Details Encl | |
ML17291A356 | 23 August 1994 | Responds to NRC 940726 Ltr Re Violation Noted in Insp Rept 50-397/94-22.Corrective Actions:Security Post Instruction Will Be Revised by 940930 & Security Officers & Supervisors Will Receive Training on Revised Security Post Instructions | |
ML17291A348 | 19 August 1994 | Responds to NRC 940722 Ltr Re Violation Noted in Insp Rept 50-397/94-15.Corrective Action:Plant Procedures Manual (PPM) 1.3.12 & PPM 1.3.12A Revised to Improve Implementation of Guidance in GL 91-18 | Half scram |
ML17291A342 | 18 August 1994 | Informs NRC That Requested Hardware Mods Discussed within NRC Bulletin 93-03,action 3,has Been Installed in WNP-2 & Placed Into Svc.W/Encl | |
ML17291A339 | 16 August 1994 | Forwards FFD Semiannual Performance Data Rept for Jan-June 1994.Charts & Graphs That Summarize Program Data Attached to Rept | Fitness for Duty |
ML17291A331 | 12 August 1994 | Forwards Rev to 940314 Response to NRC 931025 RAI Re Topical Rept WPPSS-FTS-131, Applications Topical Rept for BWR Design & Analysis. | Shutdown Margin Reactor Vessel Water Level Anticipated operational occurrence Feedwater Controller Failure |
ML17291A329 | 11 August 1994 | Provides Info Re Plant Specific Training for New Operations Manager.C Schwarz Assumed Facility Operations Manager Responsibilities Effective 940801 | |
GO2-94-183, Forwards Rev 26 to Physical Security Plan.Plan Withheld (Ref 10CFR73.21) | 5 August 1994 | Forwards Rev 26 to Physical Security Plan.Plan Withheld (Ref 10CFR73.21) | |
ML17291A316 | 5 August 1994 | Provides Final Status Rept of Revised WNP-2 Corrective Action Program | Systematic Assessment of Licensee Performance |
ML17291A294 | 28 July 1994 | Provides Response to Request for Addl Info Re Rev 1 to GL 92-01, Reactor Vessel Structural Integrity. | |
ML17291A287 | 25 July 1994 | Responds to NRC 940623 Ltr Re Violation Noted in Insp Rept 50-397/94-14.Corrective Action:Transmitter Has Been Replaced Preventing Recurrence | |
ML17291A236 | 15 July 1994 | Describes Util Planned Actions Relative to post-fire Safe Shutdown Procedures in Event of Control Room Evacuation | Safe Shutdown |
ML17291A247 | 15 July 1994 | Provides Info Re WNP-2,Operating License NPF-21, LER 93-031-01,corrective Actions That Were Completed | |
ML17291A267 | 15 July 1994 | Responds to NRC 940608 Ltr Re Violation Noted in Insp Rept 50-397/94-18.Corrective Action:Plan Procedure PPM 1.3.10 Will Be Revised | Fire Protection Program |
ML17291A223 | 14 July 1994 | Responds to NRC 940614 Ltr Re Violations Noted in Insp Rept 50-397/94-17.Corrective Actions:Initiated Immediate HP Time Out for Night Shift Personnel to Assure Awareness | |
ML20078K592 | 14 July 1994 | Requests Addl Info Pertaining to Emergency Preparedness for Each Site Listed | |
ML17291A261 | 13 July 1994 | Forwards BNL Technical Ltr Rept, On-Site Followup Assessment of Post-Fire Safe Shutdown Startup Issues at WNP-2, Conducted on 940620-24 | Safe Shutdown |
ML17291A212 | 11 July 1994 | Forwards Rev 0 to Core Operating Limits Rept,Cycle 10, for WNP-2 | |
ML17291A208 | 8 July 1994 | Responds to NRC 940608 Ltr Re Violation Noted in Insp Rept 50-397/94-18.Corrective Actions:Walkdown Was Initiated Immediately to Determine If Any Other Untreated Wood Could Be Found in Plant | Fire Protection Program |
ML17291A177 | 29 June 1994 | Forwards Description of Three 1994 Refueling Outage Restart Issues & Util Plans to Resolve Issues Prior to Restart | Safe Shutdown |
ML17291A178 | 28 June 1994 | Ack Receipt of SALP Rept 50-397/94-09 for Period Mar 1993 - Mar 1994 & Concurs W/Findings That Performance Acceptable. Response to SALP Rept Encl | Safe Shutdown Fire Barrier Systematic Assessment of Licensee Performance Fire Protection Program |
ML17291A154 | 23 June 1994 | Requests to Amend TS to Support Hydrostatic Testing | Hydrostatic |
ML17291A157 | 21 June 1994 | Informs of Change of Address for License Operator Eb Mcgowan | |
ML17291A165 | 20 June 1994 | Forwards Response to NRC Bulletin 90-002, Loss of Thermal Margin Caused by Channel Box Bow, Correction to Cycle 10 & List of Reused Channels,Assemblies & Projected EOC 10 Exposures | |
ML17291A144 | 17 June 1994 | Responds to NRC Bulletin 93-002,Suppl 1, Debris Plugging of Emergency Core Cooling Suction Strainers. | Foreign Material Exclusion Pressure Boundary Leakage Pressure boundary leak |
ML17291A195 | 14 June 1994 | Submits Objectives & Limitations for Plant Ingestion Exercise to Be Conducted on 940913-14 | |
ML17291A123 | 9 June 1994 | Transmits Results of Exam & Evaluation of Flaw in Recirculation Piping Weld 20RRC(6)-8,per GL 88-01 & Results of Evaluation of Nascrac Methodology,In Response to 930611 Request Re Review of Insp Rept on Flaw in Subj Piping | |
ML17291A117 | 7 June 1994 | Forwards Proprietary Overhead Slides to Be Presented During Meeting W/Nrc Staff.Encl Withheld (Ref 10CFR2.790(b) | |
ML17291A115 | 31 May 1994 | Informs of Completion of Updated Ipe,Including Review Comments.However,Addl Mgt Review Will Allow More Effective Implementation of IPE Recommendations & Insights,Therefore, Supply Sys Will Submit IPE by 940727 | |
ML17290B192 | 27 May 1994 | Responds to NRC 940422 Ltr Re Violations Noted in Insp Rept 50-397/94-12.Corrective Actions:Two Deficiencies Associated W/Chiller CCH-CR-1B Corrected & Chiller Returned to Svc on 940411 | Probabilistic Risk Assessment |
ML17290B191 | 23 May 1994 | Responds to 940324 RAI Re Util 930308 Response to NRC Bulletin 90-001,Suppl 1, Loss of Fill-Oil in Transmitters Mfg by Rosemount. | |
ML17290B189 | 20 May 1994 | Responds to NRC Bulletin 90-002, Loss of Thermal Margin Caused by Channel Box Bow, Which Responds to Questions on Cycle 10 Operation | |
ML17290B182 | 13 May 1994 | Forwards Response to NRC 931229 RAI Re Power Uprate,W/Regard to Increase of Bottom Head Pressure & High Pressure Scram Setpoint on Structural & Functional Integrity of Control Rod Drive Sys | |
ML17290B181 | 13 May 1994 | Responds to Request for Addl Info Re 940217 Request for Amend to TS to Support Hydrostatic Testing | Ultimate heat sink Hydrostatic |
ML17290B174 | 3 May 1994 | Responds to Request for Info Re 930709 Submittal to Increase WNP-2 Licensed Power Level | Ultimate heat sink |
GO2-94-100, Forwards Rev 25 to Physical Security Plan.Rev Withheld,Per 10CFR73.21 | 2 May 1994 | Forwards Rev 25 to Physical Security Plan.Rev Withheld,Per 10CFR73.21 | |
ML17290B143 | 29 April 1994 | Responds to NRC 940315 Ltr Re Violation Noted in Insp Rept 50-397/94-02.Corrective Actions:Surveillance Procedure (PPM 7.4.6.1.2) Changed to Include Independent Verification of EFCV Bypass Valve Closure for Listed Valves | |
ML17290B124 | 25 April 1994 | Clarifies Intent of 931220 Request for Amend to TS 3/4.6.1.8, Drywell & Suppression Chamber Purge Sys & Suppl by 940325 Ltr | |
ML17290B123 | 25 April 1994 | Provides Comments Re Concerns Noted in NRC 940318 Ltr Re EOP Insp Rept 50-397/94-01 on 940207-18.Separate Ltr Further Clarifying Actions Taken by Util in Response to 1991 NRC EOP Insp Will Be Submitted by 941231 | Safe Shutdown Boric Acid |
ML17290B116 | 20 April 1994 | Advises That Anfb Critical Power Correlation, ANF-1125(P)(A),suppl 2,dtd Apr 1990 Contains Proprietary Info & Should Be Withheld from Public Disclosure Per 10CFR2.790 | |
ML17290B112 | 19 April 1994 | Responds to NRC Bulletin 93-002,suppl 1, Plugging of Emergency Core Cooling Suction Strainers. | Pressure Boundary Leakage Pressure boundary leak |
ML17290B115 | 18 April 1994 | Responds to Violation Noted in Insp Rept 50-397/94-04. Corrective Actions:Valves W/Same Deficiency Changed to Include Mode 1 Specific Actions.Arp Added to Required Reading List for Operations Personnel | |
ML20029C741 | 14 April 1994 | Forwards Amend to Rev 11 to Security Training & Qualification Plan.Amend Withheld | |
ML17290B111 | 14 April 1994 | Submits Response to Suppl 3 to GL 89-10 in Response to Insp Rept 50-397/93-23 | Stroke time |
ML17290B117 | 14 April 1994 | Expresses Appreciation for Efforts in Hosting Meeting & Training Session for 15 Members of Util Staff on 940321,to Exchange Ideas to Address NRC Concerns & Increase Quality of Util Submittals & Util Familiarity W/Nrc Processes | |
ML17290B106 | 13 April 1994 | Forwards Rev 1 to COLR 93-9, WNP-2,Cycle 9 Colr. COLR Reviewed & Approved by Util Plant Operating Committee |